2
Outline.
1. Background 32. Project Definition 4
2.1. Project Brief 4
2.2. Objectives 42.3. Requirements 52.3.1. Company 52.3.2. Headquarters 52.3.3. Equipment 82.3.4. Services 112.3.5. Labour force 132.3.6. Financials 13
2.4. Analyses 152.4.1. Market Analysis 15
A. SWOT analysis 15B. Promotion 16C. Clients 16D. Competition 17E. Conclusions 18
2.4.2. Risk Analysis 18A. Technical risks 19B. Financial Risks 19C. Legal Risks 20D. Staff related risks 20E. Other risks 20
2.4.3. Financial Analysis 21A. Preliminaries 21B. Indexes 21
3. Project Planning 223.1. PERT Analysis 223.2. Gantt Chart 233.3. Future Development 23
4. Conclusions 26
7/27/2019 photocopier feasibility study 56
3/27
Project Feasibility Study
3
1.Background.The aim of this project is to create a commercial centre offering students andother possible clients various paper services, such as copying and printing. Theproject arisen as a direct consequence of the lack of similar copy centres in thevicinity of two major universities. Such a situation is not new. Many locationsaround the city suffer from the absence of a performance copy centre (universitycampuses, financial, legal or administrative offices, a.s.o.), and such market
opportunity is addressed by this project.
The location of the centre was chosen in order to correspond to our spacerequirements and renting capabilities, and also to be situated in the proximity ofthe universities, in a high visibility area.
As any other projects, the constraints affecting us regard the financial, timeand quality aspects of the project. Since the time factor is of little importance, andwe are prepared to accept a somewhat lower quality (many pieces of equipmentwill be purchased second hand), the major constraint was the budget, as wedecided (based on the securities we could offer and the possibility ofreimbursement) to keep it at a maximum of 10.000 euros.
The activity will be targeted towards the student clientele and accordinglywe expect a high demand for services such as copying, printing, binding andscanning. As a consequence, the charges will be very low for these services, butgiven the high workload, we assume a good profit. We also expect clients fromother social categories, for services such as digital photo scanning and printing,identity services or text editing. For such orders the price will be higher, but stillunder the market average charge.
The competition in the region is quite low and we expect no majorhindrance in attracting customers, as the services we will offer are of higherquality and at a lower price. The productivity and the overall level ofprofessionalism are also emphasized.
7/27/2019 photocopier feasibility study 56
4/27
Project Feasibility Study
4
2. Project Definition.
2.1. Project Brief
Project title: NEXTPRINT Keywords: copy centre, paper services, imaging services, identity services. Overall objective: establishing a commercial centre offering copy, print and
binding services, mainly targeted towards students, along moreprofessional services such as photo editing and identity services.
Leaders and sponsors: Eugen Andreiadis, Andrei Iancu. Main sponsor: BERDthrough BCR
Duration: Total duration: 2.5 monthsProposed start date: 1 February 2005Required end date: 17 May 2005
Motivation: the addressing of a strong market opportunity in the lack of acopy centre at the specified location, coupled with a keen interest in officeequipment and technology.
Deliverables: reports, payment documents. Beneficiaries: targeted clients, NEXTPRINT company.
Strategy: keeping a very low price for the services offered and in the sametime maintaining a constant quality
Estimated cost: Initial estimated cost: 300.000.000 ROLMonthly operation costs: 55.500.000 ROL
Social and economical impact: the centre will not have significant influenceon the environment or the local community.
2.2. Objectives
The overall objective of the project is the establishment of a commercial centreoffering copy, print, binding and other related services to a student targetedclientele, along with more professional services such as photo editing or identityproducts for other clients, including . The objective will be reached by locating thecentre in the vicinity of two universities and a student campus, in a heavy trafficarea with a high visibility, and by fulfilling some other intermediary objectives,such as:
Keeping a very low price for student services, but at the same time Maintaining constant quality outputs and Maximising the equipment usage.
The end objective is the obtaining of profit, which will allow for:
Covering monthly expenses and
7/27/2019 photocopier feasibility study 56
5/27
Project Feasibility Study
5
Extending the equipment line and services.All these objectives can be synthesised in an organigram as shown in Figure 1.
2.3. Requirements
2.3.1. Company
This project implies the existence of the S.C. NEXTPRINT S.R.L. firm, having asobject of activity various paper and photo services, such as copying, printing and
scanning. The directors of the firm are Eugen Andreiadis and Andrei Iancu. Thiscompany will be further quoted as NEXTPRINT and is the legal entity throughwhich the activities, described in the present project, are run.
2.3.2. Headquarters
This subsection will discuss the details of the location (description, specifications,selection, principles of selection, local conditions, infrastructure, social-economicenvironment).
Considering the profile of the offered services, the location was selectedbased on the proximity of two universities (Dimitrie Cantemir Christian Universityand Nicolae Titulescu University). Next to the location there is also the Timpuri Noi
Figure 1. Organigram
7/27/2019 photocopier feasibility study 56
6/27
Project Feasibility Study
6
subway station and the intersection of four major avenues (Sincai Blvd., CaleaVacaresti, Splaiul Independentei and Nerva Traian Blvd.), providing heavy trafficand a high visibility.
Besides the fact that the centre is located in a residential area, an university
campus is also being built in the vicinity, which will provide additional labourforce and clientele.
The topography of the headquarters is illustrated in Fig. 2. The surface of thecentre will be of 20 square meters at a price of 10 euros/square meter monthlyrent. The total rent expense will be 200 euros/month.
