PUBLIC - Weeblypticbrussels.Weebly.com/uploads/9/7/0/0/970062/conference_book.pdfBRT Bus Rapid Transit #41 #BOHLP 4FOUSBM OH 1JMJQJOBT BT Build-and-Transfer ... MCIAA Mactan Cebu International
Post on 27-Apr-2020
1 Views
Preview:
Transcript
PUBLIC ! PRIVATE
2
PPP Final.indd 2 9/17/10 2:28:08 AM
PUBLIC ! PRIVATE
3P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
TABLE OF CONTENTS
I. Message of the President of the Philippines
II. Acronyms
III. Economic Agenda of the Aquino Administration
IV. Objectives of the PPP Program
V. List of Projects
a. For 2011 Rollout
b. For Medium-Term Rollout and Other PPP Projects
VII. Success Stories
Annexes:
I. Macroeconomic Updates
Supplemental:
1
2
1 : The list of PPP projects included herein is an initial list that will be constantly updated and expanded.2 : The power projects included herein are open to joint ventures.3 :The Department of Energy of (DOE) has identi!ed these potential hydro areas for private sector invesment.
3
PPP Final.indd 3 9/17/10 2:28:08 AM
PUBLIC ! PRIVATE
4
PPP Final.indd 4 9/17/10 2:28:08 AM
PUBLIC ! PRIVATE
6
ACRONYMS
ARMM Autonomous Region in Muslim MindanaoBIR Bureau of Internal RevenueBOC Bureau of CustomsBOI Board of InvestmentsBLT Build-Lease-and-Transfer
BOP Balance of PaymentsBOT Build-Operate-TransferBRT Bus Rapid Transit
BT Build-and-TransferBTO Build-Transfer-and-OperateC-5 Circumferential Road 5C-6 Circumferential Road 6CAO Contract-Add-and-OperateCAAP Civil Aviation Authority of the Philippines CALA Cavite-Laguna
EIA Environment Impact AssessmentERC Energy Regulatory CommissionESA Electricity Sales AgreementFBT Food, beverages and tobacco
FPI Foreign Portfolio Investments
FTI Food Terminal Incorporated
GIR Gross International ReservesGNP Gross National Product
LGU Local Government UnitLRT Light Rail Transit
PPP Final.indd 6 9/17/10 2:28:13 AM
PUBLIC ! PRIVATE
7P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
ACRONYMS
LRTA Light Rail Transit AuthorityMCIAA Mactan Cebu International Airport Authority MIAA Manila International Airport Authority
MRT Metro Rail TransitMRF Materials, Recovery Facility
NAIA Ninoy Aquino International AirportNCR National Capital Region NIA National Irrigation Administration
Committee NG National GovernmentNGCP National Grid Corporation of the Philippines
NPL Non-Performing Loans
O&M Operation and Maintenance
PMO Project Management O"cePMO-BOT Project Management O"ce for Build-Operate-Transfer
PPP Public Private PartnershipPRA Philippine Reclamation Authority
PSP Private Sector Participation
RATs Run After The SmugglersRATEs Run After Tax EvadersRIPS Revenue Integrity Protection Service
SEC Securities and Exchange Commission
TOR Terms of ReferenceTransCo National Transmission Corporation
*Exchange Rate used: PhP45.00 = USD1.00
PPP Final.indd 7 9/17/10 2:28:13 AM
PUBLIC ! PRIVATE
8
The Aquino Administration’s Socio-economic Agenda
and formulating e"ective social safety nets.
sector investment through a stable macroeconomic environment and sound and consistent
investing in infrastructure, and improving governance by reducing the cost of doing business,
opportunities for full employment and e#cient allocation of resources. The levels of private investment and entrepreneurship, especially among micro, small and medium enterprises
investment in human capital, especially in education, primary health care and nutrition,
equal access to infrastructure, credit, land, technology, and other productive inputs. And the
improves governance and strengthens institutions.
of climate change.
PPP Final.indd 8 9/17/10 2:28:13 AM
PUBLIC ! PRIVATE
9P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
IV. OBJECTIVES OF THE PPP PROGRAM
Objectives of the PPP Program
by the Government.
reasonably-priced infrastructure services.
a. For 2011 Rollout
iii. Ready to tender in 2011.
b. For Medium-Term Rollout and other PPP Projects i. Included in the PPP pipeline projects of the Implementing Agencies, and ii. Initial preparation on-going, i.e., concept stage, hiring of consultants for Feasibility Study preparation.
Enhanced Processing E!ciency
The Government is committed to facilitating the approval and implementation process for
approval process.
PPP Final.indd 9 9/17/10 2:28:13 AM
PUBLIC ! PRIVATE
10
PROJECT TITLE NLEX!SLEX LINK EXPRESSWAY
DESCRIPTION
The project aims to close the gap and
contribute to the decongestion of Metro
provide 24-hour access to Manila ports by providing faster, safer and more comfortable
No. of Lanes = 4 lanes
MODE PPP IMPLEMENTATION SCHEDULE Mid 2011 - 2014
PROJECT COST PhP 21,000 Million SPONSORING AGENCY
PROJECT STATUS
•
•
•
CONTACT INFORMATION
Name : MARIA CATALINA CABRAL Designation : Assistant Secretary Agency : Telephone No. :Fax No. : Email Address :
V. LIST OF PROJECTS
PPP Final.indd 10 9/17/10 2:28:14 AM
PUBLIC ! PRIVATE
11P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
PROJECT TITLE CALA EXPRESSWAY ! MANILA SIDE SECTION "27.5 KM#
DESCRIPTION
and NAIA, Manila Port and Batangas Port, and contribute to the economic development and decongestion of tra"c along Cavite roads, particularly Aguinaldo
Extension and ends at Silang, Cavite
No. of Lanes = 6 lanes
MODE PPP IMPLEMENTATION SCHEDULE Mid 2012 - Mid 2015
PROJECT COST PhP 10,500 Million SPONSORING AGENCY
PROJECT STATUS
•
•
•
CONTACT INFORMATION
Name : MARIA CATALINA CABRAL Designation : Assistant Secretary Agency : Telephone No. :Fax No. : Email Address :
V. LIST OF PROJECTS
Manila side Section
PPP Final.indd 11 9/17/10 2:28:14 AM
PUBLIC ! PRIVATE
12
PROJECT TITLE MRT/LRT EXPANSION PROJECT
DESCRIPTION
The project aims to integrate and expand the capacity of existing MRT 3 and LRTA
passenger stations, a satellite depot for light maintenance to be located at the southern end of the proposed line, and intermodal facilities installed at high-demand stations, including the provision of additional
systems enhancements. Also included is the integration of Lines 1 and 3 to permit through-train operations.
MODE PPP IMPLEMENTATION SCHEDULE 2011-2014
PROJECT COST PhP 70,000 Million SPONSORING AGENCY
PROJECT STATUS
O&M for LRT 1 and MRT 3 may be bid out to the private sector as a single contract. Prior to this,
CONTACT INFORMATION
Name : RUBEN S. REINOSO, JR.Designation : UndersecretaryAgency : Telephone No. :Fax No. :Email Address : benny.reinoso@gmail.com
V. LIST OF PROJECTS
PPP Final.indd 12 9/17/10 2:28:15 AM
PUBLIC ! PRIVATE
13P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
PROJECT TITLE LRT LINE 2 EAST EXTENSION PROJECT
DESCRIPTION
The project involves the expansion, operation and maintenance of the existing LRT Line 2. Expansion covers the
extension of LRT Line 2 from Santolan in Pasig City to Masinag Junction in Antipolo,
be located at Sta. Lucia Mall and at Masinag.
MODE PPP IMPLEMENTATION SCHEDULE 2011-2013
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
Name : RUBEN S. REINOSO, JR.Designation : UndersecretaryAgency : Telephone No. :Fax No. :Email Address : benny.reinoso@gmail.com
V. LIST OF PROJECTS
LINE 2 EAST EXTENSION ALIGNMENT
PPP Final.indd 13 9/17/10 2:28:15 AM
PUBLIC ! PRIVATE
14
V. LIST OF PROJECTS
PROJECT TITLE NEW BOHOL AIRPORT
DESCRIPTION
facility complex of international standards,
the existing Tagbilaran Aiport.
MODE PPP IMPLEMENTATION SCHEDULE 2012-2015
PROJECT COST PhP 7,543 Million SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
Name : RUBEN S. REINOSO, JR.Designation : UndersecretaryAgency : Telephone No. :Fax No. :Email Address : benny.reinoso@gmail.com
PROJECT LOCATION
PPP Final.indd 14 9/17/10 2:28:16 AM
PUBLIC ! PRIVATE
15P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
PROJECT TITLE PUERTO PRINCESA AIRPORT
DESCRIPTION
existing Puerto Princesa Airport to meet the standards of the International Civil
such as a passenger terminal building,
building, cargo terminal building, rescue
control equipment.MODE PPP IMPLEMENTATION SCHEDULE 2012-2015
PROJECT COST PhP 4,362 Million SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
Name : RUBEN S. REINOSO, JR.Designation : UndersecretaryAgency : Telephone No. :Fax No. :Email Address : benny.reinoso@gmail.com
V. LIST OF PROJECTS
PROJECT LOCATION
Puerto Princesa Airport
PPP Final.indd 15 9/17/10 2:28:16 AM
PUBLIC ! PRIVATE
16
PROJECT TITLE DEVELOPMENT OF CITY TERMINAL FOR DMIA
DESCRIPTION
The project involves the development of
in order to reduce cargo loading times at
proposed city terminal.
