Transcript
NORTH BIHAR POWER DISTRIBUTION CO.LTD.
(Reqd Office:Vidvut Bhawan Bailev Road Patna)
Letter No: RIq77V χ″ θ′5子′
"′。
=35′■0,F′‐■″
Dated: p? | h5-l 2D15-
CllV IV● υ40=098R20■25σ
`0′
8920ca″ rarr″α +,2‐ 77●38J,0コ 」
E ma l cebrgfnbttdOOmalcom
From,B. K Choudhary,Chie, Engineer, Projects-l.
To,
M/s Godrej & Boyce MIg. Company Limited,Pirojsha Nagar, Vikhroli, lvlumbai400 079.
lLetter of Award for Supplyl
Sub: - Letter of Award for supply of materials & equipments for "composite work of Supply
& Erection work of 33/11 KV PSs, Augmentation of Power transformers &
Distribution Transformers, New & R&M of 33 KV lines, New 11 KV lines, R&M of L1
KV Lines (Partly AB Cable), New & R&M of LT Lines (Partly AB Cable), New & R&M of
DSS etc on turnkey basis for Strengthening, Improvement & Augmentation of
Distribution system under Special Plan (BRGF) scheme Phase'll, Balance work of
PhaseJ and Phase-ll (Part-C) in N,luzaffarpur Vaishali, Sitamarhi and Sheohar district
against NtT No: 229,/PR/NBPDCt/2014.
R.f, 1, NVRFP NO' 22\/PR/NBPDCL/20L4.
2. Your Offer Letter Nor GNB/229lPR/NBPDCU2014 dated 03.01.2015.
3. This Office Letter Nor 328 dated 15.01.2015.
4. Board Of Director's 44th Meeting Resolution No.44'05.03 dated 03.02.2015
Oear Sir,
With reference to your offer submitted against RFP Noi 229IPR/NBPDCL/2014,
subsequent clarifications and your submission vide your letter no.
GNB/229IPR,/NBPDCL/2014/REPLY dated 17.0I.2015, we confirm a.ceptance of your bid
price read in conjunction with the Specifications, Terms and (onditions of the bddrllg
documents and award on you a contract (herein atter refer to as "First Contract" or "Supply
Contract") for supply of all equipments and materials Composite work of supply & Erection
work of 33/11 KV PSS, Augmentation of Power transformers & Distribution Tran5formers,
¢ メ ″〆
R&M of LT Lines (Partly AB Cable), New & R&M of DSS etc on turnkey basis lor
Strengthening, Improvement & Augmentation ol Distribution system under Special Plah
(BRGF) scheme Phase-ll, Balance wo* of Phase-l and Phase-ll (Part-C) in Muzaffarpur
Vaishali, Sitamarhi and Sheohar dastrict and other works as set forth in the Bidding
documents bearing RFP No: 22glPR/NBPDCV2014.
1. Scope of work:
The scope of work under this package shall include but not limited to the following:
This includes survey, engineerinq, de5i9n, preparation of all drawings, testing of the material5
at manufacturers works, supply of materials and equipments as per technical specifications,
loading, unloading, transportation, delivery, storage at works sites, erection and
commissioning in all respect of 33/1lKV PsS, augmentation & renovation of 33/11 XV PSS
includihg associated Civil works, 33 KV & 11 KV Lines etc and allied works including supply
of all related materials on turnkey basis and handing over of the same to NBPDCL. Detailed
scope of work is specified in the technical specification which interalia includes the
followings.
Any other item of work not specifically mentioned above but is required for erection, testing
& commissioning and satisfactory operation ol the 33/11 KV PSs, New/renovated 33 KV &
11 KV lines, Nedrenovated tT Lines, NeuAugmented Power Transformer etc,
NevAugmented Distribution transformer and any other equipment installed under the
contract etc are deemed to be included in the scope of contractor unless 5pecifically
excluded.
The scope of work shall cover the works in complete conformity with the tender specification
and the works specified-
lv. All civil works required for completion of the work shall be deemed to be included in the
scoPe of work.
v. Satisfactory and safe operation of the complete 33,/11 KV PSS, New/renovated 33 KV & 11
KV lines, new/renovated LT Lines, New/Augmented Power Transformer etc, New/Augmented
Distribution transformer and any other equipment installed under the contract etc shall be
0k
¨β
0epOCthe s
/
nded
血′¨
%ahO
emed一 凛
e一 e
d ” Supply/229
V‖
Detail survey, identification inclLlding route alignment, profiling, po e spotting
submission/approval of drawing, a! per direction of Chief Engineer/Engineer In-Charge for
NeWR&M of 33111 KV PSS,33 KV lines, 11 KV lines, LT lines, Distribution Transformers and
for other associated works etc.
Walk through identification of the ele.trical network
execution of the work.
Preparation of all relevant drawings.
x.
Detail survey, ldentification and assessment of R&M work of the 33/11 KV P55, 33 KV lines,
11 KV lines !4ith respect to proper loading of the system/network.
All olher relevant, associated, required works
The Scope of work doe s nolinclude dittribution frrnchise ar.a.
2. Contract oricci
The total contract price for the scope of suppiy for completion of works as contained in
the tender documents thall be Rs. 3,02,91,92,907.00/' (Rs. Three Hundred Two Crores Ninetv
One Lacs Ninety Two Thousand Nine Hundred Seven only) (as detailed in Annexure-l'A & lB)'
which is inclusive of all taxes, duties, insurance, freight (except State or Local taxes like entry
tax/octroi) etc.
3. Pric6:
The prices shall remain "FIRM" excePt gpecified as in APpendix 2: Price Adjustment Clause
1.0 of RFP/ NIr.
L
4. Ouantit!r:
NBPDCL have taken reasonable care to correctly assess the requirement/ /quantity
mentioned in the tender notice and general conditions but due to inherent nature of the
contract, it is to be noted by the contractors that such requiremenvquantity are apploxirnate
actual and sLlbject to increase or decrease as the case may be' No claim will be entertained
for the decrease in quantity or elimination of items tendered' Any minor work required for
comptetion of the job and not mentioned in the tender specifications shall be done by the
contractor without extra cost to NBPDCL. Nonethetess if it is jointly assessed by the Employer
and the Contractor that any major item/component of the work essential for completion rs
r-\NY -)-
in the project area lor planning the
=̈
X
V
Page I of 32
2- @e-'S!ppty/229
Vl
not included in the specification (and is of such nature that has to be necessarily be inclucj'ed
separately), then cost of such items shall be negotiated between Employer and Contractor. It
is nevertheless understood by both Employer and the Contractors that such a provrsion is
enabling in nature and is to be used in only exceptaonal circumstances in genuine deserving
cases of omission from specifications of major items.
The scope of work under this tender/contract shall be generally as detailed under this
tender specification. The Owner reserves the right to increase or de(rease the quantities of
works/items covered under this contract during its execution without any change in the
rates, terms and conditions. There shall be no limit of quantity for the individual items but
the total varaations in all such items shall be timited to +20% ptus twenty percent of the
aontract prices without any change in unit rates, term5 and conditions.
Also, the quantities of individual items may exceed LOA quantity as per site
requirement within the approved lump-sum award cost. The Contractor shall be responsible
for supply and execution of such enhanced quantity for completion of the works after
approval of competent authority.
The contractor shall be paid for such finalized quantity at the unit rate indicated in
the Letter of Award/Contract.
ii. lf any non schedule item is required due to field requirement during execution of work whrch
is not covered in the bid proposal, the rate such atem may bejudacaously decided after proper
rate analysis in special circumstances and the rates so decided sha be mutually agreed to
between the Employer and the Contractor as full and final settlement for that item.
5. Time of completion:
i. The completaon period for the work under Bid shall be Two (2) years as per RFp/NlT
ii. The work shall be considered to be completed only when the Electricat Superintending
Engineer under whom the work is being carried out will issue certificate to this effect.
iii. Strict adherence to the time schedule for pe(orming the works specified in the tender
specification sha‖ be the essence of the contract
iv. As per the MIestOnes specified in Nrr/RFP, The
subm`Jon Of blに ofヂ ppし,ereclon and d● wO
タ
following timeline has been provided fo.