Figure 2. Topography of the neighbouring area
The shops interior design style will be concentrated on functionality,productivity and efficiency, as shown in Figure 3. The costs for this operation areestimated at only 35.000.000 ROL, as we intend to purchase the furniture itemssecond hand. A detailed description of the furniture and its price is given in Table 1.
7/27/2019 photocopier feasibility study 56
7/27
Project Feasibility Study
7
Table 1. Workspace elements
Code Item Qty. Price (ROL/piece) Observations
A Chairs 2 1.500.000 For staff
B Chairs 2 1.000.000 For clients
C PC curvedworkbenches
2 6.500.000 For PCs.
D Counters 2 3.000.000 Storage and equipment suchas scanner and printer.
E Bookcases 2 1.000.000 For paper storage.
F Counter 1 4.000.000 For storage with lock. Thetop side is for clients: sorting.
G Curved counter 1 5.000.000 For supplies storage andequipment such as laminator,
trimmer etc.
H Tap 1 - For staff. Already installed.
Other expenses will cover the acquisition of various necessities such as lightbulbs, cleaning items (mop, bucket etc.), small carpets etc. (estimated cost:1.000.000 ROL).
Facilities such as sanitation (running water) and power (220V/50Hz) are also
provided.
Figure 3. Interior layout
7/27/2019 photocopier feasibility study 56
8/27
Project Feasibility Study
8
Social-economic environment is not important for this type of business, asthe services are quite affordable, appeal to a variety of persons and are notdiscriminatory in any circumstances. The centre will not have significant influenceon the environment and on the local community.
The area has a medium to low criminality. Nonetheless, for protection andsafety of the equipment, metal blinds will be installed (estimated price: 5.000.000ROL). The headquarters will also be protected by a police monitored alarm system.
The total cost of furnishing and other auxiliary items is approximated at41.000.000 ROL.
2.3.3. Equipment
Given the profile of the business, the equipment will consist of copiers, printers,PCs and other related equipment, which are described in Table 2.
Table 2. Technical Equipment
Equipment Model Technical Specifications Cost (ROL) Observations
Copier Minolta EP8010
81 ppm, A3/A4, sorter,duplex, large paper tray.
53.000.000 This professional copier isintended for the heavyduty workloads as can beseen from the technicalspecifications. Purchased
second hand.Copier MinoltaCF900
Digital, colour, A3/A4, 8ppm colour, 30 ppmcolour, PC interface.
60.000.000 This digital copier hasmultiple roles such ascolour printing, colourcopying and scanning (A3and A4). Purchasedsecond hand.
LaserPrinter
Minolta PP1300W
A4 monochrome,1200x1200, 16 ppm, 8 MBmemory, USB + parallel,48 MHz processor, 15.000pages/month, 150 pagefeeder.
7.000.000 The laser printer is anauxiliary piece ofequipment for printingmedium workloads, fromdigital medium.
InkjetPrinter
HPPhotoSmart7660
A4, photo, thermal inkjet,4800x1200 dpi, 12 ppmmonochrome, 15 ppmcolour, 16 MB, PCL3, USB +card reader (11 types),colour display, PhotoRETIV, 6 colours, 3000pages/month
6.400.000 The HP PhotoSmart isused for high qualitycolour prints from digitalcameras or other digitalmedia (CD-ROM, memorycards, scanned film etc.)as part of the digitalphoto service.
FilmScanner
UMAXPowerLook180
CCD, 1800 dpi, 42bit, USB,Adobe Photoshop LE
13.000.000 This device is used forscanning 35 mmnegatives and slides, aspart of the digital photo
service.Flatbedscanner
UMAXAstra 6700
CCD, A4, 2400 dpi, 48bit,USB 2.0, OCR
8.000.000 The flatbed scanner isused for scanning prints
7/27/2019 photocopier feasibility study 56
9/27
Project Feasibility Study
9
and text, as part of thedigital photo and textediting services.
PC Best Pentium 4, 2.4 GHz, 512DDR-RAM, 80 GB WesternDigital, CDRW Asus,
DVDROM Asus, mouse,keyboard, graphic tablet.
25.000.000 Because of the powerfulconfiguration, this PC isused for photo editing
and identity services.
PC SiemensScenic 600
Pentium III, 700 MHz, 512MB, 40 GB, CDRW, mouse,keyboard.
10.000.000 This PC is mainly used fortext editing, printing andtext and photo scanning.Purchased second hand.
Display SonyTrinitron
19, 1600x1200@70Hz, 0.24dot pitch, TCO 99
2 x4.000.000
This equipment is used inconfiguration with one ofthe PCs.
BindingMachine
Dahle75030
Capacity: 150 sheets,paper guide, built-inmargin control.
11.500.000 Heavy duty model withstraightforward effortlessoperation. Used for
bindings.ThermalBindingMachine
Attalus 200 200 pages capacity, built-in cover size guide,cooling tray.
5.000.000 Professional model usedfor thermal bindingdocuments with specialcovers.
Laminator AttalusNovo A3
A3 size, speed: 325mm/min, protectionagainst moisture, dirt,tear, cold lamination alsopossible.
4.000.000 Hot roller system used forprotecting documentswith the aid of pouches.
Trimmer GBC 3530 Cutting length 35 cm,capacity 3,5 mm (35sheets), automatic clampand security cover.
5.000.000 Apparatus used forstraight trimming.
RollTrimmer
GBC 360 A4, capacity 1 mm (10sheets).
