NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting V
December 1, 2006
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
Today’s Meeting Goals and OutcomesToday’s Meeting Goals and Outcomes
• Update and recalibrate
• Incorporate new information regarding ISC into staffing discussion
• Refine mission operations and staffing needs/opportunities
• Develop a draft operating plan for 2008
•Update the strawman document for staffing the ship
Products, Outcomes and Next StepsProducts, Outcomes and Next Steps
Product and OutcomesProduct and Outcomes1. Meeting Summary2. Refined mission operating profiles3. Draft operating plan for 20084. Refined staffing plan outline 5. Next steps/actions and updated timeline for the overall process Next StepsNext Steps1. Draft Summary2. Next meeting date and agenda3. Subsequent meetings required4. Outstanding issues for overall process
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
Okeanos Explorer Conversion StatusOkeanos Explorer Conversion Status
Phase I Items:Phase I Items:
Major infrastructure modsMajor infrastructure mods
Deck equipmentDeck equipment
Ship regulatory electronicsShip regulatory electronics
Some power supplies/UPSSome power supplies/UPS
DP System & bow thrusterDP System & bow thruster
Multibeam systemMultibeam system
Seawater sampling systemSeawater sampling system
Phase II Items:Phase II Items:
Most mission electronicsMost mission electronics
Networks/cablingNetworks/cabling
Power suppliesPower supplies
Mission spacesMission spaces
Telepresence systemTelepresence system
Telecom systemsTelecom systems
Misc Systems (ADCP, CT Misc Systems (ADCP, CT Room, etc.)Room, etc.)
Phase III Items:Phase III Items:
Whatever doesn’t make Whatever doesn’t make Phase IIPhase II
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
TimelineTimeline
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
ROV UpdateROV Update
• Preliminary Design Review was Sep.1• Feedback in process, investigating:
– “Architecture” reconfiguration for sled ops– Further lighting optimization– Tether lengths
• Preparing to discuss contract mods.– Schedule slip?– Ship auxiliary gear (USBL, power, hydraulics)– Enhance tether management (slip rings, quick
disconnects etc.)
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
Additional updatesAdditional updates
• Personnel• Institutional arrangements• OEAWG• Data management• Other?
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
Facility DevelopmentFacility Development
• Ocean Technology Center – Reorg of current space– Furniture installation Dec 4
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
Inner Space CenterInner Space Center
• Facility – project out to bid by Jan 1
• Business Plan
•URI Service Center model
• Draft Strategic Plan
• Parameters for draft ops plan for 2008
• 07 Joint Project as test for data management
Overview of outcomes from Nov 29 meetingOverview of outcomes from Nov 29 meeting
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
Mission Control
Operations Production
IAO
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
Inner Space CenterInner Space CenterDraft Ops Plan for 2008Draft Ops Plan for 2008
• 160 days Okeanos
• IFE Archaeology cruise – Black Sea or other
• NMSP/IFE – Monterey
• NMSP – potentially with the magic bus (1-3 events)
• ORION or IODP?
I. OperationsI. Operations
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
II. Education and OutreachII. Education and Outreach
III. MarketingIII. Marketing
IV. Partnership DevelopmentIV. Partnership Development
V. FundraisingV. Fundraising
07 Data Management Test07 Data Management TestFunctionality RequirementsFunctionality Requirements
• Real-time time-series data plots• Real-time display of sonar data• Real-time display of HD frame grabs• Real-time navigation with bathymetry• Post dive maps, tracklines, etc.
