KALINDI BYE-PASS PROJECT
being planned by PWD, Govt. of Delhi
Project Features
• The proposed Kalindi Kunj road is located in south eastern part ofDelhi connecting from Maharani Bagh near Noida toll bridge toBadarpur border
• This bypass is planned to decongest National Highway-2 (NH-2)and to alleviate the traffic of ring road
• Based on preliminary alignment plans, the project road is 14 km
Background • The need of this Project was identified long back and
work on ground was also started in 2006
• A solution for the clogged DND interchange and ringroad section is required.
• Kalindi bypass is the bypass of NH-2 from Ashramchowk in Delhi to Ballabhgarh in Haryana. It startsfrom Ring road near DND flyway and terminate atBorder near Faridabad via Kalindi kunj (Road no-13A)
• It will also share the traffic of Road No-13A (KalindiKunj-Sarita Vihar) which make the smooth trafficflow near Border area.
Surroundings of Study Area
Outcome of Classified Volume Count Survey
Traffic Volume (In ADT)
Traffic Volume(In PCU)
Peak Hour(Morning)
Peak Hour(Peak Hour)
1,73,181 1,81,427 09:00 – 10:00 18:00 – 19:00
Traffic Volume (In ADT)
Traffic Volume(In PCU)
Peak Hour(Morning)
Peak Hour(Peak Hour)
1,03,432 1,28,553 09:00 – 10:00 19:00 – 20:00
Traffic Volume (In ADT)
Traffic Volume(In PCU)
Peak Hour(Morning)
Peak Hour(Peak Hour)
80,119 1,03,811 09:00 – 10:00 19:00 – 20:00
Traffic at Road no. 13 A near Kalindi Kunj
Traffic at NH2 Ashram Chowk
Traffic at Road no. NH2, Badarpur Border
Comparison of AlternativesS
NoDescription Alignment -01 Alignment-02 Alignment-03
1 Total Length (Km) 14.100 13.4 13.0
2Length of elevated structure (km)
6.550 5.500 4.500
3 Land Acquisition in Hec. 57.73 56.62 50.38
4Rehabilitation & Resettlement
Applicable and very complicated
NIL Nominal
5 Effected Agencies.
UP irrigation Bird Centaury.Delhi Jal BoardEnclaveDDA.MCD., DMRC.
UP irrigation Delhi Jal BoardDDA.MCD.DMRC.
UP irrigation Delhi Jal BoardHoly Family HospitalJMI UniversityGraveyardDDA., MCD., DMRC.
6 Effected ColonyAbul FazalShaheen Bagh
NIl
New Friends Zakir NagarGaffar manzilOkhla VihatHaji Colony
7 Estimated Cost (Cr) EPC- 800 EPC- 750 EPC- 680
8 Remarks Not Recommended Recommended Not Recommended
Alignment-01 (River bank to Bird Sanctuary, Kalindi Kunj park, Madanpur Khadar Ash (NTPC) Molarband, Mithapur, Agra Canal )
