Transcript
Detailed Kickoff Presentation for ICT Assessment at CRPF19TH JUN 2013
Placing the Agenda
• Document Scope
• Project Team & Governance
• Potential Benefits to CRPF from the Project
• Project Plan & Methodology
• Questionnaire & Expectations from CRPF Branches
• Immediate Next Steps
2Copyright © 2013 Accenture. All rights reserved.
Document Scope
• Covers details on the ICT assessment of the CRPF.
• CRPF - Armed Force of the Union of India - Assists the State/Union Territories in Police operations to maintain law and order.
• Elaborates current ICT infrastructure; ICT applications, ICT policies, ICT organization structure at CRPF
• Description of challenges faced across various related domains.
3Copyright © 2013 Accenture. All rights reserved. ICT = Information Communications & Technology
Broad areas at CRPF:
ICT Governance
and Organization
Process Automation
Technology Applications
and Infrastructure
ICT Assessment- Central Reserve Police Force (CRPF)
Three broad areas were covered:
1. Governance and Organization: Assessment of strength of the ICT organization. Allocation of roles and responsibilities, Specialization of skills Overall management strategy for designing organization-wide ICT roadmap for CRPF.
2. Processes: Assessment of robustness of the current processes. in the force in terms of Major functions, activities and roles assigned to associated departments/ units.
3. Applications and IT Infrastructure: Assessment of the maturity level of current ICT applications. Assessment of ICT infrastructure - To support the force’s ICT interventions.
4Copyright © 2013 Accenture. All rights reserved.
5Copyright © 2013 Accenture. All rights reserved.
CRPF IT Organization Structure
• CRPF has separate IT Wing to specifically handle ICT initiatives. It is done under the guidance of the DIG (IT) CRPF.
• <>Write one line about AC(IT) and DC(IT) about their role
• There are total 28 authorized positions in units and 19
Personnel from various Signal.
• Basic training for usage of computers is provided to force personnel in Central Training College (T&IT) on need basis through internal resources.
• Online training courses are not part of the system yet.
• CRPF has opened a new College of IT (CIT) in Bangalore to provide IT training to the officials.
ICT Policies at CRPF
6Copyright © 2013 Accenture. All rights reserved.
<> Put a nice title here. Like policies are done as per so and so… font shud be white
Cyber Security Policy Backup Policy Password Policy
Disaster Recovery & Business
Continuity Plan Policy
SELO Implementation
• M/s NIIT developed an integrated web based software. at the cost of 1.39 Crores in March 2000.
• Major Modules:
Personnel information system
Inventory management.
Finance and budgeting.
Operational management.
Mail/management and work flow environment .
Document management system.
7Copyright © 2013 Accenture. All rights reserved.
8Copyright © 2013 Accenture. All rights reserved.
Application Assessment
• Functionality
• Operational Security
• Access Modes/Service Channel
• Integration
• Scalability
• Overall Maturity of Application
Application is
assessed on the
following Key
parameters:
9Copyright © 2013 Accenture. All rights reserved.
Key Issues in ICT Applications Based on the Application Performance Assessment at CRPF, the following are the key findings:
• Need for an integrated Dashboard View for its senior leadership to provide real time single consolidated view to track various activities.
• Need for Application Intelligence which would able to generate intelligent information for enhanced decision making.
• Although SELO application has automated its major processes, some of the functions needs to be integrated and automated.
• Integration with other/ external modules like GIS, Operations Command Center, PAO etc.
• Increase Scalability of applications. The SELO application is currently accessible till group center and is to be made scalable to facilitate access to force personnel till battalion level.
• CRPF has implemented individual software and tools for analytics, security, monitoring. However there is a need for effective planning for utilization of these tools and software.
• Mobile gateway needs to be integrated with application so as to provide required information details to Jawans.
10Copyright © 2013 Accenture. All rights reserved.
Key Findings Parameter Assessment findings
IT Vision The planned SELO Phase II Project is being conceptualized in accordance with the IT Vision of the agency
Target Setting and Reporting CRPF has defined service levels to monitor IT infrastructure and application, however it requires manpower with right skills to monitor and track the target performance .
IT Leadership Some of the IT team members with technical knowledge to handle the IT operations have been deployed on ad-hoc (attached) basis from Signal branch.CRPF has displayed focus by deputing one officer for each of the major modules to ensure successful implementation.CRPF needs to strengthen the IT team to handle IT issues and operational support with regular training programs.
Documentation Need to have following additional policies: Authorization guidelines for accessing internal applications Authorization control for accessing IT infrastructure Information security Data Retention policy
B. Organization
11Copyright © 2013 Accenture. All rights reserved.