• Centralized event planning and management• Automated system for file transport between RSP
and RSCs
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
Recommended development priorities for Recommended development priorities for additional functionalityadditional functionality
• Automatic logging of video system (AsRun logs)• Automated generation of post-activity reports
(tracklines, activity duration, operational footprint, etc)
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
Hypothetical ops plan for year 1Hypothetical ops plan for year 1
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
•Exploration/Recon mission
Recon Focused Ops
Search Locate something of interest
Initial Discovery
Decide discovery is worth effort
Ramp up
Intense Survey/Outreach
24 hr ops
Hypothetical ops plan for year 1Hypothetical ops plan for year 1
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
•Potential participants and partners
•On shore vs. at sea science participation
•Audience
Hypothetical ops plan for year 1Hypothetical ops plan for year 1
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
•Data/specimen management
- Processing
- Product development
- Dissemination
•Archive
•Anticipated satellite needs
UNH CCOM
Hypothetical ops plan for year 1Hypothetical ops plan for year 1
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
•Staffing needs
M. Grady
Hypothetical ops plan for year 1Hypothetical ops plan for year 1
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
•Outreach/education
•Marketing strategies
Revisit staffing optionsRevisit staffing options
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
•Physical scientists vs. ET’s/Sonar Techs
•Corps officer billets
- Flexible Ocean Exploration grad degree program at URI
- Combination land/sea assignments
•Contracting
•Training/educational opportunities
Potential overlap in Mission SpecificPotential overlap in Mission SpecificSkills and ExpertiseSkills and Expertise
ROV pilots and engineers – Contractors may fill positions at first, with knowledge, skills and abilities developed within the core ship crew over time.
Video/Satellite technicians and Data specialists – Positions can be filled with a combination of new hires, contractors, NOAA physical scientists, ET’s, and survey technicians. There is potential for one or more of these positions to rotate between the ISC.
ROV Navigators – Positions would be best suited to NOAA Corps officers who have had at least one tour of sea duty, preferably trained through the Office of Coast Survey.
Sonar technicians –Positions can be filled with a combination of ET’s, survey technicians, NOAA physical scientists, and NOAA Corps officers trained by the Office of Coast Survey.
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
Revisit berthingRevisit berthing
Ship's Crew Mission Crew
STAFF POSITION DEPARTMENT TOTAL STAFF POSITION DEPARTMENT TOTAL
Commanding Officer Wardroom Sonar Acquisition Science Dept.
Executive Officer Wardroom Sonar Processing Science Dept.
Operations Officer Wardroom TOTAL 6
4th Officer Wardroom
Junior Officers Wardroom
Licensed Engineers Engineering
Unlicensed Engineers Engineering
Chief Bos'n Deck Dept.
Assistant Bos'n Deck Dept.
Deckhands Deck Dept.
Electronics Technician ET Dept.
Survey Technician Survey Dept.
PHS Medic Medical
Chief Steward Stewards Dept.
Cooks Stewards Dept.
TOTAL 29
46 Total Berths
29 Ship Crew
17 Mission Crew
NOAA Ship Okeanos Explorer/URI Inner Space Center Staffing Meeting VDecember 1, 2006
Mission CrewSTAFF POSITION DEPARTMENT TOTAL TOTAL BERTHS
ROV pilots Science 3 3ROV Engineers Science 3 3Video/Satellite techs Science, ET, Survey 3 2Data Specialists Science, ET, Survey 3 1ROV Navigators Wardroom 3 0Watch Leaders Science 3 3Science Techs Science 2 2Education & Outreach Science 3 3Sonar Techs Wardroom, ET, Survey 2 0Total 25 17
Working GroupsWorking Groups
Name Organization
Conversion Phase I
Conversion Phase II: Ship
Conversion Phase II:
Telepresence
ROV Development
Data Management
Plan
Inner Space Center
Remote Consoles
Staffing Plan
Operating Plan
Budget and Administration
McDonough NOAA/OEMartinez NOAA/OEManley NOAA/OEPinner NOAA/OESamuelson NOAA/OERussell NOAA/OEWeirich NOAA CorpMoore NOAA CorpBarr NOAA/NMSPLong NOAA/EEDTrembley NOAA/MEDReed NOAA/ContractsHallock NOAA/MEDBohr NOAA/NMAOGreen NOAA/NMAOMcAllister NOAA/NMAOPerry NOAA/EEDSchleiger NOAA CorpLoignon NOAA/MEDHubbard NOAA/NMAOColeman IFEField IFENewman IFEWitten IFE
Lead