Design Development Update

New PK-5 Claremont Road School - Design Development Update Public Presentation to FTPS BOE on 12 November 2015

Project Goals

MISSION STATEMENT To build environmentally friendly, healthy,

learning spaces;

In a way that is supportive of the School

District’s academic mission;

So that the Claremont Road School building will

serve as a model of innovative strategies for

conserving resources.

HIGH PERFORMANCE GOALS • Energy Star 90 (26.9 Kbtu/SF)

• 50% Water Use Reduction

• 100% Daylighting In All Instructional Spaces

• Provide High Quality Indoor Air Environment

– Low VOC Materials

– Displacement Ventilation

– Monitoring of CO2

• Maintain High Acoustical Quality Of School

STAKEHOLDERS Team included administrators, educators, & staff

Hands-on involvement by Dr. John Ravally, James Strimple, Rick Goetz,

Connie Coriell, Dr. Jeff Charney, Roberta Mitchell, Rebekah Solomon,

Brian Bonanno, Dr. Brenda Sofield, Dr. John Roberts, Albert Fico,

Madlen Rizkalla, Tania Kelly, Miguel Rivera, Evelyn Rutledge, John

Haney, Lonni Mountainland, & Margaret DeBlasi

SCHEMATICS Schematic Design Meetings every 2 weeks

Building Tour to view LEED features & options

Discussion on Circulation, Room Adjacencies, Layouts, Sizes,

Instructional Activities, and Space Utilization

Discussion on Site Orientation & Site Development

DESIGN DEVELOPMENT Design Development Meetings every 2 weeks

Discussion on Furniture Layouts & Equipment

Discussion on Materials, Finishes, Supervision, Safety,

Security, Utilization, Maintenance and Operations

Design Process

Updated Site Plan

New PreK-5 Elementary School located on BOE Claremont Road property with target FES capacity of 853-948 (based on 6cr/grade plus 2 PK, 3 PKSE, and 6 SE CRs = Total 47 CRs)

Updated Floor Plan

2nd Floor

1st Floor

View of Main Entrance

View of Bus Entrance

Side View from Loop Road

View of Courtyard (facing North)

View of Courtyard (facing South)

Overall Front Elevation (showing Gym Wing)

Pre-K Special Ed Classroom

Kindergarten Classroom

1st Grade Classroom

Media Center Layout

Science and Art Classrooms

Science Classroom Art Classroom

Gymnasium Wing Layout

Summer/Fall 2015 Remainder of

Capital & ESIP Work

Spring/Fall/Winter 2015 – Design

Claremont to NJ DOE Final Edu. Approval

Winter/Spring 2016 – Code Reviews, Bidding & Award

Summer 2016 to Summer 2017 –

Additions & Alterations @ SGS

Summer 2016 to Summer 2018 –

Claremont Hillcrest Elizabeth

Bus Routes (Planning 2017-18

for Fall 2018 Implementation)

ES/MS Grade Reconfiguration

(Planning 2015-18 for Fall 2018)

ONE LESS MOVE Successful FALL 2018

Summer 2015 to Fall 2018

Referendum Milestones

Construction Management Services

Construction Schedule