2.000.000 Apparatus used forvarious shaped trimming.
SurgeProtection
InfosecPFS6Master TFR
Voltage 250V, intensity10A, power 2350W, peakvoltage 5000V, noisefilter, phone lineprotection.
2 x1.400.000
Devices used forprotecting the equipmentagainst power surges.
CashRegister
Rohnson Thermal printing. 9.000.000 Used for fiscal operations.
AlarmSystem
Viper 3000 Motion sensors, heatsensors, dual power: AC
and DC. Calls up to 5numbers.
10.000.000 Used for protection ofthe location.
Stationery - Stapler, perforator,dispenser etc.
2.000.000 Necessary officeequipment.
The projected cost for the equipment detailed in the above table is around243.000.000 ROL. Besides this equipment, we also take into account an initialstock of consumables, estimated to last more than a month, which are listed inTable 3.
7/27/2019 photocopier feasibility study 56
10/27
Project Feasibility Study
10
Table 3. Initial stock of consumables
Consumable good Price (ROL)
Copy paper A4 (500 sheets/pack) 50 x 100.000
Copy paper A3 (500 sheets/pack) 2 x 200.000
Cardboard (various thicknesses, colours, textures) 1.000.000
Transparent sheets A4 750.000
Laminator pouches 500.000
Thick paper A4 750.000
Special paper (photo, coloured, glossy) 1.000.000
Thermal binding covers (various thicknesses, formats) 500.000
Envelopes (personalized with company id) 500.000
Other necessities (paper clips, adhesive tape, staples etc.) 600.000
Ink and toner (various types) 4.000.000
The estimated cost of the consumables totals to 15.000.000 ROL.
Stock Management
Due to the intrinsic activity in the company, the stocks are classified according the
their importance (i.e., the rate of consumption) and not according to their value.Indeed, the less expensive items (standard copier paper) are also the mostimportant. Accordingly, the stock is divided into:
High consumption items (e.g., A4 copier paper) Medium consumption items (e.g., cardboards, transparent foils, bindings
etc.)
Low consumption items (e.g., photo paper, A3 copier paper, thermalbinding etc.)
The consumption rate varies proportionally to the demand for that item, andthus the accessibility is essential for the high consumption supplies. For example, alarge stock of copier paper will be located in the bookcases E near the copiers (seefor reference Figure 2). The bookcases are also useful for holding variousunfinished orders and other necessary items, such as cardboards, transparentsheets, coloured paper and A3 format paper.
Near the PC workbenches, in counter D, will be stored another stock ofsupplies useful for the specific activities run there (e.g., A4 paper, transparentfoils, cardboards, photo paper etc.), On the top of the curved counter G will beplaced the trimmer, binding machine and the laminator, and so the counter will
store the necessary consumables, such as cardboards, bindings, thermal bindingcases a.s.o. The major part of the supplies stock will be kept locked in counter F
7/27/2019 photocopier feasibility study 56
11/27
Project Feasibility Study
11
and will be available only to the executive staff. In this way we can prevent theexcessive use of supplies and maintain a necessary level of security. Otherexpensive items such as ink cartridges, copier toner and drums are also keptlocked in the same counter.
The initial stock of consumables is expected to last for about one week (inthe case of the high and medium consumption supplies) and about one month forthe rest. Depending on the specific demands, the stock will be replenished whennecessary.
The supplies are to be bought directly from producers or importers (whenpossible), of from major wholesalers, trying to obtain discounts for high orders.Attention will be given to the exact specifications for each type of consumable.
2.3.4. Services
The company offers a broad range of services, meant to suit a wide variety ofnecessities and needs in the domain that we operate. The services provided arepresented below:
Copying services: black and white / colour, A3 / A4, paper / cardboard /transparent sheets / stickers / thermal transfer paper;
Printing services: black and white / colour, inkjet / laser, various media(including CD printing), photo paper printing;
Photo services: film scanning (35 mm slide / negative), photo printing,photo editing and repair;
Binding: plastic / metal bindings, thermal binding; Laminating services: A3/A4; Scanning services: text (OCR) / photo / transparencies (35 mm film and
slide);
Cartridge refill: laser / inkjet, various models; Identity services: flyers / brochures / cards / id tags / logos / presentations /
catalogues / personalized sheets / product labels;
Text editing services: text editing / layout / translations; Promotional offers: various discounts for large orders / important orders
are delivered in an envelope with the NEXTPRINT logo;
Additional services: CDR / CDRW burning.
A detailed account of the services offered, their charged price and the netprofit in each case is given in the table below:
7/27/2019 photocopier feasibility study 56
12/27
Project Feasibility Study
12
Table 4. Services
Serviceclass
Service Price (ROL) Net profit(ROL)
A4 black and white 400 150A4 colour 8.000 5.000
A3 black and white 800 350
A3 colour 16.000 10.000
A4 Cardboard + 5.000 + 1.500
Copying
A4 Transparent sheets + 15.000 + 5.000
A4 black and white / laser 1.000 750
A4 colour / laser 8.000 5.000
A3 black and white / laser 2.000 1.500
A3 colour / laser 16.000 10.000
A4 Cardboard + 3.500 + 1.500
Printing
A4 Transparent sheets + 15.000 + 5.000
Film scanning (per 1 frame) 15.000 15.000
A4 Photo scanning 10.000 10.000
A4 Photo printing photo paper 25.000 15.000
Photo
Photo editing and repair (per hour) 180.000 180.000
Plastic bindings (diam. 6 51 mm) 12.000 35.000
10.000 30.000
Binding
A4 Thermal binding 50.000 25.000
Laminating A4 pouches 10.000 5.000
A3 pouches 20.000 10.000
A4 Text scanning 8.000 8.000
A3 Text scanning 16.000 16.000
A4 Colour scanning 12.000 12.000
A3 Colour scanning 24.000 24.000
Scanning
OCR (per sheet) + 10.000 + 10.000
Identity Per hour of work 230.000 230.000
Textediting
Per sheet 75.000 75.000
CDR/CDRW burning (per CD) 7.500 7.500Additional
CDR burning (CD included, per CD) 20.000 9.500
7/27/2019 photocopier feasibility study 56
13/27
Project Feasibility Study
13
2.3.5. Labour force
The major source of labour force for the centre will be provided by the near-byuniversities. Additional labour force will be available from the local residents.
