Transcript
NORTH CENTRAL RAILWAY
KANPUR PARLIAMENTARY CONSTITUENCY
Shri Narendra ModiHon'ble Prime Minister
Uttar Pradesh, the most populous state of the nation, is
served by North Central Railway along with Northern, North
Eastern and East Central Railways. Indian Railways (IR) plays a
very important role in development of the state and provide
connectivity for freight and passengers, including international
tourists. IR has a history of more than 160 years in the state and
has the highest route kilometers - 9100 route kilometers-with in it,
which is 14% of entire Indian Railways network.
IR has made Uttar Pradesh proud by giving it Nation's first
semi high speed train Gatimaan Express, which initially ran
between Agra and Delhi. It has now been extended upto Jhansi - a
move that will boost tourism in Bundelkhand region of Uttar
Pradesh. After Gatiman, the nation's first engineless semi high
speed train set "Vande Bharat Express" which is running from
New Delhi to Varanasi is also serving the state of Uttar Pradesh.
Efforts for further development of railway infrastructure in
Uttar Pradesh have been intensified in last seven years with
461% more investment in comparison to previous years. Results
of such a massive investment are becoming visible with
enhanced infrastructure and modern passenger amenities. Soon
the era of congestion and inconvenience will be matter of past and
a new Railway equipped with state-of-the art facilities will be able
to serve the citizens in a better manner and provide them
enhanced value for their money. The longest stretch of the under
construction Eastern Dedicated Freight Corridor i.e. almost 57%
of the entire length lies in Uttar Pradesh from Pt. Deen Dayal
Upadhyaya Jn. to Ghaziabad.
In this brochure, we have compiled the important
contributions and achievements of Indian Railways in the
development of the constituency of Uttar Pradesh in
last seven years.
I hope that it will serve as a ready reckoner for those eager to
know about the role of Railways in the development of this
constituency.
It may be noted that the budgets allocated to various projects
are not apportioned constituency wise but reflect the cost of the
project.
KANPUR
Vinay Kumar TripathiGeneral Manager
North Central Railway
INPUTS BY RAILWAY IN KANPUR PARLIAMENTARY CONSTITUENCY
KANPUR PARLIAMENTARY CONSTITUENCY
A. ASSEMBLY SEGMENTS:
Kanpur Cantonment, Arya Nagar, Govind Nagar, Sishamau, Kidwai Nagar.
B. WORKS COMPLETED IN LAST SEVEN YEARS:
1. INFRASTRUCTURAL DEVELOPMENT
2. IMPROVEMENT IN PASSENGER AMENITIES:
D.clock, LED Display Board & Speakers in Waiting Room & Auto announcement, Counter Comm. & POET at
all D category stations of Izzatnagar Division at a cost of Rs. 87.88 lakh.
LHB Coach care Center at New coaching complex at Kanpur at a cost of Rs. 0.99 Cr.
07 Lifts at Kanpur Central & 03 at Tundla and 01 escalator at Vindhyachal.
60 CCTV cameras at Kanpur at a cost of Rs. 2.50 Cr.
Coach Guidance System at Prayagraj Chheoki, Manikpur & Panki at a cost of Rs. 2.50 Cr.
Washable apron at Kanpur at a cost of Rs.1.80 Cr.
Supply & Installation of CCTV cameras for PRS counters at Kanpur Cantt., Govindpuri, Panki at a cost of
Rs.1.05 Cr.
Provision of minimum passenger amenities at stations in Kanpur-Tundla section at a cost of Rs. 1.52 Cr.
51 Wifi locations at Kanpur at a cost of Rs. 0.70 Cr.
01 Lift at Kanpur Central Railway station at a cost of Rs. 0.43 Cr.
Toilets for divyang at all platforms of Kanpur Central at a cost of Rs. 0.19 Cr.
03 LED type station name boards at Kanpur Central at a cost of Rs. 0.06 Cr.
02 LED type station name boards at Panki Railway station at a cost of Rs. 0.04 Cr.
Electrification of Rooma Railway station at a cost of Rs. 0.10 Cr.
C. OTHER DEVELOPMENT
NEW TRAINS INTRODUCED WITH STOPPAGED OVER KANPUR CONSTITUENCY
Train No 14101/ Kanpur Express - Daily - From Prayag to Kanpur Central.
Train No 14221/ Intercity Express - Daily - From Faizabad to Kanpur Anwarganj.
Train No 22443/ Bandra T Express - Weekly - From Kanpur Central to Bandra T.
l
l
l
Electrification of Kanpur Anwarganj-Kanpur at a cost of Rs. 286 Lakh.
Electrification of Rooma railway station at a cost of Rs. 0.10 Cr.
One Mega Watt Power Roof top Solar Power Plants at Kanpur Central Railway Station Electric Loco Shed at
a cost of Rs. 3.59 Cr.