Page 4 o(32´
suppty/229
SI No Period after awad ot work (D.r. ot LOA) Bi l,ubmis,ion S`hedule
1 9 Иヽonths 15% of the awarded work value
2 15ヽИonths 0% of the awarded work value
3 21 Иヽonths 57o % ot the awarded work value
4 24ヽИonth5 100 % of the awarded work va ue
v, Ihe contractor shall submit a detailed PERT Nehvork/Bar chan withln the tirne frame agreed
and as per milestone consisting of adequate number of activities coverinq var ous key phases
of the work sLlch as survey, design, Procurement, manufacturing, shipment and field erectlon
testing & commissioning activities within fifteen (15) days from the date of agreement of the
Contract for approval by Chief Engineer' This network shall also indcate the inter face
facilities to be provided by the NBPDcVowner and dates by wh ch such facilitles are needed
Finalization of the Network/bar charts will be precondition to release of any lnitial advance
payment to the contractor. During the performance of the contract, if in the opinion of the
Engineer in charge, proper progress is not maintained, suitable changes will be made n the
contractor's operations to ensure proper progress without any cost implcation to the
NBPDCV Owner. The interface facilities to be provided by the NBPDCL/owner in accordance
with the agreed network shall also be reviewed while reviewing the progress of the
contractor,
vi. The PERT Cha BAR Chart shall include all a.tivities included n scope of Work separately
vii. Based on the above-agreed Network/Bar chart, weekly/fortnightly/Monthly progress report
shall be submitted by the contractor as directed by the Engineer in charge/NBPDCL
viii. Subsequent to the finalization of the Network, the contractor shall make avai able to the
Engineer in charge/NBPDCL a detailed programme in line with the agreed Contract Network.
Such programme shall be reviewed, up dated and submitted to the Enqineer in
charge/NBPDCL regularly.
Contract performance guarantee (Securiw DePosit) & Performan<e Guarantee:
The successful bidder shall furnish to the NBPDCL/Employer a Contract Performance
Guarantee (Security Deposit) & Performance Guarantee against the contract as Per the terms
prescribed below.
An amount ol l)ok ol total contract value (supply & erection) towards successfLrl
performance of the contract in terms of conditions of the contra.t
:
6
Page 5 oI32 ク/7
Supptyl229
The amount of security money /CPG deposited shall be refunded after successiul
completion of the entire work & taking over of the project & submission ol performance
guarantee.
li, Validity of Bank Guarantee for CPG will be 60 days beyond schedute comptetion period of rhe
project and will be extended till actual successful comptetion of the enrire work and taking
over of the project and submi5sion of performance guarantee.
lil. The performance guarantee shall cover the following guarantee al5o, to the Owner.
iv, The successful bidder guarantees the successful and satisfactory operation of the equipment
furnished and erected under the contract, as per the tender specifications.
v. The Successful bidder further guarantees that the equipment provided and insta|ed by him
shall be free from all defects in design, material and workmanship and shall upon written
notice from the Owner, fully remedy free of expense to the Owner/ 5uch defects as developed
under the normal use of the said equipment within the period of guarantee specified in the
tender specifications.
vi. The contract performance guarantee is intended to secure the performance of the entire
contract. However, it is not to be construed limiting the damages under performance
guarantee clause and damages stipulated in other clauses in the tender document.
vli. The performan(e guaGntee will be returned to the Contractor without any interest at the end
of the period mentioned under clause 34.1.2 above, unless otheMise specified in the tender
specifications.
viii. The Bank Guarantee shall be issued from a Nationalized lndian Bank or Eligibte Scheduled
Eank) (and shall become acceptable to the NBPDCL only after verification by a competent
authority/ officials of the NBPDCL.
ix. The sLrccessful bidder, after receapt of LOA, shall execute the agreement within 30 days of
award of the contract after duly furnishing the 10% bank guarantee. If there is delay beyond
the specified period in submission of contract performance 8G, 15 days notice will be given
to the successful L-l bidder and after which NBPDCL may entail cancellation of letter of
award after giving another 15 days final notice and forfeiting of Earnest Money/bid guarantee
as also detailed under Earnest Money clause.
61 Performance Cuarantee:‐
L To ensure satisfactory performance of works up to the guarantee per od, the contractor shall,
after full completion of the work furnish Eank Guarantee of the amount equal to 5olo (Five
Page 6 o'32 多/́´
´́
よ
(1:〕
`2=二
_ Supplプ
229
percent) of the value of the order (supply and erection ptus civil work). The B.c. ot 5%
Submitted against contract performance guarantee may be adjusted against performance
8.G.
In Case some items have guarantee period more than that of project,
corresponding Performance BG witl require to be submitted and the performance BG would
be released only after receipt of such BG.
The validity of Bank Guarantee will be 60 days beyond
guarantee/warrantee/defect ljability peraod as per clause 22.2 of Volume-1, Sect on IV (CCC).
On due performance and execution, of the order in all respects, the BG will be returned the
contractor without any interest on presentation of ,,No Demand Cedificate.,
Failure of ihe successful Bidder to comply with the requirements of fTB Clause 33 or Ctause 34
5hall constitute sufficient grounds for the annulment of the award and forfeiture of the bld
security, in which event the Employer may make the award to the next owest evaluated
Bidder or call for new bids.
Exe<ution of work:
Electrical lxecutive Engineer: project of the respective district shail function as
Engineer in-Charge, who will be assisted by the concerned Assistant Electrica Engineer:
Project and Junior Electrical Englneer: project. The bill wil be submitted to the Engrneer rn
Charge in quadruplicate.
The bills verified by Engineer-in charge and countersigned by the concerned
Electrical Superintending Engjneer of concerned Electric Supply Circle shall be forwarded tothe Chief Enqineer.
The Scope of Work as indicate in RFp/NtT.
NBPDCL resetues the right to include any incjdental/associated work coosidered
necessary during execution, which has not been covered in the project. The rate of such
works will be payables as per the quoted rates by agency in BOe. In case of non_availability
of rates in BOQ for su.h additional items/works, the rates will bejud cio!sty decided by the
NBPDCL.
Any Civil Work with regard to modification/alteration/extension in 33/11 KV power
Sub Station required on account of aforesaid works, not covered under the scope ofwork/8oQ, will have to be carried out by the agency as per schedule of rates of such civrl
7
k
9
W。 ′
軸 珈
euegaeh
BSPHCLTルυCDPBS
呻//
ntinNBπ
ea
爾pa
2
疏一 e7。F9
The volume of work indicated rn Annexure is tentative and may vary. The NBPDIL
reserves the right to change the volume oI work as per actual field requirement to be
decided by NBPDCL.
Any discrepancy between specification and bid if not specifically/clearly brought out
in the schedule will not be considered as a valid deviation.
ln case of items/works for which price has not been quoted by agency in price bid, it
shall be deemed as 'Zero' price for such items.
7-l Powe. to varv or omit wo.k:
No alterations, under the contract shall be made by the contractor except as
directed in writing by the NBPDCL, but the NBPDCL shall have flrll power slbje(t to the
provision hereinafter contained from time to time during the execution of the contract by
notice in writing, to instruct the Contractor to make such variation without prejudice to the
contract and the contractor shall carry out such variations and be bound by the same
conditions as far as applacable, as though the same variation occurred in the contract.
If any suggested variations would, in the opinion of the contractor, rf (arned oot,
prevent him from fulfilling any of his obligations, or guarantees under the contract, he shall
notify the NBPDCL thereof in writing and the NBPDCL shall decide fo(hwith whether or nol
the same shall be carried out and if the NBPDCL conflrms his instructions, the Contractor's
obligations and guarantees shall b€ modified to such an extent as may bejustitied.
