Northern Highways Program2014-2018
Ministry of Northern Development and Mines
TABLE OF CONTENTS
Northern Regional Map 1
Introduction 2
Expansion Projects 3
Rehabilitation Projects 6
!
!!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
N O R T H W E S T E R N
N O R T H E A S T E R N
E A S T
W E S TC E N T R A L
Ottawa
North BaySault Ste. Marie
New Liskeard
Thunder Bay
Marathon
Cochrane
Kenora
Windsor
London
St. Catharines
TorontoPort Hope
KingstonOwen Sound
BancroftHuntsville
Sudbury
dc101
dc17
dc26
dc402
dc417
dc401
dc11
dc7
dc11
dc3
dc3
dc401
dc17
dc11
dcQEW
dc144
dc400
dc11dc
400
dc69dc17
dc7
dc17
dc17
dc71 dc11
dc416
dc21dc6
dc6
MTO Provincial Highways Management Region
Northeastern
Northwestern
Central/Eastern/West
OPS Regions
Roads
Produced by: Geomatics OfficeHighway Standards Branch
Sources:Base: DCRBRoads: LHRS Routes, January 2014
Projection: CSRS Ontario MNR Lambert Datum: NAD 83
October 28, 2014
This map should not be relied on as a precise indicator of routes or locations, nor as a guide to navigation. The Ontario Ministry of Transportation (MTO) shall not be liable in any way for the use of, or reliance upon, this map or any information on this map
© Queen's Printer for Ontario, 2014
1
MINISTRY OF TRANSPORTATIONNorthern Regions
2
NORTHERN HIGHWAYS PROGRAM 2014-2018 INTRODUCTION Creating Jobs and Building a Stronger Ontario
In 2014/15, the Ontario government will be investing almost $2.5 billion to repair and expand provincial highways and bridges. This includes $527 million for Northern Ontario, creating or sustaining more than 5,200 direct and indirect jobs. Improving Ontario’s transportation network is part of the government’s plan to strengthen the economy.
2014 Planned Accomplishments Northern Ontario
New highways 19 lane km
Highways rehabilitated 390 centreline km
Bridges rehabilitated 43
The time of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
3
NORTHERN EXPANSION 2014 – 2018
NORTHEASTERN ONTARIO EXPANSION 2014-2018
Hwy Status Location Type of Work
Target Completion Date
66 Planned Hwy 66, Virginiatown Re-alignment 2017
69 Planned CNR Re-alignment, south of Hwy 522 Four-lane widening 2017
69 Planned Hwy 526 northerly, Britt Four-lane widening
Beyond 201у
69 Planned Hwy 69 Connection to Sudbury SE By-Pass Four-lane widening
Beyond 201у
69 Planned Hwy 7182 (Shebeshekong Rd.) Four-lane widening 2016
69 Planned North Hwy 7182 (Shebeshegong Rd.) northerly, north of Nobel
Four-lane widening
Beyond 201у
69 Planned North of Hwy 522 northerly, French River Four-lane widening
Beyond 201у
69 Planned North of Hwy 559, northerly Four-lane widening
Beyond 201у
69 Underway North of Hwy 607 northerly, north of French River
Four-lane widening 2016
69 Underway North of Hwy 64 northerly, north of Alban Four-lane widening / new four-lane highway
2015
69 Planned South of Hwy 7182 northerly 5 km Four-lane widening
Beyond 201у
4
NORTHEASTERN ONTARIO EXPANSION 2014-2018
Hwy Status Location Type of Work
Target Completion Date
69 Planned South junction of Hwy 529 northerly, Pointe au Baril
Four-lane widening
Beyond 201у
69 Planned South of north junction of Hwy 529 northerly, Pointe au Baril Station
Four-lane widening
Beyond 201у
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
5
NORTHWESTERN ONTARIO EXPANSION 2014-2018
Hwy Status Location Type of Work
Target Completion Date
11/17 Planned 5.0 km west Hwy 587, easterly Four-lane widening 2017