14102
14222
22444
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
INPUTS BY RAILWAY IN KANPUR PARLIAMENTARY CONSTITUENCY
KANPUR PARLIAMENTARY CONSTITUENCY
Train No 64589/ MEMU Passenger Service - DAILY - From Kanpur Central to Phaphund.
Train No 12595/ Humsafar Express -Bi- Weekly - From Gorakhpur to Anand Vihar T.
Train No 12571/ Humsafar Express -Bi- Weekly - From Gorakhpur to Anand Vihar T.
Train No 15063/ Lokmanya Tilak T Express - Weekly - From Gorakhpur to Lokmanya Tilak T.
Train No 15065/ Panvel Express - 04 days a Weekly - From Gorakhpur to Panvel.
Train No 15068/ Gorakhpur Express - Weekly - From Bandra T to Gorakhpur.
Train No 19041/ Ghazipur City Express -Bi-Weekly - From Bandra T to Ghazipur city
Train No 19305/ Guwahati Express -Weekly - From Indore to Guwahati via Kanpur Central.
Train No 22434/ Ghazipur City Express -Bi-Weekly - From Anand Vihar T to Ghazipur City.
Train No 22121/ AC Express -Weekly - From Lokmanya Tilak T to Lucknow via Kanpur Central.
Train No 22921/ Antyodaya Express -Weekly - From Bandra T to Gorakhpur via Kanpur Central.
Train No - Antyodaya Express -Weekly - From Gorakhpur to Bandra T via Kanpur Central.
Train No 20502/ Anand Vihar T - Agartala Rajdhani Express - Weekly - From Anand Vihar T to
Agartala.
Train No 22427/ Bhrigu Express -Weekly - From Ballia to Anand Vihar T via Kanpur Central.
Train No 12179/ Intercity Express - From Lucknow to Agra Cantt.
Train No 12451/ Shram Shakti Express - From Kanpur Central to New Delhi.
Train No 14163/ Sangam Express - From Prayagraj Jn to Meerut City.
Train No 11079/ Gorakhpur Express -Weekly - From Lokmanya Tilak T to Gorakhpur via Kanpur
Central.
Train No 11407/ Lucknow Express -Weekly - From Pune to Lucknow via Kanpur Central
Train No 12597/ Jan Sadharan Express -Weekly - From Gorakhpur to Mumbai CST.
Train No 19401/ Lucknow Express -Weekly - From Ahmedabad Jn to Lucknow.
Train No 19022/ Bandra T Express -Weekly - From Lucknow Jn to Bandra T.
Train No - Lucknow Express -Weekly - From Bandra T to Lucknow Jn.
Train No 19715/ Jaipur - Lucknow Express -Tri- Weekly - From Jaipur to Lucknow.
Train No 13167/ Kolkata - Agra Cantt Express -Weekly - From Kolkata to Agra Cantt.
Train No 22411/ Naharlagun - New Delhi AC Express -Weekly - From Naharlagun to New.
Train No 15029/ Gorakhpur- Pune Express - Weekly - From Gorakhpur to Pune via Kanpur
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
64590
12596
12572
15064
15066
15067
19042
19306
22433
22122
22922
20501
22428
12180
12452
14164
11080
11408
12598
19402
19021
19716
13168
22412
15030
INPUTS BY RAILWAY IN KANPUR PARLIAMENTARY CONSTITUENCY
KANPUR PARLIAMENTARY CONSTITUENCYCentral.
Train No 12419/ Gomti Express - From Lucknow to New Delhi.
Train No 14155/ Kanpur - Jammu Tawi Express - Bi-weekly - From Kanpur Central to Jammu Tawi.
Train No 22857/ Santragachi - Anand Vihar T Express - Bi-Weekly - From Santragachi - Anand Vihar.
D. ONGOING WORKS ·
Construction of flyover between Bhimsen to Kanpur Central at a cost of Rs. 189.73 Cr.
Rooma-Chakeri-Chandari - 3rd line 12.5 km at a cost of Rs. 176.68 Cr.
EI Yard remodelling work of Panki at a cost of Rs. 107.68 Cr.
4th line Bhaupur - Panki at a cost of Rs. 97.33 Cr.
Construction of MEMU Car shed at Kanpur at a cost of Rs. 49.62 Cr.
Construction of RCC boundary wall at Kanpur-Rura section at a cost of Rs.17.83 Cr.
Provision of Minimum Essential Amenities over Prayagraj division at a cost of Rs. 15.47 Cr.
RPF barracks & misc. other works at Firozabad, Phaphund, Prayagraj & Kanpur at a cost of Rs. 5.79 Cr.
New works for splitting of two block sections, provision of logistic park, chord line, satellite station, sand humps,
simultaneous movement and conversion to B-class station at Kanpur Anwarganj at a cost of Rs. 2.76 Cr.