Parameter Assessment findings
Roles and Responsibilities • Although, there is a designated department (IT Wing)
defined for handling ICT initiatives, operations and services at CRPF, there is a need to strengthen the IT wing by adding more IT specialists.
• Key performance objectives needs to be defined for IT team to measure their performance
Skills and Training • Training has been provided based on their skills sets and
requirements on entry level training and basic usage of computers .
• Application Training on the modules is required for their daily operations activity so as to increase their overall efficiency.
• High-end specialized training for personnel who are IT-savvy with a technical background. This would cover training on data center management, database management, network integration, installation of network devices etc.
12Copyright © 2013 Accenture. All rights reserved.
SELO IMPLEMENTATION
* ICT = Information Communications & Technology
Project Plan & Methodology: Deliverable Timelines
13Copyright © 2013 Accenture. All rights reserved. * ICT = Information Communications & Technology
Months March April May June July August & Sept.
Milestones / Deliverables 1st - 15th 16th - 31st 1st - 15th 16th - 30th 1st - 15th 16th - 31st 1st - 15th 16th - 30th 1st - 15th 16th - 31st 1st - 15th 16 Aug. -
16 Sep.
Project Plan
Inception Report (D1)
Current State Assessment and Gap Analysis Report (D2)
BPR Report (D3)
ICT Strategy & Roadmap (D4)
Human Resource Augmentation Report (D5)
Implementation Plan (D6)
Project Start Date: 05th March 2013
= Deliverables
Suggested End Date: 05th September 2013
Project Plan & Methodology: Delivery Approach
14Copyright © 2013 Accenture. All rights reserved.
Coverage = HQs: 1 Force HQ, 4 Zonal HQs, 1 CoBRA HQ, andBranches of Directorate/HQs: ~ 25
Focus Segments: Directorate/Zonal HQ > Branch > Team >Post/Staff Role
Assess orgzn. & HR ProcessesAssess ICT* Assets and Practices
Assess Business Processes
Questionnaire data: Process 1
Assess orgzn. & HR ProcessesAssess ICT* Assets and Practices
Assess Business Processes
Questionnaire data: Process 2 . . . .. . . .
. . . .. . . .
For the agreed ~50no. of processes in CRPF
Outcomes
Inception Report
Current State Assessment Report
Gap Analysis Report
BPR Report
ICT Strategy & Roadmap
HR Augmentation Report
Our study would involve Questionnaire and process analysis–based capturing of the interplay between business process, HR procedure and ICT setup, at all mandated CRPF establishments.
* ICT = Information Communications & Technology
Project Plan & Methodology: Data Capture Areas
15Copyright © 2013 Accenture. All rights reserved.
HR Augmentation
Study
Capture business
processes
Process standardization
or decentralization
Capture ICT* landscape &
skills
ICT* Capacity building needs
Capture HR effort
Volume Time taken
Type
Our study would drill down in the following manner to capture data
* ICT = Information Communications & Technology
Project Plan & Methodology: AS-IS Capture & Validation
16Copyright © 2013 Accenture. All rights reserved.
Data captured through completed Questionnaires
+Accenture consultant will visit
select / required CRPF Branches / Locations to capture
“VARIANCE”
in Branches’ functioning/processes
Interviews / meetings with Zonal / Branch
Heads to validate the captured data
Project Plan & Methodology: ICT Landscape Review
17Copyright © 2013 Accenture. All rights reserved.
ICT* landscape
IT policy
IT usage
Assets
Asset life
cycle
People IT skills
ICT* capacity building
Our study would apply a 6-degree view to assess the ICT* Landscape
* ICT = Information Communications & Technology
Project Plan & Methodology: Work Study
18Copyright © 2013 Accenture. All rights reserved.
SDG / ADG / IG / DIG
SM / Insp. / SI (DAs)
Comdt. / DC / AC
Acr
oss
orga
niza
tiona
l lev
els
Work Study will be conducted across organization levels
Project Plan & Methodology: Process Re-design
Capturing step-by-step activities at each Branch/Cell level
Data Capture
• Identifying processes/ activities that increase workload and time
• Developing AS-IS Process maps
ProcessAS – IS
Revised Process Maps
Re-Design
19Copyright © 2013 Accenture. All rights reserved.
• Intervention of ICT to increase efficiency and reduce workload
• Standardization & streamlining of business process or decentralization
* ICT = Information Communications & Technology
Project Plan & Methodology: Staff Re-sizing Plan
20Copyright © 2013 Accenture. All rights reserved.
