P14032: Skipper’s Chair
ME Students: Richard Dzionara-Norsen Jeffery Flowerday Jonathan Nguyen
IE Student: Kassandra Schlott
Project Design Review
BackgroundCurrent Product
Problem Statement Constraints Stakeholders Customer Requirements Engineering Requirements Functional DecompositionRisk AssessmentSchedule
2
Overall Agenda
3
BackgroundThe Skipper’s Chair is used to secure the user and allow access to the tiller, which is used for steering.
The tiller is attached to the submerged rudder, which directs the sailboat.
The 1st Senior Design iteration was developed for only one user, Richard Ramos.
The 2nd Senior Design iteration strived to develop an ergonomic, safe, and comfortable design for the majority of the population.
Picture courtesy of: http://gulfportyachtclub.webs.com/learntosail.htm
Successes:● Fits in a regulation Sonar Sailboat● Seat adjustable to 90% of
individuals● Contains quick release tillerFailures:● Fails to maneuver Sonar Sailboat● 117 lbs.● Long installation time:
- 30 min. assembly- 15 min. installation- 30 min. adjustment
● Many different custom parts - 400+ machining hrs.
4
Current Product - P13032
• The scope of the project is to design a device that allows a disabled individual to act as a skipper on a Sonar sailboat.
• The ideal goal of the device is to steer the boat as a lightweight, and cheap design that is an easily manufacturable assistive sailing device.
5
Problem Statement
Systemic:● Non-permanent attachment● Purely mechanical system● Conformance to racing standards
Independant:● Budget● Time
6
Constraints
Caitlyn Connolly
Richard Ramos Jr.
Keith Burhans
Volunteers of Piers Park
7
Stakeholders
8
Customer Requirements
• Needs to steer boat
• Removable chair system
• System should be used for more than one season
• Ease of adjustment to new user
9
Top Customer Requirements
10
Engineering Requirements
• Steps required to release rudder in emergency
• Minimize line cross-over
• Tools Needed
• Environmental Resistance to Wear
• Make seat vertically adjustable to boom height
11
Top Engineering Requirements
12
Functional Decomposition
13
Risk Assessment
14
Schedule
15
Questions
Functional DecompositionBenchmarkingConcept DevelopmentTesting OutlineRisk AssessmentSchedule
16
Project Design Agenda
17
Functional Decomposition
18
Functional Decomposition
19
Functional Decomposition
20
Benchmarking
21
Concept Development
- Corrosion Testing- Galvanic Corrosion- Graphitic Corrosion- Crevice Corrosion- General Corrosion
- Stress Analysis- Stress Concentrations
- Ergonomic Compatibility- Hardness Testing
- Steady Wear- Complete System Trial Runs
22
Testing Outline
23
Risk Assessment
Top few
24
Risk Assessment
25
Schedule
top related