Transcript
REFERENCE LIST Cable-Stayed BridgesNo. JobNo. 653 859 994 1087 1275 1181 1263 1362 1372 1375 Name Country Year Opened Design for traffic completed 1958 1961 1969 1972 1968 1967 1976 1971 1969 Main Span [m] 260 69 319 287 12 x 160 230 258 1500 / 1750 750 Total Length [m] 476 93 561 434 2080 480 591 3300 1150 Traffic Type Girder Material Steel Steel Steel Steel Concrete i a - f, h a - c, i a - c, e, g a, b, e Activity of LAP Client
1 2 3 4 5 6 7 8 9
Dsseldorf North Br. Schillersteg Kniebridge Northbridge Mannheim-Ludwigshafen
Germany Germany Germany Germany
Roadway Pedestrian Roadway Roadway + Streetcar Roadway Roadway + Streetcar Roadway + Streetcar Road + Rail Roadway
City of Dsseldorf City of Stuttgart City of Dsseldorf City of Mannheim Joshi Construction Co. Hein, Lehmann AG, Dsseldorf City of Dsseldorf Gruppo Ponte Messina, Rome Swan-Wooster, CBA, Consulting Eng. Vancouver City of Villingen
Ganga River Bridge at India Allahabad Rhinebridge Bonn South Oberkassel Bridge Germany Germany
Composite a, b, e Steel Steel Steel i a, b, e i
Bridge across Messina Italy Straights Burrard Inlet Crossing, Vancouver Bickensteg Villingen Canada
10
70 003
Germany
1972
67
97
Pedestrian
Concrete
a-f
a feasibility study b preliminary design c tender design and preparation of all tender documents
d detailed design e development of erection methods and erection equipment f detailed construction engineering and dimensioning of equipment
g checking of detailed design, construction engineering and equipment dimensioning h construction administration and field services i general consulting for client
REFERENCE LIST Cable-Stayed BridgesNo. JobNo. 70 007 Name Country Year Opened Design for traffic completed 1974 Main Span [m] 624 Total Length [m] 1176 Traffic Type Girder Material Steel Activity of LAP a - c, e Client
11
Kochertalbridge Geislingen Bckinger Spange Bridge across Golden Horn, Istanbul Zrate-Brazo Largo (2 identical bridges)
Germany
Roadway
Autobahnamt Baden-Wrttemberg, Stuttgart City of Heilbronn Polensky & Zllner, Frankfurt Techint-Albano, Buenos Aires
12 13 14 15 16 17
70 008 70 035 71 011 72 217 71 014 72 155 72 157 75 546 72 212
Germany Turkey Argentina 1977 1978 1974
1971 1971
112 2 x 212 2 x 320 140
202 424 2 x 550 253 636 547
Roadway Roadway Rail + Road Pedestrian Roadway Roadway
Steel Concrete Steel Concrete Steel Concrete
a, b, e, i a, b, e d,e, f, h
Neckar-Center Bridge, Germany Mannheim Vigo Bridge Pasco-Kennewick Intercity Bridge Neckarbridge Weitingen Spain USA
a - c, e, g, i City of Mannheim a - c, e a - f, h Huarte SA, Madrid Cities of Pasco and Kennewick, Washington DOT
1972 1978
396 299
18
Germany
1978
234 - 263
497
Roadway
Steel
a - c, e, g, i Autobahnamt Baden-Wrttemberg
a feasibility study b preliminary design c tender design and preparation of all tender documents
d detailed design e development of erection methods and erection equipment f detailed construction engineering and dimensioning of equipment
g checking of detailed design, construction engineering and equipment dimensioning h construction administration and field services i general consulting for client
REFERENCE LIST Cable-Stayed BridgesNo. JobNo. 72 215 Name Country Year Opened Design for traffic completed 1977 Main Span [m] 235 Total Length [m] 485 Traffic Type Girder Material Steel Activity of LAP Client
19
Rhinebridge Neuwied
Germany
Roadway
