Design of Flexible Pavement(Guide to Pavement Technology Part 2:Pavement
Structural Design Austroads)
First Published 2008, Updated : Feb 2010
a.k.a NAASRA (National Association of
Australian State Road Authorities), 1979
8/11/2019 metoda austroads 2011_updated.ppt
2/41
2
Overview Austroads is the association of State, Territory, and
Federal Road and traffic authorities in Australia. It
was established in 1989 to replace NAASRA (National
Association of Australian State Road Authorities)
Austroads published A Guide to the Structural Design
of Road Pavement in 1992, renewed May 2008, last
updated Feb 2010)
This Guide based on Analytical Approach in
Pavement Design
8/11/2019 metoda austroads 2011_updated.ppt
3/41
3
Guide to Pavement Technology
by Austroads
8/11/2019 metoda austroads 2011_updated.ppt
4/41
4
Pavement Design System by Austroads
(Chapter Framework)
8/11/2019 metoda austroads 2011_updated.ppt
5/41
5
Project Reliability (Chapter 2)
8/11/2019 metoda austroads 2011_updated.ppt
6/41
6
Environment Moisture Environment
The stiffness/strength of unbound materials and subgrades isheavily dependent on the moisture content of the materials.
The moisture condition in unbound granular pavement materials
can also have a major effect on performance. When the degree ofsaturation of unbound granular materials exceeds about 70% thematerial can experience significant loss of strength/stiffness
Temperature Environment
For pavement design, the temperature of asphalt can becharacterized in terms of the Weighted Mean Annual PavementTemperature (WMAPT). The WMAPT takes into account therelationship between asphalt temperature and fatigue life ofthick asphalt pavement, published by SHELL in 1978. Calculationof WMAPT can be seen in Appendix B.
8/11/2019 metoda austroads 2011_updated.ppt
7/41
7
Procedure to calculate WMAPT
8/11/2019 metoda austroads 2011_updated.ppt
8/41
8
Sample WMAPT in Australia Region
8/11/2019 metoda austroads 2011_updated.ppt
9/41
9
Subgrade Evaluation
8/11/2019 metoda austroads 2011_updated.ppt
10/41
10
8/11/2019 metoda austroads 2011_updated.ppt
11/41
11
8/11/2019 metoda austroads 2011_updated.ppt
12/41
12
Presumptive value of CBR
8/11/2019 metoda austroads 2011_updated.ppt
13/41
13
Subgrade Strain Criterion
8/11/2019 metoda austroads 2011_updated.ppt
14/41
14
Flexible Pavement Material
Unbound Granular Material
Modified Granular Materials
Cemented Material
Asphalt
8/11/2019 metoda austroads 2011_updated.ppt
15/41
15
Pavement Material Category
8/11/2019 metoda austroads 2011_updated.ppt
16/41
16
Unbound Granular Material
Consist of gravelor crushed rockswhich
have a grading that makes them
mechanically stable Characterization : Modulus Elastic and
Poisson ratio (assumed : 0.35)
Properties : Cross Anisotropic
Presumptive value : Table 6.3
8/11/2019 metoda austroads 2011_updated.ppt
17/41
17
Presumptive Value of Elastic
Parameter of Unbound Granular
8/11/2019 metoda austroads 2011_updated.ppt
18/41
18
Modified Granular Material
8/11/2019 metoda austroads 2011_updated.ppt
19/41
19
Cemented Material
8/11/2019 metoda austroads 2011_updated.ppt
20/41
20
Presumptive Values
8/11/2019 metoda austroads 2011_updated.ppt
21/41
21
Fatigue Criteria
8/11/2019 metoda austroads 2011_updated.ppt
22/41
22
Asphalt
Combination of bitumen and aggregates
which are mixed together, spread, and
compacted while hot to form pavement layer Characterization : Modulus Elastic and
Poisson ratio, can be determined by
Laboratory (UMATTA) or nomograph (Figure
6.7)
Properties : Isotropic
8/11/2019 metoda austroads 2011_updated.ppt
23/41
23
8/11/2019 metoda austroads 2011_updated.ppt
24/41
24
Modulus of Asphalt (Australian
Typical)
8/11/2019 metoda austroads 2011_updated.ppt
25/41
25
Fatigue Criteria
8/11/2019 metoda austroads 2011_updated.ppt
26/41
26
Design Traffic
8/11/2019 metoda austroads 2011_updated.ppt
27/41
27
8/11/2019 metoda austroads 2011_updated.ppt
28/41
28
8/11/2019 metoda austroads 2011_updated.ppt
29/41
29
8/11/2019 metoda austroads 2011_updated.ppt
30/41
30
Design New Flexible Pavement
There are two option :
Mechanistic Procedure
Using CHARTS, see the catalogue in Table 8.4 3 Layers
Granular Base (EC01 to EC03)
Cemented Base (EC07 to EC18)
2 Layers Full Depth Asphalt (EC04 to EC06)
4 Layers (EC19 to EC24)
8/11/2019 metoda austroads 2011_updated.ppt
31/41
31
Pavement Structure Model
Model of Pavement Loading
-Dual Wheel
-Uniform Circular Loading
-Spacing 330mm center to center
8/11/2019 metoda austroads 2011_updated.ppt
32/41
32
8/11/2019 metoda austroads 2011_updated.ppt
33/41
33
8/11/2019 metoda austroads 2011_updated.ppt
34/41
34
Two Layers (Full Depth Asphalt)
8/11/2019 metoda austroads 2011_updated.ppt
35/41
35
Three Layer (Unbound Granular
Based)
8/11/2019 metoda austroads 2011_updated.ppt
36/41
36
Three Layers (Cemented Base)
8/11/2019 metoda austroads 2011_updated.ppt
37/41
37
Four Layers
8/11/2019 metoda austroads 2011_updated.ppt
38/41
38
Mechanistic Procedure
8/11/2019 metoda austroads 2011_updated.ppt
39/41
39
CIRCLY Output
8/11/2019 metoda austroads 2011_updated.ppt
40/41
CIRCLY Output
8/11/2019 metoda austroads 2011_updated.ppt
41/41
CIRCLY Output