The qualifications required from the employees will be mainly PC skills(Windows, Microsoft Office, Adobe Photoshop, Adobe Illustrator, Corel Draw) andcreativity. Preferably the employee should have the know-how for copiermaintenance. As the main target as employees will be students, college degreewill not be required.
Minimal training will be required for the new employees on using thecopiers, scanners and other specific equipment (laminator, binders). Additionaltraining will be provided for better understanding of extended functions of
equipment and specific internal procedures.
The employee selection will be made considering the persons social traitssuch as: teamwork, presence, tact.
For the beginning, besides the firm directors (2, which also work in thepremises), there will be permanently hired another employee for copier duty. Inthe exams period, when we expect heavier workloads, we will temporarily employa second person to handle the supplementary clientele.
The predicted wages will be:
Directors: 7.000.000 ROL (each) Employee: 5.500.000 ROL
The working hours will start at 8.00 am and end at 7.00 pm during workdays, and will start at 9.00 am and end at 3.00 pm on Saturdays. The centre will beclosed on Sundays and national holidays. In case the workload exceeds theallocated time, the centre will work overtime until the completion of the orders.The employees will be paid for working overtime.
2.3.6. Financials
As detailed in the sections above, the total initial costs for this project include:
- Equipment acquisition costs, estimated at 243.000.000 ROL. Includes the costsfor main equipments such as copiers, PCs, printers and scanners and alsoadditional equipment such as binding machine, trimmer, cash register andalarm system.
- Initial stock of supplies, approximated at 15.000.000 ROL. The highconsumption items are estimated to last a month, while the rest of the supplies
will have a higher life time.
7/27/2019 photocopier feasibility study 56
14/27
Project Feasibility Study
14
- Office facilities, estimated at 41.000.000 ROL. Include furnishing costs,purchase of other necessary items and the installing of metal blinds forprotection.
All this totals to an initial cost of 300.000.000 ROL, or the equivalent of
7.300 euros.
We analysed the option of opening a credit line of 10.000 euros, which willcover all the initial costs and the first months costs, allowing also for the existenceof a reserve fund in case of necessity (impact of major risks, a.s.o.). Theprogramme chosen is founded by the European Bank for Reconstruction andDevelopment through the Romanian Commercial Bank and is intended specificallyto Small and Medium Enterprises. The eligibility conditions are fully met. The loanperiod is of 4 years with an yearly interest rate of 8%. The bank commissions totalto 2%. A maximum grace period of 6 months is granted, depending on the type
of project.
Under these specific conditions, the monthly reimbursement adds up to9.200.000 ROL.
The monthly costs take into account the following:
- Location rent (20 square meters at a price of 10 euros/sqm), estimated at10.000.000 ROL.
- Stock replenishment, estimated at 7.000.000 ROL.- Equipments spare parts, 1.000.000 ROL.- Technical assistance, 200.000 ROL.- Promotional expenses, 300.000 ROL.- Electrical bill, 2.000.000 ROL.- Mobile phone bill, 1.000.000 ROL.- Wages, estimated at 19.500.000 ROL.- Accounting services, 5.000.000 ROL.- Bank loan payments of 9.200.000 ROL.
All the above costs total to a monthly expense of 55.500.000 ROL.
The budget expenses for the next two years are detailed in the table below:
Table 5. Budget Forecast
Total(First and second year)
Estimations (ROL)
First yearEstimation
(ROL)
Second yearEstimation
(ROL)
A. Direct expenses - total 789.600.000 394.800.000 394.800.000
A1. Personnel expenses 468.000.000 234.000.000 234.000.000
A.1.1. Permanent personnel wages 468.000.000 234.000.000 234.000.000
A.1.2. Additional personnel wages 0 0 0
A.1.3. Other expenses 0 0 0
A.2.1. Equipment expenses 192.000.000 96.000.000 96.000.000
a). Equipments 24.000.000 12.000.000 12.000.000
7/27/2019 photocopier feasibility study 56
15/27
Project Feasibility Study
15
b). Consumables 168.000.000 84.000.000 84.000.000
A.2.2.Third-party services 129.600.000 64.800.000 64.800.000
a). Legal services 120.000.000 60.000.000 60.000.000
b). Promotion expenses 7.200.000 3.600.000 3.600.000
c). Interior design 2.000.000 1.000.000 1.000.000
e). Technical assistance 400.000 200.000 200.000
B. Indirect expenses - total 532.800.000 266.400.000 266.400.000B.1. Rent 240.000.000 120.000.000 120.000.000
B.2. Facilities 48.000.000 24.000.000 24.000.000
B.3. Loan reimbursement 220.800.000 110.400.000 110.400.000
B.4. Phone bill 24.000.000 12.000.000 12.000.000
C. Acquisitions 299.000.000 299.000.000 0
C.1. Furniture, equipments, officeutilities
221.600.000 221.600.000 0
C.2. PC equipment and peripherals 77.400.000 77.400.000 0
TOTAL (A+B+C) 4.331.400.000 2.315.200.000 2.016.200.000
2.4. Analyses
2.4.1. Market Analysis
A. SWOT analysisBy analyzing the market of the paper and photo services in the targeted area, wehave come to the following SWOT analysis:
Strengths:
The location near two private universities, a subway station and theintersection of four major avenues providing heavy traffic and highvisibility.
