Project Management in Team Software Projects The primary challenge of project management is to achieve all of the goals of the project charter while adhering.
Post on 28-Mar-2015
215 Views
Preview:
Transcript
Project Management in Team Software Projects
“The primary challenge of project management is to achieve all of the
goals of the project charter while adhering to the four classic project
constraints – scope, time, cost, quality”
Introduction
Leeds Source-IT
Version Control for Software Development
Infrastructure for Agile Project Management
Group Project Management
Leeds Source-IT
“Leeds Source-IT is a consultancy service staffed by high calibre Computing student programmers and managed by experienced staff. We undertake self contained projects on
a fixed price basis. All projects are tightly specified up front and undertaken using Agile Programming
techniques, monitored on-line with dedicated project management software and client sign off stages”
Version Control for Software Development
Using Subversion (SVN)
Making Changes
Deleting Files
Managing Conflicts
Retrieving from SVN
Initial check out of an existing project. The following command will check out a working copy of an existing project:
svn checkout <repository URI>
This will check out the project into the current directory. A particular revision can also be specified with “revision”
number. ‘checkout’ can also be ‘co’.
You are now ready to work using SVN. Subsequent commands require entry from the root of the checked out project directory.
Notifying Subversion of local modifications
Adding to SVN
Modifications to existing files will be automatically detected by Subversion and included in future commits (and updates).
Adds file to Subversion (to be included in the next commit). If file is a directory, file is added recursively, including all subdirectories and files.
svn add <file>
commit your changes now.
Deleting to SVN
Subversion must be notified of changes to the directory structure including notifications of additions, deletions, copies and moves:
svn delete <file>
Deletes file from the working copy and informs Subversion to delete the file from the repository at the next commit
commit your changes now.
Pushing Changes to SVN
To share changes made to the local copy with other developers, the changes must be uploaded to the central repository:svn commit [-m “Explanation of changes”]
Wait for other users to commit their files.
Pushing Changes to SVN II
Updating the local copy with the latest changes in the repository. To update a local copy:
svn update
This command fetches the HEAD version of each file from the repository and lists each file with a prepended flag specifying the state of the file in relation to the current working copy.
Flag Description
Reference: c/files/documents/15/177/svn-ref.ps
Flag Description
U The file has been updated with changes fro the server.
A The file or directory has been added
D The file or directory has been deleted
R The file or directory has been replaced (an existing file was deleted, then a new file of the same name was created)
G The file has been changed locally and remotely, but the changes did not conflict and have been automatically merged by subversion.
C The file conflicts with changes from the server.
Managing Conflicting Changes
Subversion will merge multiple changes to the project so that subsequent checkout commands will retrieve the latest version of each file in the repository. What happens if a file has been modified by multiple
users since the last checkout/commit cycle?
Subversion cannot know which version is correct informs the user there is a conflict prevent further changes until this conflict is resolved Conflict needs to be resolved manually Usually this will require a discussion between the
authors of the changes. The file can then be edited to the correct state.
Managing Conflict II
Once a conflict has been resolved, Subversion must be informed of this resolution before the working copy is allowed to be committed
svn resolved filename
Marks the conflict on filename as resolved. The file can now be committed to the repository. Perform these steps again, so your partner can resolve a conflict.
Managing Conflict Task
In groups discuss the following questions:
1. Who decides which changes are kept and which is deleted?2. What impact do you see during code development?3. What mechanisms would you put in place to ensure the correct
decisions are made?4. What are the different scenarios causing conflict (consider
different orders of checkout, update, resolve and commit)
SVNFile AUser 3
File AUser 1
File AUser 2
Tools and Infrastructure of Software Development
This section of the workshop demonstrates how to set up the Eclipse IDE for use with Leeds
Source-IT infrastructure.
Installing an Eclipse Subversion plug-in
Two Eclipse plug-ins exist for Subversion: Subclipse from the original Subversion
developers, and Subversive, from the Eclipse foundation.
Both offer the same functionality and are presented in a similar way.
This workshop discusses installing Subversive, but the steps are similar if your prefer Subclipse.
Installing Subversive
In Eclipse, navigate to: Help | Software Updates...
On the panel that appears, click the Add Site... button on the right and enter the following URL in the location field that is displayed:
http://www.polarion.org/projects/subversive/download/eclipse/2.0/update-site/
Select the following: Subversive SVN Connectors SVN Team Provider SVN Team Provider Localization SVNKit (either version)
Then click the Install... button.