7.2 Subletting of contract
i. The Contractor shall not subcontract the whole of the Works.
ii. The Contractor may sub(ontract parts of the Work/Facilities with prior written consent of
the Employer.
iii. Subcontracting does not alter the Contractor's obligations in any manne. and the
Contractor shall ensure sufficient superintendence as well as impose such terms and
conditions on the sub-Contractor as are appropriate to the parts of the Works/Facilities to
enable the Contractor comply with his obligations under the Contract.
Statutorv Fee and other charoes:-
The tenderer will be deemed to have made
difficulty associated with the site and work
additronal cost or exoense which need to be/
themselves acquainted with any special
indi.ated in the tender including any
incurred to ensure full compliance with
73
βPage E ol32 g
の Supply/229
74
75
current statutory regulation in force. The right of way, !4ay leave, crop compensation,
forest and other clearances will be the responsibility of the contractor and expenditures
towards above if any, shall be borne by the contractor. However, only the statutory fee
towards forest clearance, Railway crossing or any statutory fees, whatsoever, for charging
of equipments and lines etc, if any, shall be paid by NBPDCL. NBPDCL sha extend a
assistance in obtaining the clearances from the Govt. Department
Marking on equipments: All equipments shall be marked Special plan (BRGF) withspecified color coding.
!43LP9!ugE: The tenderer shall have to keep a minimum strength of manpower atsite for execution of the pro.ject as given Clause No-37 of Volume I, Section II olRFP/NIT- However, The tenderer shall keep sufficient experienced strength of manpower in consistence with the target of completion of power sub-stations at siteduring the period of execution.
7,5 Comgliance With Regulations And Bylaws: The Contractor shall conform rn a
aspects with:
i. the provision of any enactment in lndia as applicable from time to time
ii. the regulations or bye-laws of any local body and utilities.
iii. The Contractor shall be bound to give all notices required by statute, regulations or by
laws, as aforesaid and to pay all fees and bills payable in respect thereof. The Contractor will
arrange necessary clearances and Approvals before the Work is taken up.
Ignorance of Rules, Regulations and gylaws shall not constitute a basis for any
claim at any stage of work
7.7 Neoligence:
If the contractor shall neglect to execute the work with due diltgence and expedilon
or shall refuse or neglect to comply with any reasonable orders given to him in writing by
the Enqineer/NBPDCL in connection with the work, or shall contravene the provisions of the
contract, the NBPDCL may give notice in writing to the contractor calling upon him to make
good the failure, neglect or contravention complained of should the contractor fail tocomply with such notice within a period considered reasonable by the NBPDCL from the
date of service thereol in the case of a failure, neglect or contravenrion, incapabte of berng
CDPB
9
N
22
d
ワ
m ・珈
pOe
¨ι
aem
hinsuCh多W
呻 〆
ehO
¨/
thatt/
within蝉
32
made 中
be reasonable necessary for making it good then and jn such case the NBPDCL,halt have
the option and be at liberty to take the work wholly or in part, out of the Contractor s hand
and may carry on the woak envisaged in the contract either by himself or by his agents or
may re-contract at reasonable prace with any other person or persons to execute the same or
any pan thereof and provide other materials, tools, tackle or labour for the purpose of
completing the works or any part thereof. In such event, the NBPDCL shall without being
responsible to the Contractor for fair wear and tear of the same, be entitled to seize and take
possession and have free use of all materials, tools, tackles or other things which may be
available at the site, for use at any time in connection with the work to the exclusion of any
right of the Contractor over the same and the NBPDCL shall be ent tled to retain and apply
and balance sum which may otheMise be than due on contract to Contractor or such part
thereof as may be necessary, to the payment of the cost of execution of sirch work as
aforesaid.
If the cost of executing the work as aforesaid shal exceed ihe balance due to the
contractor and the Contractor fails to make good the deficit, the said materials, tools, tackles
construction plant/equipment or other things, the property of the Contractor as may not
have been used up in the completion of the works, may be sold by the NBPDCL and the
sales proceeds of such sale shall be paid by the contractor on the certificate of the Engineer,
but when all expenses, costs and charges incurred in the completion of the work are pald by
the contractor all such materials, tools, tackles, construction plant or other things not used
up in the completion of the work and remaining unsold shall be removed by the Contractor
7.7 Replacement of defective parts and materials:
a) If during the performance of the contract, the Engineer ln Charge/NBPDCL shall decide
and inform in writing to the Contractor that the Contractor has manufactured any
material any equipment or part of the equipment/material unsound and imperfect or has
furnished any equipment inferior to the quality specified, the contractor on receivtng
details of such defects or deficiencies shall at his own expense, within 7 (Seven) days of
his receiving the notice, or otherwise, within such tirne as may be reasonably necessary
for making it good, proceed to alter, reconstruct or remove such works and furnish fresh
equipmenvmaterials up to the standards of the specifications. In case, the contractor
fails to do 50, the Engineer in Charge/NBpDCL may on giving the contractor seven (7)
days notice in writillc of his intentions to do so, proceed to remove the ponion of the
Page 10。 (32 多/
シ
Supply/229
works so complained of and at the cost of the contractor, perlorm all 5uch work or
furnish all such equipmenvmaterial provided that nothing in this clause shall be deemed
to deprive the Owner/NBPDCL of or affect any rlght under the contract which the o\rner
may otherwise have in respect of defects and deficiencies. The amount so incorred by the
Owner/NBPDCL on above whatsoever, will be deducted from the contractor s
subsequent bill/ performance 5ecurity, as applicable.
b) The contractor's tull and extreme liability under this clause shall be satisfied by the
payment to the owner of the extra cost, of such replacement procured including erection
as provided for in the contract, such extra cost being the ascertained difference between
the price paid by the Owner for such repla.ements and the Contract price by portion for
su.h defective equipment/ materialslrork and repayment of any sum paid by the Owner
to the Contractor in respect of such defective equipment/material. Should the owner not
so replace the defective equipments/materials, the Contractor's extreme liability under
this clause shall be limited to repayment of all sums paid by the owner under the
contract for such defective equipmenvmaterials.
7.4 R€oorts and PhotoorEoh3:
During the various stages of work progress, the contractor shall at its own cost
submit computer generated periodic progress repons (Weekly/Fortnightly/Monthly)/tvIS
reports as may be reasonably requlred by the Engineer-in-Charge with such materials as
charts, netwo*s, photographs containing dates, test certificates etc_ Such reports 5ha be in
format and size as may be required by Engineer-in-Charge/NBPDCL and shall be submitted
in at least three copies, or as required. Report for assets capitalization shall also be
submitted in appropriate format to be decided in consent with the Engineer-in
Charge/NBPDCt.
8. Payment Term
Payment to the contractor for the performance of the contract will be made by ihe
Senior Manager tinance and Accounts, NBPDCL Patna as per the conditaons specified here
under. The final payment shall be made on completion of all the works and tulfillment by
the contractor of all his liabilities and responsibilities under the contractor. The bidder is
required to submit measurement sheet and bills for the work done as per the actual work
Paee11or322r.9&sueetvt2*s
done following new procedure order. proper item wise accounting of material supply,
erection and asset created has to be maintained by the contractor which will e verified by
Engineer in charge from time to time
Payment Terms applicable to Contracts under Special plan (BRGF) Scheme:
A Payment O, Th€ Work:
A.l Advan<€ Pavmant:
Interest bearing mobilization advance @ 150,6 of the contract value of ex works componentof supply portion shall be paid after contract agreement is siqned aqainst submission of an
irrevocable Bank Guarantee of 110% of the value of mobitization advance issued by anyNationalized Bank or Scheduled Bank to the satisfaction of NBPDCL. The Bank Guaranteeshall be valid upto scheduled completion period which wi be extended ti recovery ofentire advance amount.
Note: Interest rate for Mobilization advance shall be chargeable as per Bank rate prevailing on 1,,
day of month in which advance is paid_
The advance shall be deducted on pro,rata basis from the running bills of the contractor.