Fast delivery, high quality and low price of services, along with the personalinvolvement of the staff.
Extended work hours depending on orders, ability to meet deadlines.
Weaknesses:
Because the company is small and newly created, there are insufficientfunds for a proper advertising strategy and campaign, thus the consumerawareness is low.
The profit is variable, due to the cyclic nature of the activity; the maximumpeak is before and during the exams period.
Low budget available for development. The requirement to reimburse a loan.
Opportunities:
Near the location of the centre, a student campus is being built, which willdrastically increase the number of clients.
7/27/2019 photocopier feasibility study 56
16/27
Project Feasibility Study
16
Fast growth possibility due to the traffic generated by the near-byuniversities and subway station.
Threats:
Other market competitors, as described in Section D.
B. Promotion
The promotion will be limited by the initial budget only to distribution of flyers inhigh traffic areas, around the universities and student campus, advertisementsand notices posted inside the student campus and the universities, on highvisibility public areas, in local newspapers and on the Internet.
The company will also be present on the Internet with a functional website.
The company logo is presented below, in Fig. 4.
Figure 4. The company logo
For large orders there will be available promotional offers, in the form ofdiscounts and delivery in envelopes with the NEXTPRINT identity.
C. Clients
The copy and print services are targeted towards students, and are priced belowthe market minimum price. The professional services (photo editing, identityservices) are targeted towards a more demanding clientele, and have somewhathigher prices, but still under the market average charge. Along the regularclientele, the professional services are expected to appeal to corporate clientelealso.
Estimations of the service demand and the expected monthly profit are
represented in Table 6.
Table 6. Service demand and the profit per month
Serviceclass
Service Sold qty. Net profit peritem (ROL)
Net profit perservice (ROL)
A4 black and white 25.000 150 3.750.000
A4 colour 500 5.000 2.500.000
A3 black and white 300 350 105.000
A3 colour 50 10.000 500.000
Copying
A4 Cardboard 100 + 1.500 150.000
7/27/2019 photocopier feasibility study 56
17/27
Project Feasibility Study
17
A4 Transparent sheets 100 + 5.000 500.000
A4 black and white / laser 5.000 750 3.750.000
A4 colour / laser 500 5.000 2.500.000
A3 black and white / laser 100 1.500 150.000
A3 colour / laser 25 10.000 250.000
A4 Cardboard 250 + 1.500 375.000
Printing
A4 Transparent sheets 100 + 5.000 500.000
Film scanning (per 1 frame) 150 15.000 2.250.000
A4 Photo scanning 100 10.000 1.000.000
A4 Photo printing photo paper 300 15.000 4.500.000
Photo
Photo editing and repair (per hour) 6 180.000 1.080.000
Plastic bindings (diam. 6 51 mm) 375 10.000 30.000
7.500.000Binding
A4 Thermal binding 50 25.000 125.000
Laminating A4 pouches 100 5.000 500.000
A3 pouches 10 10.000 100.000
A4 Text scanning 50 8.000 400.000
A3 Text scanning 5 16.000 80.000
A4 Colour scanning 50 12.000 600.000
A3 Colour scanning 5 24.000 120.000
Scanning
OCR (per sheet) 40 + 10.000 400.000
Identity Per hour of work 75 230.000 17.250.000
Textediting
Per sheet 50 75.000 3.750.000
CDR/CDRW burning (per CD) 50 7.500 375.000Additional
CDR burning (CD included, per CD) 50 9.500 475.000
The monthly revenue is estimated around 56.250.000 ROL, considering theprojections presented in the above table.
D. Competition
The market competition can be divided in two, according to the geographicalpositioning of the respective players.
a) Market players in the vicinity of the centre:
one copy centre inside the university. Low threat, their services areexpensive.
7/27/2019 photocopier feasibility study 56
18/27
Project Feasibility Study
18
one copy stand located inside the subway station. Low threat, it offers onlycopying services at a moderate price.
b) Other similar copy centres, offering related or more complex services, located inother areas than the immediate vicinity:
OCE: their main services revolve around plotting, they have a very wellestablished clientele among the students at the Architecture Institute. Theyalso offer printing, copying and scanning services, but at a higher price.
Copy & Print Center: this centre represents the true competition in thismarket niche, as it offers quite similar services and is located centrally, inthe vicinity of the Economic Studies Academy. It has a very well establishedposition among the students at ESA. Medium threat, their location is toofar away from NEXTPRINTs to exert a strong influence.
E. Conclusions
Considering the low competition, the high demand of this type of service in thearea and the adequate location, NEXTPRINT shall be able to establish a fair shareof the market in a short period of time, even if lacking a more intensivemarketing campaign.
2.4.2. Risk Analysis
The risk assessment was done taking into account as many factors as possible thatcould influence the project and prevent its completion and further development.Each risk was ranked according to its probability of occurrence (on a scale of 1 to9, where 9 stands for a high probability) and impact on the project (high, mediumand low).
High Significant effects on the project schedule and costs.Must be monitored regularly and carefully.