Checking Out an Existing Project
To check out an existing project:File | New > Project...
In the displayed dialog select SVN | Projects from SVN
A new dialog will be displayed containing existing SVN repositories that Eclipse is aware of. Select a repository if it in the list, otherwise select the ‘Create a new repository location’ and click next. If a new repository is selected, enter your username and password and enter the URL to retrieve the SVN
Each project will be running its own SVN and you will be provided with the correct URL to access the SVN for a project
A list of directories will be displayed (corresponding to available projects if a project name was not specified in the URL). Select the appropriate directory and click Finish to check out the project into an Eclipse project of the same name (Next will allow this default name to be changed).
Working with a Shared Project
Eclipse greatly simplifies using Subversion when compared to the command line approach.
To update or commit a project right click the project name in the Project Explorer view and choose Team | Commit... to commit changes (and a commit message) Team | Update to get the latest changes. Team | Synchronise with Repository does a commit and
shows any conflicts. Double clicking the conflicts opens an editor displaying the local
copy and the latest repository copy side by side Once all conflicts have been resolved, the project will need to be
recommitted (conflicts prevent the first commit from completing).
As well as easing the conflict resolution task, Subversive handles changes to the directory structure by automatically performing the correct svn command for moves, deletes and copies.
Introduction to Mylyn
Mylyn extends the Eclipse SDK with sophisticated mechanisms for keeping track of tasks. A task is any unit of work that you want to recall or share with
others, such as a user-reported bug or a note to yourself about improving a feature.
Mylyn lets you store tasks locally in your workspace or work with tasks stored in one or more task repositories.
Leeds Source-IT uses Redmine as a task repository and to coordinate all aspects of project management. To connect to the Leeds Source-IT task repository, you must
have installed a Mylyn connector for a web based repository.
Installing Mylyn
To install Mylyn for your version of Eclipse, use the Eclipse Update Manager:Help > Software Updates > Find and install > Search for new features to install
The Mylyn web connector is currently in the Eclipse incubator, so will need to be added to Eclipse’ list of sites to search for updates. Click on Add Site and enter the following URL:
http://download.eclipse.org/tools/mylyn/update/incubator
Click OK
Now select the Mylyn Connector: Web Templates (Advanced) and click on Install.
Connecting Mylyn to a Redmine Task Repository
Open the task repository view in Eclipse:Window > Show View... > Other...
The select Task Repositories under the Mylyn folder and click OK. In the Task Repositories window, right click and select Add Task
Repository. In the dialog, select Web Template (Advanced) and click Next.
For the server, enter the following URL, id, passwd: http://sourceit.leeds.ac.uk and provide an appropriate label. Enter your user id and password and click the Advanced Configuration
arrow. Enter the following:
Task URL: ${serverUrl}/issues/show/New Task URL: ${serverUrl}/projects/<projectName>/issues/newQuery Request URL: ${serverUrl}/issues [GET]Query Pattern: <td class="subject">.*?<a
href="/<projectName>/issues/show/(\d+)">(.+?)</a></td>Login Request URL: ${serverUrl}/login?username=${userId}&password=$
{password} [POST]
Click Finish
Group Project Management
Leeds Source-IT Group Project Management
What is Project Management? Sequence of tasks Consumes resources Achieves an objective Results in something new
Golden Rules of Project Success Develop a comprehensive, realistic plan and keep it up-to-date Gain consensus on project outcomes Make reasonable resource requirements Build the best team you can and take care of them Keep the stakeholders informed Be willing to change or to try new things
The Source-IT infrastructure provides all the necessary tools available to achieve these points if used correctly.
Project Members need to keep the project information current
Project Stages
Contract Set-up Phase (LSIT managers) liaise with clients to understand their requirements
and agree the Specification. Price for the work will be derived from this, based on the agreed
Skills List and estimated times. Hourly rates or a task based rate will be agreed and formalised
within the Client Contract. We will use standard templates provided by University of Leeds
Consultancy Ltd (ULCL).
Initiate Plan Implement CloseSet goals and objectives Define Project Scope Obtain resources
Identify expectations Identify tasks Lead team
Appoint project manager Sequence Tasks Maintain communication Shut down operations
Select team members Define resource needs Evaluate change requests Disband team
Conduct post-project review
Prepare final deliverables
Software Requirements Specification (SRS)
Well-designed, well-written SRS accomplishes four major goals: 1. It provides feedback to the customer.
