Transcript
Ahmed Nagy Mohammed Ramadan
Egyptian
July 23rd 1990,Cairo,Egypt
Ahmed.nagy111@gmail.com
www.facebook.com/AhmedNagy111
www.facebook.com/Ahmed.Nagy.Photography
(+02) 01063771964
(+974) 33399877
EDUCATION BACKGROUND
2004 - 2007 Al-Ahram High School
Doha - Qatar
2010 - 2015 Bachelor of Architecture and Urban Design | German University
In Cairo | 5th Settlement - Cairo - Egypt
Cumulative GPA: B |German system (scale 0.7 - 5): 2.4|
Graduation Project Grade : A in the German Grading System
PERSONAL DETAILS
LANGUAGES
Arabic | Mother Tongue English | Fluent
German | Elementary French | Elementary
AHMED NAGYSELECTED WORKS
Architecture Portfolio
Ahmed.nagy111@gmail.com Mobile NO: +20163771964 +97433399877
Complex: Tahrir ...................................................................................... 1 Tower
Cultural: GUC ...................................................................................... 7 Library
Cultural: El Manyal ..................................................................................... 11 Cultural Centre
Recreatioan: GUC ...................................................................................... 17 Campus
Recreatioan: 90 Road ...................................................................................... 21 Urban Solution
Recreatioan: Black Plaza ...................................................................................... 25 Urban Solution
Resedential: The Unit ...................................................................................... 31 House
Resedential: Interbau ...................................................................................... 35 House
Selected WorksSKILLS
Microsoft Office
AutoCAD
Revit
Rhinoceros
Google Sketchup
Adobe Photoshop
Adobe Indesign
Adobe Illustrator
Grasshopper
3dsMax
Cinema 4D
Lumion
PROFESSIONAL EXPERIENCE
Summer 2012 CEG International | 1 Month Internship | Doha - Qatar
Summer 2013 Lilac Landscape | 3 Months Internship | Doha - Qatar
Summer 2014 ExeLand Projects L.L.C | Redesign Project of “Al Matar Centre “ | Doha - Qatar
April - Present 2016 Al Jazeera Consulting Engineering | Jr.Architectural
Designer & Draftman | Doha - Qatar
TAHRIR TOWER
The concept begins with the relation between the revolution and the structure , in other words the dynamic of revolution , and the static of the building.So this building took the monumental massive structure style to memorize the revolution that took place in this area , in an architectural way .The difference of level represents the ups and downs of the revolution while the missing parts of the building give us the idea that our revolution is not yet « perfect « and it still missing some parts .The orientation and the site of the building defines the floor plans shapes that already oriented to the main street of the Egyptian Museum
1 2
Basement
Ground FloorAerial View
1
4
Isometric detail section: This detail shows how the structural steel bracket and angles hold the bronze Tee-bar, and their relationship to the bronze mullion
Structure System:In order to achieve the project, a grid of 10 meters was used. The square coloumns were 1m X 1m starting from the -4th level to the 97th,while the core walls were 0.5m width
3
typical Floor plan type1
typical Floor plan type2
typical Floor plan type3
65Front Facade Side FacadeSection 1 Section 2
GUC LIBRARY
The Library was designed to be a reflection
of the GUC technical revolution. the continues
building to include all the library functions
under one roof while in the same it shall give
some space of interactions with the outside in
the ground level. The paramtric facades was
designed according the global location of the site
and to create indirect shading most of the day.
87
Ground Floor 1st Floor 2nd Floor
2
The Double-skin facade is a system of building consisting of two skins placed in such a way that air flows in the intermediate cavity. the second material that was used as the outter surface is Aluminium panels that is known for its Durability, Design flexibility, lightweight, Excellent Corrosion Resistance, Easy Surface Treatment
109longitudinal Section Section Detail
South Facade
Heat map for the outter surface
EL-MANYAL
The concept begins with the relation between the revolution and the structure , in other words the dynamic of revolution , and the static of the building.So this building took the monumental massive structure style to memorize the revolution that took place in this area , in an architectural way .The difference of level represents the ups and downs of the revolution while the missing parts of the building give us the idea that our revolution is not yet « perfect « and it still missing some parts.The orientation and the site of the building defines the floor plans shapes that already oriented to the main street of the Egyptian Museum.
1211Zone Masterplan Masterplan + Front Facade
3
1413
Cross Section
Cross Section 3D
Accessibility Facade detail
Functions
1615
GUC CAMPUS
Current Situation :
• Buildings already have high percentage of glass that can be replaced with photovolatic winows and adding more solar panels on the roof and the facades to reduce the amount of energy consumed
• Campus already have large green areas, so we can existing plants with productive and native plants.
• Empty spaces in the campus can be used to adopt waste recycle industries.
Green Areas Meeting Areas Sports Areas
Educational Commercial Adminstrative Industrial
Unkown TheatreSustainable Approaches :
Outside the campus :
• Interact with the surrounding neigbhourhoods according to their needs.
• Creating Cultural centre , University market , Geological Centre and Club house that serves the neighbourhoods.