At a later stage, if the contractor deposits revised i(evocable B.G. co(esponding to
balance mobilization advance, the same shall be accepted and the original/previous B.G.
shall be released.
The mobilization advance will be paid to the Contractor in two installments of 7.5./o each.
.The first installment of 7.5% shall be relea5ed on preseotation of the following documents:
1) Contractor's Request Letter for Mobilization Advance along with the invoice
2) Execution of the agreement by the Contractor
3) Submission of Irrevocable Bank Guarantee as above
3) Detailed PERT Nehrork/Bar chart and its approval by the Employer
The second installment of 7.5 % shall be released on presentation of contractor invorce
and satisfactory utilization certificate of first advance installment.
This payment is an optional payment.
A.2- ProgrersivePaymentr
An interim payment of 75 o/o
portion shall be made og the
(Seventy five percent)
basis of actual supply
&.K/
" of the price components of supply
made as per the bill (separate bill lor
Page 12 of 32 多//
ル
Suppiy/229
Part-A and Part-B work) duly verified and admitted by the Engineer-in_Charge and
countersigned by the concerned Electrical Superintending Engineer or officer authorized
by NBPDCL after deduction/adjustment of the Mobilization advance on pro,rata basrs
and also on submission of documents indicated herein under subject to the conditions laid
down in under noted sub-para,(i) to (iv):-
(a) Certification of receipt of material at site by the Engineer of the Owner.(b) Contractor's detailed anvoice & packing list identifying contents of each shipmenr.(c) Insurancepolicy/certificate(d) Manufacturer's/Contractor'sguaranteecertificateoleuality.(e) Material lnspection Clearance Cenificate (MICC) for dispatch issued by the Employer,s
representative and the Contracto/s factory inspection report.(0 Test certificate
A.3 The payment as for above schedule shall be made tilt 50% payment mitestone for suppty is
achieved. Thereafter payment against supply ponion for a particular Unit becomes eligibte
upon completion of 40% erection work in that unit at which A ,,Unit,, is defjned as
combination of certain !upply and erection schedules.
In case, the Contractor opts not to take interest free advance then this payment shall
be 90% instead of 75%.
a) The "useful section" means that portion of the "Unit,, which enhances the reliability ofpower supply the capacity of distribution system.
b) for this project following "Units,, have been constituted.
Unit 1: Supply & erection work related to New 33/11 kV Substations
Unit 2: Supply & erection work related to Augmentation and additional power
Transformer 5 MVA & 10 MVA of existing 33/11 kV Substatjons
Unit 3: Supply & erecuon work related to New 33 kV Lines
Unit 4: Supply & erection work related to R&M of existing 33 kV Lines/feeders, 11 KV
Lines/feeders and LT lines (AB Cables).
Unit 5:Supply & Erection work related to New 11 KV line with or without new DSS. (Except
the work cover in t Below)
Unit 6: Supply & Erection work related to New LT lines (A8 Cabte) with or wrthout new
DSS.(Except the work cover in F Below)
9 ”
n
2
m ψ
ofex‐ 勁
M&Rd9¨
■
CO
tedt ″
aFE
n
& お
PP‐y 山
Su “ 2
7 d
nit
i3
U
e町
(b)
Unit 8: Supply & Erection work related to work related to miscellaneous items of materials
and works not covered under unit 1 to 7. (Ercept the work cover in F Eelow)
Unit 1 consists of erection of certain number of new 33/11 kV Power Substations. For
example, if four (4) nos. of new 33/11kV power substations are identafaed for erection in
any tender; then the contractor on completion of 2 nos. of new 33/11 kv Power Sub_
stations (i.e. 50% of 4 nos. of power sLrbstation) in all respect shall be eligible for payment
towards supply of material beyond 50% for unit 1. However, the progressive payment
towards supply portion items, beyond 507", shall be released to the Contractor after
converting such power substations into "Useful completion of work of as5ociated 33 kV
incoming lines and 11 kV outgoing feeder.
Unit 2 consists of R&M and augmentataon work of certain numbers of existing Power
Substations. For example, completion of augmentation of 10 Nos of Power Transformers
and installation of 10 Nos additional Power Transformer (400/6 of 10 Nos of augmentation
and 10 Nos of additional Power Transformers i.e. 4 Nos each) in all respect shall make
contractor eligible for the payment towards supply of material beyond 50% of unit 2.
Unit 3 consists of new 33 kV feeders. Each 33 kV example, if 10 new 33 kV lines are
decided to be erected, the contractor, on work completion of 4 feeders (400,6 of 10 feeders)
in totality shall be eligible for payment towards supply of material beyond 5070 for unit 3.
Unit 4 consists of RSaM of existing 33 kV feeders/lines, 11 KV feeders/lines and LT Lines
Each existing 33 kV, 11 (V feeder and LT line lrom Particular DSS is a "Useful Se(tion . For
example, if fifteen nos of 33 KV feeders, Fifteen Nos of 11 KV feeders and 100 Nos of LT
Lanes are identifled for Renovation & Modernization, the contractor, on work completion
of 6 Nos of 33 KV feeders, feeders (40% of 15 feeders), 6 Nos 11 KV feeders 140'k ol 15
feeders) and 40 Nos ot LT Lines (40% of 100 LT Lines) in totality shall be eligible for
payment towards supply of material beyond 5070 lor unit 4.
Unit 5 consists of 11 KV Lines/feeders with or without new DSs. For example, Unit 5 (onslsl
of identified 15 Nos. of new 11 KV lines/ feede6 wath or without new DSS, the contractor,
on work completion of 6 Nos. (40 % of 15 Nos. of feeders/lines) of 11 KV lines/leeders in
totality shall be eligible tor payment towards supply of material beyond 50olo for unit 5.
Unit 6 consists of new LT lines with or without new DSs. For example, Unit 6 consist of
identified 15 Nos of New LT lines from existing DSS or new DSS , the contractor, on work
completion of 6 Nos (40 % of 15 Nos of lines) of new LT lines with old or new DSS in
totality shall be eligible lor payment towards supply of material beyond 50% for unit 6
(d)
(e)
,Page t4 o(32 多′/
ル
Supplソ′229
(a)
(C)
Unit 7 consists of capacity augmentation and R&M of existing DSS. Complete R&M work
of the distribution sub Station and/or augmentation of existing DT capacity, wherever
required is a useful section, majority of these wok go simultaneously as per actual quantity
decided afterjoint survey. For example, for identified 60 Nos of DSS, for R&M works the
contractor on work (ompletion of 24 Nos. (40 % of 60 Nos of DSS) along with capacity
aiJgmentation as required as per scope of work in totality shall be eligible for paymenl
towards supply of material beyond 50% for unit 7.
Unit 8 consists of supply and Erection wo* related to miscellaneous items of materials and
works not covered under unit 1 to 7.
Erection means installation of all the components mentioned in'unit'
The Progressive payment to be given up to 50% of the supply of materials and, beyond
50%,40% erection work is to be completed as defined unit wise as above.
The payment shall be restricted up to 80% of interim payment.
Further, payment for remaining 20% of supply portion for a parti(ular unit shall be
released on completion of 75016 of total erection of that particular unit. The concept of 75%
erection shall conform to as considered for40% erection as explained above.
Erection Pri(e Component (including civil works):
Advance Payment (Optional) ***t
Interest beadng mobilization advance @ 10 % of contract value for erection items
(including civil items) shall be paid after contract agreement against Eank Guarantee of
110% of the value of mobilization advance issued by any Nationalized Eank or Scheduled
Bank. The validity of Bank Guarantee will be scheduled completion period which will be
extended till recovery of entire advance amount.
lnterest rate ror Mobilization advan(e shall be chargeable a5 per Bank rate prevaiting on 15'
day of month in which advance is paid.
The advance shall be deducted on pro,rata basis from the running bills of the
contractor. At later stage, if the contractor deposits revised 8.G. corresponding to balance
mobilization advance, the same shall be accepted and the original/prevrous B.G. shall be
released.