MODE PPP IMPLEMENTATION SCHEDULE 2011-2012PROJECT COST SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
Name : RUBEN S. REINOSO, JR.Designation : UndersecretaryAgency : Telephone No. :Fax No. :Email Address : benny.reinoso@gmail.com
V. LIST OF PROJECTS
Macapagal International
Airport
PPP Final.indd 16 9/17/10 2:28:16 AM
PUBLIC ! PRIVATE
17P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
PROJECT TITLE PRIVATIZATION OF LAGUINDINGAN AIRPORT
OPERATION AND MAINTENANCEDESCRIPTION
The project involves the Operation and
facilities of international standards. The airport can accommodate 1.2 million passengers per year based on its Master Plan.
MODE PPP IMPLEMENTATION SCHEDULE 2013PROJECT COST SPONSORING AGENCY
PROJECT STATUS
maintenance by concession.
CONTACT INFORMATION
Name : RUBEN S. REINOSO, JR.Designation : Undersecretary Agency : Telephone No. :Fax No. : Email Address : benny.reinoso@gmail.com
V. LIST OF PROJECTS
PROJECT LOCATION
Laguindingan Airport
PPP Final.indd 17 9/17/10 2:28:17 AM
PUBLIC ! PRIVATE
18
PROJECT TITLE DARAGA INTERNATIONAL AIRPORT
DESCRIPTION
The project involves the conduct of a
preparation of detailed engineering designs, and construction of airport facilities. It also includes land acquisition of about
development;
MODE PPP IMPLEMENTATION SCHEDULE 2012-2015
PROJECT COST PhP 3,075 Million SPONSORING AGENCY
PROJECT STATUS
•
•
•
CONTACT INFORMATION
Name : RUBEN S. REINOSO, JR.Designation : Undersecretary Agency : Telephone No. :Fax No. : Email Address : benny.reinoso@gmail.com
V. LIST OF PROJECTS
PPP Final.indd 18 9/17/10 2:28:17 AM
PUBLIC ! PRIVATE
19P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
PROJECT TITLE SUPPLY OF TREATED BULK WATER FOR METRO MANILA
DESCRIPTION
The project aims to supplement the long-
Manila.
developed by 2010.
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST SPONSORING AGENCY
Metropolitan
PROJECT STATUS
• respectively.
•
CONTACT INFORMATION
Name : ENGR. MACRA A. CRUZDesignation : O"cer-in-Charge Agency : Telephone No. :Fax No. : Email Address :
V. LIST OF PROJECTS
PPP Final.indd 19 9/17/10 2:28:17 AM
PUBLIC ! PRIVATE
20
PROJECT TITLE KABULNAN!2 MULTI!PURPOSE IRRIGATION AND POWER PROJECT
DESCRIPTION
under the existing irrigation system (in
management. It envisions the construction
across Maganoy River.
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST PhP 14,373 Million SPONSORING AGENCY National Irrigation
PROJECT STATUS
of peace and order in the area.
CONTACT INFORMATION
Name :Designation : Agency : Telephone No. : Fax No. : Email Address : milo_landicho@yahoo.com
V. LIST OF PROJECTS
CAG AY AN
K AL IN GA
B AT ANE S
A PA YAO
ILO CO S
IL OC OSSUR MT. P RO VINC E
IF UG AOIS AB ELA
QU IR INO
N UE VAV IZ CAY A
BE NG UET
LA U NION
P ANG AS INAN
TAR LA CZAM BAL ES
BA TAA N
P AMP ANG ABU LA CAN
Q UE ZON
M AR IN DU QU E
R OMB LO NMA SB ATE
AL BAY
SO R SOG O N
NO RT HE RN S AMA R
EA STE RN SAM ARS AMAR
LE YT E
CE BU
BO HO L
C AMIG UIN
S UR IG AODE L NO RTE
AG US ANDE L NO RT E
M IS AMISOR IE NT AL
MIS AMISOC CIDE NTA L
L AN AODE L NO RT E
ZA MBO AN GADE L NO RTE Z AMBO AN GA
D EL SU R
B AS IL AN
S ULU
TA WI-T AWI
LAN AO D EL S UR
A GU SAN D EL S UR
BU KID NO N
D AV AO
DA VA OOR IENT AL
DA VA ODE L SUR
NO RT H CO TA BA TO
S OU TH C OT AB ATO
SU LTA N K UD AR AT
MAG UIND AN AO
SU RIG AODE L SUR
NE GR OSOR IENT AL
N EG RO SOC CIDE NT AL
ILO IL O
G UIMA RA S
C APIZ
A KLA N
AN TIQU E
SIQ UIJO R
SOU TH ER NLEY TE
CA TA ND UAN ES
O RIEN TALMIND OR O
O CCID EN TALMIN DO RO
PA LA WA N
RIZAL
LA GU NA
C AMA RINE SSU R
BA TA NG AS
C AV IT E
ME TR O MA NILA
NU EV A E CIJA
AU RO R A
NO R TE
AB RA
µ
REG ION I
RE GION II
C AR
REG ION III
NC RR EGIO N V
REG ION VIII
R EGIO N VI
R EGIO N V II
R EGIO N X
REG ION XI
REG ION VIIIREG ION VIII
ARMM
R EG IO N X II
R EGIO N X III(CA RAG A)
C OM PO STE LAVA LLE Y
S AR AN GA NI
REG IO N 4
REG IO N IXKABULNAN-2 MULTIPURPOSE IRRIGATION AND
POWER PROJECTIsulan, Sultan Kudarat
PROJECT LOCATION MAP
PPP Final.indd 20 9/17/10 2:28:19 AM
PUBLIC ! PRIVATE
21P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
PROJECT TITLE BALINTINGON RESERVOIR MULTI!PURPOSE PROJECT
DESCRIPTION
The project is expected to provide irrigation
the eastern section of the Central Plain of
MODE PPP IMPLEMENTATION SCHEDULE 2011 - 2021
PROJECT COST PhP 15,670 Million SPONSORING AGENCY National Irrigation
PROJECT STATUS
CONTACT INFORMATION
Name :Designation :Agency :Telephone No. : Fax No. :Email Address : milo_landicho@yahoo.com
V. LIST OF PROJECTS
PPP Final.indd 21 9/17/10 2:28:19 AM
PUBLIC ! PRIVATE
22
V. LIST OF PROJECTS
PROJECT TITLE ESTABLISHMENT OF COLD CHAIN SYSTEMS
COVERING STRATEGIC AREAS IN THE PHILIPPINESDESCRIPTION
maintain an inventory of quality perishable
prices and promote food safety consciousness.
up of distribution systems using appropriate
building.
1. Benguet-Manila Route (for the vegetable production areas in
production areas in all Visayas Regions, for transport mainly to
production areas in various Mindanao Regions, for transport
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST PhP 5,300 Million SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
Name :Designation : Agency :
Telephone No. : Email Address : execdir@bpre.gov.ph
Name :Designation :Agency :Telephone No. : Email Address :
PPP Final.indd 22 9/17/10 2:28:19 AM
PUBLIC ! PRIVATE
23P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
PROJECT TITLE ESTABLISHMENT OF COLD CHAIN SYSTEMS
COVERING STRATEGIC AREAS IN THE PHILIPPINESDESCRIPTION
maintain an inventory of quality perishable
prices and promote food safety consciousness.
up of distribution systems using appropriate
building.
1. Benguet-Manila Route (for the vegetable production areas in
production areas in all Visayas Regions, for transport mainly to
production areas in various Mindanao Regions, for transport
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST PhP 5,300 Million SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
Name :Designation : Agency :
Telephone No. : Email Address : execdir@bpre.gov.ph
Name :Designation :Agency :Telephone No. : Email Address :
PROJECT TITLE ESTABLISHMENT OF GRAINS CENTRALS WITH
BULK HANDLING FACILITIESDESCRIPTION
and corn postharvest activities, including
and Postharvest Facility Service Centers for
rice production areas.
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST PhP 2,031.21 Million SPONSORING AGENCY PhilMech
PROJECT STATUS
CONTACT INFORMATION
Name :Designation :Agency :
Telephone No. :Email Address : execdir@bpre.gov.ph
Name :Designation :Agency :Telephone No. :Email Address :
V. LIST OF PROJECTS
PPP Final.indd 23 9/17/10 2:28:20 AM
PUBLIC ! PRIVATE
24
PROJECT TITLE LOGISTICS SUPPORT ON THE AGRI!FISHERY PRODUCTS
SUPPLY CHAIN"TRANSPORTATION OF AGRI!FISHERY PRODUCTS UTILIZING THE SOUTHRAIL MAIN LINE#
DESCRIPTION
The project is expected to reduce postharvest losses in various agri-food commodities (grains, fruits, vegetables,
e"ciency of food transport and handling
Consolidation Centers, Transport & Storage Facilities and other Infrastructure.