Stainless Steel Benches at Stations over Prayagraj Division at a cost of Rs. 2.04 Cr.
Provision of new hydrant pipe line on PF No.1, rehabilitation of hydrants at PF-2&3 at Anwarganj station at a
cost of Rs. 2.00 Cr.
Kanpur Provision of hydrant pipe lines for train watering at Govindpuri at a cost of Rs. 1.80 Cr.
Lifts at A1, A other pilgrim stations with high passenger density at a cost of Rs 1.72 Cr.
RPF barracks misc. other works at Kanpur at a cost of Rs. 1.44 Cr.
Water treatment and recycling plants at Coaching Depot Kanpur at a cost of Rs. 1.29 Cr.
True colour LED Display Boards for train information system at Kanpur at a cost of Rs. 1.25 Cr.
Kanpur central Raising and resurfacing of Platform no. 10 at a cost of Rs.1.23 Cr.
Kanpur Modification in layout of track of PF No. 2 3 to accommodate 24 coach length trains at a cost of Rs.
0.99 Cr.
CCTV surveillance system in coaching depots Prayagraj and Kanpur central at a cost of Rs. 0.59 Cr.
01 escalator at Kanpur at a cost of Rs. 0.40 Cr.
Improvement of illumination in various goods shed of Prayagraj Division at a cost of Rs. 0.39 Cr.
Provision of Coach guidance display board and train timing display board at Govindpuri station at a cost of
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
12420
14156
22858
INPUTS BY RAILWAY IN KANPUR PARLIAMENTARY CONSTITUENCY
KANPUR PARLIAMENTARY CONSTITUENCY
Rs. 1.51 Cr.
32 inch LED Panel for Coach Guidance cum Advertisement system at PF No. 1 of Kanpur Central at a cost of
Rs. 0.52 Cr.
Coach Indicator Display boards at all platforms of Kanpur Anwarganj at a cost of Rs. 0.91 Cr.
RCC over head tank 100000 gallons capacity & tube well for watering at Govindpuri station at a cost of Rs.
1.25 Cr.·
50000 gallon capacity RCC over head tank, deep tube well, pump house & associated pipe line at Kanpur
Anwarganj at a cost of Rs. 1.25 Cr.
Coach guidance display system and train timing display boards at Aligarh, Etawah, Jhinjhak, Tundla &
Phaphund at a cost of Rs. 5.13 Cr.
Improvement of loading and unloading area of goods shed at Panki Dham at a cost of Rs. 2.36 Cr.
Raising and Improvement of Kanpur Central goods shed at a cost of Rs. 2.20 Cr.
Replacement of old and worned out coach guidance system with new integrated PA & coach guidance display
system at Kanpur Central at a cost of Rs. 2.50 Cr.
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
Auto announcement system at Burhwal, Colonelganj, Daliganj, Kanpur Anwarganj, Barhni & Gola
Gokarannath at a cost of Rs. 47.85 lakh.
LHS /ROB/RUB in lieu of:
Provision of height gauge at 9 saubways in Kanpur Anwarganj-Mathura Cantt section at at cost of 41.68 Lakh.
Level Crossing No. 32 on Kanpur Anwarganj-Farrukhabad section at a cost of Rs. 249.83 Lakh.
Level Crossing No. 154 at Fatehgarh-Farrukhabad section at a cost of Rs. 3501.96 lakh.
Level Crossing No.10 at Anwar Ganj-Kasganj section at a cost of Rs. 3501.96 lakh.
Level Crossing No. 13 at Kalyanpur yard at a cost of Rs. 3501.96 lakh.
Level Crossing No.4 at Kanpur Anwarganj-Rawatganj section at a cost of Rs. 3637.04 lakh.
Level Crossing No.9 Kanpur Anwarganj-Rawatpur section at a cost of Rs. 3637.04 lakh.
Level Crossing No. 31 between Kanpur Anwarganj - Farrukhabad section at a cost of Rs. 249.83 lakh.
Level Crossing No. 7 at Kanpur Anwarganj-Rawatganj section at a cost of Rs. 3501.96 lakh.
Level Crossing No. 2 at Kanpur Anwarganj-Rawatganj section at a cost of Rs. 3501.96 lakh.
Level Crossing No.3 at Kanpur Anwarganj-Rawatganj section at a cost of Rs. 3501.96 lakh.
Level crossing No. 74 at Prayagraj-Kanpur section.
Escalator at Kanpur. Digital Reservation Chart Display Board.
Inauguration of Bandra-Patna Express at Kanpur.
Inauguration of Lifts at Kanpur Central
Inauguration of integrated Passenger information system at Etawah station
Inauguration of FOB at Bindki Road station
top related