The mobilization advance shall be released in two installment. The first installment of 5 %
of total erection price shall be paid on presentation of the following further document5:
(9)
A.4.
(D
(a) Subm、●On of detailed invoに e for advance payment
,の″Page l5 ol32 2 Supply/229
(b) Establishment of Contractor's site offices, and certification by Engineer-in charge
that satisfactory mobilization for erection exasts.
The second installment of 5 7o shall be released on presentation of contractors invoice and
satisfactory utilization certificate of first advance installment.
This payment is an optional payment.
(i0 80% (eighty percent) .,'of the erection price component wilt be paid on progressive basis
depending on the actual work done as against each completed erection activity and as per
the bill duly verified and admitted by the Engineer-in Charge and countersigned by the
concerned Electrical Superintending Engineer of electric Supply Circle and after deduction
/ adjustment of the Mobilization advance and interest on pro,rata basis. The assets
register is mandatorily to be submitted along with the bill for capitatization of assets
*'* In case, the contractor opts not to take advance then this payment shall be 90% instead of 8070.
In case the Contractor opts to take advance, after adjustment of advance the interim
payment limit will increase to 90% instead of 80% of erection price component.
(iii) The balance 10 % (ten percent) of the erection pri(e component shalt be paid after 5uccessfut
completion of testing & commissioning of the lines, substations, taking over works as per
scope of the tender and issuance of taking over certificate by Engineer-in-Charge and
acceptance of closure proposal.
The above retention amount may be released on request of contractor aqainst submission
of Bank guarantee of equivalent amount which will be valid upto hvo months beyond
completion and taking over of the project and will be exteaded upto two months beyond
acceptance of closure proposal of of the project.
Note: Commissioning, for the purpose of payments shall mean satisfaatory completion of all
supplies, erection, commissioning checks and successful completron of atl site tests and
continuous energisation of the equipmenvmaterials at rated voltage as per the Contract
and to the satisfaction/approval of the Employer.
Note:Payment towards Taxes and Duties
Taxes and duties, applicable as per Indian Tax laws, in respect of direct transactron
between NBPDCL and the contractor and to be reimbursed by NBPDCL as per the contract,
will be reimbursed on receipt of materials and equipments in good condition against
documentaTy evidence. !ntry taxl octroi is to be y
bornebルNBDPCL as per Contract.
^ Su99lyl229
d*----/r...
Paqe 16 ot 32 /'
!'
Payment towards taxes & duties shall be released by NBPDCT d rectly to the
Contractor against invoices along with documentary evidence, to be submitted by the
Contractor as specifled in the Contract. The details are mentioned at Clause 10 oi GCC,
Volume-1, SectionlV.
A.5. Incentive/Stage penalty against earlv/delaved <ompletion of the proiect:
If the contractor achieves completion of the whole of works and takeover of the project,
prior to the project completion schedule or any extension given to them, the ernployer shal
pay to the contractor an extla amount @ 0.57" per week subiect to max rnLrm 4% of the
contract amount. The payment will be done after the release of project competion
certificate by employer against the invoice raised for incent ve against early completion of
project and acceptance of closure report of the project by Emp oyer.
Milestones for submission of bills of supply, erection and civil works
5. No Period after award of work(Date of LOA)
Bill subm ssion Schedule
1 9 Иヽonths 15% of the awarded work value
2 15ヽИontlls 40olo of the awarded work value
3 21 Иヽonths % of the awarded work value
4 24 Months 100 o/o of the a!,varded work value
For delay/ failure in submission of bills both for tupply & erection as per
above mentioned milestones, stage penalty shall be levied & recovered from the bills @0.5
% per week from value of the non-submitted bills of supply & erectlon/ clvi work which is
scheduled to be submitted as per milestone sub.ject to conditlon that limit of all pena ties for
delay shall not be exceed the limit of liquidated damage for delay i.e. maximum of
10% of contract value-
The deducted amount towards stage penalty for a particular rnilestone shall be released
immediately if that bill of un executed items of supply or erection / civil works is sLrbmitted
subsequently matching with the next milestone of project as specified in above table.
VH1 6 Mode of Pavment
Vllll -6.1 Payments shall be made
Contractols invoice complete in all respects
promptly by the EmpLoyer after receipt of
and supported by the requisite documents and
G-0p
Page 17 of 32
1 ,,/(,/ v supply/229
82
fulfillment of stipulated conditions, if any. All the payments made during the contract shallbe on account payment only.
VIII-.6.2 In case the Contract is awarded on a joint venture. the Advance gank
Guarantees as well as Contract Performance Guarantees referred above shall be in the nameof the Joint Venture covering all the partne6 of the Joint Venture and not in the name of theLead Partner or any partner (s) of the Joint Venture alone.
Insurance of suoolied material and ere<tio[ thereofr
ln addition to conditions specified in the tender specification in various other clauses
following shall also apply:
All the equipments and materials being supplied by the Contractor 5ha be kept comptetety
insured by the Contractor at his cost from the time of dispatch from the Contractor s/Sub
vendor'! works, up to the completion of erection and final cheaking, testing and
commissioning, at site and taking over of the project by NBPDCL. The Contracior has to
submit proof of insurance of all equipment and materials along w th the bills. The insurance
value cannot be less than that of payment already made / proposed to be made to the
Contractor.
Funher, all the equipments and materials being supplied by the NBpDCL (herein after to be
referred as NBPDCL supplied items) for the pe.formance of the works shall be kepl rnsured
by the Contractor against any loss, damage, theft, pilferage, fire etc for the comptere penod
of storage, erection and aommissioning up to the time of taking over of the works by
NBPDCL. The insurance cost caused by the NBPDCL supptied items, if any, sha be borne by
the Contractor.
It will be the responsibility of the Contractor to todge, pursue and settle all claims with the
Insurance Company in case of any damage, loss, theft, pilferage or fire. The aontraator shall
replace the losvdamaged materials promptly irrespective of the settlement of ctaim by the
underwriters and ensure that the work progress is as per agreed schedule. The losses, if any
in such replacement will have to be borne by the Contractor.
Reconciliation of accounts:
The contractor shall prepare and submit every three months statement covering payments
claimed and the payments received vis,i-vis the works executed, for reconciliatron of
accounts with the employer.:fhe contractor shall also prepare end submit a deta led account
2r'Paqe l! ot 32 Y'
90
.9@h-
Stpply/229
8.4
of employer issued materials received and utilized by him for reconciliation purpose in a
format to be discussed and finalized with the employer before the award of (ontract.
10.0 Taxes and Duties: All terms related to Taxes and Duties shall be applicable as per terms of
RFP/NN.
11.0 Liquidated damagE for delay in completion of proiects:-
For delay/ failure in submission of bills both for supply & erection as per above mentioned
milestones, stage penalty shall be levied & recovered from the bills @0.5 o/o per week from
value of the non-submitted bi s of supply & erection/ civil work which is scheduted to be
submitted as per milestone subject to condition that limit of a penalties for detay shall nor
be exceed the limit of ljquidated damage for delay i.e. maximum of Loyo of contract value.
The deducted amount towards stage penalty for a panicuar milestone sha be reteased
immediately if that bill of un-executed items of supply or erection / civil works is submitted
subsequently matching with the next milestone of project a5 specified in above tabte.
12. Takino Oven
12.1 Upon successful Trial - Operation of the Facalities or any part thereof, pursuant to cCC Sub,
Clause 20.1.4, the Project Manager shall issue to the Contractor a Taking Over Ce.tificate as a
proof of the acceptance of the Facilities or any part thereof. Such certificate shall not re|eve
the Contractor of any of his obligations which otheMise survive, by the terms and
conditions of Contract alter issr,e of such certificate.
72.2 lf within forty (40) days after receipt of the Contractor.s notice, the project Manager fa ls to
issue the Taking Over Certificate or fails to inform the Contractor in writing of thejust flable
reasons why the Project Manager has not issued the Taking Over Cenificate, the Facilities or
the relevant part thereof shall be deemed to have been Taken Over as at the date of the
Contractor's said notice.