Medium Less serious effect on the schedule.
Some effect on costs.Monitored regularly.Low Not expected to have any serious effect on the project.
Reviewed regularly for ranking and monitoring.
The risks are classified into technical, financial, legal, staff related and otherrisks. A detailed analysis is presented below.
7/27/2019 photocopier feasibility study 56
19/27
Project Feasibility Study
19
A. Technical risksDescription Ranking Consequences Strategy
The equipmentdoes not meet
the requiredperformanceand qualitystandards.
Probability:2
Impact:High
- Test failure on run-up- Breakdowns
- Not enough capacity- Low utilization factor- Overall performance
decrease- Quality decrease
- thorough equipment control onacquisition
- purchasing quality new andsecond hand equipment
Equipmentfailure(accidentally oras a result ofwear)
Probability:4Impact:High
- partial / total cease ofactivity
- schedule delays oforders
- products with warranty (evensecond hand)
- hiring of person with properknow-how on equipmentmaintenance and repair (copiers,PCs, printers) in case of minordefects.
- continuous monitoring ofequipment- protection against power surges
using adequate devices- the acquisition of equipment is
preceded by a rigorous analysisof the market offers and benefits
- (in case of accidental or staffnegligence failure): ensuringthorough training of staff
Destruction /deterioration ofclients
materials
Probability:3Impact:
Medium
- payment ofcompensation to theclient
- ensuring that the staff is trained- the compensation of the client is
deducted from the responsible
employees wageDepletion ofconsumablesstock
Probability:3Impact:Low
- total / partialcessation of activity
- schedule delays
- efficient stock management andmonitoring
Inadequateconsumablesspecifications
Probability:1Impact:Medium
- poor quality outputs- equipment damaging- delays
- careful purchase of supplies- running a specifications check
B. Financial Risks
Description Ranking Consequences Strategy
Impossibility offinding financing
Probability:2Impact:High
- projectcompromising
- assuming a low budget,resulting in a low creditrequirement
- exploring of all financingpossibilities
- creation of a economicallyviable project, which couldattract investors
Impossibility of
bank loanpayment
Probability:
3Impact:High
- bankruptcy - assuming a low budget,
resulting in low payments- efficient marketing, resulting in
profits
7/27/2019 photocopier feasibility study 56
20/27
Project Feasibility Study
20
- finding co-financers to back theproject
Under or over -evaluated costestimations
Probability:4Impact:Medium
- budget over-run- insufficient resources
- thorough cost and profitanalysis and correct estimation
- efficient cost management andmarketing
C. Legal Risks
Description Ranking Consequences Strategy
Unlicensed PCsoftware
Probability:7Impact:High
- fines- imprisonment
- gradual license acquiring for theimportant PC software
D. Staff related risks
Description Ranking Consequences Strategy
Lack of tact andprofessionalism
Probability:3Impact:Low
- client loss- damaging of
company image
- careful hiring of qualifiedpersonnel, adapted to thecompany requirements.
Insufficientqualification,incompetence,lack of experience
and training
Probability:3Impact:Medium
- client loss- equipment and
materials damaging- work related
accidents- damaging of
company image
- careful hiring of qualifiedpersonnel, adapted to thecompany requirements.
Un-effectiveteamwork
Probability:4Impact:Low
- conflicts betweenemployees
- careful hiring of qualifiedpersonnel, adapted to thecompany requirements.
Equipment andsupplies stealing
Probability:3Impact:Medium
- shortage of suppliesand equipment
- motivating wage- various benefits and incentives- rigorous control of supplies- equipment protection
E. Other risks
Description Ranking Consequences Strategy
Schedule delays Probability:6Impact:Medium
- clients loss- damaging of
company image
- rearranging the workload inorder to fulfil an order
- put more effort and additionalresource into the job
- lower the scope and/or qualityof the results demanded (notrecommended)
Theft / damagingof equipment;headquarters
Probability:5Impact:
- temporary cessationof activity
- supplementary
- securing the headquarters(metal blinds, police monitoredalarm system)
7/27/2019 photocopier feasibility study 56
21/27
Project Feasibility Study
21
destruction High expenses for repairs /acquisitions
- protection of valuableequipment and supplies
- theft insurance
Fire Probability:3Impact:
High
- temporary /permanent cessationof activity
- high expenses forrepairs / acquisitions
- respecting the safetyregulations
- presence of fire extinguishers
- fire insurance
Natural risks:earthquakes,floods etc.
Probability:1Impact:High
- temporary /permanent cessationof activity
- high expenses forrepairs / acquisitions
- ignored
2.4.3. Financial Analysis
A. Preliminaries
As detailed in Section 2.3.6. the initial costs for this project are of 300.000.000ROL, and the monthly expenses add up to 55.500.000 ROL. The monthly revenuesare of 56.250.000 ROL, as was estimated in Section 2.4.1. Paragraph C. The netprofit per month is of 750.000 ROL, and is predicted to remain at a low value forthe next 4 years, until the bank loan reimbursement is completed. A budgetforecast for the next two years is also presented in Section 2.3.6.
B.
Indexes
A few financial indexes are computed below.
VNA (actualised net revenue) computed for the first two years (millionsROL):
6801501
00000096
1501
00000096000000300
1501
000000675
1501
000000675
2121=
++
+
+
++
+=
).(
..
).(
....
).(
..
).(
..VNA
Interpretation: VNA > 0 so the project can be accepted.
RS (Long Debt to Equity) per one year:
420000000675000000300
000000410.
....
