Transcript
8/18/2019 pvsyst steps to design
1/27
PV SYST-
ashishverma@gensol.co
mailto:ashishverma@Gensol.commailto:ashishverma@Gensol.com
8/18/2019 pvsyst steps to design
2/27
Mandatory• Orientation• System• Detailed losses
Optional• Horizon• Near S• Module• Econom• Miscell
8/18/2019 pvsyst steps to design
3/27
8/18/2019 pvsyst steps to design
4/27
Location details1. Coordinates: Latitude (N or S) & Longitude (E or W)
Or
Address
2. Pin code ,State & Country
Technical de1.Type of system : On Grid /Off
2. PV Module technology : Mo
3.Module Capacity :Wp or make
4. Inverter : Type ,Capacity, Mak
8/18/2019 pvsyst steps to design
5/27
latitude(N or S) /Longitude(E or W) & Altitude(in Meter )
(0° = South Reference
(+ Angle for Clock wise
(- Angle for Anti clock wise
Don’t go any where, Just use this feature in PVSYST 6
Follow the steps
Databases
Click on
geographicalsite
Choose newoption
Go toInteractiveMap section
•Enter yourLocation
How it lookslike
8/18/2019 pvsyst steps to design
6/27
DatabaseClick on
geographicalsite
Go to Newoption
ChooseInteractive Map
& Enterlocation /lat
long on addressbar then click on
Import
Go toGeographical
Coordinatesection & Verifydetails ,choose
Meteodatasource i.e
Meteonorm6 orNASA-SSE
8/18/2019 pvsyst steps to design
7/27
8/18/2019 pvsyst steps to design
8/27
8/18/2019 pvsyst steps to design
9/27
Fixed tilted Plane
Loss by respected to optimum should be 0%Global radiation on collector plane
Tilt
angle
Loss by respect
to Optimum(%)
29 -0.1
30 -0.1
31 0
32 0
33 0
34 0
35 -0.1
8/18/2019 pvsyst steps to design
10/27
• The shading losses should be in limit ≤1.40%
Module Placement on tilted plane
If module mounting is Portrait : Enter the (L)length (in meter)
If module mounting is landscape : Enter the (W)width (in meter)
(check out these dimension from Module sheet )
Show Optimization Shading loss %> Change the Pitshading losses limit up to 1.40% >Exit from orientation
8/18/2019 pvsyst steps to design
11/27
http://localhost/var/www/apps/conversion/tmp/scratch_2/PV%20SYST-%20Steps%20%20for%20%20simulation%20%20of%20%20Grid%20connected.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_2/PV%20SYST-%20Steps%20%20for%20%20simulation%20%20of%20%20Grid%20connected.pptx
8/18/2019 pvsyst steps to design
12/27
string ,Central or micro based on economics(investmentinstallation and efficiency ,No of mppt , make ,% loading on inverter (oversized or under size )
8/18/2019 pvsyst steps to design
13/27
8/18/2019 pvsyst steps to design
14/27
Go to DC circuit: ohmic losses for the array > click on loss fraction at STC > Enter the value in betwee(these losses computed considering ohmic losses of array to String combiner box and String combine
These loses occur due to resistance of DC wire in the Module strings to String combiner box/String Monstring combiner box to Inverter DC input.
8/18/2019 pvsyst steps to design
15/27
Go to AC circuit: Inverter to injection point> click on loss fraction at STC > Enter the value in between(these losses occur at Inverter output to Point of injection of energy in to the grid (switch yard). The loss
Inverter output to LT panel ,LT panel , HT panel .)
*Transmission line losses are not included on this because it depends upon the point of injection /Joint m& respective state regulations.
The voltage drop should be below 2.1%
8/18/2019 pvsyst steps to design
16/27
8/18/2019 pvsyst steps to design
17/27
8/18/2019 pvsyst steps to design
18/27
8/18/2019 pvsyst steps to design
19/27
8/18/2019 pvsyst steps to design
20/27
8/18/2019 pvsyst steps to design
21/27
8/18/2019 pvsyst steps to design
22/27
8/18/2019 pvsyst steps to design
23/27
8/18/2019 pvsyst steps to design
24/27
8/18/2019 pvsyst steps to design
25/27
8/18/2019 pvsyst steps to design
26/27
8/18/2019 pvsyst steps to design
27/27
top related