Trading and other consolidation centers: To be set up near the train
e"cient loading of goods.
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST PhP 1,500 Million SPONSORING AGENCY PhilMech
PROJECT STATUS
CONTACT INFORMATION
Name :Designation :Agency :
Telephone No . :Email Address : execdir@bpre.gov.ph Name :Designation :Agency :Telephone No. :Email Address :
V. LIST OF PROJECTS
PPP Final.indd 24 9/17/10 2:28:21 AM
PUBLIC ! PRIVATE
25P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
PROJECT TITLE CALA EXPRESSWAY ! LAGUNA SIDE SECTION "14.3 KM#
DESCRIPTION
and NAIA, Manila Port and Batangas Port, and contribute to the economic development and decongestion of tra"c along Cavite roads, particularly Aguinaldo
Calamba, Laguna Province. It is an at-grade
No. of Lanes = 6 lanes
MODE PPP IMPLEMENTATION SCHEDULE 2013-2015
PROJECT COST PhP 7,000 Million SPONSORING AGENCY
PROJECT STATUS
•
•
•
CONTACT INFORMATION
Name : MARIA CATALINA CABRAL Designation : Assistant Secretary Agency : Telephone No. :Fax No. : Email Address :
V. LIST OF PROJECTS
PPP Final.indd 25 9/17/10 2:28:21 AM
PUBLIC ! PRIVATE
26
PROJECT TITLE C!5/FTI/SKYWAY CONNECTOR
DESCRIPTION
present, activities in FTI are depressed due to poor access. Once accessibility is provided, FTI can be developed as an advanced commercial and residential center.
No. of Lanes = 2 lanes to 4 lanes
MODE PPP IMPLEMENTATION SCHEDULE 2012-2015
PROJECT COST PhP 5,640 Million SPONSORING AGENCY
PROJECT STATUS
•
•
•
•
CONTACT INFORMATION
Name : MARIA CATALINA CABRAL Designation : Assistant Secretary Agency : Telephone No. :Fax No. : Email Address :
V. LIST OF PROJECTS
PPP Final.indd 26 9/17/10 2:28:21 AM
PUBLIC ! PRIVATE
27P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
PROJECT TITLE NAIA EXPRESSWAY !PHASE II"
DESCRIPTION
provide vital access to NAIA Terminals 1,
No. of Lanes = 4 lanes
MODE PPP IMPLEMENTATION SCHEDULE 2013-2015
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
• FS completed in 2010.•
•
CONTACT INFORMATION
Name : MARIA CATALINA CABRAL Designation : Assistant Secretary Agency : Telephone No. :Fax No. : Email Address :
V. LIST OF PROJECTS
PPP Final.indd 27 9/17/10 2:28:22 AM
PUBLIC ! PRIVATE
28
PROJECT TITLE C!6 EXPRESSWAY "GLOBAL CITY LINK# ! SOUTH SECTION
DESCRIPTION
a distributor of tra"c coming from
appropriate location in Metro Manila. The
San Mateo, Antipolo, Taytay and Taguig,
the mega commercial and business center of Global City.
No. of Lanes = 4 lanes
MODE PPP IMPLEMENTATION SCHEDULE 2013-2016
PROJECT COST PhP 40,400.00 Million SPONSORING AGENCY
PROJECT STATUS
•
•
•
•
CONTACT INFORMATION
Name : MARIA CATALINA CABRAL Designation : Assistant Secretary Agency : Telephone No. :Fax No. : Email Address :
V. LIST OF PROJECTS
PPP Final.indd 28 9/17/10 2:28:22 AM
PUBLIC ! PRIVATE
29P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
PROJECT TITLE CENTRAL LUZON EXPRESSWAY !CLEX" #
PHASE I, TARLAC#CABANATUANDESCRIPTION
The project is expected to support the development of regional urban centers
to decrease overconcentration of socio-
completed.
For PPP: O&M of CLEx Phases 1 and 2, including construction of Phase 2.
No. of Lanes = 2 lanes
MODE PPP IMPLEMENTATION SCHEDULE 2012-2014
PROJECT COST PhP 11,500.00 Million SPONSORING AGENCY
PROJECT STATUS
•
•
•
CONTACT INFORMATION
Name : MARIA CATALINA CABRAL Designation : Assistant Secretary Agency : Telephone No. :Fax No. : Email Address :
V. LIST OF PROJECTS
PPP Final.indd 29 9/17/10 2:28:22 AM
PUBLIC ! PRIVATE
30
PROJECT TITLE CENTRAL LUZON EXPRESSWAY !CLEX" #
PHASE II, CABANATUAN#SAN JOSEDESCRIPTION
The project is an extension of CLEx Phase
San Jose City in Nueva Ecija Province. It
overconcentration in Metro Manila of socio-
provide faster and safer access to Region II.
For PPP: O&M of CLEx Phases 1 and 2, including construction of Phase 2.
No. of Lanes = 2 lanes
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST PhP14,200.00 Million SPONSORING AGENCY
PROJECT STATUS
•
•
•
CONTACT INFORMATION
Name : MARIA CATALINA CABRAL Designation : Assistant Secretary Agency : Telephone No. :Fax No. : Email Address :
V. LIST OF PROJECTS
PPP Final.indd 30 9/17/10 2:28:23 AM
PUBLIC ! PRIVATE
31P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
PROJECT TITLE SLEX EXTENSION !TO LUCENA CITY", 2#LANE
DESCRIPTION
The project is an extension of the existing SLEx from Sto. Tomas, Batangas Province
to contribute to the socio-economic development of the areas traversed and of
No. of Lanes = 2 lanes
MODE PPP IMPLEMENTATION SCHEDULE 2013-2016
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
Government after concession agreement.
CONTACT INFORMATION
Name : MARIA CATALINA CABRAL Designation : Assistant Secretary Agency : Telephone No. :Fax No. : Email Address :
V. LIST OF PROJECTS
PPP Final.indd 31 9/17/10 2:28:23 AM
PUBLIC ! PRIVATE
32
PROJECT TITLE CALAMBA ! LOS BAÑOS EXPRESSWAY
DESCRIPTION
The project is expected to vitally support the tourism development of Los Baños and its
to the decongestion of the national road. It
pass through Los Baños City and end at the Bay. It is proposed to be a combined
No. of Lanes = 4 lanes
MODE PPP IMPLEMENTATION SCHEDULE 2014-2016
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
Name : MARIA CATALINA CABRAL Designation : Assistant Secretary Agency : Telephone No. :Fax No. : Email Address :
V. LIST OF PROJECTS
PPP Final.indd 32 9/17/10 2:28:23 AM
PUBLIC ! PRIVATE
33P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
PROJECT TITLE R!7 EXPRESSWAY
DESCRIPTION
of the most heavily congested corridors
No. of Lanes = 4 lanes
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
Conceptual Stage.
CONTACT INFORMATION
Name : MARIA CATALINA CABRAL Designation : Assistant Secretary Agency : Telephone No. :Fax No. : Email Address :
V. LIST OF PROJECTS
PPP Final.indd 33 9/17/10 2:28:23 AM
PUBLIC ! PRIVATE
34
PROJECT TITLE NLEX EAST/ LA MESA PARKWAY
DESCRIPTION
No. of Lanes = 4 lanes
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST PhP 32,530 Million SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
Name : MARIA CATALINA CABRAL Designation : Assistant Secretary Agency : Telephone No. :Fax No. : Email Address :
V. LIST OF PROJECTS
PPP Final.indd 34 9/17/10 2:28:24 AM
PUBLIC ! PRIVATE
35P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
PROJECT TITLE PRIVATIZATION OF NAIA 3 AND DMIA
DESCRIPTION
MODE PPP IMPLEMENTATION SCHEDULEPROJECT COST SPONSORING AGENCY
PROJECT STATUS
November 2010 to November 2011. Study to determine development approach.
CONTACT INFORMATION
Name : RUBEN S. REINOSO, JR.Designation : Undersecretary Agency : Telephone No. :Fax No. : Email Address : benny.reinoso@gmail.com
V. LIST OF PROJECTS
PPP Final.indd 35 9/17/10 2:28:24 AM
PUBLIC ! PRIVATE
36
PROJECT TITLE MACTAN!CEBU INTERNATIONAL AIRPORT AUTHORITY "MCIAA#
DEVELOPMENT PROJECTDESCRIPTION
buildings and other essential facilities to cater to international and domestic airline
terminal.
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST SPONSORING AGENCY MCIAA
PROJECT STATUS
FS and master plan to commence by 3rd quarter of 2010.
