Power Failure
XYZ Port FacilityMaritime Security Drill
Briefing for Controllers
date
Power Failure
Emergency Response –Contingencies
Power Failure
Drill D421
Power FailureScope• Date, time, location• Aim• Objectives• Desired outcomes• Controllers• Players• Materials• Scenario• Master Events List• Controller Tasks• Communications• Safety• Debrief
Power Failure
Drill number: X/XX
Date:
Start Time:
Location:
Estimated End Time:
Power Failure
Aim
To enhance the proficiency of port facility staff in responding to a power failure
Power Failure
Objectives
• Operations staff to switch on backup power within the time limit as specified in the PFSP
• Security staff to respond to power failure according to procedure in the PFSP.
Power Failure
Desired outcomes
Staff will be able to:• Switch on backup power quickly in the event of a main power failure.
• Respond appropriately to a power failure.
Power Failure
Control Team• Chief Controller: PFSO, Mr. AAA
• Controllers Chief Electrical Engineer – Mr. XXX Electrical Engineer – Mr. YYY
• Safety officer
Power Failure
Players
• Security staff on duty• Operations staff on duty
Power Failure
Materials• Selected lighting zone in the Port Facility .
Power Failure
ScenarioThere has been several blackouts in recent times. Staff have to be prepared to get the electrical supply available again quickly and to additional measures to ensure the security of the port facility is not compromised while electrical supply is not available.
Power Failure
Master Events ListS/N Time Event From To Means of
DeliveryExpected Response
Remarks
001 1930 All participants in position
002 1935 Drill commence
Chief Controller
All Walkie Talkie
None “Drill Start”
003 1955 Security lighting failed
Controller Security staff
Physically cut off power
Inform ops department, take actions to maintain security
004 2100 Drill completed
Chief Controller
All Walkie Talkie
Dispersal of personnel/ equipment
“Drill End”
005 2101 Restore main and emergency power supply
Chief Controller
All Restore all
services
Tested to be fully functional
006 2130 Hot Wash Chief Controller
All N/A
Power Failure
Controller Tasks• Select an area where both main and backup power can be isolated.
• Shut down the power at the appropriate time.
• Main and backup power to be restored at the end of the drill
Power Failure
Communications
• Mobile phone • Walkie-Talkie
Player – Ch YY Controllers – Ch ZZ
Power Failure
Drill Start The drill is to commence
Drill Suspend The drill is temporarily suspended
Drill Go The drill is to resume from where it was suspended
Drill Stop The drill is to be terminated (prematurely)
Drill End The drill is completed
Drill, Drill, Drill The message or statement that follows this preamble relates to the drill only, and is not to be confused with real activity
Code words
Power Failure
Safety• Physical safety of personnel is paramount• There is to be no physical contact between player and controllers acting as intruders, etc.• Security staff are not to use abusive language when talking to controllers acting as “intruders”• Do not neglect the safety of equipment
Power Failure
Debrief
• Location:
• Secretary:
• Attendance
Power Failure
Any questions ?
top related