Project of traditional Malay house

Post on 09-Aug-2015

356 Views

Category:

Engineering

7 Downloads

Preview:

Click to see full reader

Transcript

PREPARED BY:

WOODTAKER ENTERPRISE

PREPARED FOR :

TRADITIONAL MALAY HOUSE ‘s

ARCHITECTURAL DESIGN, DIMENSION &

CONNECTION

MADAM RAFIZAH BINTI NORDIN SIR FAREH BIN MAJID

PROJECT BRIEF• LOCATION:

• Jalan Kota Lama Kiri, Kuala Kangsar, Perak.

• CONCEPT:

• Perak’s House ( Rumah Kutai )

• MATERIAL USE:

• Mostly CENGAL’s Timber HERE

OVERALL MEASUREMENT OF THE HOUSE

• AREA : 32480 x 11440 mm

• HIGH : 7665 mm

• CONCRETE FOOTING : 400 x 435 mm

• TIMBER COLUMN : 180 x 180 mm

• TIMBER STAIR : Thread: 205 mm & Riser: 220 mm

: Material : Timber & Concrete

• ROOF:- TRUSSES & ROOFING SHEET

• KING POST : 50 x 1200 mm

• RAFTER : 50 x 100 mm

• CORRUGATED ZINC : 15 mm thickness

PROJECT DETAIL

RISER

THREAD

HEIGHT FROM GROUND LEVEL TO

FLOOR LEVEL

COLUMN

FOOTING

GAP BETWEEN COLUMN

BAMBOO WOVEN WALL

WINDOW OPENING:

DOUBLE OPENING OUT SASH WINDOW

CLOSE STRING CLOSE TREAD

TIMBER COLUMN

CONCRETE FOOTING

FLOOR BEAM

FLOOR JOIST

FLOOR BOARD

FLOOR BEAM

TIMBER COLUMN

STRUCTURAL QUANTITY

• CONCRETE FOOTING : 41 UNIT

• TIMBER COLUMN : 41 UNIT

• FLOOR BOARD : 425 UNIT

• ROOF :-

• RAFTER : 115 UNIT

• KING POST : 14 UNIT

• STAIR : 3 UNIT ( TIMBER )

1 UNIT ( CONCRETE )

PROJECT DETAIL

DRAWING

FLOOR PLAN

LIVING ROOMKITCHEN

RUMAH IBU PELANTAR

SERAMBI

KELEK ANAK

BATH ROOM

MAIN SPACES : FLOOR PLAN

ROOF PLAN

DRAWING

HIP ROOFGABLE ROOF

HIP ROOFFLAT ROOF

TYPE OF ROOF: ROOF PLAN

FRONT ELEVATIONBAMBOO WOVEN

WALLVERTICAL WEATHER

BOARDING

CONCRETE WALL

BAMBOO WOVEN WALL

DOUBLE OPENING OUT SASH WINDOW

VERTICAL WEATHER BOARDING

REAR ELEVATION

VERTICAL WEATHER BOARDING

HORIZONTAL WEATHER BOARDING

AIR VENTILATION TIMBER FIXED LOURVED HORIZONTAL WEATHER

BOARDING

LEFT ELEVATION

BAMBOO WOVEN WALL

VERTICAL WEATHER BOARDING

HORIZONTAL WEATHER BOARDING

DOUBLE OPENING OUT SASH WINDOW BAMBOO WOVEN WALL

RIGHT ELEVATIONBAMBOO WOVEN

WALL

VERTICAL WEATHER BOARDING

HORIZONTAL WEATHER BOARDING

BAMBOO WOVEN WALL

DOUBLE OPENING OUT SASH WINDOW

VERTICAL WEATHER BOARDING

BAMBOO WOVEN WALLVERTICAL WEATHER

BOARDING

HORIZONTAL WEATHER BOARDING

LIST OF FINISHES

DRAWING

FOOTING TO COLUMN

CONNECTION

COLUMN

FOOTING

STEEL ROD

FOOTING TO COLUMN

DRAWING

COLUMN TOBEAM

CONNECTION

COLUMN TO BEAM

COLUMN

BEAMTIMBER

WEDGES

DRAWING

BEAMTO

FLOOR JOIST

CONNECTION

DRAWING

STAIRCASE -String to Beam

CONNECTION

DRAWING

STAIRCASE -Tread to String

CONNECTION

• As a conclusion, we had learned and gained lots of

experience and knowledge during completing this

research. We knew how to identify the type of

connection used at the house, the materials used

and also type of finishes used.

• We had learned lots about the uniqueness of the

architectures of Traditional Malay House which is a

heritage that we should be proud of and should

preserve it for our future and also for our future

generations.

CONCLUSION

~ THANK YOU ~

Q & A

top related