a, b, e, g, i Straenverwaltung Rheinland-Pfalz, Koblenz i (stay cables) a, b, e a, b, e a, b, e a, b, e d, f (side spans) a, b, e a, b, e a, b, e Stahlton AG, Zrich Deutsche Bundesbahn, Kln Kunz & Co., Mnchen Deutsche Bundesbahn, Mnchen Thosti AG, Nrnberg Kgel AG, Frankfurt Gammon, India Voest AG, Linz Thosti AG, Nrnberg
20 21 22 23 24 25 26 27 28
73 297 73 347 74 377 74 404 75 507 75 524 75 528 75 542 75 563
Save Bridge Belgrade Rhinebridge Worringen Danube Bridge Straubing S-Bahn Munich Danube Bridge Pfatter-Wrth Rhinebridge Flehe Dehli Railway Danube Bridge LinzSteyeregg S-Bahn Frankfurt
Yugoslavia Germany Germany Germany Germany Germany India Austria Germany
1981 1974 1974 1974 1975 1979 1975 1975 1975
254 256 200 189 146 368 182 242 170
354 488 320 295 270 1148 319 402 330
Railway Railway Roadway Railway Roadway Roadway Pedestrian Roadway Railway
Steel Steel Concrete Concrete Concrete Concrete side spans Concrete Steel Concrete
a feasibility study b preliminary design c tender design and preparation of all tender documents
d detailed design e development of erection methods and erection equipment f detailed construction engineering and dimensioning of equipment
g checking of detailed design, construction engineering and equipment dimensioning h construction administration and field services i general consulting for client
REFERENCE LIST Cable-Stayed BridgesNo. JobNo. 76 715 76 667 76 755 77 780 77 861 77 884 Name Country Year Opened Design for traffic completed 1976 1976 1977 1987 1978 (1980) Main Span [m] 180 Total Length [m] 260 Traffic Type Girder Material Concrete Concrete / Steel Concrete Concrete Concrete Steel Activity of LAP a, b, e a, b, e a, b, e a - c, e a, b, e, i Exchange of stay cables g, i Design of cable alternate i Client
29 30 31 32 33 34
Dubai Creek Orinoco Bridge Hammerbrook Bridge Posadas-Encarnacin Faro Bridge (Tender Design) Khlbrand Bridge
United Arab Emirates Venezuela Germany Argentina Denmark Germany
Pedestrian + Streetcar
Baresel, Stuttgart Techint S.A., Buenos Aires Kgel AG, Frankfurt Coppen, Cons.Eng., Buenos Aires Christiani & Nielsen Cons., Copenhagen Thyssen Aufzge GmbH, Hamburg City of Dsseldorf Prescon Corp., San Antonio Dyckerhoff & Widmann AG, Munich
400 / 550 / 740 / 1020 Railway 700 / 1200 130 330 290 325 240 560 574 520 Railway Road + Rail Roadway Roadway
35 36
77 904 78 961
Heinrich-Erhardt Bridge, Dsseldorf Dame Point Bridge, Jacksonville Metten Bridge
Germany USA
1981 1979
89 396
149 792
Roadway Roadway
Steel Concrete
37
78 976
Germany
1980
145
213
Roadway
Concrete
a feasibility study b preliminary design c tender design and preparation of all tender documents
d detailed design e development of erection methods and erection equipment f detailed construction engineering and dimensioning of equipment
g checking of detailed design, construction engineering and equipment dimensioning h construction administration and field services i general consulting for client
REFERENCE LIST Cable-Stayed BridgesNo. JobNo. 78 991 Name Country Year Opened Design for traffic completed 1979 1979 1979 1979 1979 1994 Main Span [m] 350 231 780 310 320 457 Total Length [m] 644 380 1380 550 520 823 Traffic Type Girder Material Concrete Concrete Steel Concrete Concrete Activity of LAP a - c, e a, b, e i i a, b, e Client
38 39 40 41 42 43
Paranaiba Bridge
Brazil Northern Ireland Denmark Germany Venezuela
Roadway Roadway Roadway Roadway Road + Rail Roadway
Noronha Cons. Eng., Rio de Janeiro A. Monk, Manchester Statsbron Storebelt, Copenhagen Bilfinger & Berger Techint S.A., Buenos Aires Hooghly River Bridge Commission, Calcutta Wayss & Freytag AG, Frankfurt / Precomprimido, Caracas Gammon, India Dravo Co., Pittsburg