An SRS is the customer’s assurance that the development organization understands the issues or problems to be solved and the software behaviour necessary to address those problems.
SRS should be written in natural language, in an unambiguous manner that may also include charts, tables, data flow diagrams, decision tables, etc.
2. It decomposes the problem into component parts. The simple act of writing down software requirements in a well-designed format
organizes information, places borders around the problem, solidifies ideas, and helps break down the problem into its component parts in an orderly fashion.
3. It serves as an input to the design specification. SRS serves as the parent document to subsequent documents, such as the software
design specification and statement of work. SRS must contain sufficient detail in the functional system requirements so that a
design solution can be devised.
4. It serves as a product validation check. SRS also serves as the parent document for testing and validation strategies that
will be applied to the requirements for verification.
SRS – IEEE Standard 830-1998
Adaptation and Extension of the Standard1. Introduction 1.1 Purpose 1.2 Document conventions 1.3 Intended audience 1.4 Additional information 1.5 Contact information/SRS team members 1.6 References
2. Overall Description 2.1 Product perspective 2.2 Product functions 2.3 User classes and characteristics 2.4 Operating environment 2.5 User environment 2.6 Design/implementation constraints 2.7 Assumptions and dependencies
3. External Interface Requirements 3.1 User interfaces 3.2 Hardware interfaces 3.3 Software interfaces 3.4 Communication protocols and interfaces
4. System Features 4.1 System feature A 4.1.1 Description and priority 4.1.2 Action/result 4.1.3 Functional requirements 4.2 System feature B
5. Other Nonfunctional Requirements 5.1 Performance requirements 5.2 Safety requirements 5.3 Security requirements 5.4 Software quality attributes 5.5 Project documentation 5.6 User documentation
6. Other Requirements
Appendix A: Terminology/Glossary/Definitions listAppendix B: To be determined
Specification Task
Sort yourself into groups and complete the following
specifications and requirements.
Specifications: Create a picture with geometrical shapes
of various colours. The picture will have a red star, a blue circle and a green
triangle not overlapping with two diagonal black lines crossing at the
centre.
Requirements:1. Diagonal lines 1.1 lines are black and straight 1.2 lines are drawn to intersect in the
centre of the page 1.3 First line is from the top left (below the
corner) to bottom right (above the corner) 1.4 Second line is from top right corner to
bottom right corner
2. Red star 2.1 Start is red and colour filled 2.2 Star is a six pointed star 2.3 Star is positioned on the upper right
section of the page 2.4 Star is small in size3. Green triangle 3.1 Triangle is green bordered with no fill 3.2 Triangle is positioned on the top left
below the line from top left to bottom right 3.3 Triangle is large in size4. Blue circle 4.1 Circle is blue with no fill 4.2 Circle is position at the bottom of the
page 4.3 Circle is not touching the black lines 4.4 Circle is medium in size
Draw the picture to the specification and requirements.
Specification Task II
Discuss any differences in the image and the specification. How does it differ? What specifications needed to be added to make it an
exact replica.
Question: What impact would differences here have on the
development of software?
Issues: Features, Documents and Bugs
Using the Source-IT infrastructure and online software for project management (Redmine). Issues are used to define features, documents
and bugs needed for development and new versioning.
Issues == Requirements == Features
Identifying and Linking Requirements to Source
Requirements (or issues in Source-IT) for development require the following fields:
Requirement Number Unique IdentificaitonRequirement Type Type as defined by the project and
Source-ITSpecification Numbers To map the requirement to the client
specificationDescription One sentence statement of the
requirementOriginator Who created the requirementFit Criterion The measurement of the requirement
to test is the solution matches the requirement
Priority Rating of the customer valueSupporting Material Pointers to documents that explain
this document (probably the specification document)
History Creation, changes, deletions etc.
In the Source-IT infrastructure, the requirements are added as Issues labeled Features within the Software Application. A unique ID is already allocated. Fields within the application.
Low Normal High Urgent Immediate
Redmine and Requirments
Specification for Milestone Requirements WhoNew Issues/Feature set in system Client / Manager / Consultant
Assigned Assigns issue to consultant Manager / ConsultantResolved Issue status as completed Consultant
Feedback Manager / Consultant
Closed / Rejected Manager / Consultant
Need to be mapped to Source-IT specifications Code committed to SVN and revision number added. Code passes all unit tests
Issue requires acceptance testing from client
All issues related to the milestone are completed. Issue titled “Feedback” created and assigned �to client and manager contacts client.