Captured HR efforts data
• Staff size, workload & efficiency (volume of work & time taken) at Branches/Directorate
• Roles & responsibilities of each individual post
Staff Re-sizing
• Addition or reallocation of posts, depending upon captured workload & efficiency
• Intervention of ICT enablers where work maybe efficiently completed through IT support
Branch ‘A’ (with say Staff strength = A)
After resizing, Strength = A+6
Branch ‘B’ (with say Staff strength = B)
After resizing, Strength = B+2
Measuring work’s:• Volume• Time effort• Type/nature
Work effort reasonably high
Staff Posts
Work effort significantly high+ | –
ILLUSTRATION
* ICT = Information Communications & Technology
Project Plan & Methodology: Implementation Plan
21Copyright © 2013 Accenture. All rights reserved.
Branch wise Staff headcount addition /
reduction
Inter/Intra Branch Staff re-allocation / re-
assignment
ICT future plan & assets to drive
business process re-engineering (BPR)
Business processes and workflows to be
re-designed to improve efficiency
a) Phase wise implementation of:
• Headcount addition
• ICT assets for BPR
b) Review of some of the Government of India / MHA recommended norms for Work study and Staff augmentation, for possible incorporation
Draft Staff Augmentation / Re-sizing Proposal submitted to MHA for review and approval
* ICT = Information Communications & Technology
ILLUSTRATIVE Implementation plan that would be submitted to MHA ILLUSTRATIVEPossible
Recommendations
Placing the Agenda
• Scope of Work
• Key Stakeholders & Responsibilities
• Project Team & Governance
• Potential Benefits to CRPF from the Project
• Project Plan & Methodology
• Questionnaire & Expectations from CRPF Branches
• Immediate Next Steps
22Copyright © 2013 Accenture. All rights reserved.
Questionnaire & Expectations from CRPF Branches (1/2)
23Copyright © 2013 Accenture. All rights reserved.
Draft Questionnaire document for discussionOrganization Processes Assessment – Diagnostic Questionnaire 1.1 Questionnaire Description Organization processes baseline (business process, workforce activities & load, ICT maturity, career progression). May, 2013 The purpose of this document is to capture the AS-IS data of the CRPF organizational staffing, key business processes & activities of Zonal HQ and CoBRA HQ Branches, deployed IT/ICT infrastructure landscape & skills and Support/Office Function staff’s career progression. Information is requested from individual Branches only, on separate Questionnaires. Please do not send separate Questionnaires for a sub-branch, or cell / wing. Thank you! Please provide the following general details about your Branch, in the table below.
Name
Designation/Rank
Name of Branch
CRPF Office Location
Branch Point of Contact’s (POC’s) Name
Branch POC’s Email
Branch POC’s Mobile No.
Date of Questionnaire Completion
Questionnaire & Expectations from CRPF Branches (2/2)
24Copyright © 2013 Accenture. All rights reserved.
• CRPF key stakeholders to provide feedback/suggest changes (if any) on the Questionnaire and the Consultants would revise and re-submit the final version within a week
• Questionnaire to be completed by CRPF within 7 days from receipt of the final version
• Questionnaire should be filled in and completed in the soft copy version itself
• The Questionnaire is required to be completed by each Branch at the Zonal and CoBRA HQs. Only one completed Questionnaire response must be sent per Branch at the HQ.
• Information must be provided in completeness, in the format requested (where applicable), and each Questionnaire should be validated by its respective Branch Heads (IGs/DIGs)
• Only approved/ validated Questionnaires must be emailed/ submitted
• For any queries or clarification on the Questionnaire, please contact Consultant on: vivek.a.singh@accenture or +91 99 536 11 990. Request you to please make calls only between 09h00 to 18h00. Thank you !
Placing the Agenda
• Scope of Work
• Key Stakeholders & Responsibilities
• Project Team & Governance
• Potential Benefits to CRPF from the Project
• Project Plan & Methodology
• Questionnaire & Expectations from CRPF Branches
• Immediate Next Steps
25Copyright © 2013 Accenture. All rights reserved.
Immediate Next Steps
26Copyright © 2013 Accenture. All rights reserved.
• Identification and nomination of CRPF Point of Contacts (POCs) for each Branch of Zonal and CoBRA HQs, to facilitate data capture during AS-IS Assessment phase
• After receipt of completed and verified Questionnaires, the planning of the logistics for Consultant visits to CRPF locations needs to be done
• Consultants would revise the current Project Plan based on timeline & tasking adjustments and submit the revised version as and when deemed necessary
27Copyright © 2013 Accenture. All rights reserved.
Thank You !
Q&A