78 1006 Foyle River Bridge 78 1007 Great Belt Bridge 78 1018 Prototype 78 1036 Angosturita Bridge
78 1123 Hooghly River Bridge India Calcutta 79 1191 Maracaibo Bridge Venezuela
Composite a - f, h
44
(1979)
6 x 235
1645
Roadway
Concrete
Exchange of stay cables a, b, e e
45 46
79 1255 Adhamiyah Bridge, Bagdad 79 1268 Dame Point Bridge, Jackonsville
Iraq USA
1979 1979
183 396
404 792
Roadway Roadway
Concrete Concrete
a feasibility study b preliminary design c tender design and preparation of all tender documents
d detailed design e development of erection methods and erection equipment f detailed construction engineering and dimensioning of equipment
g checking of detailed design, construction engineering and equipment dimensioning h construction administration and field services i general consulting for client
REFERENCE LIST Cable-Stayed BridgesNo. JobNo. Name Country Year Opened Design for traffic completed 1985 Main Span [m] 274 Total Length [m] 460 Traffic Type Girder Material Concrete Activity of LAP a-e Client
47
79 1319 East Huntington Bridge across Ohio River 80 1338 Tjrn Bridge
USA
Roadway
W. Virginia DOT, Charleston Kjessler & Mannerstrle AB, Stockholm, resundvarret Landskrona Ministry of Public Works, Athens Vejdirektoratet, Kopenhagen NV Wegebo, Brussels Wayss & Freytag AG, Frankfurt City of Tbingen Florida DOT Gruppo Lamtertini Taisei Corp., Tokyo
48
Sweden
1980
366
526
Roadway
Steel
a, b, e
49 50 51 52 53 54 55 56
80 1348 Rion-Antirion Bridge 80 1422 Faro Bridge (Realized Design) 80 1437 Viaduct de lEau Rouge 81 1489 Weserbridge Bodenwerder 78 980 Bridge Tbingen
Greece Denmark Belgium Germany Germany USA 1985
1981
630 290
2090 530 450 260 230 660 3550 420
Roadway Roadway Roadway Roadway Pedestrian Roadway Road + Rail Roadway
Concrete Steel Concrete Concrete Concrete
a - c, e i a, b, e a, b, e a - c, e
1981 1981 1981 1982 1982 1982
270 155 128 366 1750 222
81 1509 Sunshine Skyway
Composite a - c, e Steel Concrete a, b, e i
82 1626 Bridge across Messina Italy Straights 82 1707 Kabejima Bridge Japan
a feasibility study b preliminary design c tender design and preparation of all tender documents
d detailed design e development of erection methods and erection equipment f detailed construction engineering and dimensioning of equipment
g checking of detailed design, construction engineering and equipment dimensioning h construction administration and field services i general consulting for client
REFERENCE LIST Cable-Stayed BridgesNo. JobNo. Name Country Year Opened Design for traffic completed 1982 1982 1983 1983 1987 1983 1983 Main Span [m] 119 150 230 297 330 195 384 Total Length [m] 220 276 430 654 550 335 Traffic Type Girder Material Concrete Steel Activity of LAP a, b, e a, b Client
57 58 59 60 61 62 63 64 65 66 67 68
82 1714 Flsser Bridge, Frankfurt 82 1667 Mainbridge Veitshchheim 83 1774 Obere Argen Bridge 83 1792 Portsmouth Bridge across Ohio 83 1811 Posadas-Encarnacin 83 1823 Nantenbach Bridge Ring Road, Riyadh 83 1909 (3 bridges) 83 1927 Annacis Bridge 83 1928 Savannah Harbor, Georgia 84 1996 Pforzheim Bridge
Germany Germany Germany USA, Kentucky/Ohio Argentina Germany Saudi Arabia Canada USA Germany 1987
Roadway Railway Roadway Roadway Road + Rail Railway
Wayss & Freytag AG, Frankfurt Deutsche Bundesbahn Autobahnamt Baden-Wrttemberg Kentucky DOT Consorcio PosadasEncarnacin Deutsche Bundesbahn Dar Al-Handassah, London Canron Inc., Vancouver, B.C. Georgia DOT City of Pforzheim
Composite a, b Concrete Concrete Concrete Concrete b f a g
2116 Roadway (3 bridges) 931 632 70 Roadway Roadway Pedestrian
