Kinnickinnic Watershed Action Team Meeting March 2011

• KK-2 has 3 of the top five priority values and is third for phosphorus (P) loads.

• KK-3 has 2 of the top five priority values and is number 5 for baseline total loads for Total Suspended Solids (TSS).

• KK-4 has none of the top five priority values and is number 2 for baseline total loads for TSS.

• KK-5 has 3 of the top five priority values and is ranked number 3 for baseline total loads for TSS, and also number 1 for Phosphorus.

• KK-6 has 3 of the top five priority values and is number 2 for baseline total loads of Phosphorus.

• KK-8 has 2 of the top five priority values and is number 1 for TSS baseline total loads, and number 4 for Phosphorus baseline total loads.

• KK-10 has 2 of the top five priority values and is number 4 baseline total loads for TSS and number 5 for Phosphorus.