Presentation of UFAB. Agenda A contract manufacture within these areas of expertise 13 000 Hours 28 000 Hours35 000 Hours48 000 Hours.

Post on 29-Mar-2015

214 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

Transcript

Presentation of UFAB

Agenda

A contract manufacture within these areas of expertise

13 000 Hours 28 000 Hours 35 000 Hours 48 000 Hours

The Mattsson group

• Founded: 1961• Turnover: 35 MEUR• Employees: 200• Operates in:

• Uddevalla• Gothenburg• Säffle• Shanghai

Presentation overview - references

Siemens

• Machining• Welding• Heat treatment• Advanced

manufacturing

National Oilwell Varco

• Subsea• Offshore• Marine

GE Healthcare

• High volume production

• Flexible production• Medicine• Lean production

TT3

• Complete production• Product testing• Full scale testing

before delivery

GKN

• Project team• Communication• Prototype• Engineering• Competence• CAD• Simplicity

Presentation overview – Our way of work

Our way of work MD

Joacim Johansson

Sales

Packaging

Medical

Energy

Manufacturing

Engineering

Mechanical

Automation

Documentation

Mechanical

Automation

Documentation

Mechanical

Automation

Documentation

Mechanical

Automation

Documentation

Logistic

Purchasing

Supplier Quality

Purchasing

Supplier Quality

Purchasing

Supplier Quality

Purchasing

Supplier Quality

Production

Technique

In House Quality

Improvements

Technique

In House Quality

Improvements

Technique

In House Quality

Improvements

Technique

In House Quality

Improvements

QA System

HSE

Management Sys.

Customer Quality

Management Sys.

Customer Quality

Management Sys.

Customer Quality

Management Sys.

Customer Quality

UFAB and the world

Our factory in Uddevalla

• Development and Assembly

• High technical processes

• LEAN production (Cost reduction)

Our factory in Shanghai

• Manufacturing• Milling, turning &

welding• 2 shift operation• Long purchasing

experience

Presentation overview – Capacity

Capacity

13 000 Hours 28 000 Hours 35 000 Hours 48 000 Hours

Capacity – Construction 13 000 hours

• DFM Design For Manufacturing

• DFA Design For Assembly

• ProEngineer, Inventor, SolidWorks, Frame Maker, ELCAD

Capacity – Welding 28 000 hours

• 5 000 m²• License • Stainless steel• Low volume / High

volume

Capacity – Machining 35 000 hours

• 2 100 m²• Low volume – Complex• Machine parts

Capacity – Assembly 48 000 hour

• 5 500 m²• Europe • China

Presentation overview – Finish

Together we´re stronger

Customer references

What can we do for you?

top related