1984 1985
465 351 30
Composite f Composite b - e Concrete c-f
a feasibility study b preliminary design c tender design and preparation of all tender documents
d detailed design e development of erection methods and erection equipment f detailed construction engineering and dimensioning of equipment
g checking of detailed design, construction engineering and equipment dimensioning h construction administration and field services i general consulting for client
REFERENCE LIST Cable-Stayed BridgesNo. JobNo. Name Country Year Opened Design for traffic completed 1995 1984 Main Span [m] 381 366 Total Length [m] 754 730 Traffic Type Girder Material Activity of LAP Client
69 70
84 2007 Houston Ship Channel USA at Baytown, Texas 84 2021 Dame Point Bridge Florida (Contractors alternate) 84 2089 Rovaniemi Bridge 85 2137 Kolbenschmidt Audi Bridges 85 2206 Rhine Bridge Emscherschnellweg 85 2250 Perak River Bridge 86 2307 Luling Bridge across the Mississippi 86 2328 Santos Bridge USA
Roadway Roadway
Composite b - e Composite b, e
Texas DOT Peter Kiewit & Sons
71 72 73 74 75 76 77
Finland Germany
1989 1985
126 75,3 57,5 1985 1985 1986 1986 310 350 377 600
210 146,7 111,5 467,5 618 678 140
Roadway Pipeline
Concrete / i (stay Composite cables) Composite g
Suunnittellu Kortes OY, Oulu, Finland Energieversorgung Schwaben AG, Stuttgart Thyssen Engineering, Dortmund Temel Mhendislik + STFA, Istanbul Louisiana DOT, Baton Rouge, LA Anotnio A. Noronha, Rio de Janeiro City of Waiblingen
Germany Malaysia USA Brazil
Roadway Roadway Roadway Roadway
Steel + Concrete Steel + Concrete Steel Steel
b, e b, e Stay cable repair b, e
78
86 2370 Galgenberg Bridge, Waiblingen
Germany
1988
42
62
Pedestrian
Concrete
a - e, h
a feasibility study b preliminary design c tender design and preparation of all tender documents
d detailed design e development of erection methods and erection equipment f detailed construction engineering and dimensioning of equipment
g checking of detailed design, construction engineering and equipment dimensioning h construction administration and field services i general consulting for client
REFERENCE LIST Cable-Stayed BridgesNo. JobNo. Name Country Year Opened Design for traffic completed 1993 1989 1995 1991 1988 1989 Main Span [m] 201 70 381 425 650 420 Total Length [m] 325 296 754 780 1040 700 Traffic Type Girder Material Activity of LAP Client
79 80 81 82 83 84 85
86 2373 Burlington Bridge across the Mississippi
USA
Roadway Roadway Roadway Roadway Road + Rail Road
Concrete / e, g, h, i Composite Concrete d, e, f
Sverdrup & Parcel, St. Louis, MO City of Ulm Texas SDHPT, Austin, Texas Statens Vegvesen, Oslo Precowayss Hong Kong Highway Department Hong Kong Highway Department Thyssen / Dywidag / Wayss & Freytag / Greek contractors New South Wales Dep. of Roads Costain / Fairclough / Wimpey / Thyssen
86 2395 Blaubeurer Tor Bridge Germany 87 2491 Houston Ship Channel USA at Baytown, Texas 87 2579 Helgeland Bridge 84 2078 Orinoco Bridge 87 2623 Ting Kau Bridge Norway Venezuela Hong Kong Route 3 Hong Kong Route 3 Greece
Composite a - e, g, h Concrete b-f
Composite b Concrete b
86 87
87 2623 Container Port Bridge 87 2650 Rion Antirion Bridge
1989 1988
800 1166
1300 2090
Road Road
Composite b Steel b
88 89
89 2875 Glebe Island 89 2907 2nd Severn Crossing
Australia Great Britain
1995 1989
345 456
637 780
Road Road
Concrete
g
Composite b
a feasibility study b preliminary design c tender design and preparation of all tender documents