Issue status set as completed. If rejected, can be reopened or new issue/feature set to pass
Issue “feedback” closed by client. �Client required to sign of Milestone as “accepted” �
During the team kick off meeting for a project. Clients, Source-IT management and consultants will discuss and set the specification requirements to create a Source-IT requirements specification document (technical document) to be signed off by the client and management. Each specification will have a unique id and allocated to a milestone agreed by the kick-off team and setup as an issue/feature within the Source-IT infrastructure. The above table specifies the process to create, implement and sign off a specification.
Penny Queue Exercise: Waterfall and Agile
This simple simulation exercise helps people to understand the efficiency that can come from moving away from a waterfall or large batch process. The exercise can be done with 20 pennies, 5 people and a clock with a second hand.
The exercise simulates processing work in the form of flipping pennies from heads to tails and back. Four people in the Team sit at a table or other hard surface in a line beside each other. The surface must allow for easily sliding the pennies. The fifth person, the Manager, starts the process and times it.
Penny Queue Exercise: Waterfall and Agile II
First Pass - Waterfall Large Batch1. The Manager gives all the pennies to the first person in the
Team and notes the start time. The pennies should be in a big jumble.
2. The first Team member chooses a side (heads or tails) and flips all the pennies onto that side.
3. The person with the pennies passes the whole pile of pennies to the next person. That person then flips all the pennies to the other side.
4. Repeat step three until the last person on the Team has flipped them.
5. The manager notes how long this took.
Penny Queue Exercise: Waterfall and Agile III
Second Pass - Waterfall Small Batch1. The Manager gives all the pennies to the first person in the
Team and notes the start time. The pennies should be in a big jumble.
2. The first Team member chooses a side (heads or tails) and flips all the pennies onto that side. As each penny is flipped, the Team member passes it along to the next person.
3. Each person flips their pennies as quickly as possible and immediately passes them on to next person.
4. Do this until they are all flipped.
5. The manager notes how long it took for the first penny to go through all four Team members, and how long it took for all of them to finish.
Penny Queue Exercise: Waterfall and Agile IV
Third Pass - Parallel Small Batch1. All the pennies are in a random jumble in the middle of the
table.
2. One Team member calls heads or tails and the manager notes the start time.
3. Each person grabs a penny at a time from the pile.
4. All working at the same time as quickly as possible, each person flips the pennies first so they are all the same as the original call if needed, and then three more times
5. As each penny is finished 3 or 4 flips (as appropriate) it is pushed into a separate done pile in the middle of the table.
6. The Manager records the time for the first penny to be put into the done pile and for all of them to be completed.
Milestones
Milestones are arranged by Leeds Source-IT managers, you (the project team) and the clients.
Develop An Overall Model - goal is to identify and understand the fundamentals of the domain that your system is addressing Build Features List, grouping them into related sets and
Subject areas. These first two steps map to the initial envisioning effort of AMDD .
Plan By Feature, the end result being a development, the identification of class owners (more on this in a minute), and the identification of feature set owners.
Design By Feature, design feature Build By Feature, complete client values function
Milestones II
The majority of the effort on an FDD project, roughly 75%, is comprised of the fourth and fifth steps Design By Feature and Build By Feature. These two activities are exactly what you’d expect, they include tasks such as detailed modeling, programming, testing, and packaging of the system.
FDD also defines a collection of supporting roles, including: Domain Manager; Release Manager; Language Guru; Build Engineer; Toolsmith; System Administrator; Tester; Deployer; Technical Writer
Milestone and Features Allocation Task
Set yourself into groups of 5 (appoximately).
From a set of tasks handed out, sort the task into a features list allocate who will do which task. Finish the tasks and write down your results for X.
Question:1.What were your milestones?2.What problems did you encounter?3.Who ensures the issues and features have passed to
close a milestone?
Discussion adding requirement from tasks into Redmine. Think about allocation, completion and testing
Testing
“Software testing is an empirical investigation conducted to provide information”
Finding Faults Early
It is commonly believed that the earlier a defect is found the cheaper it is to fix it.
Time DetectedRequirements Architecture Construction System Test Post-Release
1 3 5–10 10 10-100– 1 10 15 25-100– – 1 10 10-25
Testing Methods
Specification Based Testing aims to test the functionality according to the
requirements. (requires thorough test cases to be provided to the tester who then can simply verify that for a given input, the output value or behavior)
Black Box Testing treats the software as a black-box without any knowledge
of internal implementation. methods include: equivalence partitioning, boundary value analysis, all-pairs
testing, fuzz testing, model-based testing, traceability matrix, exploratory testing, specification based testing, etc.