11/17 Planned Black Sturgeon River to Red Rock Four-lane widening
Beyond 2018
11/17 Underway Hwy 527 easterly to Mackenzie Station Rd. Four-lane widening 2015
11/17 Planned Hwy 587 to Pearl Creek Four-lane widening
Beyond 2018
11/17 Underway Nipigon River Bridge and approaches Four-lane widening 2018
11/17 Underway South Trout Creek Bridge, west of Nipigon Four-lane widening 2014
11/17 Planned Stillwater Creek, Nipigon, westerly Four-lane widening
Beyond 2018
17 Planned Manitoba border easterly Four-lane widening / new four-lane highway
Beyond 2018
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
6
NORTHERN REHABILITATION 2014 – 2018
NORTHEASTERN ONTARIO REHABILITATION 2014
Hwy Status Location Type of Work
Target Completion Date
Project Length (km)
11 Planned Mattice to Hearst Resurfacing / culvert rehabilitation / replacement
2016 31
11 Underway Meadow Creek, south Hwy 579, Cochrane Culvert replacement 2014 n/a
11 Planned Mondor Creek culvert, south of Hwy 579, Cochrane Culvert replacement 2015 n/a
11 Underway Montcalm Creek Bridge, Crow Creek Bridge, west of Opasatika
Bridge replacement 2014 n/a
11 Underway Otasawian River Bridge, west of Calstock Bridge replacement 2014 n/a
11 Underway Smooth Rock Falls to Driftwood Resurfacing 2014 26
11 Underway South of Hwy 64 northerly, Marten River
Resurfacing / bridge rehabilitation 2014 28
11 Underway Valentine River Bridge, west of Hearst Bridge replacement 2015 n/a
11 Underway White Clay River Bridge, north of Hwy 66, Sesekinika Bridge replacement 2014 n/a
11 & 573 Underway Englehart River, Aidie Creek
Bridges, Earlton Bridge rehabilitation 2014 n/a
11, 636 & 652 Underway West and east of Cochrane Culvert replacement 2014 n/a
17 Underway Batchawana River Bridge, Carp River Bridge, Batchawana Bay Bridge rehabilitation 2014 n/a
17 Underway Coldwater River Bridge, north of Montreal River Bridge rehabilitation 2014 n/a
7
NORTHEASTERN ONTARIO REHABILITATION 2014
Hwy Status Location Type of Work
Target Completion Date
Project Length (km)
17 Underway CPR overhead, west of Hwy 6, Webbwood Bridge replacement 2015 n/a
17 Underway East of Hwy 548 easterly, Bruce Mines
Resurfacing / culvert replacement 2014 17
17 Underway Hwy 64 easterly, Verner Resurfacing 2014 5
17 Underway Hwy 94 easterly to Hwy 531, Corbeil Resurfacing 2015 12
17 & 532 Underway
Chippewa River, Harmony River, Goulais River, south of Batchawana Bay
Bridge rehabilitation / culvert rehabilitation 2014 n/a
17 & 538 Underway Mississagi River and Lauzon
Creek Bridges, Iron Bridge Bridge rehabilitation / bridge replacement 2014 n/a
17 & 631 Planned South and north of Hornpayne Culvert replacement /
rehabilitation 2015 n/a
63 Underway Ottawa River Bridge (West Channel), Ontario / Quebec Border
Bridge replacement 2015 n/a
65 Underway Blanche River, Wright Creek, east of New Liskeard Bridge rehabilitation 2014 n/a
65 Underway Ontario / Quebec boundary westerly, east of New Liskeard
Resurfacing / bridge rehabilitation 2015 22
65 Underway Sutton Creek, east of Hwy 11B, east of New Liskeard Culvert replacement 2015 n/a
66 Underway Crooked Creek, west of Hwy 11, Kenogami Lake Culvert replacement 2014 n/a
66 Underway Hwy 11 easterly to Chaput Huges Rd., Kirkland Lake Resurfacing 2014 12
8
NORTHEASTERN ONTARIO REHABILITATION 2014
Hwy Status Location Type of Work
Target Completion Date
Project Length (km)
101 Underway Hwy 144 westerly, west of Timmins Resurfacing 2015 17
