Playbook
Pump & Motor Services
32
Insta
nt R
ep
lay
When it comes to the heart of your motor, you need reliability. This utility called on AREVA to do a fleetwide replacement of its stators. Why? The utility had already lost approximately $20M in reactor coolant pump (RCP) motor failures. Our stators reduce power consumption and are built for the life of the plant. And none of our 220+ RCP motors have ever experienced an electrical failure. The amount of revenue the utility has lost due to RCP motor failures since our stators were installed? Zero.
Replacement Play #1Stator Replacement - Fleetwide
Challenge: Stator aging Solution: Replacement statorBenefits: Improved reliability; reduced electrical losses
Before After
54
Challenge: Shaft damage Solution: GTAW weld buildup, nickel plateBenefits: Save cost and time over rotor replacement; restores critical fit
Insta
nt R
ep
lay
How important is it for a rotor shaft and flywheel to fit? Critical. During site-performed disassembly, this rotor shaft was damaged — affecting the critical fit between the rotor shaft and flywheel. An unstable fit creates the risk of pump vibration — which could lead to a plant shutdown. The solution? Manual welding, machining, nickel plating, and grinding. The fit was restored without the cost of replacing the rotor — or shutting down the plant.
Before After
Repair Play #2Rotor Shaft Repair
76
Insta
nt R
ep
lay
Two housings destroyed in service. No replacements available. Only 10 days left in the outage. Panic? No. The housings were expedited to the Pump & Motor Service Center (P&MSC) and precision machined and welded to the original specs (.001” tolerance) — and the outage was not even extended one day.
Repair Play #3RCP Seal Housing Repair
Challenge: Housings damaged Solution: Weld and machineBenefits: Reduced cost; quick response; no outage extension
Before After
98
Insta
nt R
ep
lay
Challenge: Stator wear & tear Solution: Stator rewindBenefits: Reduces operating temperature; reduces cost vs. new stator
Before After
Everything old can be new again. Putting in a brand new stator costs more money — and produces more contaminated waste — than remanufacturing your current stator. Our remanufacturing process reduces the operating temperatures of your stator — increasing insulation life and saving money on power consumption. And we increase the longevity of your stator over a standard industry-supplied rewind.
Repair Play #4Stator Rewind
1110
Insta
nt R
ep
lay
Challenge: Primary system leakage Solution: In-situ machiningBenefits: Restores to original specifications; eliminates leakage
Welding Machining
How low can we go? With our AREVA-designed shielded foreign material exclusion (FME) plug, we can provide a low-dose environment for our machinists while maintaining triple-seal protection against foreign material incursion into the primary system. When this plant had a leak through the pump to the casing joint in the primary system, we were able to fix it using our low-dose environment for in-situ machining. The result? No leakage. Original specs restored to the pump. And low dose.
Upgrades& Modifications
Play #5RCP Casing Machining
1312
Insta
nt R
ep
lay
Challenge: Shaft wear Solution: Replacement shaftBenefits: Reuse impeller; economical repair; less risk of RCP vibration
Modification Result
When you need to replace a shaft, it often means you need to replace the impeller, right? Not necessarily. You don’t want to replace the impeller when you already know how the old one will perform. With our match machining capabilities, we can match a new shaft to the old impeller — so when you start up your pump there are no surprises.
Play #6RCP Internals Shaft Replacement
Upgrades& Modifications
1514
Insta
nt R
ep
lay
Challenge: RCP seal failure Solution: Mobilized field techniciansBenefits: Rapid deployment; rapid repair; saves money
Before After
A plant is down with RCP seal failures. With no time to waste, an expert team of 14 AREVA technicians is mobilized and in containment within 24 hours of notification. And within merely four shifts, the seals were replaced — saving the customer from a lengthy forced outage and minimizing loss of revenue.
Play #7Emergency RCP Seal ReplacementField Service
1716
Insta
nt R
ep
lay
Challenge: Loose laminations Solution: Custom tool compresses coreBenefit: Avoids new rotor expense; restores rotor to original condition
Before After
Would you turn back time if you could? How about for your plant rotors? We can restore your rotor to its original operating condition without the addition of materials used as fillers. A “good as new” rotor saves money and man-hours by avoiding costly and time-consuming manual tack-weld repair.
Repair Play #8Rotor Compression
Maintenance & Refurbishment
1918
Insta
nt R
ep
lay
Challenge: Wear and tear Solution: Re-engineering and refurbishmentBenefits: Support all OEMs; designed, fabricated, and installed by AREVA
Before After
From the moment of start-up, this plant was plagued by an oil leak issue. Thirty-three years later, one new stator, a redesigned oil lift system and a brand new oil enclosure — designed, fabricated and installed by AREVA — and the leak was fixed. Top that off with a level one coating of safety-related paint performed at the P&MSC, and concerns about meeting Appendix R Fire Protection requirements — gone.
Play #9Main Coolant Pump Motor Refurb & Mod
Field Service
2120
Insta
nt R
ep
lay
Challenge: RCP vibration Solution: Vibration specialist deploymentBenefits: Direct on-station inspection; avoid unnecessary outage time
Pump vibration threatens to shut down the plant. Plant decides to replace RCP internals to solve the issue. Within eight hours, AREVA has a vibration specialist and pump advisor on site. The result? Inspection and vibration modeling pinpointed a problem with the RCP motor bearing. No pump internals replacements were needed and 15 days of forced outage time were saved.
Play #10On-Site Vibration Analysis
2322
Maintenance & RefurbishmentIn
sta
nt R
ep
lay
Challenge: Unusable spare parts Solution: Decon and repairBenefits: Refurbish to original specs; extensive cost savings
Before After
Even though this plant had RCP internal spare parts, they were unusable because of high contamination levels. After decontamination, an inspection revealed that only the shaft, radial bearing, bolting, impeller and coupling needed to be replaced. The RCP was repaired and reassembled, built to original design specs and ready for installation before the next outage. The rest of the spare parts were refurbished and re-used — a solution that was approximately 40% of the cost of a new pump.
Play #11RCP Decon and Refurb
2524
AREVA U.S. Pump & Motor ScheduleVisiting Teams: (equipment we service)
• Westinghouse • Reliance• Allis-Chalmers • Flowserve• General Electric • Sulzer• Siemens
RosterProducts•Motors•Pumps•Replacementparts
•Refurbishment•On-siterepairs•Replacementstators
Services•Shipping•Inspection•Statorrewind•Statortesting•Motortesting•Vibrationanalysis•Diagnostics
Solutions•Assetmanagement•Upgradedparts•Equipmentmodification
•Extendedwarranty
•Rotorcompression•Resistanceringreplacement
The
data
con
tain
ed h
erei
n ar
e so
lely
for y
our i
nfor
mat
ion
and
ar
e no
t to
be c
onst
rued
as
a w
arra
nty
or o
ther
con
tract
ual o
blig
atio
n.©
2010
AR
EVA
Inc.
All
righ
ts r
eser
ved.
A
NP
:U-3
30-V
1-10
-EN
G
AREVA supplies solutions for carbon-free power generation. Its expertise and know-how in this field are setting the standard, and its responsible development is anchored in a process of continuous improvement.
As the global nuclear industry leader, AREVA’s unique integrated offer to utilities covers every stage of the fuel cycle, nuclear reactor design and construction, and related services. The group is also expanding considerably in renewable energies – wind, solar, bioenergies, hydrogen and storage – to be one of the top three in this sector worldwide in 2012.
Every day, AREVA’s 48,000 employees cultivate the synergies between these two major carbon-free
offers, helping to supply safer, cleaner and more economical energy to the greatest number
of people.www.areva.com