Mr. Kevin LamDirector of Airport Infrastructure & Air Navigation

Civil Aviation Authority of Macao SAR

4th China & Portuguese Speaking Countries Airports Conference –

Macau 201325.09.13

Implementation of

Performance Based

Navigation

procedures

Macao Approach

PBN is a framework for defining performancerequirements for aircraft operating along an airroute, on an instrument approach or in a designatedairspace.

What is PBN?

9/30/2013

2

PBN Implementation - Macao Approach

Through the application of Area Navigation (RNAV)and Required Navigation Performance (RNP)specifications, PBN provides a basis for the designand implementation of automated, optimized andenvironmental friendly flight paths as well as anenabler for efficient airspace design and refinedprotection against terrain.

What is PBN?

9/30/2013

3

PBN Implementation - Macao Approach

What is RNAV?

Area navigation (RNAV) is a method of instrumentflight rules (IFR) navigation that allows an aircraftto choose any course within a network ofnavigation beacons, rather than navigating directlyto and from the beacons. This can conserve flightdistance, reduce congestion, and allow flights intoairports without beacons.

9/30/2013

4

PBN Implementation - Macao Approach

What is RNP?

Required navigation performance (RNP) is a type ofperformance-based navigation (PBN) that allows anaircraft to fly a specific path between two 3D-defined points in space.

9/30/2013

5

PBN Implementation - Macao Approach

RNAV & RNP

RNAV and RNP systems are fundamentally similar.

The key difference between RNAV and RNP is therequirement for on-board performance monitoringand alerting.

9/30/2013

6

PBN Implementation - Macao Approach

Regional and International

Cooperation

9/30/2013

7

PBN Implementation - Macao Approach

ICAO Assembly Resolution

(A36‐23)

The 36th Session of the ICAO Assembly adopted aResolution (A36‐23) to resolve that States andPlanning and Implementation Regional Groups(PIRGs) should have in place a PBN implementationplan by 2009 to achieve :

1) implementation of RNAV and RNP operations (whererequired) for en‐route and terminal areas according toestablished timelines and intermediate milestones; and

9/30/2013

8

PBN Implementation - Macao Approach

...

2) implementation of approach procedures with verticalguidance (APV) (through barometric vertical navigation(Baro‐VNAV) and/or augmented Global NavigationSatellite System (GNSS)) for all instrument runway ends,either as the primary approach or as a back‐up forprecision approach by 2016 with intermediate milestonesas follows: 30% by 2010, 70% by 2014.

ICAO Assembly Resolution

(A36‐23)

9/30/2013

9

PBN Implementation - Macao Approach

ICAO Assembly Resolution

(A37-11)

The 37th Session of the ICAO Assembly adopted aResolution (A37-11) to resolve that States complete aPBN implementation plan as a matter of urgency toachieve:

1) implementation of RNAV and RNP operations (whererequired) for en route and terminal areas according toestablished timelines and intermediate milestones;

9/30/2013

10

PBN Implementation - Macao Approach

2) implementation of approach procedures with verticalguidance (APV) (Baro-VNAV and/or augmented GNSS),including LNAV-only minima, for all instrument runwayends, either as the primary approach or as a back-up forprecision approach by 2016 with intermediatemilestones as follows: 30 per cent by 2010, 70 per centby 2014; and

ICAO Assembly Resolution

(A37-11)

9/30/2013

11

PBN Implementation - Macao Approach

3) implementation of straight-in LNAV-only procedures,as an exception to 2) above, for instrument runways ataerodromes where there is no local altimeter settingavailable and where there are no aircraft suitablyequipped for APV operations with a maximumcertificated take-off mass of 5 700 kg or more.

ICAO Assembly Resolution

(A37-11)

9/30/2013

12

PBN Implementation - Macao Approach

APAC Regional PBN Implementation

Plan - Medium Term (2013-2016)

Airspace Preferred Nav. Specification Acceptable Nav.Specification

Route – Oceanic RNP 2**, RNP 4 RNAV 10

Route – Remote continental

RNP 2 RNAV 2, RNP 4, RNAV 10

Route – Continental en-route

RNAV 1, RNP 2 RNAV 2, RNAV 5

TMA – Arrival Expand RNAV 1 or RNP 1application

TMA – Departure Expand RNAV 1 or RNP 1application

Approach Expansion of RNP APCH (withBaro-VNAV) and APV

9/30/2013

13

PBN Implementation - Macao Approach

Regional Cooperation

APAC PBN Task Force

to harmonize the Regional PBN Implementation inAPAC, Macao has participated in the Task Forcemeeting since early 2010.

9/30/2013

14

PBN Implementation - Macao Approach

ICAO Flight Procedure Programme (FPP) Office

act as active participant: Macao has supported theAPAC FPP Office since Mar 2010.

3 collegues from Macao were trained in the proceduredesign course.

