Q w e s t W h o l e s a l e M a r k e t sQ w e s t W h o l e s a l e M a r k e t s
Collocation Project ManagementThe Qwest CLEC Forum
May 13-14, 2002
The information provided on every slide in the following presentation is for training purposes only. The information provided does not create or modify any legal obligations, promises or expectations between Qwest and CLEC customer. The parties’ relationship is governed by existing legal obligations and contracts.
22Q w e s t W h o l e s a l e M a r k e t s
Collocation Wholesale Project Management
33Q w e s t W h o l e s a l e M a r k e t s
Maximize service to our CLEC customers and provide effective project management
for their collocation requirements.
Collocation Wholesale Project Management
44Q w e s t W h o l e s a l e M a r k e t s
Collocation Time Line: CLEC Issues Application Order Validation Feasibility Quote Issuance Quote Acceptance Construction Completion Walk-through with SICM Acceptance by CLEC
Collocation Wholesale Project Management
55Q w e s t W h o l e s a l e M a r k e t s
Collocation Wholesale Project Management
Single Point of Contact for CLEC for all issues, questions, concerns regarding collocation sites from application through construction completion.
66Q w e s t W h o l e s a l e M a r k e t s
Application Types: New Augments Changes Transfer of Responsibility Decommissions
Collocation Wholesale Project Management
77Q w e s t W h o l e s a l e M a r k e t s
Products: Caged Cageless Virtual ICDF (Interconnect Distribution Frame) Remote FCP (Field Connection Point) Facility Connected Power Reduction Adjacent Splitter
Collocation Wholesale Project Management
88Q w e s t W h o l e s a l e M a r k e t s
http://www.uswest.com/wholesale/pcat/collocation.html
Collocation Wholesale Project Management
Q w e s t W h o l e s a l e M a r k e t sQ w e s t W h o l e s a l e M a r k e t s
WholesaleProduct Marketing
The Qwest CLEC ForumMay 13-14, 2002
The information provided on every slide in the following presentation is for training purposes only. The information provided does not create or modify any legal obligations, promises or expectations between Qwest and CLEC customer. The parties’ relationship is governed by existing legal obligations and contracts.
1010Q w e s t W h o l e s a l e M a r k e t s
Agenda
Wholesale Product Management Collocation Team Recent Product Deployments Cost Docket Status and Impacts Preview of New Products In Development Questions
1111Q w e s t W h o l e s a l e M a r k e t s
Wholesale Product ManagementCollocation Team
1212Q w e s t W h o l e s a l e M a r k e t s
Collocation Transfer of Responsibility (ToR) Facility Connected Collocation (FC) DC Power Reduction
Recent Product Deployments
1313Q w e s t W h o l e s a l e M a r k e t s
Product Description Transfer of a Collocation site to an assuming CLEC from a
vacating CLEC. Offered for Caged Physical, Cageless Physical, Virtual, and ICDF
Collocation. All other types of Collocation to be transferred will be handled on an Individual Case Basis.
Two types of Collocation Transfer of Responsibility: Transfer without working circuits Transfer with working circuits
Transfer with working circuits is offered if administration changes are required and does not involve translations activity.
Transfer of Responsibility
1414Q w e s t W h o l e s a l e M a r k e t s
Ordering Prior to submitting a Collocation Transfer of Responsibility
request: Assuming CLEC is required to have an Interconnection
Agreement with Qwest. Also will need to amend any previously-existing ICA if it does not include services to be transferred.
Vacating and Assuming CLEC must sign the Collocation Transfer of Responsibility amendment.
Process begins by the assuming CLEC submitting the Collocation Transfer of Responsibility Application form and submitting to colo@qwest.com and rfsmet@qwest.com.
Transfer of Responsibility
1515Q w e s t W h o l e s a l e M a r k e t s
Ordering continued… In addition to the application form the following information will
need to be included: Collocation Transfer of Responsibility Spreadsheet, if there
are working circuits - providing detail on each working circuit to be transferred.
Qwest Transfer Authorization Agreement, signed by the vacating and assuming CLECs.
Letter of Authorization, if the Collocation site has a CLEC-to-CLEC (Direct) arrangement, signed by the assuming CLEC and the CLEC partner.
Email verification from the vacating CLEC representing that all of its end users have been notified of the transfer, if there are working circuits.