101 Underway Ivanhoe River Bridge, Foleyet Bridge rehabilitation 2014 n/a
101 Underway West of Hwy 144 westerly, Timmins Resurfacing 2015 31
108 Underway North of Hwy 17, south of Elliot Lake Culvert replacement 2014 n/a
112 & 650 Underway Hwy 11 northerly, Kirkland
Lake Resurfacing 2015 21
124 Underway West junction Hwy 520 easterly to Distress River, Dunchurch
Resurfacing 2014 21
129 & 546 Planned North of Iron Bridge, north of
Thessalon Culvert replacement / rehabilitation 2015 n/a
141 Underway Hwy 69 easterly, west of Rosseau Resurfacing 2014 19
144 Underway Half Way Lake northerly, north of Cartier Resurfacing 2015 19
144 Underway South of Hwy 560 northerly, north of Cartier Resurfacing 2015 17
518 & 520 Underway Haines Creek east of Orrville,
Jenkins Creek, Magnetawan Culvert rehabilitation 2014 n/a
554 Underway Devees Creek, north of Hwy 546, north of Iron Bridge Culvert replacement 2014 n/a
560 Underway Gowganda East Limits to Gowganda West Limits Resurfacing 2014 3
560 Underway Little Mollie Creek, east of Hwy 144, Westree Culvert replacement 2014 n/a
9
NORTHEASTERN ONTARIO REHABILITATION 2014
Hwy Status Location Type of Work
Target Completion Date
Project Length (km)
573 Underway Blanche River Bridges, Charlton Bridge replacement 2014 n/a
583 Underway Jessie River, Prune Creek, south of Hwy 11, south of Hearst
Bridge replacement 2015 n/a
631 Underway Hwy 17 northerly, White River Resurfacing 2015 51
634 Underway North of Hwy 11, Smooth Rock Falls Culvert replacement 2014 n/a
638 Underway Leeburn Creek Bridge, west of Hwy 670, Leeburn Bridge rehabilitation 2014 n/a
7088 Underway Stokley Creek Bridge, north of Hwy 552, Goulais River Bridge replacement 2014 n/a
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements
10
NORTHEASTERN ONTARIO REHABILITATION 2015
Hwy Location Type of Work
Target Completion Date
Project Length (km)
11 Duchesnay Creek and Chippewa Creek, north of North Bay
Bridge replacement / culvert rehabilitation 2016 n/a
11 South of Lakeshore Dr. southerly, Temagami Resurfacing 2016 11
11B South junction Hwy 11B northerly to Haileybury Resurfacing 2016 7
17 Agawa River and Speckled Trout Creek culverts, north of Sault Ste. Marie Culvert rehabilitation 2015 n/a
17 Aux Sables River Bridge and CPR overhead,west and east of Sudbury Bridge rehabilitation 2016 n/a
17 Hwy 539, Warren to Hwy 64, Verner Resurfacing / culvert rehabilitation 2015 14
17 Municipal Rd. 55 interchange westerly, Sudbury Resurfacing 2017 22
17 Sturgeon Falls westerly Resurfacing 2016 10
17 & 101 South of Hwy 101 northerly, Wawa Resurfacing / culvert
rehabilitation 2016 33
60 Hwy 127 easterly, east of Whitney Resurfacing / bridge rehabilitation / culvert replacement
2016 19
101 Borden Lake culvert, east of Chapleau Culvert replacement 2015 n/a
101 Shawmere River Bridge easterly to Foleyet
Resurfacing / bridge rehabilitation 2015 48
11
NORTHEASTERN ONTARIO REHABILITATION 2015
Hwy Location Type of Work
Target Completion Date
Project Length (km)
108 Hwy 17 northerly to Elliot Lake Resurfacing 2015 25
129 Hwy 129 culverts, Thessalon Culvert replacement / rehabilitation 2016 n/a
144 Onaping northerly to Cartier Resurfacing / culvert rehabilitation / replacement
2015 18
144 Regional Rd. 12 northerly, Dowling Resurfacing 2016 12
531 & 533
Hwy 531 southerly, Bonfield and Hwy 533 northerly, Mattawa Resurfacing 2015 7
540 & 542
Mud Creek culverts, west of Little Current
Culvert replacement / rehabilitation 2015 n/a
542 & 551