12.3 upon Taking Over of the Facilities or any part thereoi the Employer shall be responsible for
the care and custody of the Facilities or the relevant part thereol together with the risk of
loss or damage thereto, and shall thereafter take over the Facilities or the relevant part
thereof.
However, Components of completion of the Facilities and Operational Acceptance i e
Physical Completion, Pre Commissioning, Commissioning, Trial Operaion, Operationat
acceptance, Practical acceptance etc shall be considered as per terms of RFp/NIT.
Pa9e 19 0子 32 ,ク ′ ″メ
'L´ ″
Soppty/229
13 IEqrance
13.1 In$ran<G R€quirGrnents Eefore commencing execution of Works, unless stated otherwise
in the Special Conditions of Contract, it shall be obligatory for the Contractor to obtain at hrs
own cost stipulated insurance cover under the following requirementsl
a- Contractor's All Risk and Third party Cover.
b. Liabilaty under the Workmen's compensataon Act, 1923, Minimum Wages Act, 1948
and Contract Labour (Regulation and Abotition) Act, l97o.and other appticable
Statutes
c. Accidents to staff, Engineers, Supervisors and others who are not governed by
Workmen's Compensation Act.
d. Damage to Material, machinery and Works due to transit, tire, theft etc.
e. Any other risk may be specified in the Special Conditions of Contract.
f. Any other insurance asked for by the Employer during exe(ution of the Contract.
13.2 Policv ln Joint Names Of Contr.ctor And Employer: The policies referred to under Sub
clause 13.1 above shall be obtained in the joint names of the Contractor and the Employer
and shall inter-alia provide coverage against the following, arising out of or in connectton
with execution of Works, their maintenance and performance of the Contract.
Loss of life or injury involving public, employee of the Contractor, or that of Employer
and Engineer, labour etc.
Injury, loss or damages to the Works or property belonging to public, Government
bodies, local authorities, utility organizations, Contractors, Employer or others.
Cunenqr ot Poli.y: The policies shall remain in force through out the period of execution
of the Works and till the expiry of the Defects Liability Period. If the Contractor faits to
effect or keep in force or provide adequate cover in the Insurance policies mentioned in
Sub-clause 13.1, or any other insurance he miqht be required to effect uoder the Contract,
then, the Employer may effect and keep in force any 5uch insurance or further insurance
and the cost and expenses incurred by him in this regard shall be deductible from
payments due to the Contfactor or from the Contractor's Performance Security.
b
13.3
メPaqe 20 ol32
A."k &- Suppty/229
14 General terms and conditions:
Terms and conditions on issues not covered in this Letter of Award thall be quided
by Terms of RFP No: 229IPR/NBPDCV2014, Bid Proposal , Technical Specification etc. of 8id
documents further Pre-bid clarifications, amendment and addendum issued and the all these
cumulatively will form the pan of this LOA. ln case, any error is obseNed in the LOA on a
future date the same shall be rectifled as per terms of RFP/NIT. General Conditions &
General technical requirements, Eid proposal, Technical specifications etc. and prevalent
norms and conditions of contract in NBPDCL/SBPDCL/8SPHCL.
AglggE€n]!:- The agency, after receipt of LOA, shall execute the agreement within 30 days
of award of the contract after duly furnishing the 10olo bank guarantee. If there is delay
beyond the specified period in submission of contract performance 8G, 15 days ootice will
be given to the agency and alter which NSPDCL may entail cancellation of letter of award
after giving another 15 days final notice and forfeiting of Earnest Money/Bid glarantee as
also detailed under Earnest Money clause.
Pavinq Authoritv:-
Senior Manager F&A, NBPDCL will be the paying authority.
Desion Reouirement-
A. All equipment and materials shall be designed and manufactured in conform ty will
Standards stated hereinafter. All provisions of lndian eledricity Rules concerned, I S S., REC,
IEC specifications NBPDCL's standard practices have to be complied with.
B. WIND LOAD:
Structure and outdoor equipment shall be designed to withstand a w nd load as set forth ln
the latest revision of I5: 875.
C. EARTHOUAKE:
The equipment shall be designed to resi5t lateral inertial forces developed rn each
corresponding mass centre due to seismic ground motion. The structural parts and thetr
anchorages shall be designed to withstand earthquake range of the Zone.
15
17
fPage 2l ol32
t ,.'(..
″Supply/229
16.
18
D. SAFETY FEAJURES:
The Contractor shall provide adequate guards for the equipment to prevent all sorts of
hazard and to safeguard personnel and property. All Safety devices shall be in accordance
with the applicability of the Government regulations and statutory requirements in force
E. MEASURTMENT SYSTEM:
All instrument/recorders etc. will be calibrated in the metric (C.G.S./MKS) system of units- In
drawings or specifications wherever both Metric and British units are indicated; the
contractor shall indicate the equipment dimensions in both the units. Location markinq of
the equipments shall be in C.G.S. (Metric) units.
F. ACCESSIBILITY]
Special attention Shall be given to the design, arrangement and assembly of all equipment
to ensure ease of maintenance and renewal of parts.
G. STANDARD EOUIPMENT & MATERIALS AND ALTERNATES:
i). Equipment, matedal and erection superyision and other services shall be complete in all
respects and in strict accordance with the specification, except that alternative
proposals may be submitted where stipulated provisions depart from the Contractor s
standards, provided that the substitutions are approved as equivalent by the NBPDCL
and the reasons therefore are stated by the Contractor in his proposal together with
the amount of money to be added or deducted in the proposal as a result of such
!ubstitutions.
ii). Any request for substitution after the contract is awarded shall be accompanied wrth
the difference in price and such substitution does not cause any addltion to the
contract pdce.
iiD. All work shall comply in all respect5 with the requirements of the latest edition of the
relevant Indian Standards, International Electro Technical Commi5sion (lEc) standards,
REC specifications or any other equivalent better Standards and NBPDCL's Standard
practices.
iv). Where contlicts occur between any of the Laws, rules, regulations standards, and so-
forth. specified herein, the more stringent requirements shall govern the work.
8ecleldcIlifilelie!:-Town wise, area wise, village and habitation wise 33 & 1l.KV network route identification
will be carried out by the contractor in consultation with field officers. A detailed route
diagram \/ill be prepared by the contractor indicating the existing infrastructure, proposed
S'([〕‐4:二´́́́́:upply/229
Pase22ot32 2
27,7 tBpection: The materials are to be inspected in following manner.Lrvel-l ln3pe<tio.r
The fo'owing eguipments/ materiars sha, be inspected by NBpDct or itsAuthority at manufacturer/ supplier premises before its dispatch. A prior notjcefrom the inspection date (r) shall be required from the contractor
a) Energy meter & CMRI
b) Transformer, CT, pT
c) Insutator (HV type)
d) UG & AB Cabtes (HT&tT)
e) Conductor
D VcB
9) AB Switch/1sOlato「
Authonzed
of 15 days
Levcl-Il inspc<tion
The following equipments/ materials shall
Authority at manufacturer/ suppljer premises
from the inspection date (s) shall be required
a) Poles
b) HG/ DO Fuse
c) Distribution 8ox
d) Lightning Arrester
e) Controt & Relay panel
D Eattery & Charger
9) Battery Set
be inspected by NBPDCL or its
before its dispatch. A prior notice
from the contractor
Authonzed
of 15 days
Level-[l in5pection
The following equipments/ materials shall be supplied to site wrthout pre-drspatchinspection by NBPDCL or its Authorized Authority. The equipment/ materials sha| besupplied as per technical specification and standard drawing/ approved drawinq. Suchwaiver of inspection shall ln no way absolve the responsibilty of contractor to provideequipment / material a5 per the requirement of contract. The dispatch document shaltinclude test reports and other documents
report (in o.ginals) prep"r"d by bo,h (r"pr:r:t;:T:ilH:::: #,,""o,jr"::,:::Page 24 al 32
多/レ
Supply/229
infrastructure under BRGf. As detailed above, town wrse, area wise viltage wjse &habitation wase diagram indicating HTILT network, distribution transformer, too wr be
prepared by the contractor. The drawings/ reports, will be 9ot approved by the Etectricat
Executive Engineer of the concerned Division or the officer so authonzed by NBPDCL forthis purpo5e, prior to execution of the work within the scope of LOA. Any deviatron,
beyond the prescribed scope of work will be 9ot approved by the Chief Engineer, project-1.