CONTACT INFORMATION
Name : RUBEN S. REINOSO, JR.Designation : Undersecretary Agency : Telephone No. :Fax No. : Email Address : benny.reinoso@gmail.com
V. LIST OF PROJECTS
PPP Final.indd 36 9/17/10 2:28:24 AM
PUBLIC ! PRIVATE
37P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
PROJECT TITLE KALIBO AIRPORT
DESCRIPTION
and also a spacious arrival lobby and
both local and foreign tourists. The design concept shall adopt the culture in the area
ventilation. The pre-departure and arrival
the building. The respective area allocation
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST PhP 1,545 Million SPONSORING AGENCY
PROJECT STATUS
• of 2011.
•
CONTACT INFORMATION
Name : RUBEN S. REINOSO, JR.Designation : Undersecretary Agency : Telephone No. :Fax No. : Email Address : benny.reinoso@gmail.com
V. LIST OF PROJECTS
Kalibo Airport
PPP Final.indd 37 9/17/10 2:28:25 AM
PUBLIC ! PRIVATE
38
V. LIST OF PROJECTS
PROJECT TITLE URBAN TRANSPORT PROGRAM FOR HIGHLY URBANIZED CITIES
!ROAD BASED MASS TRANSPORT SYSTEM"DESCRIPTION
The proposed urban transport project is envisaged to focus on integrating transport
mobility, access and safety; promoting greater use of public transport modes and
lessen vehicle emissions; and improving tra"c management and enforcement.
The transport investments proposed for inclusion in the CTF IP are BRT systems in Metro Manila and Cebu. A BRT is a mass transit system that mimics the speed and performance of metros or light rail transit
MODE PPP IMPLEMENTATION SCHEDULEPROJECT COST SPONSORING AGENCY
PROJECT STATUS
and maintenance of the BRT system.
CONTACT INFORMATION
Name : RUBEN S. REINOSO, JR.Designation : Undersecretary Agency : Telephone No. :Fax No. : Email Address : benny.reinoso@gmail.com
PPP Final.indd 38 9/17/10 2:28:25 AM
PUBLIC ! PRIVATE
39P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
V. LIST OF PROJECTS
PROJECT TITLE MRT 8
DESCRIPTION
The project involves the construction
Angono.
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST PhP 51,464 Million SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
Name : RUBEN S. REINOSO, JR.Designation : Undersecretary Agency : Telephone No. :Fax No. : Email Address : benny.reinoso@gmail.com
PPP Final.indd 39 9/17/10 2:28:25 AM
PUBLIC ! PRIVATE
40
V. LIST OF PROJECTS
PROJECT TITLE BALABAC AIRPORT DEVELOPMENT PROJECT
DESCRIPTION
The project is proposed to be located
terminal building and access road including
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST PhP1,145 Million SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
Name : RUBEN S. REINOSO, JR.Designation : Undersecretary Agency : Telephone No. :Fax No. : Email Address : benny.reinoso@gmail.com
PPP Final.indd 40 9/17/10 2:28:26 AM
PUBLIC ! PRIVATE
41P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTALV. LIST OF PROJECTS
PROJECT TITLE DEVELOPMENT OF A NATIONAL MOTOR VEHICLE
INSPECTION AND MAINTENANCE PROGRAMDESCRIPTION
system.
MODE PPP IMPLEMENTATION SCHEDULEPROJECT COST SPONSORING AGENCY
PROJECT STATUS
• Study on development of National Motor Vehicle Inspection and Maintenance Program to commence by 4th quarter of 2010.
• The study aims to determine the overall feasibility of implementing a sustainable National Motor
development plan detailing the action steps for viable program design; and to enhance the overall
and soon-to be completed improved MVIS facilities in the country.•
CONTACT INFORMATION
Name : RUBEN S. REINOSO, JR.Designation : Undersecretary Agency : Telephone No. :Fax No. : Email Address : benny.reinoso@gmail.com
PPP Final.indd 41 9/17/10 2:28:26 AM
PUBLIC ! PRIVATE
42
PROJECT TITLE PRIVATIZATION OF NORTHRAIL OPERATION AND MANAGEMENT
DESCRIPTION
Freeport Zone in Pampanga.
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
Name : RUBEN S. REINOSO, JR.Designation : Undersecretary Agency : Telephone No. :Fax No. : Email Address : benny.reinoso@gmail.com
V. LIST OF PROJECTS
PPP Final.indd 42 9/17/10 2:28:26 AM
PUBLIC ! PRIVATE
43P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE MINDANAO RAILWAY SYSTEM
DESCRIPTION
The project aims to provide a safe and economical transport alternative for moving
development of the island.
plan indicates connections to all major
line from Iligan City to Cagayan de Oro City
municipalities in Misamis Oriental, namely:
Gitagum, Laguindingan, Alubijid, El Salvador, and Opol.
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
•
•
CONTACT INFORMATION
Name : RUBEN S. REINOSO, JR.Designation : Undersecretary Agency : Telephone No. :Fax No. : Email Address : benny.reinoso@gmail.com
V. LIST OF PROJECTS
PPP Final.indd 43 9/17/10 2:28:27 AM
PUBLIC ! PRIVATE
44
PROJECT TITLE CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS
DESCRIPTION Education is considered as one of the crucial determinants, not only of economic
As a critical factor to the development of a country’s human resource and labor force, better education translates to higher
of the economy. More equitable access to education also helps reduce the gap
gain employment and income-earning
that education is adequately provided to the populace, su"cient infrastructure and facilities for such purpose should be present. The ideal student-classroom ratio is 45:1
elementary schools in the Autonomous
elementary classroom shortage in the
hand, has remained severe over the years since 2003. The student-classroom ratio in
MODE PPP IMPLEMENTATION SCHEDULE Continuing 2010-2016PROJECT COST SPONSORING AGENCY
PROJECT STATUS
•
•
CONTACT INFORMATION
Name : BROTHER ARMIN ALTAMIRANO LUISTRO, FSCDesignation : Secretary Agency : Telephone No. : Fax No. : Email Address : osec@deped.gov.ph
S O C I A L I N F R A S T R U C T U R E P R O J E C T S
V. LIST OF PROJECTS
PPP Final.indd 44 9/17/10 2:28:27 AM
PUBLIC ! PRIVATE
45P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
PROJECT TITLE CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS
DESCRIPTION Education is considered as one of the crucial determinants, not only of economic
As a critical factor to the development of a country’s human resource and labor force, better education translates to higher
of the economy. More equitable access to education also helps reduce the gap
gain employment and income-earning
that education is adequately provided to the populace, su"cient infrastructure and facilities for such purpose should be present. The ideal student-classroom ratio is 45:1
elementary schools in the Autonomous
elementary classroom shortage in the
hand, has remained severe over the years since 2003. The student-classroom ratio in
MODE PPP IMPLEMENTATION SCHEDULE Continuing 2010-2016PROJECT COST SPONSORING AGENCY
PROJECT STATUS
•
•
CONTACT INFORMATION
Name : BROTHER ARMIN ALTAMIRANO LUISTRO, FSCDesignation : Secretary Agency : Telephone No. : Fax No. : Email Address : osec@deped.gov.ph
PROJECT TITLE HEALTH FACILITIES PROGRAM
DESCRIPTION
The country remains in need of continuous improvement in terms of acquiring and applying advancements in medical technology, constructing infrastructure
e"cient and sustainable healthcare service
is in the process of advocating PPPs in the implementation of health facilities throughout the country.
MODE PPP IMPLEMENTATION SCHEDULE Continuing 2010-2016PROJECT COST SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
Name :Designation : Secretary Agency : Telephone No. :Fax No. : Email Address : etona@co.doh.gov.ph
S O C I A L I N F R A S T R U C T U R E P R O J E C T S
V. LIST OF PROJECTS
PPP Final.indd 45 9/17/10 2:28:27 AM
PUBLIC ! PRIVATE
46
PROJECT TITLE SOLID WASTE MANAGEMENT PROJECTS
DESCRIPTION
of them are still having di"culty in dealing
LGUs are having di"culty facilitating solid
localities.
municipalities amount to PhP 4.5 Billion and
activities such as closing of open dumpsites, establishment of Materials, Recovery Facilities
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
S O C I A L I N F R A S T R U C T U R E P R O J E C T S
V. LIST OF PROJECTS
Name :Designation : Agency : Telephone No. :Fax No. : Email Address :
PPP Final.indd 46 9/17/10 2:28:27 AM
PUBLIC ! PRIVATE
47P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
S O C I A L I N F R A S T R U C T U R E P R O J E C T S
V. LIST OF PROJECTS
PROJECT TITLE RECLAMATION OF THE NAVOTAS COASTAL AREA
DESCRIPTION
This involves the reclamation of the Navotas Coastal Area, to solve the housing problem in the City brought about by limited land area. The proposed components to
environmental clean-up of the coastal area;
and development of services along the marginal area including possible rebuilding
retail and commercial-type developments.
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST SPONSORING AGENCY Local Government of Navotas
PROJECT STATUS
CONTACT INFORMATION
Name : JOHN REY TIANGCODesignation : Mayor Agency : Local Government of Navotas Telephone No. :
PPP Final.indd 47 9/17/10 2:28:28 AM
PUBLIC ! PRIVATE
48
THE PPP CENTER
A. RATIONALE OF LEGAL & POLICY FRAMEWORK
process.