d detailed design e development of erection methods and erection equipment f detailed construction engineering and dimensioning of equipment
g checking of detailed design, construction engineering and equipment dimensioning h construction administration and field services i general consulting for client
REFERENCE LIST Cable-Stayed BridgesNo. JobNo. Name Country Year Opened Design for traffic completed 1993 1989 Main Span [m] 165 1204 Total Length [m] 292 2448 Traffic Type Girder Material Activity of LAP Client
90 91
89 2908 Heinola Bridge 89 2931 Great Belt Crossing Eastern Bridge 89 3039 Causeway Bridge 2nd Manama Crossing 90 3070 Helgeland Bridge 90 3092 Owensboro Bridge 90 3096 Trinity River Bridge 90 3106 Ting Kau Bridge
Finland Denmark
Road Road
Composite b, c, d, e, f Finland Road Department, Helsinki Steel b AS StorebeltForbindelsen, Kopenhagen Bahrain Ministry of Works Statens Vegvesen Nordland, Norway DOT Kentucky DART, Dallas, TX Hong Kong Highway Department Hong Kong Highway Department DOT Kentucky AAS Jakobsen, Oslo, Norway
92 93 94 95 96 97 98 99
Bahrain Norway USA USA Hong Kong Route 3
1995 1991 1990 1993 1990 1991 1991 1991 1994
100 425 363 100 420 1000 259 163
200 1065 747 215 700 1500 482 353
Road Road Road Light Rail Road Road Road Road
Concrete Concrete Concrete Concrete Concrete Steel Concrete Concrete
g h a b b a a b, i
90 3106 Stonecutters Island Br. Hong Kong Route 3 90 3108 Central Bridge, Newport, Ohio 90 3130 Salhus Bridge USA Norway
a feasibility study b preliminary design c tender design and preparation of all tender documents
d detailed design e development of erection methods and erection equipment f detailed construction engineering and dimensioning of equipment
g checking of detailed design, construction engineering and equipment dimensioning h construction administration and field services i general consulting for client
REFERENCE LIST Cable-Stayed BridgesNo. JobNo. Name Country Year Opened Design for traffic completed 1991 1995 1991 1995 1994 1997 Main Span [m] 500 36 36 409 430 602 Total Length [m] 7500 80 70 830 750 1176 Traffic Type Girder Material Composite a Concrete Concrete b, d b Activity of LAP Client
100 91 3247 Asan Bay Grand Bridge 101 91 3321 Pedestrian Bridges Ravensburg
South Corea Germany
Road Pedestrian Road Road, Light Rail Road
Yooshin, Seoul Regierungsprsidium Tbingen Stephenson, Canada K.M.Y.H. Joint Venture Asian Development Bank resundkonsortiet
102 91 3342 Northumberland Strait Canada Crossing 103 92 3590 Kap Shui Mun Bridge 104 92 3482 Yang Pu Bridge, Shanghai 105 92 3512 Oeresund Hong Kong China
Concrete / d, e, f, h Composite Composite Review of design + constr. Concrete / Design Composite Competition Composite g, i Concrete b
Denmark Sweden Finland Scotland, UK Wales, UK 1996 1995
1993
490
7500
Road & Rail
106 93 3632 Raippaluoto Bridge 107 93 3692 Leven River Bridge 108 93 3734 Dee Estuary Crossing
1997
250 133 (one tower only)
1045 198 294
Road Road Road
Suunnittelu Kortes OY, Oulu, Finland Glenrothes, Development Corp. Dragados-Amec Joint Venture
1994
194 (one tower only)
Composite c
a feasibility study b preliminary design c tender design and preparation of all tender documents
d detailed design e development of erection methods and erection equipment f detailed construction engineering and dimensioning of equipment
g checking of detailed design, construction engineering and equipment dimensioning h construction administration and field services i general consulting for client