In course of execution any deviation within the saope, will be done in consent wlth the
Electrical Superintending Engineer of the concerned circle or authorized officer of NBpDCL
for which revised drawing will be got approved.
19. qualification Criteria for selectior of Sub Contractor/vendo.: If the Contractor proposes
for approval of new Sub Contractor/ryendor during execution of work or supply of
equipments, the all documents should be submitted as per terms of RFp/NI along with
satisfactory past performance certificate issued by Central/State utility during last 5lFive)
Years as per the date of such proposals.
The employer reserves the right to reject any proposed 5ub contractors/vendor, in
case the proposed sub contractors/vendor are not meeting the qualification criteria.
consignee:-
Consignee of the materials under the LOA will be the Electricat Superintending
Engineer of Concerned Electrical supply circle of NBpDCL
lnrpection and testing at Gontractor's premiie!: pre-dispatch inspection 5hall be
performed on various materials at manufacturer's work place for which contractor shall be
required to raise requisition giving at least 7-day time. Depending on requirement,
inspection shall be witnessed by representatives of Employer..
The turnkey contractor shall ensure that pre-dispat(h inspection for materials are
intimated only when the material is completely ready for inspection. On due date of
inspection, if it is found that materials are not ready in required quantrties, all expenditures
incurred on deployment of various inspecting offi.ials along with a fine of Rs 50,OOO/-
shall be recovered from the bills of the agency. 2nd such situation at same
manufacturer/supplier shall result in rejection of name of manufacturer from list of
approved vendors/sub-vendors.
20
21
Page 23 of 32 多 srpply/229
quality & control engineer of imPlementing agency) are to be submitted' Also the
inspected materials may be subjected to inspected by utility field officers at site.
a) Earthing Materials
b) GI Items
c) MS Fabrication items
d) Danger & Sign Board
e) Nuts & Bolts
0 PV Spacers
9) Performed jointing sleeves
h) ABC Accessories
i) cuy & Schakle insulator
j) Al. Binding wire/ Barbed wire
k) Performed insulator binding
l) Lamp Holder and switch (SA) light Fitting
m) PVC Pipes (all sizes)
NBPDCL re5erve3 the right to.ddl delete any item listed above in level-I,
Level-tr and Level-lll
21.2 During the aourse of manufacturing the Employer or his authorized representat ve shal have
access to supplier / sub-supplier's works at all reasonable times for the purpose of wilnessing
the manufacturing, inspection and tesiing of all components'sub assembly and assemb y
21.3
21.4
Eefore issuing the inspection call the supplier shall ensure that all the mater als for the lot ro
be inspected is ready in all respects. lf at the time of visit of inspector the supplier fails to offer
the material as per lot of the supply order or some of the tests are not cond!cted or any items
/ equapment is found defective and would need reoffering at a later date thereby requrnng
additional visit of the inspector, the expenditure incurred by NBPDCL towards the visit of the
inspector shall be charged to the supplier as per NBPDCL rules and same shall be recovered
from his bills.
All the materials furnished shall be of tested quality and subject to rigid inspection and testing
as specified in the Technical Specification and international standard. No material shall be
dispatched untl a‖ tests, analysis and de“eCdnadeep
¨Cn”
be
onhav(郎́
deshop insp
rPage 25 al 32 Ab sleetYt22e
copies of results of tests, analysis have been accepted and dispatch instruction issued Oy ihe
Chief Engineer (Project-l).
The NBPDCL reserves the right to outsource the pre-dispatch inspection of materials wholly or
partly and also for waive of anspection, if so needed.
Quality assurance shall be undertaken in the following areas of the project implementation as
per IECnSS/REC norms:-
a) Quality of material/equipment being supplied
b) Quality of works in the field.
22 Test and Inspection:
22-l The Contractor shall at its own expense carry out at the place of manufacture and/or
on the Site all such tests and/or inspections of the Plant and Equipment and any part of
the Facilitaes as are specified in the Contract.
22.2 The Employer and the Pro.ject l,,ranager or their designated representatives shall be entitled
to attend the aforesaid test and/or anspection, provided that the Employer shall bear all
costs and expenses incurred in connection wilh such attendance including, but not limlted
to, alltraveling and board and lodging expenses.
22.3 Whenever the Contractor is ready to carry out any such test and/or inspection, the
Contractor shall give four weeks advance notice of such test and/or inspection and of the
place and time thereof to the Project Manager. The Contractor shall obtain from any
relevant third party or manufactirrer any necessary permissron or consent to enable the
Employer and the Project Manager (or their designated representatives) to attend the test
and/or inspection.
22.4 The Contractor shall provide the Project Manager with a certified report of lhe results of
any such test and/or inspection.
If the Employer or Project Manager (or their designated representatives) fails to
attend the test andlor inspection, or if it is agreed between the parties that such persons
shall not do so, then the Contractor may pro(eed with the test and/or inspection in the
absence of such persons, and may provide the Project Manager with a certified report of
the results thereof.
22.5 The Project lvlanager may require the Contractor to carry out any test and/or rnspection
not reqrrired by the Contract, provided that the Contractor's reasonable .osts and
晦‖輌r"山リッ…商
「
1毀
215
216
Contract Price. Further, if such test and/or inspection impedes the progress of work on the
Facilities and/or the Contractor,s perlormance of it5 other obtigations under the Contract,
due allowance will be made in respect ot the Time for Completion and the other
obligations so affected.
22.6 If any Plant and Equipment or any part of the Facilities fails to pas5 any test and/or
inspection, the Contractor shall either rectify or replace such plant and Equipment or part
of the Facilities and shall repeat the test and/or ihspection upon giving a notice under GCC
5ub-Clause 19.3.
22.7 If any dispute or difference ot opinion shall arire between the parties in connectron with or
arising out of the test andlor inspection of the plant and Equipment or part ot the Facilities
that cannot be settled between the partaes within a reasonable penod of time lt may
be referred to an A.bitrator lor determination in accordance with GCC Sub-Ctause 39.
22.a The Contractor shall afford the Employer and the project Manager, at the Employer,s
expense, access at any reasonable time to any place where the plant and Equipment are
being manufactured or the Facilities are being installed, jn order to inspect the progress
and the manner of manufacture or installation, provided that the project [4anager shalt
give the Contractor a reasonable prior notice_
22.9 The Contractor agrees that neither the execution of a test and/or inspe.tion of plant and
Equipment or any part of the Facilities, nor the aftendance by the Emptoyer or the pro.ject
Manager, nor the issue oI any test certificate pursuant to GCC Sub-Ctause 19.4. shall
release the Contractor from any other responsibilities under the Contract.
22,70 No part of the Facilitaes or foundations shall be covered up on the Srte wrthout the
contractor carrying out any test and/or inspection required under the contract. The
Contractor shall give a reasonable notice to the project Manager \rhenever any such part
of the Facilities or foundations are ready or about to be ready for test andlor inspection;
su(h test andlor inspection and notice thereof shall be sub.ject to the requirements of lheContract.
22.11 The Contractor shall uncover any part of the Facilities or foundations, or sha make
opehings in or through the same as the project Manager may from time to trme requrre at
the Site, and shall reinstate and make good such part or parts.
If any parts of the Facilities or foundations have been covered up at the Site
after compliance with the requirement of GCC Sub-Clause 19.10 and are found to be
executed in accOrdance w th the COntract′ the expenses OF uncOve「 ng.makin9 0penin9s in
Page 27 al 32 f,/ ? Stpply/229
23.