East junction Hwy 542 northerly, Mindemoya Resurfacing 2015 14
654 Hwy 534 easterly to Hwy 11, Nipissing Resurfacing / bridge rehabilitation 2016 23
655 Jocko Creek, north of Hwy 101, north of Timmins Culvert replacement 2015 n/a
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
12
NORTHEASTERN ONTARIO REHABILITATION 2016-2018
Hwy Location Type of Work
Project Length
(km)
6 Little Current southerly Resurfacing / culvert rehabilitation 19
6 & 17 West of Hwy 6 easterly to Nairn Centre Resurfacing / bridge
rehabilitation 21
11 Bradburn Creek culvert, west of Hearst Culvert replacement n/a
11 ONR overhead, Earlton Bridge rehabilitation n/a
11 Calamity Creek culvert, north of Hwy 11B, New Liskeard Culvert replacement n/a
11 Fraser River Bridge and culverts, west Hwy 631, west of Hearst
Bridge rehabilitation / culvert replacement n/a
11 Groundhog River Bridge, Fauquier Bridge replacement / culvert rehabilitation n/a
11 Hwy 11B interchange northerly to south junction Hwy 17 interchange, North Bay Resurfacing 6
11 Kapuskasing to Opasatika Resurfacing / culvert replacement / bridge rehabilitation
32
11 Nagagmi River to Shekek River, west of Calstock Bridge replacement 10
11 North of north junction Hwy 17/11B northerly, north of North Bay Resurfacing 7
11 North of south junction 592 interchange, Novar northerly
Resurfacing / culvert rehabilitation 8
11 Opasatika River Bridge westerly, Opasatika Resurfacing 32
13
NORTHEASTERN ONTARIO REHABILITATION 2016-2018
Hwy Location Type of Work
Project Length (km)
11 South of Hwy 579, south of Cochrane Resurfacing 17
11 West junction Hwy 101 northerly, Nellie Lake Resurfacing / culvert
rehabilitation 34
11 West of Hwy 631 easterly, west of Calstock Resurfacing 21
17 East junction Municipal Rd. 55 easterly to Hwy
535, Sudbury to Hagar Resurfacing / bridge rehabilitation 39
17 East of Hwy 6 easterly, Nairn Centre Resurfacing / culvert
rehabilitation 20
17 Harris Creek culvert, west of Iron Bridge Culvert rehabilitation n/a
17 Hwy 631 easterly, White River Resurfacing 59
17 Lauzon Creek culvert, Algoma Mills Culvert rehabilitation n/a
17 North of Harmony Lake Bridge northerly, Sault
Ste. Marie Resurfacing / bridge and culvert rehabilitation 27
17 Sand River and Barrett River Bridges, south of
Wawa Bridge rehabilitation n/a
17 Santala, CPR, Municipal Rd. 3 underpasses, Hwy
17, Sudbury Bridge rehabilitation n/a
17 South of Hwy 519, north of Wawa Culvert replacement n/a
17 & 546
Hwy 546 easterly, Iron Bridge to Blind River Resurfacing / culvert rehabilitation 24
14
NORTHEASTERN ONTARIO REHABILITATION 2016-2018
Hwy Location Type of Work
Project Length (km)
17, 548 & 638
Shewfelt Creek, Rydal Bank Creek, Kaskawan River, Bruce Mines
Culvert rehabilitation and replacement n/a
17B
Duchesnay Creek Bridge, CNR overhead, North Bay
Resurfacing / bridge replacement
n/a
60 Hwy 127 westerly, Whitney Resurfacing
27
60 Station Rd. easterly, Algonquin Park Resurfacing
14
64 From Hwy 539 northerly, Field Resurfacing / bridge removal
12
65 Makobe River Bridge, east of Elk Lake Bridge replacement
n/a
65 South of Hwy 66 northerly, north of Englehart Resurfacing 15
67 North junction Hwy 11 easterly, Iroquois Falls Resurfacing
11
69 Still River Bridge, north of 529, Britt Bridge rehabilitation
n/a
94 Hwy 654 westerly, Callander
Resurfacing / bridge and culvert rehabilitation
3
101 Foleyet easterly Resurfacing 21
101 Unknown Creek, Shillington Creek, Shillington Culvert replacement n/a