Testing Methods II
White Box Testing when the tester has access to the internal data structures
and algorithms (and the code that implement these)
Grey Box Testing involves having access to internal data structures and
algorithms for designing test cases, but testing at the user, or black-box level.
Non Functional Software Testing
Special methods exist to test non-functional aspects of software.
Performance testing checks to see if the software can handle large quantities of data or users. Generally referred to as software scalability.
Usability testing is needed to check if the user interface is easy to use and understand.
Security testing is essential for software which processes confidential data and to prevent system intrusion by hackers.
Internationalization and localization is needed to test these aspects of software, for which a pseudolocalization method can be used.
Source-IT Project Feature Process for a ConsultantTask SVN Redmine
Allocated feature
Commits test code Logs time as Activity Testing
Implements code
Test feature Update – log results in notes
Commits test code
Checkouts code from the project
Update – set “Status” and “Assigned to”
Implements test code for TDD
Logs time as Design / Development
Submit completed tested code
Update – log revision number in notes; update “Status”
Source-IT Project Milestone Process for a Consultant
Task ActionAllocated Milestone Allocated by Management and the project team
Commits test code
Reports results in Redmine
Create deliverable
Client sign off Work with management for client sign off
Checks and runs test code for features
Informs team members of issues and problems; sets new bugs and features to fix problem
Package code for deliverable, tag revision number in the SVN
Source-IT Project Finalisation
Once the project is internally signed off, it will be presented to the Client who will externally sign off. Note that this may be a staged process, depending on
the contract, as Clients may wish to sign off each part of the work (see milestones).
Once the Client has fully approved the work, they will be asked to sign a formal written Acceptance Form and the project will be terminated.
Financial payments and invoicing will be carried out by ULCL (including debt chasing if necessary).
Risk Assessment for Student Consultants
1. Students failing to complete work on time (for instance due to abilities, illness)
Careful recruitment and selection Clear guidance and briefing of terms of work Support in the case of lack of skills Students required to file work at least weekly, so that at most one week’s
work (ie. 5 hours) will be lost Students paid only on satisfactory completion of work
2. Students unable to do work and withdrawing from all or part of a project As (1).
Work allocated to another student asap. Client advised and extra time requested if necessary.
3. Students making errors in work Test plan to be part of each project Students check each others’ work Weekly monitoring
Risk Assessment for Student Consultants II
4. Clients dissatisfied Agree very tight specification, to form part of a signed agreement Clients involved in sign off at each stage of process
5. Clients refusing to pay Refer to ULCL for standard debt chasing procedures
6. Clients taking us to court Refer to ULCL
7. Clients not providing sufficient support to process (eg. not attending project management meetings or providing details for specification)
Support to project management procedures part of contract with client They need to agree either decisions made without them, or project delay.
Risk Assessment for Student Consultants III
8. Hardware failures (particularly on student computers) Appropriate guidance on backing up Encourage students to use SoC facilities including SVN Provide 1-2 LSIT machines in dedicated LSIT office
9. Software problems - delays due to need to install libraries or plug-ins for specific projects
Support asked to give priority to LSIT when there are deadlines Investigate software requirements as part of specification and start up
process
10 Not enough work coming in Students only paid if work available. Some costs of pilot phase could be covered by start up funding
11. Too much work coming in Manage client expectations Look for appropriate partners who we could pass work to in busy times Consider running a modified scheme based on vacation working
And that’s it!
Homework
Home work task for accepted Consultants
Familiarise yourself with Redmine http://sourceit.comp.leeds.ac.uk/ Other sandbox management applications for Trac; Bugzilla
etc. (search the web)
Skill: Please complete the Skills section in Redmine when you have an username
PDP: Please think what you wish to obtain from Source-IT (other than money)
Select the categories and during your time on Source-IT add examples on work you are doing.
If you wish to add any categories to the PDP, please contact a member of management
Any Questions????
Further Information
Literature Baars, Wouter (2006). Project Management Handbook (open
source), version 1.1, Edita-KNAW.
External Links: The Project Management Institute IPMA - The International Project Management Association The Australian Institute of Project Management SVN, subversion.tigris.org/files/documents/15/177/svn-ref.ps
Search the Web Prince 2; Agile; SVN; Eclipse, etc...