Alignment Length in Km1 14.100
GAIL
KALINDI KUNJ
YAMUNA RIVER
START POINT
END POINT AT NH-2 BYPASS
Alignment Length in Km
1 14.100
Alingment 01
Alignment-01 Summary of Land use pattern & Encroachment
S. No.
ChainageFrom To
Length (Km)
LeftLand Use Encroachment
RightLand Use Encroachment
1 0.000 1.950 1.95
3.2
River Bank Nil Khizarabad Bhogal Nil
2 1.950 2.900 0.95 River Bank Nil Slum Area 10 Slum+2 Building
3 2.900 3.200 0.3 River Bank Nil Open Land Nil
4 3.200 4.100 0.9 0.9 River Bank Nil Canal Colony 10 Slum + 1 Building
5 4.100 4.450 0.35
2.1
River Bank/Bird Sanctuary
NilOpen Land Irrigation
Department U.PNil
6 4.450 5.200 0.75River Bank//Bird
SanctuaryNil Abul fazal Enclave 7 Slum + 40 Building
7 5.200 5.300 0.1River Bank//Bird
SanctuaryNil
Open Land Irrigation Department U.P
Nil
8 5.300 6.200 0.9River Bank//Bird
SanctuaryNil Saheen Bagh 2 Slum + 11 Building
9 6.200 6.600 0.4
7.89
Kalindi Kunj Park NilDDA land Reserved
by MetroNil
10 6.600 7.900 1.3 Gail India Limited Nil Agra Canal Nil
11 7.900 8.600 0.7 Madanpur Khadar Nil Agra Canal Nil
12 8.600 10.700 2.1 Ash (NTPC) Nil Agra Canal Nil
13 10.700 11.800 1.1 Molarband Nil Agra Canal Nil
14 11.800 13.850 2.05 Mithapur Nil Agra Canal Nil
15 13.850 14.098 0.248 Agra Canal Nil Sector -37 Faridabad Nil
Alignment 01 Available Land Width
S NoChainage
From To Length (km) Land width (m)
1 0.000 3.700 3.700 Available
2 3.700 4,550 0.850 12-16
3 4.550 5,300 0.750 20-24
4 5.300 14.098 8.800 Available
Alignment-02 (River Bank to Canal Colony to Abul Fazal Enclave to U.P .Irrigation land to Saheen Bagh to DDA land to Madanpur Khadar Ash (NTPC) Molarband, Mithapur, Agra Canal )
Alignment Length in Km2 13.398
YAMUNA RIVER
START POINT
GAIL
KALINDI KUNJ
END POINT AT NH-2 BYPASS
Alignment-02 Summary of Land use pattern & EncroachmentS.
No.Chainage
From ToLength (Km)
LeftLand Use Encroachment
RightLand Use Encroachment
1 0 1.95 1.95
3.5
River Bank Nil Khizarabad Bhogal Nil
2 1.95 2.9 0.95 River Bank Slum Area 10 Slum + 2 Building
3 2.9 3.2 0.3 River Bank Nil Open Land Nil
4 3.2 3.5 0.3 River Bank Nil Canal Colony 1 Slum
5 3.5 3.85 0.35 0.35 Canal Colony 1 Slum Agra Canal Nil
6 3.85 5.35 1.5
2.5
Abul Fazal Enclave Police Station + 2 Slum + 1 Building Agra Canal Nil
7 5.35 5.45 0.1 Open Land Irrigation Department U.P Nil Agra Canal Nil
8 5.45 6.35 0.9 Saheen Bagh Police Station Agra Canal Nil
9 6.35 7 0.65
7.048
DDA land Reserved by Metro Nil Agra Canal Nil
10 7 7.2 0.2 Gail India Limited Nil Agra Canal Nil
11 7.2 7.9 0.7 Madanpur Khadar Nil Agra Canal Nil
12 7.9 10 2.1 Ash (NTPC) Nil Agra Canal Nil
13 10 10.7 0.7 Molarband Nil Agra Canal Nil
14 10.7 11.1 0.4 Molarband Nil Agra Canal Nil
15 11.1 13.15 2.05 Mithapur Nil Agra Canal Nil
16 13.15 13.398 0.248 Agra Canal Nil Sector -37 Faridabad Nil
Alignment 02 Available Land width
S NoChainage
From To Length (km) Land width (m)
1 0.000 3.500 3.5 Available
2 3.500 3.850 0.35 15-20
3 3.850 13.398 9.548 Available
Alignment-03 (River Bank to Khizarabad Bhogal to Ashoka Park to Zakir Nagar to ZakirNagar Park, Jamia College, Gaffar Manzil Extn.to Noor Nagar Extension to Okhla Vihar to Abul Fazal Enclave to UP Irrigation land to Saheen Bagh to DDA Land to Agra Canal to Madanpur to Khadar Ash (NTPC) to Molarband to Mithapur to Agra Canal)