B. THE BOT LEGAL FRAMEWORK
PPP Final.indd 48 9/17/10 2:28:28 AM
PUBLIC ! PRIVATE
49P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
investment.
C. HIGHLIGHTS OF RA 7718 Use of di!erent BOT variants. addition, other variants can be used provided approval is secured from the O"ce of the President. The
10. Other variations as may be approved by the President of the Philippines
Applicability for wider range infrastructure sectors. for BOT-type implementation, including such non-traditional areas such as information technology
Speci"ed levels of approvals.
PPP Final.indd 49 9/17/10 2:28:28 AM
PUBLIC ! PRIVATE
50
Grant of franchise.
- Operate and maintain a facility; and - Collect tolls, fees, rentals and other charges
This process in e"ect delegates the issuance of the administrative and legislative franchise to the appropriate
Right of proponent to collect tolls, fees, rentals.
50 years; - A share in the revenue of the project; and - Other non-monetary payments.
Entitlement to reasonable return.
Government support for BOT projects.
- Investment Incentives. Projects costing PhP 1 Billion and above are entitled to get incentives as
credit enhancements such as direct government subsidy, direct government equity, performance
D. THE PPP CENTER
investments in the country amid a stable investment climate.
PPP Final.indd 50 9/17/10 2:28:28 AM
PUBLIC ! PRIVATE
51P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
E. RELATED LAWS
1. Constitution
be noted that, under the Philippine Constitution, franchises or any other authority for the operation of a
years. The participation of foreign investors on the board of the public utility is limited to the proportionate
of the Philippines.
PPP Final.indd 51 9/17/10 2:28:28 AM
PUBLIC ! PRIVATE
52
the natural resources of the country and becomes the subject of ordinary commerce, and may be acquired by foreigners.
may then be subject to private sector involvement.
For example:
requirement of the Constitution no longer applies, and therefore, a foreign entity may build and operate
2. Public Services Act
If the PPP project requires a public utility franchise, the appropriate government regulator shall immediately
collection of tolls, fees, rentals, and other charges according to the agreed schedule in the Concession
case, the appropriate government agency has jurisdiction, supervision, and control over the franchise.
PPP Final.indd 52 9/17/10 2:28:28 AM
PUBLIC ! PRIVATE
53P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
Control and supervision generally consist of:
2. Prescribing routes or territory and operating standards; and,3. Prescribing schedule of trips and rates to be charged.
generally agreed upon by the parties and contained in the PPP Agreement.
3. Foreign Investment Act
during the Concession Period.
for Philippine nationals as partners in the Project Company.
then lease it to the IA to operate it. At the end of the concession period, the Project Company transfers
PPP Final.indd 53 9/17/10 2:28:29 AM
PUBLIC ! PRIVATE
54
4. Foreign Borrowings Act
relending to the private sector. The President may also guarantee loans or credit extended to, or bonds or
may be issued only to GOCCs for their projects and GFIs for relending to the private sector. The result is that the government may not directly guarantee loans obtained by the private sector PPP proponent.
5. Omnibus Investment Code
PPP Final.indd 54 9/17/10 2:28:29 AM
PUBLIC ! PRIVATE
55P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
VII. SUCCESS STORIES
also in non-traditional infrastructure and development sectors (such as information and communications
levels, across various infrastructure sectors.
Partnership. NORTH LUZON EXPRESSWAY
A. BACKGROUND
the main transport corridor from Metro Manila to Central
PPP Final.indd 55 9/17/10 2:28:29 AM
PUBLIC ! PRIVATE
56
VII. SUCCESS STORIES
B. PROJECT DESCRIPTION
C. TRANSACTION STRUCTURE
Proponent
Joint Venture Partners
- One of the leading infrastructure companies in the Philippines
- Australia’s largest construction company
Sources: http://www.mntc.com / http://www.adbi.org/conf-seminar papers/2009/02/05/2871.session.11.2.pascual.case.study.north.luzon.expressway/
PPP Final.indd 56 9/17/10 2:28:29 AM
PUBLIC ! PRIVATE
57P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
VII. SUCCESS STORIES
su"cient.
adjustment formula.
D. FINANCING OF THE PROJECT
E. IMPACT
management systems.
METRO MANILA WATER AND SEWERAGE SYSTEM PRIVATIZATION
A. BACKGROUND
vis-à-vis the planned expansion or
into by the Republic of the Philippines through the
PPP Final.indd 57 9/17/10 2:28:29 AM
PUBLIC ! PRIVATE
58
VII. SUCCESS STORIES
B. TRANSACTION STRUCTURE
concessionaire’s sole right to manage, operate, repair, decommission, and refurbish the facilities in the service
C. BIDDING
East Zone Proponent
Corporation.
D. IMPACT
E. STATUS
_______________________________________________________
S
PPP Final.indd 58 9/17/10 2:28:30 AM
PUBLIC ! PRIVATE
59P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
VII. SUCCESS STORIES
CIVIL REGISTRY SYSTEM INFORMATION TECHNOLOGY (CRS-IT)
A. BACKGROUND
forecasted an increase in demand for its services given
2000. In early 2000, demand for issuance, authentication,
average of 10,000 to 12,000 requests daily. Further, there
reports required by other government institutions for their
computing abilities. Hence, the Civil Registry System
B. TRANSACTION STRUCTURE
CRS.
C. BIDDING
Proponent
mission-critical environments for businesses and governments. D. IMPACT
and payment counters, and improved facilities for the convenience of the public
advantage of the public
capabilities. _______________________________________________________
PPP Final.indd 59 9/17/10 2:28:30 AM
PUBLIC ! PRIVATE
60
VII. SUCCESS STORIES
200 MW MINDANAO COAL-FIRED THERMAL POWER PLANT
A. BACKGROUND
operate, as a single integrated system all generating
covered by the NPC set up grids. Pursuant to this mandate, it issued to the public a notice inviting interested parties to bid for the development of a
Villanueva, Misamis Oriental, Northern Mindanao
arrangement. B. TRANSACTION STRUCTURE
over the facility in good operating condition to NPC.
C. BIDDING
In response to the invitation to tender from NPC, a consortium constituted of State Investment Trust, Inc. and
the project proposals from interested investors, the NPC selected the proposal of the said consortium as the most advantageous to NPC. Proponents
- One of the largest EPC contractor and complete equipment supplier for thermal, hydro and
Special Purpose Company
PPP Final.indd 60 9/17/10 2:28:30 AM
PUBLIC ! PRIVATE
61P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
VII. SUCCESS STORIES
D. IMPACT
E. STATUS
commissioned for full commercial operation in January 2007.
MANDALUYONG CITY “MARKETPLACE”
A. BACKGROUND
land remained idle and unproductive. The consuming
resulting in tra"c congestion, pollution, sanitation and
in infrastructure development.
Floor Features
service shops1st and 2nd : Commercial shops and department stores such as eateries and dry goods sections
6th : 4 movie houses including fast foods, gymnasium, billiard halls, an amusement center and a multi-purpose center
PPP Final.indd 61 9/17/10 2:28:30 AM
PUBLIC ! PRIVATE
62
VII. SUCCESS STORIES
B. TRANSACTION STRUCTURE
C. IMPACT
PPP Final.indd 62 9/17/10 2:28:30 AM
PUBLIC ! PRIVATE
63P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
ANNEXES
The Philippines: Creating Opportunities through E!ective Governance 07 September 2010
Overview In the second quarter of 2010, the Philippines posted its 45th
consumption, the macroeconomic environment remained stable through the crisis.
4 . 0
1. 1
01
234567
10
2001 2002 2003 2004 2005 2006 2007 S 1 2010
G N P
RealGDPandGNPGrowth2001‐Q12010,inPercent
administration is committed to improving good governance and
strong commitment to raising revenues and tight expenditure
the medium term, higher public capital spending and stronger
Economic Highlights
Economy sustains growth
in international trade, improvement in investor and consumer
and increase in construction activities. The services sector also
production contracted due to El Nino and the lingering e"ect of the typhoons that hit the country late last year. On the
PPP Final.indd 63 9/17/10 2:28:31 AM
PUBLIC ! PRIVATE
64
ANNEXES
real estate, and government and private services.
and consumption remained upbeat. The country’s net exports
Filipinos.
In!ation environment remains within target range
Pilipinas has maintained policy rates at 4 percent for the overnight
External position continues to strengthen
Gross International Reserves have more than tripled since 2001. As
the country’s short-term external debt based on original maturity.
year.
Foreign investments supported by investors’ continued
PPP Final.indd 64 9/17/10 2:28:32 AM
PUBLIC ! PRIVATE
65P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
ANNEXES
con! dence in the Philippine economy
higher than the year-ago level. FPI, on the other hand, yielded
Banking sector remains fundamentally sound and stable
respectively.
A manageable ! scal pro! le
expenditures amounted to P1.42 trillion.
percent higher than in the same period last year as collections
- 3 2 5-350
-300-250
-200
-150
-100-50
0'0 2 '0 3 '0 4 '0 5 '0 6 '0 7 '10 P
-6
-4
-2
0
NationalGovernmentFiscalPosition2002‐2010,inPhPBillion
PPP Final.indd 65 9/17/10 2:28:32 AM
PUBLIC ! PRIVATE
66
commitment to improve tax collection e"ciency, BIR collections
program for 2010.