Transfer of Responsibility
1616Q w e s t W h o l e s a l e M a r k e t s
Ordering continued… Qwest will review the required documentation, check the financial
status and confirm that no one is waiting in the queue for Collocation space in the requested Central Office.
Qwest will initiate a quote to the assuming CLEC, who is required to pay 100% as acceptance of the quote.
If the transfer is with working circuits, the CLEC must submit LSRs. Circuits submitted via an ASR will be processed based on the information provided on the Collocation Transfer of Responsibility Spreadsheet.
At the completion of the transfer, the vacating CLEC, assuming CLEC and Qwest will sign the Qwest Services Transfer Agreement.
Transfer of Responsibility
1717Q w e s t W h o l e s a l e M a r k e t s
Rate Elements Vacating CLEC will not incur charges for the transfer of the
Collocation site. The quote for the assuming CLEC will reflect the following:
Nonrecurring charges associated with the transfer of the Collocation site:
– Assessment Fee– Network Systems Administrative Fee
Nonrecurring charge(s) for processing Interconnection circuits, if applicable.
Transfer of Responsibility
1818Q w e s t W h o l e s a l e M a r k e t s
Collocation Product Catalog (PCAT)www.qwest.com/wholesale/pcat/collocation.html
Contract Amendmentwww.qwest.com/wholesale/clecs/negotiations.html
Jane Lacy - Product Managerjmlacy@qwest.com
Transfer of Responsibility
1919Q w e s t W h o l e s a l e M a r k e t s
Product Description Allows access to Unbundled Network Elements (UNEs)
without collocating physical equipment in a Qwest Wire Center FC Collocation takes place on a Termination Block
or Termination Panel engineered by Qwest Allows termination of a copper or fiber cable at a
demarcation point Available for cross connection to DS0 and DS1 level UNE
services. DS3 levels of service, or DS1 utilizing fiber are available via the Bona Fide Request (BFR) Process
Facility Connected Collocation
2020Q w e s t W h o l e s a l e M a r k e t s
Rate Elements – Non-Recurring Quote Preparation Fee (QPF) Engineering Labor Copper/Fiber Entrance Facility Termination Block Termination Panel DS1 Voltage Isolation
Facility Connected Collocation
2121Q w e s t W h o l e s a l e M a r k e t s
Rate Elements – Recurring Copper/Fiber Entrance Facility Termination Block Termination Panel DS1 Voltage Isolation
Facility Connected Collocation
2222Q w e s t W h o l e s a l e M a r k e t s
Ordering and Intervals Requested via the Facility Connected Application Form as
described in the Collocation PCAT Qwest will provide space feasibility within 10 Calendar days of
receiving a complete application Qwest will provision FC Collocation within 90 calendar days of
receipt of application given timely CLEC acceptance of quote CLEC must have established entrance facility at the POI within
53 calendar days upon Qwest’s receipt of complete FC Collocation Application
Facility Connected Collocation
2323Q w e s t W h o l e s a l e M a r k e t s
Collocation Product Catalog www.qwest.com/wholesale/pcat/facconcollo.html
Contract Amendmentwww.qwest.com/wholesale/clecs/negotiations.html
Benjamin Campbell - Product Managerbocampb@qwest.com
Facility Connected Collocation
2424Q w e s t W h o l e s a l e M a r k e t s
Product Description Allows CLECs to reduce primary or secondary DC power feeds
to their collocation site Primary feed may be reduced to a minimum of 20 amps Secondary feed may be reduced to 0 amps while holding cabling
and fuse position for future use (pending availability) Provides an option to hold power cabling and fuse or breaker
position on a power board or Battery Distribution Fuse Bay (BDFB) for future power augment requests
Where shortage of fuse position is imminent, CLEC has option to energize secondary feed to minimum 20 amps, or relinquish held fuse position to Qwest
DC Power Reduction
2525Q w e s t W h o l e s a l e M a r k e t s
Ordering Procedure CLEC must sign the DC Power Reduction Amendment CLEC completes power section of the Collocation Application
and submits to Qwest as described in the Collocation PCAT Qwest Collocation Project Management Center (CPMC) will
notify CLEC of any Application deficiencies within 10 calendar days of receipt
Walk through of collocation site is performed to determine work required to perform power reduction
DC Power Reduction
2626Q w e s t W h o l e s a l e M a r k e t s