101 & 129
Sideburned, Nemegosenda, Nebskawash Bridges, Chapleau Bridge rehabilitation
n/a
112
Blanche River Bridge, north Hwy 11, south of Kirkland Lake Bridge rehabilitation
n/a
15
NORTHEASTERN ONTARIO REHABILITATION 2016-2018
Hwy Location Type of Work
Project Length
(km)
129 South of south junction Hwy 101 southerly, South of Chapleau Resurfacing 22
129 Gravel River, Snowshoe Creek and Mississagi River Bridges, east of Ranger Lake Bridge rehabilitation n/a
129 South junction Hwy 101 southerly, south of Chapleau Resurfacing 26
141 Shadow River Bridge, west of Hwy 632, west of Rosseau Bridge rehabilitation n/a
144 Creek culvert, north of Hwy 661, Gogama Culvert rehabilitation n/a
144 Lord’s Creek culvert, north of Onaping Culvert rehabilitation n/a
144 Municipal Roads 35/15 northerly, Chelmsford Resurfacing 5
144 North of Hwy 17 northerly, Chelmsford Resurfacing / bridge and culvert replacement 8
144 Regional Rd. 12 northerly, Dowling Resurfacing 12
519 Hwy 17 easterly, Dubreuilville Resurfacing / bridge and culvert rehabilitation 31
520 Distress River Bridges, Magnetewan Bridge rehabilitation n/a
520 Ontario St. westerly, Burk's Falls Resurfacing 1
522 Hwy 11/McFadden Line interchange westerly, Trout Creek Resurfacing / bridge replacement 4
16
NORTHEASTERN ONTARIO REHABILITATION 2016-2018
Hwy Location Type of Work
Project Length
(km)
529 Naiscott River culverts and bridge, CPR overhead, north of Pointe au Baril
Culvert replacement, bridge rehabilitation n/a
532 & 556 West of Glendale and east of Ranger Lake Bridge replacement / culvert
rehabilitation n/a
538 CPR underpass, east of west junction Hwy 17, east of Blind River Bridge rehabilitation n/a
539 & 805
McCarty Creek and Sturgeon River Bridges, Silver Creek culvert, River Valley
Bridge rehabilitation / culvert rehabilitation n/a
539A Temagami River Bridge, River Valley Bridge replacement n/a
540 Little Current westerly Resurfacing 18
540 West of Hwy 551 easterly, Kagawong Resurfacing 27
540 & 540B West of Hwy 551, Kagawong Resurfacing 18
547 Hawk Creek and McVeigh Creek Bridges, east of Wawa Bridge rehabilitation n/a
551 Mindemoya Creek Bridge, Providence Bay Bridge replacement n/a
552 Hwy 17 westerly, Goulais River Resurfacing 5
552 & 556
Hwy 556 and Hwy 552 east of Hwy 17, Heyden Resurfacing 11
553 & 810
Sauble River and Cameron Creek, north Hwy 17, Massey Bridge replacement n/a
17
NORTHEASTERN ONTARIO REHABILITATION 2016-2018
Hwy Location Type of Work
Project Length (km)
560 6 mile Creek culvert, Tamarac Creek culvert, and Lost Lake Bridge
Bridge rehabilitation / culvert replacement / rehabilitation n/a
577 Driftwood River Bridges, north of Shillington Bridge rehabilitation / bridge replacement n/a
579 Gilles (Brower) Creek Bridge, north of Clute Bridge replacement n/a
583 Obijou River culvert, south of Hearst Culvert replacement n/a
592 CNR overhead Bridge and Ragged Creek Bridge, north of Novar Bridge replacement n/a
592 Little East River Bridges, north of Hwy 11, Novar Bridge replacement n/a
634 North of Hwy 11, north of Smooth Rock Falls Culvert replacement / rehabilitation n/a
637 Massey Creek culvert, west of Hwy 69, south of Estaire Culvert replacement 1
639 Christian Creek culvert, north of Elliot Lake Culvert replacement n/a
652 Louis River culverts, east of Cochrane Culvert rehabilitation n/a
668 Deception Creek and Smith Creek Bridges, south of Hunta
Bridge rehabilitation / bridge replacement n/a