KM 12.889
Length in Km
12.988YAMUNA RIVER
GAIL
KALINDI KUNJ
GAIL
KALINDI KUNJ
Alignment-03 Summary of Land use pattern & Encroachment
S. No.
Chainagefrom To
Length (Km)
LeftLand Use Encroachment
RightLand Use Encroachment
1 0.000 1.100 1.11.25
River Bank Nil Khizarabad Bhogal Nil
2 1.100 1.2500.15
Khizarabad Bhogal 1 Building Khizarabad Bhogal Nil
3 1.250 1.700 0.45 0.45 Ashoka Park Nil Ashoka Park Nil
4 1.700 1.8500.15 0.2
Zakir Nagar 15 Building Zakir Nagar Park Nil
5 1.850 1.9000.05
Zakir Nagar Park Nil New Friends Colony Nil
6 1.900 2.0250.125
0.125 Jamia Collage Nil Delhi Jal Board 2 Building
7 2.025 2.3500.325
1.175
Jamia Collage 4 Building Holi Family Hospital Nil
8 2.350 2.7000.35
Jamia Collage Nil Don BoscoTechnical Institute
Nil
9 2.700 3.2000.5
Jamia CollageR.M.C Mixing plant
+ 15 Huts Masihgarh Cemetery Nil
10 3.200 3.4000.2
0.2 Ghaffar Manzil Extn. Nil Hazi Colony 3 Huts
11 3.400 4.2000.8
0.8 Noor Nagar Extn. 1 Slum + 2 Huts Hazi Colony4 Huts + 2 Slums +
2 Building
Alignment-03 Summary of Land use pattern & Encroachment(Cont..)
S. No.
ChainageFrom To
Length (Km)
LeftLand Use Encroachment
RightLand Use Encroachment
12 4.200 4.250 0.050.4
Okhla Vihar Nil Jasola 2 Building
13 4.250 4.6000.35
Okhla Vihar Nil Jasola Nil
14 4.600 4.850 0.25
1.250
Abul fazal Enclave Nil Agra Canal Nil
15 4.850 4.950 0.10 Open Land Irrigation Department U.P
Nil Agra Canal Nil
164.950 5.850
0.90 Saheen Bagh Nil Agra Canal Police Station
17 5.850 6.500 0.65
7.039
DDA land Reserved by Metro Nil Agra Canal Nil
186.500 6.700 0.2
Agra Canal Nil Agra Canal Nil
196.700 7.400 0.7 Madanpur Khadar Nil Agra Canal Nil
207.400 9.500 2.1 Ash (NTPC) Nil Agra Canal Nil
219.500 10.600 1.1 Molarband Nil Agra Canal Nil
2210.600 12.650 2.05 Mithapur Nil Agra Canal Nil
2312.650 12.889
0.239 Agra Canal Nil Sector -37 FAridabad
Nil
Alignment 03 Available Land width
S NoChainage
From To Length (Km) Land width (m)
1 0.000 1.100 1.100 Available
2 1.100 1.250 0.150 20
3 1.250 2.000 0.750 Available
4 2.000 2.350 0.350Land available belongs to Various Department.
5 2.350 4.200 1.850 Available
6 4.200 4.250 0.050 25
7 4.250 12.889 8.639 Available
S No Description Alignment -01 Alignment-02 Alignment-03
1 Total Length (Km) 14.100 13.4 13.0
2Length of elevated structure (km)
6.550 5.500 4.500
3 Land Acquisition in Hec. 57.73 56.62 50.38
4Rehabilitation & Resettlement
Applicable and very complicated
NIL Nominal
5 Effected Agencies.
UP irrigation Bird Centaury.Delhi Jal BoardEnclaveDDA.MCD., DMRC.
UP irrigation Delhi Jal BoardDDA.MCD.DMRC.
UP irrigation Delhi Jal BoardHoly Family HospitalJMI UniversityGraveyardDDA., MCD., DMRC.
6 Effected ColonyAbul FazalShaheen Bagh
NIl
New Friends Zakir NagarGaffar manzilOkhla VihatHaji Colony
7 Estimated Cost (Cr) EPC- 800 EPC- 750 EPC- 700
8 Remarks Not Recommended Recommended Not Recommended
Connection with DND Flyway junction
Proposal of Junction to be Improved at end point
Option No:-01
Thank You