1Ossington Station Easier Access – Community UpdateJune 13, 2013

Ossington StationEasier Access Project Community Update – Open HouseBob Abate Community and Recreation CentreJune 13, 2013

2Ossington Station Easier Access – Community UpdateJune 13, 2013

Easier Access – Program Wide•Committedtomakingall69stationsaccessibleby

2025•31stationscompleted-almosthalfwaythere•WorkingwiththeAdvisoryCommitteeonAccessibleTransitoneffectivedesign

•Lookforelevators,slidingdoors,fare-gatesandotherfeaturesthatwillimprovemobilityforalltransit riders

3Ossington Station Easier Access – Community UpdateJune 13, 2013

EasierAccessProjectBackground•Threestationsarecurrentlyunderconstruction:

•Pape(2013year-endcompletion)

•Dufferin(2014completion)

•LawrenceWest(2014completion)

•OssingtonStationisscheduledtobeaccessiblebyearly2016

•Constructiontostartearly2014

4Ossington Station Easier Access – Community UpdateJune 13, 2013

TTCCommitmentDuringConstruction•Provideclear,accurateandtimelyconstructioninformation

•Supportthecommunityduringconstruction•Listenandrespondtoissues•CommunityLiaisontorespondtoallquestionsandadvocateforthecommunity

•Meetwithstakeholders:businesses,residentsandtheBloorcourtBIAforspecificenquiries

•Postregularupdatesonadedicatedprojectpageatprojects.ttc.ca

5Ossington Station Easier Access – Community UpdateJune 13, 2013

AerialImage

6Ossington Station Easier Access – Community UpdateJune 13, 2013

Ossington Station ProjectEasierAccessImprovements:•Barrierfreepathtoalllevelsofthestationincludinginstallationof:

•Twoelevatorstoaccesseastboundandwestboundplatforms

•Twoaccessiblefaregates •Barrierfreepathtoalllevelsofthestation(DelawareAve

automaticentrancenotaccessible) •Threeautomaticslidingdoors •Improvedsignageincludingwayfinding •CCTV–Securitycameras •Upgradestationpower

7Ossington Station Easier Access – Community UpdateJune 13, 2013

Ossington Station ProjectConstructionElevatorInstallation •Norequirementforprivateproperty •AllconstructionworktotakeplaceonTTCpropertyorCity

right-of-way •Lengthofconstruction:approximatelytwoyears(2014-2016) •Minimalimpacttotransitriders

ResurfacingBusPlatformandSectionsofRoadway •TTCexploringoptionstocombinethisworkintoonecontract •Temporaryrelocationofbusesandwaitingareaswillbe

required

8Ossington Station Easier Access – Community UpdateJune 13, 2013

Ossington Station – RoutesEglinton Ave West

Vaughan Rd

Rogers Rd

St Clair Ave West

Oss

ing

ton

A

ve

Bat

hur

st S

t

Sp

adin

a A

ve

Que

ens

Par

k C

r W

est

Que

ens

Par

k C

r E

ast

Que

ens

Par

k C

r

Bay

St

Yong

e S

t

Jarv

is S

t

Sh

erb

our

ne S

t

Par

liam

ent

St

Oak

wo

od

A

veDupont St

Ossington

Eglinton West 63 Ossington

CastleFrank

Bloor St West

Harbord St

Wellesley StCollege St

Queen St West

Dundas St West

King St West

Liberty St

Davenport Rd

Wellesley

94 Wellesley

9Ossington Station Easier Access – Community UpdateJune 13, 2013

Ossington Station Project

Removalofstep

Improved signage

NewslidingdoorsNewelevator

•Improvedsignage•Removalofstep

•Newslidingdoors•Newelevator

After–Artist'srendering

Before

10Ossington Station Easier Access – Community UpdateJune 13, 2013

OssingtonStationStreetLevel

ConcordAve

Laneway

OssingtonAve

Sidewalk

DaycareDrop-offcarflowarea

DaycareAccessPath

Laneway/Parking

NorthumberlandSt

BusBay4

Bus Bay 2 Bus Bay 1Bus Bay 3

Bus Bay 5

Driveway

Pedestrian AccessMaintained

Hoarding

SlidingDoorNewElevator–3Levels AccessibleFareGate

BusPlatformExtension

Concourse

Street Level Street Level

Platform WESTBOUND TRAIN

Concourse

Platform EASTBOUND TRAINElevator E2

Elevator E1

StreettoCoursetoPlatformLookingSouth

NewElevator–2Levels

Concourse

Street Level Street Level

Platform WESTBOUND TRAIN

Concourse

Platform EASTBOUND TRAINElevator E2

Elevator E1

CoursetoPlatformLookingNorth

11Ossington Station Easier Access – Community UpdateJune 13, 2013

OssingtonStationConcourseLevel

Kiosk

EasierAccessPath Elevator1-ConcoursetoStreetand EastboundPlatform

Elevator2-Concourseto WestboundPlatform

Laneway/Parking

Laneway

Driveway

OssingtonAve

ConcordAve

NorthumberlandSt

12Ossington Station Easier Access – Community UpdateJune 13, 2013

ScheduleOssingtonStationEasierAccess–PlannedSchedule

•Summer2013 Pre-constructionsurveysforlocal properties

•Late2013 AwardContract-TTCBoard

•Early2014 StartConstruction

•Early2016 CompleteConstruction

13Ossington Station Easier Access – Community UpdateJune 13, 2013

Ossington Station UpgradesFormoreinformation

LitoRomanoTTC,CommunityLiaison416-397-8699lito.romano@ttc.caprojects.ttc.ca

14Ossington Station Easier Access – Community UpdateJune 13, 2013

DelawareAveEntrance–ResurfacingCommunity Update – Open HouseJune 13, 2013

15Ossington Station Easier Access – Community UpdateJune 13, 2013

ImprovementsImprovementsatDelawareEntrance•Resurfacepartofareainfrontoftheentrance•Replacebollardsandfencealonglaneway•Bikelock-upmaintainedduringconstruction•Constructionperiod4months(August–November)

DelawareEntrance–Resurfacing•August2013 StartConstruction•November2013 CompleteConstruction

16Ossington Station Easier Access – Community UpdateJune 13, 2013

DelawareAveEntrance

•Maintainentranceduringconstruction•CityofTorontoPublicRealmtoexplore: • Newbikelockups • De-clutterpublicationboxes • Litterreceptacle