7044 South of North Entrance, Cartier Culvert replacement n/a
7289 & 7290
Silver Lake and Blackstone River culverts, South of Horseshoe Lake Culvert rehabilitation n/a
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
18
NORTHWESTERN ONTARIO REHABILITATION 2014
Hwy Status Location Type of Work
Target Completion Date
Project Length (km)
11 Underway Atikokan easterly and Hwy 11B to Atikokan Resurfacing 2015 20
11 Planned Beardmore easterly Resurfacing 2014 23
11 Underway French River Bridge, east of Atikokan Bridge replacement 2014 n/a
11 Planned Kabaigon River Bridge, west of Shebandowan Bridge replacement 2015 n/a
11 Underway Noden Causeway, east of Fort Frances Bridge rehabilitation 2014 n/a
11 Underway Pickerel River Bridge, east of Atikokan Bridge replacement 2014 n/a
11 Underway Seven Mile Bridge, east of Fort Frances Bridge replacement 2014 n/a
11 Underway Swamp River Bridge, west of Shabaqua Bridge replacement 2014 n/a
11 Underway West of Atikokan westerly Resurfacing 2014 21
11 Underway West of Geraldton westerly Resurfacing and culvert replacement 2014 28
17 Planned CPR overhead, Rossport Bridge rehabilitation 2015 n/a
17 Planned CPR overhead, Schreiber Bridge replacement 2015 n/a
17 Underway Cypress River Bridge, east of Nipigon Bridge replacement 2014 n/a
19
NORTHWESTERN ONTARIO REHABILITATION 2014
Hwy Status Location Type of Work
Target Completion Date
Project Length (km)
17 Underway East of Hwy 71 easterly, east of Kenora Resurfacing 2015 28
17 Underway East of Nipigon easterly Resurfacing 2014 17
17 Underway English River Bridge, English River Bridge replacement 2014 n/a
17 Underway Gulliver River Bridge, east of Ignace Bridge replacement 2014 n/a
17 Planned Ignace westerly Resurfacing 2015 20
17 Underway Jackfish River Bridge, east of Nipigon Bridge rehabilitation 2014 n/a
17 Underway Jackpine River Bridge, east of Nipigon Bridge rehabilitation 2014 n/a
17 Underway Little Gravel River Bridge, east of Nipigon Bridge replacement 2014 n/a
17 Underway Little Pic River Bridge, west of Marathon Bridge rehabilitation 2014 n/a
17 Underway Pic River Bridge, east of Marathon Bridge replacement 2016 n/a
17 Underway Raleigh Lake culvert, west of Ignace Culvert replacement 2015 n/a
61 Underway Canada/US Boundary northerly Resurfacing 2015 21
71 Planned Black River culvert, north of Sioux Narrows Culvert replacement 2016 n/a
20
NORTHWESTERN ONTARIO REHABILITATION 2014
Hwy Status Location Type of Work
Target Completion Date
Project Length (km)
71 Planned Log River Tributary culvert, south of Caliper Lake Culvert replacement 2016 n/a
71 Planned Pine Lake culvert, south of Caliper Lake Culvert replacement 2016 n/a
72 Underway Abram Lake culvert, south of Sioux Lookout Culvert replacement 2014 n/a
105 Underway Trout Lake River Bridge, north of Ear Falls Bridge replacement 2015 n/a
527 Planned Gull River Bridge, north of Hwy 811 Bridge rehabilitation 2015 n/a
527 Planned Kabitotikwia River Bridge, north of Hwy 811 Bridge rehabilitation 2015 n/a
527 Planned Kopka River Bridge, north of Hwy 811 Bridge rehabilitation 2015 n/a
527 Underway Merkley (Lachapelle) Creek culvert, south of Hwy 811 Culvert replacement 2015 n/a
587 Underway Sibley Creek Bridge, Lake Superior Bridge rehabilitation 2014 n/a
588 Underway Whitefish River Bridge, west of Thunder Bay Bridge replacement 2014 n/a
594 Underway Dryden westerly Resurfacing 2015 5