Billing Billing to CLEC for initial power will be reduced upon receipt of
payment for the charges quoted for the DC Power Reduction Reduced billing will be made effective back to the date of
acceptance of the Power Reduction Application Recurring billing for the Power Maintenance Charge will
terminate upon power restoration or fuse position return (for secondary feed)
DC Power Reduction
2727Q w e s t W h o l e s a l e M a r k e t s
Rate Elements Quote Preparation Fee (NRC) Power Reduction Charge (NRC) Power Maintenance Charge (RC) Power Restoration Charge (NRC)
DC Power Reduction
2828Q w e s t W h o l e s a l e M a r k e t s
Collocation Product Catalog (PCAT)www.qwest.com/wholesale/pcat/collocation.html
Contract Amendment www.qwest.com/wholesale/clecs/negotiations.html
Matthew Rossi - Product Managermrossi@qwest.com
DC Power Reduction
2929Q w e s t W h o l e s a l e M a r k e t s
Cost Structure for Collocation Based on TELRIC principles No economic return under TELRIC
Cost Docket Status and Impacts
3030Q w e s t W h o l e s a l e M a r k e t s
Cost Docket Status and Impacts
Recurring Studies Nonrecurring Studies
3131Q w e s t W h o l e s a l e M a r k e t s
Status of Commission Collocation cost orders Existing orders that have been received:
September 1997: OR January 1998: AZ December 1998: IA, NM June 1999: UT July 1999: CO June 2000: MN December 2000: WA
Cost Docket Status and Impacts
3232Q w e s t W h o l e s a l e M a r k e t s
Cost Docket Status and Impacts
Current activity & timeframesOctober 2001
WA , MTMarch 2002
IAApril 2002
UT, CO, NE
Actual & Estimated ordered datesMay 2002
AZJune 2002
NM, ORSeptember 2002
ID, MN, WYDecember 2002
ND, SD
3333Q w e s t W h o l e s a l e M a r k e t s
Collocation Available Inventory Competitive Fiber Providers ICDF Joint Testing Process (ICDF-JTP)
New Products in Development
3434Q w e s t W h o l e s a l e M a r k e t s
What is Available Inventory? Existing collocation sites and elements that have been returned
to Qwest due to legal proceedings, abandonment, cancellation or decommission
How will this product benefit CLECs? Enables CLECs to view available discounted collocation sites
and elements Allows CLECs to purchase reused collocation site inventory at
a reduced cost Allows reimbursable and reusable elements to be refunded to
the vacating CLEC (for up to 3 years)
Collocation Available Inventory
3535Q w e s t W h o l e s a l e M a r k e t s
How do CLECs see what is “Available?” Qwest will implement a “Collocation Classifieds” web site in
which all returned space and elements will be listed for view How do I learn more about this product?
A Presentation will be made to the CLEC community at the 5/15/02 Product and Process CMP Monthly Meeting. For more information on CMP please visit: www.qwest.com/wholesale/cmp/index.html
Matthew Rossi - Product Manager - mrossi@qwest.com
Collocation Available Inventory
3636Q w e s t W h o l e s a l e M a r k e t s
What is Fiber Provider Point of Entry? Provides a mechanism for CFPs to terminate fiber from the
Collocation Point of Entry (C-POI) to a Fiber Distribution Panel (FDP) in the central office without collocation of equipment.
How do I learn more about this product? This product is currently being developed as a level 3
Qwest initiated CMP Change Request. For more information on CMP please visit: www.qwest.com/wholesale/cmp/index.html
Benjamin Campbell - Product Manager bocampb@qwest.com
Competitive Fiber Provider
3737Q w e s t W h o l e s a l e M a r k e t s
What is ICDF Joint Testing? Will allow a CLEC and Qwest to joint test DSO, DS1, DS3 and
Line Sharing terminations for continuity at the Interconnection Collocation Distribution Frame (ICDF)
What are the Terms and Conditions? CLEC must submit a Joint Test Process Application CLEC can submit request for Joint Testing with their Collocation
Application for up to 60 days past scheduled collocation RFS. Pricing is based on a time and materials cost recovery basis
ICDF Joint Testing Process
3838Q w e s t W h o l e s a l e M a r k e t s
How do I learn more about this product? This product is currently being developed as a level 3 Qwest
initiated CMP Change Request. For more information on CMP please visit: www.qwest.com/wholesale/cmp/index.html
Benjamin Campbell - Product Manager bocampb@qwest.com
ICDF Joint Testing Process
3939Q w e s t W h o l e s a l e M a r k e t s
Thank you for your participation!
Questions?