Regional Cooperation

9/30/2013

15

PBN Implementation - Macao Approach

Macao PBN Procedure Design

9/30/2013

16

PBN Implementation - Macao Approach

PBN Procedure Team

On 01 Jun 2012, Macao International Airport PBNProcedures Team was set up.

The members of the team consisted of:

5 members from AACM

(ATC, AIS, Airworthiness & Flight Standards)

1 member from CAM

2 members from ADA (ATC)

2 members from Air Macau

(Flight OPS and Airworthiness)

9/30/2013

17

PBN Implementation - Macao Approach

PBN Procedure Design Process

The PBN procedure design task was undertaken byCAM.

The MIA PBN flight procedures design projectbetween ADA and Shanghai CAAC New Era AirportDesign & Research Institute Co. Ltd was signed on26 Sep 2012.

9/30/2013

18

PBN Implementation - Macao Approach

The MIA PBN procedures take-off meeting was heldon 15 Oct 2012 between AACM, CAM, ADA, AirMacau, HKCAD, ATMB Guangzhou, CAAC Middleand Southern Regional Administration and NewEra.

PBN Procedure Design Process

9/30/2013

19

PBN Implementation - Macao Approach

Navaid Infrastructure

GNSS

Navigation Specification:

Basic-RNP 1 (SID and STAR)

RNP APCH

The new PBN procedures will be overlaid on theexisting conventional procedures.

PBN Procedure Design Process

9/30/2013

20

PBN Implementation - Macao Approach

AACM, CAM, ADA, Air Macau, ATMB Guangzhou,CAAC Middle and Southern RegionalAdministration and New Era used A320 simulator atZhuhai Flight Training Center to validate the PBNprocedures on 05 Jan 2013.

PBN Procedure Design Process

Flight crew from AirMacau conducted theflight simulation.

9/30/2013

21

PBN Implementation - Macao Approach

On 07 and 08 Mar 2013, the on-site flight validationwas performed by the CAAC FIC Flight Check Team.

The waypoints and subsequent segments of MIAPBN Procedures meet fly ability, safety, minimumstabilization distance and accuracy requirement.

PBN Procedure Design Process

9/30/2013

22

PBN Implementation - Macao Approach

On 16 May 2013, the final assessmentmeeting was held in Zhuhai betweenAACM, CAM, ADA, Air Macau, HKCAD, ATMB Guangzhou, CAAC Middleand Southern RegionalAdministration and New Era.

The final report, verification processand contents have been discussed.The meeting adopted the said report.

PBN Procedure Design Process

9/30/2013

23

PBN Implementation - Macao Approach

CAAC, HKCAD and AACM alsoagreed to publish the saidprocedures and theimplementation date is 19September 2013.

PBN Procedure Design Process

9/30/2013

24

PBN Implementation - Macao Approach

Arrival

Departure

Missed

Approach

PBN Procedure Design Process

9/30/2013

25

PBN Implementation - Macao Approach

In consideration that some air operators mighthave practical problems in obtaining the Basic-RNP1 approval for their fleet before the aforesaideffective date, the conventional flight proceduresusing ground-based Navaids at MIA will be retainedfor a considerable period of time.

The conventional flight procedures transiting HongKong FIR are planned to be removed in one yearafter the post implementation review.

PBN Procedure Design Process

9/30/2013

26

PBN Implementation - Macao Approach

PBN readiness of

Macao Registered Aircraft

9/30/2013

27

PBN Implementation - Macao Approach

Operation requirement

The operation requirement for PBN approval hasbeen established since Nov 2011.

AERONAUTICAL CIRCULAR- AC/OPS/022R00 -Operation in Performance-based Navigation (PBN)Prescribed Airspace

9/30/2013

28

PBN Implementation - Macao Approach

PBN readiness of Macao

Registered Aircraft

There are 20 Macao registered aircraft as of Sep 2013.

Aircraft Type Number

Airbus A319 5

Airbus A320 2

Airbus A321 7

Hawker 2

CANADAIR 2

FALCON 2000 1

FALCON 2000LX 19/30/2013

29

PBN Implementation - Macao Approach

PBN Approval Status

100.00% 100.00%

75.00%

70.00%

100.00% 100.00%

100.00%100.00%

100.00% 100.00%

16.67%

0.00%

RNAV 10 RNAV 5 RNAV 1 Basic RNP 1

All

Local Airline

Private Aircraft

9/30/2013

30

PBN Implementation - Macao Approach

Challenge for PBN

Implementation in Macao

There is a need to harmonize the Macao ATZ, HongKong FIR and Guangzhou FIR implementation planand operation issues.

Private aircraft operators and foreign airlineoperators might have practical problems inobtaining the Basic-RNP1 approval for their fleet.

9/30/2013

31

PBN Implementation - Macao Approach

Questions & Answers

9/30/2013

32

PBN Implementation - Macao Approach

THANK YOU

9/30/2013

33

PBN Implementation - Macao Approach

top related