599 Underway Medcalf Lake Narrows Bridge, north of Savant Lake Bridge rehabilitation 2014 n/a
600 Underway Little Grassy River Bridge, east of Bergland Bridge rehabilitation 2014 n/a
21
NORTHWESTERN ONTARIO REHABILITATION 2014
Hwy Status Location Type of Work
Target Completion Date
Project Length (km)
601 Underway Dryden northerly Resurfacing 2015 5
613 Planned Hastie River Bridge, north of Hwy 11, Devlin Bridge rehabilitation 2015 n/a
613 Planned Munro River Bridge, north of Hwy 11, Devlin Bridge rehabilitation 2015 n/a
614 Underway Barabara culvert, south of Manitouwadge Culvert replacement 2015 n/a
614 Underway Barehead culvert, south of Manitouwadge Culvert replacement 2014 n/a
614 Underway Phillips culvert, south of Manitouwadge Culvert replacement 2014 n/a
615 Underway Off Lake Bridge, north of Hwy 11, Emo Bridge rehabilitation 2015 n/a
621 Underway Little Grassy River Bridge, Bergland Bridge replacement 2014 n/a
658 Underway Black River Bridge, Redditt Bridge replacement 2014 n/a
664 Underway Vermillion Lake Narrows Bridge, west of Hwy 72 Bridge replacement 2014 n/a
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
22
NORTHWESTERN ONTARIO REHABILITATION 2015
Hwy Location Type of Work
Target Completion Date
Project Length (km)
11 Dilke Creek culvert, east of Pinewood Culvert replacement 2016 n/a
11 Everett Creek culvert, west of Fort Frances Culvert replacement 2016 n/a
11 Fort Frances westerly Resurfacing 2016 18
11 Longlac easterly Resurfacing 2016 22
11 Noden Causeway, east of Fort Frances Bridge rehabilitation 2017 n/a
11 Pagwachuan River culverts, east of Longlac Culvert replacement 2016 n/a
11 Ramsdale Creek culvert, east of Emo Culvert replacement 2016 n/a
11 Westovers Creek culvert, west of Barwick Culvert replacement 2016 n/a
17 Cedar Creek Bridge, west of Hwy 614 to Manitouwadge Bridge rehabilitation 2015 n/a
17 CPR overhead, west of Schreiber Bridge rehabilitation 2016 n/a
17 Gravel River Bridge, east of Nipigon Bridge rehabilitation 2015 n/a
17 Ozone Creek Bridge, east of Nipigon Bridge rehabilitation 2015 n/a
17 Pays Plat River Bridges, east of Nipigon, Pays Plat Bridge rehabilitation 2017 n/a
23
NORTHWESTERN ONTARIO REHABILITATION 2015
Hwy Location Type of Work
Target Completion Date
Project Length
(km)
17 Shabaqua Corners westerly Resurfacing 2015 13
17 West of Ignace, westerly to Hwy 622 Resurfacing 2015 31
61 Pine River Bridge, south of Thunder Bay Bridge replacement 2015 n/a
71 Nestor Falls northerly Resurfacing 2015 28
72 Moose Creek Bridge, south of Sioux Lookout Bridge rehabilitation 2016 n/a
72 Pelican River Bridge, Sioux Lookout Bridge rehabilitation 2015 n/a
102 Strawberry Creek Bridges, west of Thunder Bay Bridge rehabilitation 2015 n/a
105 18 km north of Hwy 609 northerly, north of Vermillion Bay Resurfacing 2015 30
589 Surprise Lake Narrows Bridge, north of Lappe Bridge rehabilitation 2015 n/a
599 Elbow Creek Bridge, north of Silver Dollar Bridge rehabilitation 2015 n/a
599 Sturgeon River Bridge, north of Silver Dollar Bridge rehabilitation 2015 n/a
628 Big Trout Creek culvert, north of Red Rock Culvert replacement 2015 n/a
24
NORTHWESTERN ONTARIO REHABILITATION 2015
Hwy Location Type of Work
Target Completion Date
Project Length (km)
642 Minnikau River culverts, east of Sioux Lookout Culvert replacement 2016 n/a
658 Hwy 17A northerly, Kenora Resurfacing 2015 26
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
25
NORTHWESTERN ONTARIO REHABILITATION 2016-2018
Hwy Location Type of Work
