This is a MIS based presentation depicting the status of MGNREGA implementation in Naxalbari Block in darjeeling district (Siliguri Mahakuma Parishad area).

Transcript

MAHATMA GANDHI NREGA IMPLEMENTATION IN NAXALBARI BLOCK,

SILIGURI MAHAKUMA PARISHAD

An analysis based on the MIS18 January 2013

REGISTRATION

BASIC DATA

Gram Panchayats

Population Job Cards

06 144915 (2001 Census data) 21005

Job Cards Persons Male Female

21005 37493 18728 (50%) 18765 (50%)

Job Cards SC ST Others

21005 7536 (36%) 6267 (30%) 7202 (34%)

GENDER-WISE DISTRIBUTION OF REGISTERED WORKERS

18728,

50%

18765,

50%

Male-Female ratio in Workers

Male Workers regis-teredFemale Workers reg-istered

CASTE-WISE DISTRIBUTION OF REGISTERED HOUSEHOLDS

7536,36%

6367,30%

7202,34%

SC-ST and Others in registered Households

SCSTOthers

POVERTY STATUS OF HOUSEHOLDS AS IN MIS

2711,13%

18294, 87%

Households marked as BPL

Marked as BPLNo BPL marking

EMPLOYMENT

EMPLOYMENT GENERATED TILL 18 JANUARY 2013

Households employed

Person-days generated

Male Female Female percentage

11886 250958 92419 158539 63.17

Person-days generated

SC SC% ST ST%

250958 104223 41.53 80984 32.27

PERSON-DAYS PER HOUSEHOLD: RANGE

Range Households provided

Percentage

1-20 days 7448 62.8121-40 days

333428.12

41-60 days

5324.49

61-80 days

2472.08

81 + days 297 2.50

HOUSEHOLDS PERVIDED WORK: RANGE OF PERSON-DAYS

63%

28%

4%

2% 3%

Range in person-days per household

1-20 days 21-40 days 41-60 days 61-80 days 81 + days

EXPENDITURE

EXPENDITURE POSITION AS REFLECTED IN THE MIS AS ON 18-01-2013

Gram Panchayat/

Agency

Total Available

fund

Total expenditure

% of TAF

Gossainpur 125.1 123.02 98.34Hatighisa 112.73 91.41 81.09Lower Bagdogra 85.54 74.26 86.81Moniram 54.91 45.6 83.04Naxalbari 53.31 52.8 99.04Upper Bagdogra 95.25 61.75 64.83Block level Line Department 15.24 4.92 32.28PO 9.75 5.16 52.92Total 551.84 458.92 83.16

WORKS

WORK STATUS

Works taken up

Works completed

Ongoing works

Percentage of works completed

367 136 231 37

Sl N. Category of assets created during current year

No. Percentage in total

1 Flood Control 07 4.8

2 Rural Connectivity 45 31

3 Water Conservation 07 4.8

4 Renovation of traditional water bodies

01 0.7

5 Drought proofing (Social Forestry) 12 8.3

6 Irrigation canals 35 24.1

7 Land development 38 26.2

ISSUES

SOME IMPORTANT ISSUES FLAGGED

No worksite photo uploaded on the website

Photographs of the workers not uploaded on the worksite

MIS shows only 46.6% of the registered workers as having accounts Is it for the fact that accounts are single in

the household whereas there are multiple workers?

SOME IMPORTANT ISSUES FLAGGED

13 works are shown as incomplete from 2009-10 or even before that

12 works taken up in 2010-11 are still shown as incomplete

34 works taken up during 2011-12 are incomplete as yet

Majority of material payment is in cash (as high as Rs. 80.92 lakh material payment is shown to be in cash whereas cheue payment is to the tune of Rs. 18.33 lakh only

SOME IMPORTANT ISSUES FLAGGED There are 98 works where no expenditure has

been entered in the MIS for the last 4 months 6277 households have worked for less than 15

days 171 households have completed 100 days of work

in the current financial year There is no RSBY registration of NREGA workers as

yet There are only 700 households among the

households worked so far for 15 days or more whose status is marked as BPL

SWOT Analysis

STRENGTHS

Equal registration of male and female workers

High registration of SC, ST households Very good women participation in

labour force High access of SC and ST households to

work Some good schemes implemented

WEAKNESSES

5609 households (47.19 percent) have been provided work for less than 15 days

Poor BPL marking in MIS No photo uploading No RSBY convergence Very little variation in schemes Monitoring deficient

OPPORTUNITIES

Widening of the shelf of schemes by the Ministry of Rural Development

Renewed focus at the State level on convergent activities

Tea Gardens opening up to NREGS

THREATS

Urban / peri-urban nature of most of the area

Male members of the households accessing relatively more paying employment opportunities

Problem of working in Tea garden areas Limited scope of earth work