Economic and Policy Outlook
be done by improving the e#ectiveness of existing administrative
preparing the P1.6 trillion 2011 budget to ensure the e"cient use of government funds.
result in continuous reduction in debt, sustained macroeconomic
to complement government infrastructure investments and push
Investor Relations O"ce of the Republic of the Philippines
h
ANNEXES
7 2 . 3
5 0 . 7
5 7 . 6
5 6 . 5
7 1. 4
5 7 . 3
4 0
50
6 0
70
2004 2005 2006 2007 2010P
P ro gram
A c tual
NationalGovernmentDebt2004‐2010,inPercentofGDP
PPP Final.indd 66 9/17/10 2:28:33 AM
PUBLIC ! PRIVATE
67P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
ANNEXES
Roxas Boulevard, Manila, Philippines
SECRETARY CESAR V. PURISIMA
Email: cpurisima@dof.gov.ph
General Solano St., Malacañang, Manila, Philippines
Email: abad.dbm@gmail.com
Email: h
SECRETARY ROGELIO L. SINGSON
Email: jpj@dotc.gov.ph
Energy Center, Merritt Rd., Fort Bonifacio, Taguig City, Philippines
Email: rdalmendras@doe.gov.ph
PPP Final.indd 67 9/17/10 2:28:33 AM
PUBLIC ! PRIVATE
68
ANNEXES
SECRETARY PROCESO J. ALCALA
SECRETARY ALBERTO A. LIM
Email: aalim@tourism.gov.ph
SECRETARY BRO. ARMIN LUISTRO FSC
SECRETARY ENRIQUE T. ONA
PPP Final.indd 68 9/17/10 2:28:33 AM
PUBLIC ! PRIVATE
69P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE WIND FARM POWER PROJECT
DESCRIPTION
Ltd.
MODE Private Initiated IMPLEMENTATION SCHEDULE 2011
PROJECT COST PhP 5,625 Million SPONSORING AGENCY
PROJECT STATUS
Energy and Local Government Unit o"cials for the setting up of the monitoring equipment.
CONTACT INFORMATION
Name : Designation : Manager Agency : Telephone No. : Fax No. : Email Address :
P R O J E C T S I N L U Z O N
PPP Final.indd 69 9/17/10 2:28:33 AM
PUBLIC ! PRIVATE
70
SUPPLEMENTAL
PROJECT TITLE LIQUEFIED NATURAL GAS TERMINAL AND COMBINED CYCLE GAS
TURBINEDESCRIPTION
Ltd.
MODE Private Initiated IMPLEMENTATION SCHEDULE 2011
PROJECT COST PhP 12,150 Million SPONSORING AGENCY
PROJECT STATUS
a. Leased property to be used for the project.
b. Ongoing site investigation and preparation.
social acceptance of the project.
CONTACT INFORMATION
Name : Designation : Manager Agency : Telephone No. : Fax No. : Email Address :
P R O J E C T S I N L U Z O N
PPP Final.indd 70 9/17/10 2:28:34 AM
PUBLIC ! PRIVATE
71P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE NORTHWIND PAMPLONA PROJECT
DESCRIPTION
plant in Pamplona, Cagayan Valley.
MODE Private Initiated IMPLEMENTATION SCHEDULE 2011
PROJECT COST PhP 3,375 Million SPONSORING AGENCY
PROJECT STATUS
cooperation in the development of the project.
Sangguniang Bayan of the Municipality of Pamplona, and o"cials of the prospective host barangays of Bidduang, Allasitan and Nagattatan.
d. Conducting initial survey on the applied area.e. Submitted documentation to the local Community Environment and Natural Resources O"ce
agreement.
CONTACT INFORMATION
Name : MR. NEILS JACOBSENDesignation : President Agency : Telephone No. :Fax No. : Email Address :
P R O J E C T S I N L U Z O N
PPP Final.indd 71 9/17/10 2:28:34 AM
PUBLIC ! PRIVATE
72
SUPPLEMENTAL
PROJECT TITLE NORTHWIND APARRI PROJECT
DESCRIPTION
plant in Aparri, Cagayan Valley.
Companies.
MODE Private Initiated IMPLEMENTATION SCHEDULE 2011
PROJECT COST PhP 4,500 Million SPONSORING AGENCY
PROJECT STATUS
•
CONTACT INFORMATION
Name : MR. NEILS JACOBSENDesignation : President Agency : Telephone No. :Fax No. : Email Address :
P R O J E C T S I N L U Z O N
PPP Final.indd 72 9/17/10 2:28:34 AM
PUBLIC ! PRIVATE
73P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE MULTI!FUEL BIOMASS POWER PLANT
DESCRIPTION
San Leonardo, Nueva Ecija.
Included in the Phase 1 projects to be
Philippines Inc.
MODE Private Initiated IMPLEMENTATION SCHEDULE
PROJECT COST PhP 2,205 Million SPONSORING AGENCY
PROJECT STATUS
d. Barangay and Municipal Endorsements expected to be obtained by end of-September 2010.e. Completed Resource Assessment.
individual farmers’ cooperatives and irrigators’ associations to be signed by 4th Quarter 2010.
CONTACT INFORMATION
Name : Designation : Chief Executive O"cer Agency : Telephone No. : Fax No. : Email Address :
P R O J E C T S I N L U Z O N
PPP Final.indd 73 9/17/10 2:28:35 AM
PUBLIC ! PRIVATE
74
SUPPLEMENTAL
PROJECT TITLE KANAN B1 HYDRO POWER PROJECT
DESCRIPTION
Ltd.
MODE Private Initiated IMPLEMENTATION SCHEDULE
PROJECT COST PhP 13,050 Million SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
Name : Designation : Manager Agency : Telephone No. : Fax No. : Email Address :
P R O J E C T S I N L U Z O N
PPP Final.indd 74 9/17/10 2:28:35 AM
PUBLIC ! PRIVATE
75P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE BURGOS WIND POWER PROJECT
DESCRIPTION
line shall be constructed to connect to a substation in Laoag.
Corporation.
MODE Private Initiated IMPLEMENTATION SCHEDULE 2012
PROJECT COST PhP 11,610 Million SPONSORING AGENCY
PROJECT STATUS
a. Ongoing bidding activities.
CONTACT INFORMATION
Name : Designation : Agency : Telephone No. : Fax No. : Email Address :
P R O J E C T S I N L U Z O N
PPP Final.indd 75 9/17/10 2:28:35 AM
PUBLIC ! PRIVATE
76
SUPPLEMENTALP R O J E C T S I N L U Z O N
PROJECT TITLE MULTI!FUEL BIOMASS POWER PLANT
DESCRIPTION
project in Pangasinan.
Included in the Phase 2 projects to be
Philippines, Inc.
MODE Private Initiated IMPLEMENTATION SCHEDULE Phase 1 – 2013
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
e. Land acquisition is under negotiation.f. Finished preliminary & intermediate plant design.g. Signed biomass supply contract.
CONTACT INFORMATION
Name : Designation : Chief Executive O"cer Agency : Telephone No. : Fax No. : Email Address :
PPP Final.indd 76 9/17/10 2:28:36 AM
PUBLIC ! PRIVATE
77P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE TANAWON GEOTHERMAL PROJECT
DESCRIPTION
Bacman Geothermal Field, Sorsogon.
Corporation.
MODE Private Initiated IMPLEMENTATION SCHEDULE 2013
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
a. Ongoing assessment of geothermal resource.
CONTACT INFORMATION
Name : Designation : Agency : Telephone No. : Fax No. : Email Address :
P R O J E C T S I N L U Z O N
PPP Final.indd 77 9/17/10 2:28:36 AM
PUBLIC ! PRIVATE
78
SUPPLEMENTAL
PROJECT TITLE COAL!FIRED POWER PLANT
DESCRIPTION
The proponent is Redondo Peninsula Energy Incorporated.
MODE Private Initiated IMPLEMENTATION SCHEDULE
PROJECT COST PhP 24,300 Million SPONSORING AGENCY
PROJECT STATUS
b. Grid Impact Studies approved by the National Transmission Corporation in 2007.
Natural Resources is under negotiation.g. Financing is under negotiation.h. Engineering, Procurement and Construction contract is under negotiation.
CONTACT INFORMATION
Name :Designation : Vice-PresidentAgency : Redondo Peninsula Energy Inc. Telephone No. : Fax No. : Email Address :
P R O J E C T S I N L U Z O N
PPP Final.indd 78 9/17/10 2:28:36 AM
PUBLIC ! PRIVATE
79P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE COAL FIRED POWER PLANT
DESCRIPTION
Calaca, Batangas. Provisions shall be made
unit in the future.
The proponent is Trans Asia Oil and Energy
MODE Private Initiated IMPLEMENTATION SCHEDULE 2013
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
c. Grid Impact Study to be conducted by the National Grid Corporation of the Philippines on January 2011.