REFERENCE LIST Cable-Stayed BridgesNo. JobNo. Name Country Year Opened Design for traffic completed 1994 2000 1997 1994 1994 1997 1996 1996 2002 Main Span [m] 565 490 140 (one tower only) 300 750 300 400 350 Total Length [m] 1010 7844 280 546 2800 526 1712 608 Traffic Type Girder Material Concrete / c Composite Composite i Composite b Concrete a Activity of LAP Client
109 93 3746 Ting Kau Bridge 110 93 3765 Oeresund 111 94 3811 Elbebridge Meien 112 94 3945 Batang Rajang 113 95 4295 Fehmarn Belt 114 96 4414 Rama 8, Bangkok 115 96 4443 Sunningesund Bridge 116 96 4500 Rosario-Victoria 98 5151 Bridge
Hong Kong Denmark Sweden Germany Malaysia Denmark Thailand Sweden Argentina
Road Road & Rail Road Road Road , Rail Road Road Road
KLHC Joint Venture resundkonsortiet Straenbauamt Meien Government of Malaysia COWI / Lahmeyer J.V. Spanish Contractor Dragados Siab / Veidecke J.V. Impregilo-Iglys / Hochtief / SidecoTechint / Benito Roggio & Sons
Composite a , Steel Composite b Composite b Concrete b, c
a feasibility study b preliminary design c tender design and preparation of all tender documents
d detailed design e development of erection methods and erection equipment f detailed construction engineering and dimensioning of equipment
g checking of detailed design, construction engineering and equipment dimensioning h construction administration and field services i general consulting for client
REFERENCE LIST Cable-Stayed BridgesNo. JobNo. Name Country Year Opened Design for traffic completed 1996 Main Span [m] 350 Total Length [m] 1535 Traffic Type Girder Material Concrete g Activity of LAP Client
117 96 4545 My Thuan Bridge
Vietnam
Road
Australian Agency for Intl Development, Ministry of Transp. & Communication, Vietnam J. V. Ph. Holzmann Thai - Brohm Vidat Vkverket Borlnge, Sweden Necso, Spain Jiangxi Provincial Communications Department Yooshin Engineering Corporation Vkverket Borlnge, Sweden Brckenbau Plauen Cons. BRAVE
118 96 4610 Rama 8, Bangkok
Thailand
2002 2000 1997 1999 1997
290 414 180 318
526 1712 250 636
Road Road Road Road
Composite g Composite g Composite a Concrete h, i
119 97 4700 Uddevalla Bridge over Sweden Sunningesund 120 97 4748 Port Bridge Barcelona Spain 121 97 4774 Jiujiang Poyang China Hukou Bridge, Jiangxi Province 122 98 4960 Samcheonpo Bridge 123 98 5048 Kolkbaeksbro over Ume lv 124 98 5132 Ilverich Bridge 125 00 5700 Orinoco Bridge South Korea Sweden Germany Venezuela
2003 2001
2000 2001 2002
230 130 287 2 x 300
436 512 1287 3120
Road Road Road Road + Rail
Composite g Composite g Steel Steel / Concrete d, f f, g, i
a feasibility study b preliminary design c tender design and preparation of all tender documents
d detailed design e development of erection methods and erection equipment f detailed construction engineering and dimensioning of equipment
g checking of detailed design, construction engineering and equipment dimensioning h construction administration and field services i general consulting for client
REFERENCE LIST Cable-Stayed BridgesNo. JobNo. Name Country Year Opened Design for traffic completed project stopped 2000 2000 2007 2005 2005 2000 2002 2001 Main Span [m] 240 1019 192 185 105 Total Length [m] 1350 1640 366 250 460 Traffic Type Girder Material Steel Steel / Concrete Activity of LAP a, i b Client
126 00 5711 2nd Sungai Selangor Bridge 127 00 5575 Stonecutters Island Bridge 128 00 5840 Elbe Bridge 04 6955 Niederwartha 129 00 5900 Rhine Bridge Kehl Straburg 130 01 6135 Geuck Luck Bridge
Malaysia Hong Kong Germany Germany / France South Korea South Korea Panama
Road Road Road Pedestrian Road
