BASIC LOGISTIC

Danni Hidayat

22 March 2014

“It’s easy to change the cash into inventory …… the challenge is to turn inventory back into Cash!”

- maximum efficiency -

Service

Turnover

“The Art of Leadership is going from Failure to Failure without Losing Enthusiasm”

Warehouse Lay Out – Indoor type 1 door – Tarakan (capacities 3000 line item)

Warehouse Lay Out – Indoor type 1 door– Samarinda Capacities 1500 line item

Warehouse Lay Out – Container – Berau Capacities 300 line item

STORAGE CALCULATION

tahunmgedungsewabeaxrDistributoamountStockareastorageLuas

//1)( 2

22 063.1

/200.1$1797.275.1$ m

mUSxUSareastorageLuas

Catatan :Misal harga sewa gudang = US$ 1.200 / m2

STORAGE AREA S/D 1000m2 1000 - 3000 m2 3000-… m2

- Small Storage 50% 40% 30%- Large Storage 30% 30% 30%- Floor Storage 15% 20% 25%- Outdoor Storage 5% 10% 15%

Jumlah 100% 100% 100%

Misalnya 1.063m2 maka yang dipakai:

• Small parts = 1.063 x 40% = 425 m2

• Large parts = 1.063 x 30% = 319 m2

• Floor partsArea = 1.063 x 20% = 213 m2

• Outdoor storage Area = 1.063 x 10% = 106 m2

TOTAL = 1.063 m2

Storaging System

Location System

New Standard :

A 1 A 1 0 M 2

Row 2Column 2Level / drawer MCabinet no. 10Aisle ALevel 1

LogicalAlphabetic first digit to cover more areasEasy to understand1 item 1 location (for drawers / bin)Support multilevel storage system

2

Area A

I found and believe that “Logistic is about 2 things; space of warehouse and speed of replenishment/ supplying stock within planned distribution.”

Distribution Control

MRP’s Schedule Chart

SAMARINDA

Anggana

Melak

Kota Bangun

Port

ETD : ?ETA : ?

ETD : ?ETA : ?

ETD : ?ETA : ?

ETD : ?ETA : ?

ETD : ?ETA : ?

FactFactNow days, we don’t have any regular transport’s schedule and delivery time.ProposedProposed• Pick up consolidation• Last cut off transfer schedule

NTN

Inventory Concept

Rup 6,798,324,940.78 Rup 279,118,924.81jika

DEADSTOCK

Dampak finansial yang berkaitan langsung dengan Asset Dampak finansial yang berkaitan langsung dengan Asset InventoriInventori

Stok yang ada di Gudang = Rp 19,191,770,931.84

EXHAUSTED

Rp 12,393,445,991.06Rp 12,114,327,066.25

Tapi, permasalahan yang berdampak besar adalah “SURPLUS”, karena sebelumnya tidak ada kontrol minimum dan maksimum suatu stok di setiap site dan di gudang Rapak Dalam

Dan jika kita bisa mengontrol stok yang berlebih itu dan effisiensi? Rp 1,587,669,744.44Rp 1,587,669,744.44

PT. Mitra Riau Pratama ( Offline DATA – Not For PT. Mitra Riau Pratama ( Offline DATA – Not For Shared)Shared)

Forecasting Taxonomyproper on end-user company/ such as fabricant, construction, exploration and or manufacturing company.

FORECASTING

CAUSAL

EXPONENTIALSMOOTHING

MOVINGAVERAGE

AVERAGE

SMOOTHING

REGRESSION

TIME SERIES

MODELQUALITATIVE

MODELQUALITATIVE