23.L
or through, reinstating, and making good the same shall be borne by the Employer, and
the Time for Completion shall be reasonably adjusted to the extent that the Contractor has
thereby been delayed or impeded in the performance of any of its obligations under the
Contract.
Equipment Performance Guarante6:
The Contractor guarantees that the Equipments, named in the SCC, shall attain the rating
and performance requirements specified in Appendix - 8 (Guarantees, LiqLtidated
Damages for Non - Performance) to the Contract Agreement, sub.lect to and upon lhe
conditions therein specifled.
23.2 If the guarantees specified in Appendix 8 (Guarantees, Liquidated Damaqes for Non
Performance) to the Contract Agreement are not establi5hed, then the Employer shall, at
the Employer's discretion either
(a) Reject the equipment, or
(b) Accept the equipment after assessing liquidated damages in accordance with
the provision in the SCC aqainst the Contractor and such amounts shall be deduated from
the Contract Price or otherwise recovered from the Contractor-
23,3 In case the Employer exercises its option to reject the equipment, the Contractor shall at its
cost and etpense make such changes, modifications and/or additions to the equipment or
any part thereof as may be necessary to meet the specified guarantees. The Contra(tor
shall notit the Employer upon completion of the necessary changes, modifications and/or
additions, and shall request the Employer to repeat the Test until the level of the specil ed
qualantee has been met.
23.4 Whenever the Employer exercises its option to accept the equipment after levy of liquidated
damages, the payment of liquidated damages under GCC Sub-Clause 242, upto the
limitation of liability specified in the SCC, shall completely satisfy the Contractor's
guarantees under GCC Sub-Clause 24.2, and the Contractor shall have no further liability
whatsoever to the Employer in respect thereof.
In respect of goods supplied by sub contractor/supplier/manufacturer to the
contractor, where a lonqer guarantee (more than 12 months) i5 provided by such sub
contractor, the owner shall be entitled to the benefit of such lonqer guarantees. However,
叫 み
R0rterm 5
,
eP
』 /
aCppaebaugehd ン
a‐‐ び
b 褻” Suppty/229
' 24- Mistak€E in dr.wings:
The Contractor shall be responsible for and shall pay for any alterations of the work
due to any discrepancies, erro6 of omissions in the drawings or other particulars supplied by
him whether such drawings or particulars have been approved by the NBPDCL or not lf any
dimensions figured upon a drawing or a plan differ from those obtained by scaling the
drawing or plan, the dimensions as figured upon the original drawing of plant shall be taken as
correct.
Int.oduction of Manoowen
The contractor has to lurnish the details of manpower a5 per RFP clause
1. Team Leader
2. Project Engineer (Minimum one (1) for each district)
3. Quality Control Engineer-2
4. Site Superviso6 (Minimum one (1) for each district)
The tenderer have to provide all details of such persons within seven days from
the date of agreement. Any change/replacement of Manpower should not be done without
prior knowledge of employer.
Materlals and workmanship:
All materials used in the manufacture of the equipment shall be selected from the
best available for the purpose, considering strength, durability and best available engrneer n9
practice. Liberal lactors of safety shall be used throughout the design and espe(ially in the
design of all parts subject to alternating stressed or shocks.
All the works shall be performed and completed in thorough workmanship like
manner and shall follow the best modern practice in the manufacture of high grade
equipment not withstanding any omissions in the speciflcations. Casting shall be free hom
blowholes, flaws, cracks or other defects and shall be smooth, cold grained and true forms and
dimensions-
No plugged or filled-up holes or other defects w I ordinarily be allowed. Su(h
25
26
castings are liable to be rejected.
However, the contractor may
methods in accordance with the standard
rectily minor castings defects by welding or other
manufacturing practice provided such rectification
9"-olbSucglYl229
I
G'9"Page 29 of 32 ?r<
27
does not affect the strength of the casting or impair the efficient working of the planr and p;ror
approval of the NSPDCL is obtained for the same. All terms related to Defect Liabitity,
tunctional Guarantee and Equipment Performance Guarantee shall be applicable as per terms
Of RFP/NIT.
ComplelenEs of eouioment-
The equipment shall be complete in every respect with all mountings, fixtures and
standard accessories, which are normally supplied even though not specifi.ally detailed in the
specification. The Contractor shall not be eliqible for any extra payment in respect of such
mountings, fittings, fixtures and accessories which are needed for safe operation of the
equipment as required by applicable codes of the (ountry though these might not have been
included in the contract.
All similar components parts of similar equipment supplied shall be interchangeable
with one another. The various equipments to be supplied under this contract shall be subject
to the NBPDCL's approval.
Compliance with act
All equipments and materials 5upplied and all works carried out shall comply
in all respects with the requirements of the Electricity Act 2003, Indian Electriclty Rules, 1956 or
any revision thereof which may be issued during the aurrency of the order, RE spe(ifications
and with the requi.ements of any other regulations and Act in India to which the purchaser
may be subjected as well a5 NBPDCL's general speciflcations and practices.
Right ot chiet Engineen
The Chief Engineer (Project-l) reserves the right to accept or reject part or whole of any or
all of the tender without assigning any reason.
'fhe Chief Engineer (Project-l) reserves the right to cancel \rhole or part of the awarded
contract without assigning any reason of those firms whach are found defaulters of delayed
All the reports related to performance of the Bidder have to be approved by Chief €ngineer
(Project I). The Chief Engineer (Project-l) reserves the right to reject or disapprove any
performance related repJEt submitted by Bidder
29
291
292
293
身
paOe 30 or32 レ´
Stpply/229
夕/
30 Jurisdictlon of <ourt:
All disputes/claims/counter claims for andlor against the NBPDCL arising out of agreement
contraats/orders between the NBPDCL and the firms 5hall be subjeat to the ex(lusve
jurisdiction of Courts at Patna and no othe. Court or Arbitrator.
Enclosure: As above
Yours faithfully
Copy with enclosures forwarded to the Chief Engineer (Civit), NBPDCL, patna for
information and necessary action. He is requested to nominate the Engineer in Charge
(Civil) for execution of Civil works under intimation to the Electrical Superintending Engineer
of concerned Electric Supply Circle.
Enclosure:As above
⑦いJ特
Pa"∂ あ″″ψ ″ θ・
∫
出 午(B κ ChOudhary)
Chief Engineer(prOlect‐ :)
rat", aa tea, ? 7,/02/2 0 7 5
Copy with enclosures forwarded to the Financial Controfler/DcM Accounts. NBpDCL/Senror
Manager Accounts, NBPDCT / the Resident Audit Offacer, NBpDCL, patna for informanon and
necessary action- This order is being issued after approval of the BOD in its 44th meeting
held on 03 02 2015 vides ts Resolut On oo 44-0503
Enclosure:As above
Memο 7V● 3墜
励 ο
“
エ
(B K Choudhary)
Chief Engineer(PrOlect:)
θム鳴(B K Choudhary)
Chief Engineer(prOlect‐ 1)
Page 31 o132 Stpply/229
励 οに
一
Parra“"“
″ ″ θ」J
Copy with enclosures lorwarded to the DGM-cum-ESE, Tirhut Electric Supply Area
Muzaffarpur /ESE Electric Supply Circle Muzaffarpur, Electrical Executive Engineer/ tlectric
Supply Division/AEE (Project)/lEE (Project) Muzaffarpur, Vaishali, Sitamarhi and Sheohar for
information and necessary action.
Enclosure:As above
のんだ会を(B K Choudhary)
Chief fn91neer(PrOlect‐ 1)
P,tna d.t.d' 0? /02/2075ル′θ″07V●エ
Copy forwarded to U.S. to CMD, BSPHCI- Patna / OSD to MD, NBPDCL/Director (Project) lor
favour of information.
Enclosurei As above
3- ¨(B К ChOudhary)
Chief En9ineer(PrOlect‐ 1)
Page 32 of 32 Stpply/229/