..RS =
+=
MP (Profit Margin On Sales)
720100000500103
000750.*
..
.MP ==
Res (Retum on Equity / Net Worth)
00250000000300
000750 ...
.sRe ==
7/27/2019 photocopier feasibility study 56
22/27
Project Feasibility Study
22
3. Project Planning.
3.1. PERT Analysis
The tasks required for the execution of the project are as follows:
Table 7. Tasks List
ID Task Name Duration Start Finish Pred
1 Business plan definition 16 days Tue 01.02.05 Tue 22.02.05
2 Market Analysis 13 days Tue 01.02.05 Thu 17.02.05
3 Define the opportunity addressed 1 day Tue 01.02.05 Tue 01.02.054 Describe the market and the new business 1 day Wed 02.02.05 Wed 02.02.05 3
5 Create market analysis plan 1 day Thu 03.02.05 Thu 03.02.05 4
6 Interview owners of similar businesses 5 days Fri 04.02.05 Thu 10.02.05 5
7 Assess market size and stability 2 days Fri 11.02.05 Mon 14.02.05 6
8 Identify competition 2 days Tue 15.02.05 Wed 16.02.05 7
9 Identify target market niche 1 day Thu 17.02.05 Thu 17.02.05 8
10 Identify Needed Materials and Supplies 3 days Fri 18.02.05 Tue 22.02.05
11 Identify required equipments 1 day Fri 18.02.05 Fri 18.02.05 9
12 Identify needed consumables 1 day Mon 21.02.05 Mon 21.02.05 11
13 Estimate the equipment costs 1 day Tue 22.02.05 Tue 22.02.05 12
14 Assess the risks 1 day Tue 22.02.05 Tue 22.02.05 12
15 Business Plan Development 12 days Tue 22.02.05 Wed 09.03.05
16 Describe the objectives 1 day Tue 22.02.05 Tue 22.02.05 12
17 List assumptions 1 day Wed 23.02.05 Wed 23.02.05 16
18 Make SWOT analysis 1 day Thu 24.02.05 Thu 24.02.05 17
19 Estimate sales volume 1 day Fri 25.02.05 Fri 25.02.05 18
20 Forecast operating costs 1 day Mon 28.02.05 Mon 28.02.05 19
21 Establish pricing strategy 1 day Tue 01.03.05 Tue 01.03.05 20
22 Forecast revenue 1 day Wed 02.03.05 Wed 02.03.05 21
23 Develop startup plan 2 days Thu 03.03.05 Fri 04.03.05 22
24 Develop sales and marketing strategy 1 day Mon 07.03.05 Mon 07.03.05 23
25 Reassess the risks 2 days Tue 08.03.05 Wed 09.03.05 24
26 Business Plan Execution 63 days Fri 18.02.05 Tue 17.05.0527 Choose a location 1 day Thu 10.03.05 Thu 10.03.05 11;25
28 Establish Business Structure 40 days Fri 18.02.05 Thu 14.04.05
29 Choose a name and identify implications 1 day Fri 18.02.05 Fri 18.02.05 9
30 Choose a Bank 5 days Fri 11.03.05 Thu 17.03.05
31 Establish accounts 4 days Fri 11.03.05 Wed 16.03.05 27;29
32 Establish line of credit 1 day Thu 17.03.05 Thu 17.03.05 31
33 Choose legal representation 1 day Thu 17.03.05 Thu 17.03.05 31
34 Solving Administrative Aspects 20 days Fri 18.03.05 Thu 14.04.05
35 Set up the accounting system 2 days Fri 18.03.05 Mon 21.03.05 33
36 Obtain the licenses and authorizations 12 days Tue 22.03.05 Wed 06.04.05 35
37 Obtain needed insurance 4 days Thu 07.04.05 Tue 12.04.05 36
38 Establish security plan 2 days Wed 13.04.05 Thu 14.04.05 3739 Develop Marketing Program 4 days Fri 18.03.05 Wed 23.03.05
40 Establish an advertising program 2 days Fri 18.03.05 Mon 21.03.05 32
7/27/2019 photocopier feasibility study 56
23/27
Project Feasibility Study
23
41 Develop a logo 1 day Tue 22.03.05 Tue 22.03.05 40
42 Develop promotional materials 1 day Wed 23.03.05 Wed 23.03.05 41
43 Provide Physical Facilities 15 days Fri 15.04.05 Thu 05.05.05
44 Location renting 2 days Fri 15.04.05 Mon 18.04.05 38;41
45 Provide furniture and equipment 5 days Tue 19.04.05 Mon 25.04.05 44
46 Equipment installing 1 day Tue 26.04.05 Tue 26.04.05 45
47 Select computer hardware 1 day Wed 27.04.05 Wed 27.04.05 46
48 Install computer software 1 day Thu 28.04.05 Thu 28.04.05 47
49 Testing the equipment 1 day Fri 29.04.05 Fri 29.04.05 48
50 Acquiring other utilities 3 days Mon 02.05.05 Wed 04.05.05 49
51 Move in 1 day Thu 05.05.05 Thu 05.05.05 50
52 Provide Staffing 8 days Fri 06.05.05 Tue 17.05.05
53 Interview and test candidates 5 days Fri 06.05.05 Thu 12.05.05 51
54 Hire staff 1 day Fri 13.05.05 Fri 13.05.05 53
55 Train staff 2 days Mon 16.05.05 Tue 17.05.05 54
56 Start up the business 0 days Tue 17.05.05 Tue 17.05.05 55
These tasks can be organized in a logical diagram according to their dependenciesas shown in the PERT diagram (Figure 5).