CONTACT INFORMATION
Name : Designation : President and Chief Executive O"cer Agency : Telephone No. : Fax No. : Email Address :
P R O J E C T S I N L U Z O N
PPP Final.indd 79 9/17/10 2:28:36 AM
PUBLIC ! PRIVATE
80
SUPPLEMENTAL
PROJECT TITLE KALAYAAN PUMPED STORAGE POWER PLANT III !CBK EXPANSION"
DESCRIPTION
in Lumban, Laguna.
Corporation.
MODE Private Initiated IMPLEMENTATION SCHEDULE 2014
PROJECT COST PhP 32,400 Million SPONSORING AGENCY
PROJECT STATUS
a. Conducting feasibility study and Environmental Impact Analysis study.
c. Grid Impact Studies completed by the National Transmission Corporation.
CONTACT INFORMATION
Name : Designation : Chief Executive O"cer Agency : Telephone No. : Fax No. : Email Address :
P R O J E C T S I N L U Z O N
PPP Final.indd 80 9/17/10 2:28:37 AM
PUBLIC ! PRIVATE
81P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE MAUBAN WIND FARM PROJECT
DESCRIPTION
MODE Private Initiated IMPLEMENTATION SCHEDULE 2014
PROJECT COST PhP 1,350 Million SPONSORING AGENCY
PROJECT STATUS
a. Gathering registration requirements.b. Pre-development stage.
CONTACT INFORMATION
Name : MR. SIMO SANTAVIRTADesignation : General Manager Agency : Telephone No. : Fax No. : Email Address : ssantavirta@intergen.com
P R O J E C T S I N L U Z O N
PPP Final.indd 81 9/17/10 2:28:37 AM
PUBLIC ! PRIVATE
82
SUPPLEMENTALP R O J E C T S I N L U Z O N
PROJECT TITLE RANGAS GEOTHERMAL PROJECT
DESCRIPTION
in the Bacman Geothermal Field, Bacon, Sorsogon.
MODE Private Initiated IMPLEMENTATION SCHEDULE 2015
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
a. Ongoing resource assessment and feasibility studies.
CONTACT INFORMATION
Name : Designation : Agency : Telephone No. : Fax No. : Email Address :
PPP Final.indd 82 9/17/10 2:28:38 AM
PUBLIC ! PRIVATE
83P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTALP R O J E C T S I N L U Z O N
PROJECT TITLE BALINTINGON RIVER MULTI!PURPOSE PROJECT
DESCRIPTION
in General Tinio, Nueva Ecija.
The proponent is the National Irrigation Administration.
MODE Private Initiated IMPLEMENTATION SCHEDULE 2015
PROJECT COST PhP 2,700 Million SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
Name : MR. ANTONIO S. NANGELDesignation : Acting Administrator Agency : Telephone No. : Fax No. : Email Address : administrator@nia.gov.ph
PPP Final.indd 83 9/17/10 2:28:38 AM
PUBLIC ! PRIVATE
84
SUPPLEMENTALP R O J E C T S I N L U Z O N
PROJECT TITLE QUEZON POWER EXPANSION PROJECT
DESCRIPTION
MODE Private Initiated IMPLEMENTATION SCHEDULE 2016
PROJECT COST PhP 40,500 Million SPONSORING AGENCY
PROJECT STATUS
Resources.b. Grid Impact Study completed by the National Transmission Corporation.
CONTACT INFORMATION
Name : MR. SIMO SANTAVIRTADesignation : General Manager Agency : Telephone No. : Fax No. : Email Address : ssantavirta@intergen.com
PPP Final.indd 84 9/17/10 2:28:38 AM
PUBLIC ! PRIVATE
85P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE MANITO!KAYABON GEOTHERMAL PROJECT
DESCRIPTION
in the Bacman Geothermal Field, Bacon, Sorsogon.
MODE Private Initiated IMPLEMENTATION SCHEDULE 2016
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
a. Ongoing resource assessment and feasibility studies.
CONTACT INFORMATION
Name : Designation : Agency : Telephone No. : Fax No. : Email Address :
P R O J E C T S I N L U Z O N
PPP Final.indd 85 9/17/10 2:28:38 AM
PUBLIC ! PRIVATE
86
SUPPLEMENTAL
PROJECT TITLE MINDORO BIOMASS POWER PROJECT
DESCRIPTION
plant in Mindoro.
This project is included in the Phase 3 of
Mindoro Philippines, Inc.
MODE Private Initiated IMPLEMENTATION SCHEDULE 2017
PROJECT COST PhP 1,575 Million SPONSORING AGENCY
PROJECT STATUS
b. Completed the Biomass Supply Assessment. c. Ongoing site selection.d. Finished preliminary & intermediate plant design.e. To prepare requirements for initial Environmental Examination.
g. Ongoing selection of Engineering, Procurement and Construction contractor.
CONTACT INFORMATION
Name : Designation : Chief Executive O"cer Agency : Telephone No. : Fax No. : Email Address :
P R O J E C T S I N L U Z O N
PPP Final.indd 86 9/17/10 2:28:39 AM
PUBLIC ! PRIVATE
87P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE PAGBILAO EXPANSION PROJECT
DESCRIPTION
The proponent is Team Energy Corporation.
MODE Private Initiated IMPLEMENTATION SCHEDULE
PROJECT COST PhP 32,400 Million SPONSORING AGENCY
PROJECT STATUS
property tax issue.
CONTACT INFORMATION
Name : Designation : Executive Vice President for Operation Agency : Team Energy Corporation Telephone No. : Fax No. : Email Address :
P R O J E C T S I N L U Z O N
PPP Final.indd 87 9/17/10 2:28:39 AM
PUBLIC ! PRIVATE
88
SUPPLEMENTAL
PROJECT TITLE PAGUDPUD WIND POWER PROJECT
DESCRIPTION
Pagudpud, Ilocos Norte.
MODE Private Initiated IMPLEMENTATION SCHEDULE
PROJECT COST PhP 4,500 Million SPONSORING AGENCY
PROJECT STATUS
a. Currently updating the feasibility study.
CONTACT INFORMATION
Name : Designation : Agency : Telephone No. : Fax No. : Email Address :
P R O J E C T S I N L U Z O N
PPP Final.indd 88 9/17/10 2:28:39 AM
PUBLIC ! PRIVATE
89P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE VILLASIGA HYDROPOWER PROJECT
DESCRIPTION
in Sibalom, Antique.
Company Incorporated.
MODE Private Initiated IMPLEMENTATION SCHEDULE 2012
PROJECT COST PhP 720 Million SPONSORING AGENCY
PROJECT STATUS
project site.
CONTACT INFORMATION
Name : Designation : President Agency : Telephone No. : Fax No. : Email Address :
P R O J E C T S I N V I S A Y A S
PPP Final.indd 89 9/17/10 2:28:39 AM
PUBLIC ! PRIVATE
90
SUPPLEMENTALP R O J E C T S I N V I S A Y A S
PROJECT TITLE NEGROS BIOMASS POWER PROJECT
DESCRIPTION
plants in Negros.
The project is included in the Phase 1 projects to be implemented by Global Green
MODE Private Initiated IMPLEMENTATION SCHEDULE 2014
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
b. Completed the Biomass Supply Assessment c. Ongoing site selectiond. To prepare requirements for initial Environmental Examination
f. Ongoing selection of Engineer and Engineering, Procurement and Construction contractor
CONTACT INFORMATION
Name : Designation : Chief Executive O"cer Agency : Telephone No. : Fax No. : Email Address :
PPP Final.indd 90 9/17/10 2:28:40 AM
PUBLIC ! PRIVATE
91P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE SAMAR BIOMASS POWER PROJECT
DESCRIPTION
plant in Samar.
The project is Included in the Phase 2 projects to be implemented by Global Green
MODE Private Initiated IMPLEMENTATION SCHEDULE 2015
PROJECT COST PhP 1,575 Million SPONSORING AGENCY
PROJECT STATUS
b. Completed the Biomass Supply Assessment. c. Ongoing site selection.d. To prepare requirements for initial Environmental Examination.
f. Ongoing selection of the Engineering, Procurement and Construction contractor.
CONTACT INFORMATION
Name :Designation : Chief Executive O"cer Agency : Telephone No. : Fax No. : Email Address :
P R O J E C T S I N V I S A Y A S
PPP Final.indd 91 9/17/10 2:28:40 AM
PUBLIC ! PRIVATE
92
SUPPLEMENTALP R O J E C T S I N V I S A Y A S
PROJECT TITLE DAUIN GEOTHERMAL PROJECT
DESCRIPTION
MODE Private Initiated IMPLEMENTATION SCHEDULE 2017
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
a. Ongoing resource assessment and feasibility studies.
CONTACT INFORMATION
Name : Designation : Agency : Telephone No. : Fax No. : Email Address :
PPP Final.indd 92 9/17/10 2:28:40 AM
PUBLIC ! PRIVATE
93P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE SOUTHERN LEYTE GEOTHERMAL PROJECT
!FORMERLY CABALIAN GEOTHERMAL"DESCRIPTION
Southern Leyte.
