Preparing for an OHSAS18001:2007 Audit

AMRE20 April 2010

I Jooste Group Risk Manager – RSV (MSc OpsMan)

AMRE Presentation

HSE Achievements

RSV Achievements

• First EPCM in Africa to be OHSAS 18001:2007 Certificated

• End January 2010: One Million Fatality Free Man Shifts – Total RSV (Pty) Ltd

Our objective for RSV and our Clients is“ZERO HARM”

to people and the environment

• It is an international standard used by companies globally to measure their safety standards.

• Equivalent to the ISO 9001 and ISO 14001.

• Some companies integrate 3 Systems

What is OHSAS 18001:2007?RSV HSE

Every person needs to contribute to the system

RSV HSE

Pre-requisiteRSV HSE

Pre-requisite:

The Safety Management System to be audited,

must be in place for a minimum period of 3

months

RSV HSE OHSAS 18001:2007 Elements

• PLAN• DO • CHECK • ACT

RSV HSE

Injury Analyses

RSV HSE

Preparation process for OHSAS 18001:2007 certification audit

• Clarification and System alignment session between Auditing Body and Senior HSE Management

• Clarification and alignment session for site audit

Preparation

RSV HSE

Injury Analyses

RSV HSE How do we prepare for an OHSAS 18001:2007 certification audit?

1. Determine short comings within the HSE System

2. Inform people about the OHSAS18001:2007 Standard and audit process

3. Pre-audits4. Have a well established HSE Management

System

Preparation

RSV HSE

• By means of a Gap Analysis Audit (3rd

Party)

• Use GA Report and award actions

• Follow up on actions

Preparation

1. Determine short comings within the HSE System

RSV HSE 2. People’s knowledge about the OHSAS 18001:

2007 Standard

Preparation

• Identify and train key persons on the

OHSAS 18001:2007 standard

• Include the OHSAS 18001:2007 standard

in the Induction process

• Ensure continuous use of the HSE

Management System

RSV HSE Preparation

3. Pre- Audits

• Schedule and implement audit programme• Internal audits

• Peer review audits

• Compile action register and address

identified shortcomings

4. HSE Management System

RSV HSE

• Have a well established HSE Management System

• The Safety Management System to be audited to be in place for a minimum period of 3 months

RSV HSE MANAGEMENT SYSTEM

RSV HSE

ANY QUESTIONS?