NABUUR GAMAULI

CONSTRUCTION OF TWO ROOMS’ BUILDING

Partners

Local Level: Krishna Primary School/Management

committee/local community

International level: Nabuur

2

Partner school of Nabuur

3

Development so far

• Student number increased from 145 to 209• Mr. Garry Miller has supported salary for two

teacher now the number of teacher is 5 (government supported -2, Nabuur suppored- 2 & community supported-2)

• Sufficient teaching materials- provided by Stacy Helmus

• Parents visit school and work together• Teachers are punctual work trying child centered

education

4

Community combination

• Total house holds: 200– Dalits: 104– Thakuri: 39– Chhetries: 57

• Occupation– Farming: All families– Employ:

• 11 people in private companies • 7 people in government offices

5

Recent needs and priority

1. Building with two rooms2. Training for teachers (Child centered) and

materials3. Compound wall (125 Meter)4. Drinking water5. Toilet

6

Community participation

• Community can participate in following areas– Labor contribution (un skilled)– Wood– transportation

7

Support Required

• Following support is required with partner– Cash for Cement– Cash for Rods– Cash for skilled labor– Bricks/stone– Grill – Other things that need to import from outside

8

Map of building

• Map ( 23Š20 Feet/room)

9

Total length: 46 Feet

East elevation

Measurement Details Windows;

– Length= 6 feet– Height= 5 feetDoors;– Breath=3feet– Height= 7feetWall; Thick= 14 InchHeight=11 feet

10

Questions asked by Tatjana• Floor plan, elevation, sections, dimensions, position of entrance, north

orientation, photos of the building, Ans: Pls. go to building sketch, it is decided by local contractor and me. • Marked place for the future extensionAns: Marked in map• Roof is concrete slap• Measures are in feet • Foundation depth is 5 feet• Materials are stone, sand, cement, wood, concrete, rods etc

11

Estimated CostREQUESTED WITH DONOR

  Unit Rate (Rs.) Total (Rs.) USD

Cement        

Piller 40 950 38000 558.8

DPC 30 950 28500 419.1

Wall 50 950 47500 698.5

Slap 200 950 190000 2794.1

Plaster 60 950 57000 838.2

Rod (Piller, Beam and Slap) 15 10000 150000 2205.9

Nails, banding wire (Kg) 30 100 3000 44.1

Equipments 20 500 10000 147.1

Skilled labor 200 350 70000 1029.4

Total: -     594000 8735.3

12

Estimated cost

SHARED BY COMMUNITY

  Unit Rate (Rs.) Total (Rs.) USD

Land cutting (Person) 30 200 6000 88.2

Wood (Cubic feet) 60 1500 90000 1323.5

Transportation (Person) 100 200 20000 294.1

Un skilled labor (Person) 100 200 20000 294.1

Stone (Cubic Feet) 400 50 20000 294.1

Total:-     156000 2294.1