Project Length (km)
11 Baudette Rainy River International Bridge to U.S. Bridge replacement n/a
11 Brule Creek culvert, west of Thunder Bay Culvert replacement n/a
11 Caribus Lake Tributary culvert, west of Atikokan Culvert replacement n/a
11 Chowder Creek culvert, east of Longlac Culvert replacement n/a
11 Fish Creek culvert, east of Longlac Culvert replacement n/a
11 Flood Creek West culvert, west of Sapawe Culvert replacement n/a
11 Flynne Creek culvert, east of Longlac Culvert replacement n/a
11 Flynne Creek East culvert, east of Longlac Culvert replacement n/a
11 Fort Frances easterly Resurfacing 27
11 Gagne Lake culvert, west of Atikokan Culvert replacement n/a
11 Helen Lake culvert, north of Nipigon Culvert replacement n/a
11 Kakabeka Falls Bridge, Kakabeka Bridge rehabilitation n/a
11 Mills Creek culvert, west of Atikokan Culvert replacement n/a
26
NORTHWESTERN ONTARIO REHABILITATION 2016-2018
Hwy Location Type of Work
Project Length (km)
11 Mineral Creek culvert, west of Longlac Culvert replacement n/a
11 Shamrock Lake Centre culvert, west of Macdiarmid Culvert replacement n/a
11 Shamrock Lake East culvert, west of Macdiarmid Culvert replacement n/a
11 Shamrock Lake West culvert, west of Macdiarmid Culvert replacement n/a
11 Suckle Creek culvert, west of Longlac Culvert replacement n/a
17 Rae Lake Arch culvert, east of Hwy 71 Culvert replacement n/a
17 Revell River Bridge, west of Ignace Culvert replacement n/a
17 Marathon westerly Resurfacing 27
17 White Lake Narrows Bridge, west of White River Bridge rehabilitation n/a
61 Jarvis River culvert, south of Thunder Bay Culvert replacement n/a
61 Slate River Tributary culvert, south of Thunder Bay Culvert replacement n/a
71 Hwy 17 southerly, west of Emo Resurfacing 23
105 Hwy 17, Vermilion Bay northerly Resurfacing 31
27
NORTHWESTERN ONTARIO REHABILITATION 2016-2018
Hwy Location Type of Work
Project Length (km)
105 Pickerel Creek culvert, north of Vermillion Bay Culvert replacement n/a
502 North of Hwy 11 northerly, Dryden Resurfacing 38
502 Kawawia Creek culvert, north of Hwy 11 Culvert replacement n/a
516 Mills Creek culvert, east of Sioux Lookout Culvert replacement n/a
527 North of Hwy 11/17 northerly, north of Thunder Bay Resurfacing 22
527 East Dog River culvert, north of Thunder Bay Culvert replacement n/a
588 Hwy 11/17 southerly, Thunder Bay Resurfacing 7
589 McIntyre River culvert, north of Highway 102 Culvert replacement n/a
590 Hwy 11/17, Kakabeka southerly Resurfacing 24
595 Cedar Creek culvert, west of Thunder Bay Culvert replacement n/a
595 Sitch Creek culverts, west of Thunder Bay Culvert Replacements n/a
596 Alice Creek culvert, south of Minaki Culvert replacement n/a
599 Crow River (July Falls) Bridge north of Central Patricia
Bridge replacement n/a
28
NORTHWESTERN ONTARIO REHABILITATION 2016-2018
Hwy Location Type of Work
Project Length (km)
599 Albany River Overflow(Cedar Rapids), south of Pickle Lake
Bridge rehabilitation n/a
601 Wabigoon River Tributary culvert, north of Hwy 17, Dryden
Culvert replacement n/a
603 Melgund River culvert, north of Hwy 17 Culvert replacement n/a
605 Shoshowae Creek culvert, north of Hwy 17 Culvert replacement n/a
614 Black River Bridge, north of Hwy 17 Bridge rehabilitation n/a
617 Pinewood River Bridge, north of Hwy 11 Bridge replacement n/a
625 Sandlink Creek culvert, north of Caramat Culvert replacement n/a
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.