3.2. Gantt Chart
The project is due to start on the 1 st February 2005 and its duration is estimated at2.5 months. The expected end date is on the 17th May 2005 which will coincidewith the start of the exam period generating a heavy workload. The details of the
plan are presented in the Gantt Chart (Figure 6).
3.3. Future Development
The future plans and their expected consequences and effects are discussed inTable 8.
Table 8. Future Actions
Action EffectPurchase of another heavy dutycopier (second hand, such as aCanon MP 6050 at a cost of45.000.000 ROL)
Extending the centre copying capacity Faster delivery of services Backup copier (in case of other equipment failure
Acquisition of software licenses Minimization of legal risks
Installing an air conditioningunit
Increase in comfort of clients and staff
Renting additional space Expanding the usable workspace Possibility of increasing the number of massive
equipments used (copiers, laser printers)
Purchase of new equipment fordocument binding andmanipulation
Extending the range of provided services
7/27/2019 photocopier feasibility study 56
24/27
4
5
6
7
8
9
11
12
13 14 16
17
18
19
20
21
22
23
24
25
27
29
31
32 33
35
36
37
38
40
41
42
44
45
46
47
48
49
50
51
53
54
55
56
3
Figure 6. PERT Diagram 24
7/27/2019 photocopier feasibility study 56
25/27
ID
TaskName
Duration
1
Businessplandefinit
ion
16days
2
MarketAnalysis
13days
3
Definetheopportunityaddressed
1day
4
Describethem
arketandthenewbusiness
1day
5
Createmarketanalysisplan
1day
6
Interviewowne
rsofsimilarbusinesses
5days
7
Assessmarket
sizeandstability
2days
8
Identifycompetition
2days
9
Identifytargetm
arketniche
1day
10
IdentifyNeededM
aterialsandSupplies
3days
11
Identifyrequiredequipments
1day
12
Identifyneeded
consumables
1day
13
Estimatetheeq
uipmentcosts
1day
14
Assesstherisks
1day
15
BusinessPlanDevelo
pment
12days
16
Describetheobjectives
1day
17
Listassumptions
1day
18
MakeSWOTanaly
sis
1day
19
Estimatesalesvolu
me
1day
20
Forecastoperating
costs
1day
21
Establishpricingstrategy
1day
22
Forecastrevenue
1day
23
Developstartuppla
n
2days
24
Developsalesand
marketingstrategy
1day
25
Reassesstherisks
2days
26
BusinessPlanExecu
tion
63days
27
Choosealocation
1day
28
EstablishBusines
sStructure
40days
29
Chooseanameandidentifyimplications
1day
30
ChooseaBan
k
5days
31
Establishaccounts
4days
32
Establishlineofcredit
1day
33
Chooselegalrepresentation
1day
34
Solvingadmin
istrativeaspects
20days
35
Setuptheaccountingsystem
2days
36
Obtainthelicensesandauthorisations
12days
37
Obtainneededinsurance
4days
38
Establishsecurityplan
2days
39
DevelopMarketingProgram
4days
40
Establishanadvertisingprogram
2days
41
Developalogo
1day
42
Developpromotionalmaterials
1day
43
ProvidePhysicalFacilities
15days
44
Locationrenting
2days
45
Providefurnitureandequipment
5days
46
Equipmentinstalling
1day
47
Selectcompute
rhardware
1day
48
Installcompute
rsoftware
1day
49
Testingtheequ
ipment
1day
50
Acquiringother
utilities
3days
51
Movein
1day
52
ProvideStaffing
8days
53
Interviewandtestcandidates
5days
54
Hirestaff
1day
55
Trainstaff
2days
56
Startupthebusine
ss
0days
M
TW
T
F
S
S
M
TW
T
F
S
S
M
T
W
T
F
S
S
M
T
W
T
F
S
S
M
T
W
T
F
S
S
M
TW
T
F
S
S
M
TW
T
F
S
S
M
T
W
T
F
S
S
M
TW
T
F
SS
M
TW
T
F
S
S
M
TW
T
F
S
S
M
T
W
T
F
S
S
M
T
W
TF
S
S
M
T
W
T
F
S
S
M
TW
T
F
S
S
M
TW
31Jan'05
07Feb
'05
14Feb'05
21Feb'05
28Feb'05
07
Mar'05
14Mar'05
21Mar'05
28Mar'05
04Apr'05
11Apr'05
18Apr'05
25Apr'05
02May'05
09May'05
16May'
Task
CriticalTask
Progress
Milestone
Summary
RolledUpTask
RolledUp
CriticalTask
RolledUp
Milestone
RolledUpProgress
Split
ExternalTasks
ProjectSummary
GroupBySummary
Deadline
Figure 7. Gantt Chart
7/27/2019 photocopier feasibility study 56
26/27
Project Feasibility Study
26
4. Conclusions.
The aim of this project is to establish a commercial centre offering paper andidentity services to students and other more professional clients. The project isfinanced by a bank loan which must be reimbursed in four years, covering all theequipment costs and other expenses. The monthly revenues are sufficient to coverall the expenses allowing for a small profit. The duration of the project is of 2.5months with an expect end date of the 15th of May 2005. The analyses concludethat the project is viable and that the market can accept this type of business.
7/27/2019 photocopier feasibility study 56
27/27
Project Feasibility Study
This document was prepared as a project for the Project Management Course.
Submission Date: May 2004Contact Information: andreiadis@dap.ro; andrei.iancu@home.ro
top related