MODE Private Initiated IMPLEMENTATION SCHEDULE
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
a. Ongoing resource assessment and feasibility studies.
CONTACT INFORMATION
Name : Designation : Agency : Telephone No. : Fax No. : Email Address :
P R O J E C T S I N V I S A Y A S
PPP Final.indd 93 9/17/10 2:28:40 AM
PUBLIC ! PRIVATE
94
SUPPLEMENTAL
PROJECT TITLE BUNKER!FIRED POWER PLANT
DESCRIPTION
plant.
The proponent is Mindanao Energy Systems,
MODE Private Initiated IMPLEMENTATION SCHEDULE 2011
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
Name : MRS. CONSUELO G. TIONDesignation : President and Chief Operating O"cer Agency : Mindanao Energy Systems, Incorporated Telephone No. : Fax No. : Email Address : cgtion@cepalco.com.ph
P R O J E C T S I N V I S A Y A S
PPP Final.indd 94 9/17/10 2:28:41 AM
PUBLIC ! PRIVATE
95P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE AGUS 3 HYDROELECTRIC PLANT
DESCRIPTION
in Lanao del Sur.
MODE Private Initiated IMPLEMENTATION SCHEDULE 2011
PROJECT COST PhP 20,250 Million SPONSORING AGENCY
PROJECT STATUS
a. Updated feasibility study.
CONTACT INFORMATION
Name : MR. JOSE VENANCIO BATIQUINDesignation : President Agency : Telephone No. : Fax No. : Email Address :
PPP Final.indd 95 9/17/10 2:28:41 AM
PUBLIC ! PRIVATE
96
SUPPLEMENTAL
PROJECT TITLE SOUTHERN MINDANAO COAL!FIRED POWER STATION
DESCRIPTION
Maasim, Sarangani.
The proponent is Conal Holdings Corporation.
MODE Private Initiated IMPLEMENTATION SCHEDULE Phase I – 2013Phase II - 2014
PROJECT COST PhP 16,200 Million SPONSORING AGENCY
PROJECT STATUS
construction of Phase 1.
CONTACT INFORMATION
Name : MR. TIRSO G. SANTILLANDesignation : Chief Executive O"cer Agency : Conal Holdings Corporation Telephone No. : Fax No. : Email Address : tgsagc@globenet.com.ph
PPP Final.indd 96 9/17/10 2:28:41 AM
PUBLIC ! PRIVATE
97P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE TAGOLOAN HYDROPOWER
DESCRIPTION
Corporation.
MODE Private Initiated IMPLEMENTATION SCHEDULE 2012
PROJECT COST PhP 6,120 Million SPONSORING AGENCY
PROJECT STATUS
a. Completed feasibility study.
CONTACT INFORMATION
Name : MR. JOSE VENANCIO BATIQUINDesignation : President Agency : Telephone No. : Fax No. : Email Address :
PPP Final.indd 97 9/17/10 2:28:41 AM
PUBLIC ! PRIVATE
98
SUPPLEMENTAL
PROJECT TITLE BUKIDNON BIOMASS POWER PROJECT
DESCRIPTION
The project is included in the Phase 1
MODE Private Initiated IMPLEMENTATION SCHEDULE 2013
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
b. Completed the Biomass Supply Assessment. c. Ongoing site selection.d. To prepare requirements for initial Environmental Examination.
f. Ongoing selection of Engineering, Procurement and Construction contractor.
CONTACT INFORMATION
Name : Designation : Chief Executive O"cer Agency : Telephone No. : Fax No. : Email Address :
PPP Final.indd 98 9/17/10 2:28:42 AM
PUBLIC ! PRIVATE
99P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE DAVAO BIOMASS POWER PROJECT
DESCRIPTION
The project is included in the Phase 3 of
MODE Private Initiated IMPLEMENTATION SCHEDULE 2017
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
b. Completed the Biomass Supply Assessment. c. Ongoing site selection.d. To prepare requirements for initial Environmental Examination.
f. Ongoing selection of Engineering, Procurement and Construction contractor.
CONTACT INFORMATION
Name : Designation : Chief Executive O"cer Agency : Telephone No. : Fax No. : Email Address :
PPP Final.indd 99 9/17/10 2:28:42 AM
PUBLIC ! PRIVATE
100
SUPPLEMENTAL
PROJECT TITLE CAMIGUIN ISLAND WIND POWER PROJECT
DESCRIPTION
in Camiguin.
Corporation.
MODE Private Initiated IMPLEMENTATION SCHEDULE
PROJECT COST PhP 562.50 Million SPONSORING AGENCY
PROJECT STATUS
b. Pre-development stage.
CONTACT INFORMATION
Name : Designation : Agency : Telephone No. : Fax No. : Email Address :
PPP Final.indd 100 9/17/10 2:28:43 AM
PUBLIC ! PRIVATE
101P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE AMBURAYAN RIVER HYDROPOWER PROSPECT
DESCRIPTION
The source is the Amburayan River in
Sugpon, Benguet. The available head is 50 meters.
MODE PPP IMPLEMENTATION SCHEDULE
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
PPP Final.indd 101 9/17/10 2:28:43 AM
PUBLIC ! PRIVATE
102
SUPPLEMENTAL
PROJECT TITLE ILAGUEN HYDROPOWER PROSPECT
DESCRIPTION
The source is the Pinacanuan de Ilaguen River in San Mariano, Isabela. A run-of-river
MODE Private Initiated IMPLEMENTATION SCHEDULE
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
PPP Final.indd 102 9/17/10 2:28:43 AM
PUBLIC ! PRIVATE
103P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE QUIRINO HYDROPOWER PROSPECT
DESCRIPTION
The site is located in Cayus, Quirino, Ilocos
MODE Private Initiated IMPLEMENTATION SCHEDULE
PROJECT COST PhP 1,125 Million SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
PPP Final.indd 103 9/17/10 2:28:43 AM
PUBLIC ! PRIVATE
104
SUPPLEMENTAL
PROJECT TITLE BINONGAN HYDROPOWER PROSPECT
DESCRIPTION
The sources are the Binongan and Tineg Rivers in Tineg, Abra. The scheme of
dam and transbasin tunnel. Estimated
MODE Private Initiated IMPLEMENTATION SCHEDULE
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
PPP Final.indd 104 9/17/10 2:28:44 AM
PUBLIC ! PRIVATE
105P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE ADDALAM HYDROPOWER PROSPECT
DESCRIPTION
The source is the Addalam River in Aglipay, Quirino. The scheme of development is
Corporation.
The local government of Quirino intends to develop this project as an Independent
Corporation of the Philippines.
MODE Private Initiated IMPLEMENTATION SCHEDULE
PROJECT COST PhP 5,175 Million SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
PPP Final.indd 105 9/17/10 2:28:44 AM
PUBLIC ! PRIVATE
106
SUPPLEMENTAL
PROJECT TITLE HUBO HYDROPOWER PROSPECT
DESCRIPTION
The source is the Hubo River in San Agustin,
The elevation at the catchment area ranges
The electricity generated can be sold to the grid through Surigao del Sur Electric
franchise area of 13 municipalities.
MODE Private Initiated IMPLEMENTATION SCHEDULE
PROJECT COST PhP 1,125.00 Million SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
PPP Final.indd 106 9/17/10 2:28:44 AM
PUBLIC ! PRIVATE
107P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE ASIGA RIVER HYDROPOWER PROSPECT
DESCRIPTION
The source is the Asiga River in Santiago, Agusan del Norte. A run-of-river type plant
MODE Private Initiated IMPLEMENTATION SCHEDULE
PROJECT COST PhP 1,271.25 Million SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
PPP Final.indd 107 9/17/10 2:28:45 AM
PUBLIC ! PRIVATE
108
SUPPLEMENTAL
PROJECT TITLE CATEEL E HYDROPOWER PROSPECT
DESCRIPTION
head is 113.20 meters.
MODE Private Initiated IMPLEMENTATION SCHEDULE
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
PPP Final.indd 108 9/17/10 2:28:45 AM
PUBLIC ! PRIVATE
109P U B L I C - P R I V A T E P A R T N E R S H I P P R O J E C T S
SUPPLEMENTAL
PROJECT TITLE TRAN AC RIVER HYDROPOWER PROSPECT
DESCRIPTION
concrete gravity dam. The estimated
meters and the drainage area is 721.4 square
MODE Private Initiated IMPLEMENTATION SCHEDULE
PROJECT COST PhP 3,442.50 Million SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
PPP Final.indd 109 9/17/10 2:28:45 AM
PUBLIC ! PRIVATE
110
SUPPLEMENTAL
PROJECT TITLE LAKE MAINIT RIVER HYDROPOWER PROSPECT
DESCRIPTION
The project is located in Jabonga, Agusan del
generation. The scheme of development is the reservoir itself. Estimated capacity is
MODE Private Initiated IMPLEMENTATION SCHEDULE
PROJECT COST SPONSORING AGENCY
PROJECT STATUS
CONTACT INFORMATION
PPP Final.indd 110 9/17/10 2:28:46 AM