RENEWABLE ENERGY GENERATION
INTERNATIONAL
Commercial Solutions in Construction
INTERNATIONALwww.qualsurv.co.uk
WIND ENERGY PROJECTS
RENEWABLE ENERGY PROJECTS
•BarrowoffshoreWindFarm,90MWe / 2006
•Q7PrincessAmaliaWindPark,120MWe / Completed July 2008
•Belwindphase1,165MWe / Completed December 2010
•Northwind,216MWe / Financial Close May 2012
•Belwindphase2,165MWe / Project Initiation
INTERNATIONALwww.qualsurv.co.uk
RENEWABLEENERGYPROJECTS
Q7 PRINCESS AMALIA WIND PARK
The Princess Amalia offshore Windfarm is located in
block Q7 of the Dutch Continental Shelf. This block is
located 23 km from the shore where the water is 19
to 24 metres deep. This project was the first offshore
windfarm to be constructed in deep waters and at such
a distance from the shore (beyond the 12-mile limit).
The Princess Amalia comprised 65 no. wind turbine
structures on mono-pile foundations linked by a low
voltage cable network to an offshore high voltage
substation, with a 30km HV export cable to the land
base.
QUALSURV provided contract and commercial advice
on behalf of the employer throughout the construction
phase of the project including defence of contractor
claims, forensic planning, dispute resolution and delay
analysis.
INTERNATIONALwww.qualsurv.co.uk
RENEWABLEENERGYPROJECTS
BELWIND 1 OWF
Belguim’s largest energy project consists of 55 no.
Vestas V90 3MW turbines with a maximum output
of 165 MW. Belwind covers a surface of 17 km² and
is set up on the Bligh Bank, 46 km off the coast of
Zeebrugge. This sandbank is outside the shipping
routes and outside territorial waters, the area the
government delimited for wind farms.
The 55 turbines are connected by 33 kV sea cables
to an offshore high-voltage station. A 150 kV cable
connects the station to an onshore high-voltage
station, and then to the Belgian high-voltage grid in
Zeebrugge.
QUALSURV provided contract specialist services to
the project team including the provision of advice and
assistance in respect of the use and interpretation
of FIDIC yellow book form of contract, commercial
support, assistance with change management and
control, preparation and management of client
claims, defense of contractor claims, report writing for
management and participation in project management
tasks.
INTERNATIONALwww.qualsurv.co.uk
RENEWABLEENERGYPROJECTS
ENERGY from WASTE PROJECTS
•DeesideCHPEnergyfromWastePlant
•IntegratedWasteManagementProjects–MiddleEast
•AtherstoneRenewableEnergyPark •AnaerobicDigestion
•Biomass
•SandwellCHPEnergyfromWastePlant
INTERNATIONALwww.qualsurv.co.uk
RENEWABLEENERGYPROJECTS
DEESIDE CHP ENERGY FROM WASTE PLANT
QUALSURV are co-developing a 12 MWe combined heat and power plant with CHO
Power for a major international industrial conglomerate in the UK. The advanced
gasification plant will run on 50,000t/year of Solid Recovered Fuel sourced from
Commercial and Industrial Waste streams.
INTERNATIONALwww.qualsurv.co.uk
RENEWABLEENERGYPROJECTS
INTEGRATED WASTE MANAGEMENT
The existing waste management arrangements in
many Middle Eastern countries require improvement
and QUALSURV have produced an Integrated
Waste Management Strategy which will promote the
introduction of world-class collection, processing
and disposal systems. Qualsurv are managing the
development design, procurement, construction and
operation of these systems to provide long-term
environmentally sustainable waste management
solutions for a number of Middle Eastern countries,
their people, visitors and the environment. Schemes
include waste collection and recycling stations, Material
Recovery Facilities and CHP Energy from Waste Plants.
INTERNATIONALwww.qualsurv.co.uk
RENEWABLEENERGYPROJECTS
ATHERSTONE RENEWABLE ENERGY PARK
This project is for the redevelopment of a disused
shale tip adjacent to the site of a former colliery into a
renewable energy park.
This £20m brownfield development consists of the
design and construction of a 3ha platform suitably
prepared for the installation of 2MWe Anaerobic
Digestion and 4.5 MWe Biomass waste to energy
plants. The infrastructure phase consists of a 500,000
m3 earthworks operation, deep drainage and the
construction of access roads and service corridors
together with extensive landscape planting.
QUALSURV is providing strategic advice, project
management and construction services to the client.
Activities includes an overall development planning,
budget preparation and forecasting, procurement
and supervision of a ground investigation contract,
procurement and management of the infrastructure
design contract, and procurement and supervision of
infrastructure construction contracts.
INTERNATIONALwww.qualsurv.co.uk
RENEWABLEENERGYPROJECTS
SANDWELL ENERGY FROM WASTE PLANT
QUALSURV is preparing a feasibility study for a 9MWe Energy from Waste plant in the
West Midlands. The fuel source for a gasification plant will be SRF from commercial
and industrial waste.