Ed. Zblin AG, Germany Highways Department of HK SRA Highway Authority Meien, Germany Cities of Kehl and Straburg Saman Engineering / SK Corporation Seoul Hyundai Engineering & Construction Co., Ltd. MOP Panama JV of Kunwha Eng., Saman Eng., DongIl. Eng. Hyundai Engineering
Composite b, d, f Composite c, d, g, h Steel i
131 01 6249 Geo Geum Bridge
under constr. 2004
2002
480
1116
Road
Steel / Concrete Concrete Steel / Concrete
a, b
132 02 6280 2nd Bridge across the Panama Canal
420 2002 varies
1052 varies
Road Road
d, e, f a, i
133 02 6306 Yuseo-Gehong Project South Korea 134 03 6600 Mok Po Bridge South Korea
2003
550
970
Road
Composite a, b, i
a feasibility study b preliminary design c tender design and preparation of all tender documents
d detailed design e development of erection methods and erection equipment f detailed construction engineering and dimensioning of equipment
g checking of detailed design, construction engineering and equipment dimensioning h construction administration and field services i general consulting for client
REFERENCE LIST Cable-Stayed BridgesNo. JobNo. Name Country Year Opened Design for traffic completed not built under constr. 2003 2004 2004/2005 2004 2007 under constr. 2005 2005 under constr. 2005 2005 2005 2005 Main Span [m] 240 400 540 130 600 200 140 500 185 90 Total Length [m] 467 740 1114 530 198 360 276 1020 285 180 Traffic Type Girder Material Composite b Composite a, b, i Steel / b, g, i Composite Concrete Steel Concrete Concrete b, i g, i g, i a, i Activity of LAP Client
135 03 6705 Gerban Selatan Bersepadu Bridge 136 03 6743 Ma Chang Bridge 137 04 7020 Bukhang Northern Harbour Bridge 138 04 7075 Cholak Bridge (extradosed) 139 04 7100 Ziegelgraben Bridge Strelasund Crossing 140 05 7319 Geumodo-Ando Bridge (extradosed) 141 05 7320 Incheon 2nd Bridge Connection Road
Malaysia South Korea South Korea South Korea Germany South Korea South Korea
Road Road Road Road Road Road Road Road Road Road
DSD Dillinger Stahlbau Hyundai Eng. Co. Hyundai Developm. Soosung Eng., Dongbu Corp. DEGES Berlin, Germany Yongma Engineering Corp. Cheil Engineering / Dongbu Eng. Corp. CableTek JV ILM / Zblin Dongil Engineering
142 05 7329 Dolsan Hwatae Bridge South Korea 143 05 7345 Sungai Prai Bridge 144 05 7374 Cheon An Bridge Malaysia South Korea
Steel / e, g, i Composite Concrete Concrete i a, i
a feasibility study b preliminary design c tender design and preparation of all tender documents
d detailed design e development of erection methods and erection equipment f detailed construction engineering and dimensioning of equipment
g checking of detailed design, construction engineering and equipment dimensioning h construction administration and field services i general consulting for client
REFERENCE LIST Cable-Stayed BridgesNo. JobNo. Name Country Year Opened Design for traffic completed 2009 2009 2007 2007 Main Span [m] 242 335 Total Length [m] 968 772 Traffic Type Girder Material Activity of LAP Client
145 05 7403 Golden Ears Bridge 05 7631 146 05 7600 Rhine Bridge Wesel
Canada Germany
Road Road
Composite g, i Steel d, f
Golden Crossing Constructors JV AG Rheinbrcke Wesel (Kirchner, Donges)
a feasibility study b preliminary design c tender design and preparation of all tender documents
d detailed design e development of erection methods and erection equipment f detailed construction engineering and dimensioning of equipment
g checking of detailed design, construction engineering and equipment dimensioning h construction administration and field services i general consulting for client
top related