Inside the campus :
• Generating Main axis defining the campus zones.
• Less Cars in the campus with more pedestrian paths.
• Connecting the campus buildings with landscape elements.
• Creating a main node that includes library and adminstration.
• Waste Managemnt and recycling industries.Masterplan
1817
4
Cars Lanes Promenade
longitudinal Section
zoom-in view to Library
2019
Aerial View
El TES’EEN STREET
The concept is about solving the pedestrian problem in El Tes’een street without distracting the exisitng urban
surrounding but by following the context of the organic patterns that would provide the pedestrians useful, safe
and also an entertaining public spaces in the spaces that are currently unusable, making it more functional.
The Exisiting Situation
Section A-A’
Section B-B’
Section C-C’
Phase 1: (Infrastrcture) Sidewalks Secondary Streets Green Areas
Phase 2: (Facilities & Accessability) Tunnel Bridge Supertram
Phase 3: (Development) Softscape Hardscape Shading elements
phase 1 will take 3-5 years to provide suitable infrastructure
phase 2 will start from 2018 and it will take up to 7 years
phase 3 will take 2-3 years to be accomplished
2221
5
Site Plan
Tram Pedestrian Cycling Bus
2423
BLACK PLAZA
The Strategy targets both neighborhoods beside the
ring road, and demolish the social barrier that is
visible by the physical barrier and use it to be the
meeting point by on integrating social acctivites such
as theatres,exhibitions and public plazas,that would
strengthen the social bonds with a cultural identity.
2625
Siteplan
6
2827
Functions
longitudinal Section
Cross Section Cross Section 3D
3029
THE UNIT
The concept of this residential building is providing the ability of different areas for housing according to the
different needs ( Small studios for one or two persons ) - ( Medium apartments for small families ) - ( Big apartments
for bigger families ), in the same way it still approach the main concept of privacy ,comfortable accommodation
with the respect to the orientation of the building and visual relationship between all the surroundings.
3231
Ground Floor
1st Floor
2nd Floor
7
The form of The building created by the
outer surface of the projections of the
building.
That defined also by the combination
forms of « tetris « so that it would have
aesthetic modern style
3433
Cross Sectionlongitudinal Section
INTERBAU HOUSINGWhy going outside, when you have everything you need inside
The term vertical district means in this design project , how to transform the horizontal urbanization of district that consist of mixed use functions with the green areas and even the apartments, under one roof in a vertical leveling combinations. So it saves much space, creating more possibilities of social interactions and be a module that would spread out in similar communities.The Main Purpose and concept of the building is: affordability that you have all your needs in one closed unit; however the area or the number of rooms you want to have, the building can afford that. The remarkable statue or sculpture are The V pillars lifting the building , which was inspired by Hansaviertel Interbau Apartment House by Oscar Niemeyer.
3635
Ground Floor 1st Floor
2nd Floor
8
3rd Floor
3837
longitudinal Section Front Facade
Cross Section Side Facade
The Building facades are a reflection to the surroundings with a taste of traditional Egyptian elements, to introduce a
modern functional façades in addition to interact with the surrounding environment.
The Facades consist of 3 elements; the building structure + the second layer + the shading elements.
The building structure material which is the concrete is cladded with a light paint to reflect the heat instead of absorb it,
and the second layer is the GRC material, covering the building like several ribbons to work as a massive wall reducing
the thermal bridge and filled inside with a thermal insulation material.
39
The Shading element has a modern style of mashrabya that indirects sunlight and giving some privacy for
the residents, divided into two elements: Fixed ( Balaconies ) and flexible ones ( The shading windows ).
The Colors of the building were chosen to be light colors and in the
same way have almost the same colors of the surroundings ( Sand,
rocks and trees ).
These elements combined with each other to have facades that are
functional, thermal treated and traditional in a modern way
41
Interests
Photography has always been my obsession since i was a little kid and it was one of the main reasons i started to give attention to the details of architecture.
I started professional photography at 2010 using a semi-professional camera and established a freelance career in Egypt and Qatar.
I was awarded the 1st prize at the photography competition that was held by “35 mm club“ @ German University In cairo on 2012.
“What i like about photographs is that they capture a moment that’s gone forever, impossible to reproduce.” Karl Lagerfeld
I would end my words with “A picture is a secret about a secret, the more it tells you the less you know” For the whole albums u can visit:www.facebook.com/Ahmed.Nagy.Photography
42
The 2nd special feature which is semi-private
is the community level in the 1st floor, that’s
divded into two parts that it has an access to the
exterior area which is a green space to create
an urban softscape areas for seating and having
a feeling of freedom
The 1st special feature is the pedestrian
route network connected from a side with
neighbors buildings and from the other side
to a secondary street .The network is facing a
wide seating area open to the main street and
surrounded restaurants, cafes and shops
40
Architecture Photography “ Qatar “Architecture Photography “ Egypt “
4443
AHMED NAGYSELECTED WORKS
Architecture Portfolio
Ahmed.nagy111@gmail.com Mobile NO: +20163771964 +97433399877
Miscellaneous
45
top related