ITI Ankleshwar Station Road, Opp. Bus Station, Ankleshwar Email:-prlankleshwariti@yahoo.co.in, Website:- Phone & Fax : 91-2646-

Post on 14-Dec-2015

218 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

Transcript

ITI AnkleshwarStation Road, Opp. Bus Station,

AnkleshwarEmail:-prlankleshwariti@yahoo.co.in,

Website:-www.itiankleshwar.org.inPhone & Fax : 91-2646- 247028

Progress of ITI after the Implementation of COE scheme

Institute Management Committee YEAR 2007-08

SR. NO NAME

COMMITTEE DESIGNATION NAME OF INDUSTRY

1 SHRI U. S AMBEGAOKAR CHAIRMAN LUPIN LTD. ANKLESHWAR

2 DR. C. B. UPASANI MEMBERJYOTI OM LABORATORIES, ANKLESHWAR

3SHRI NIRMAL CHAUDHARI MEMBER

J. B. CHEMICAL PVT. LTD. , PANOLI

4 SHRI A. K. SAHANI MEMBER GNFC, BHARUCH

5 SHRI ASHOKBHAI PANJVANI MEMBER CII MEMBER

6 SHRI V. A. PUJARA CO-MEMBER GNFC, BHARUCH

7 SHRI A. P. DAVE CO-MEMBER NCPL, BHARUCH

8 R.D.D., SURAT MEMBER  

9 SHRI J. A. MEHTA MEMBER SECRETARY   PRINCIPAL, ITI ANKLESHWAR

10 SHRI V. D. VASAVA MEMBER

 DISTRICT EMPLOYMENT OFFICER

11 SHRI N. D. KATARIYA MEMBER  

12 SHRI A. V. VARIA CO-MEMBER  

13 TRAINEE MEMBER  

BEFORE AFTER

AFTER BEFOE

AFTER BEFORE

AFTER BEFORE

AFTER BEFORE

AFTER BEFORE

AFTER BEFORE

BEFORE AFTER

AFTER BEFORE

AFTER BEFORE

AFTER BEFORE

AFTER BEFORE

AFTER BEFORE

AFTER BEFORE

AFTER BEFORE

AFTERBEFORE

AFTER BEFORE

AFTER BEFORE

AFTERBEFORE

AFTER BEFORE

AFTERBEFORE

AFTER BEFORE

AFTER BEFORE

AFTER BEFORE

• Power point training delivery material for each Modules of CoE.

Advance Module Lab - CoE

LABS EQUIPED WITH LATESTEQUIPMENTSEXPENDITURE Rs. 75 Lacs.

BBBT Module Lab - CoE

DUST PROOF PHYSICS & CHEMISTRY LABS

CERAMIC FLOORING

COE Class Room

PLACEMENT BEURAU

PLACEMENT BEURAU

MISC. EXPENDITURE

ATTRACTIVE DISPLAY BOARDS & PLANNER

MISC. EXPENDITURE

EXHIBITION BOARDS

INSTRUMENT NAME PLATES USING POLYVINYLE LABLES

POLYVINYLE PRINTING CHARTS

ATTRACTIVE TEACHING AIDS

COLOURFULL CHARTS

FOR EASY UNDERSTANDING

CAMPUS INTERVIEWS

FROM 01-04-2007 TO 31-03-2009

SR. NO. NAME OF INDUSTRIES RECRUITMENT AVERAGE PAY (Rs.)

1 SRF Ltd. , Gurgaon 40 3500

2 Larsen & Tubro Ltd. , Hazira 20 4300

3 FN Consultant, Bharuch 06 3000

4 ISGEC , Dahej 03 3200

5 ABG Shipyard, Dahej 61 3500

6 Larsen & Tubro Ltd. , Hazira 25 4500

7 Gujarat Glass Ltd., Kosamba 11 3200

8 PRABHACAR Enterprice, Ankleshwar 13 2800

9 Larsen & Tubro Ltd. , Hazira 07 4000

10 PRABHACAR Enterprice, Ankleshwar 24 3000

11 Gujarat Glass Ltd., Kosamba 09 3000

12 Larsen & Tubro Ltd. , Hazira 27 4000

13 IPCG, Selvas 02 3000

14 Vazan Engineering, Ankleshwar 13 3200

15 Gujarat Glass Ltd., Kosamba 17 3400

SEATS UTILIZATION CoE

Sr. No. NAME OF MODULE SANCTIONED FILLED ONROLL

1 BBBT 96 120 104

2 ADVANCE 96 - -

CoE RESULT

Sr. No. NAME OF MODULE APPEARED PASSED OUT PERCENTAGE

1 BBBT 92 83 90

2 ADVANCE 86 85 99

PLACEMENT OF CoE TRAINEES

Sr. No. MODULE PASSED OUT

(IN YR 2007-08)

PLACED

(IN YR 2007-08)

PERCENTAGE

1 CHAT 1 – AOCP 30 30 100

2 CHAT 2 – MMCP 31 12 39

3 CHAT 3 – IMCP 31 20 65

On Job Training

Sr. No. MODULE PASSED OUT NO. OF TRAINEE PERCENTAGE

1 CHAT 1 – AOCP 38 37 97

2 CHAT 2 – MMCP 09 07 82

3 CHAT 3 – IMCP 38 37 97

TOTAL TARGET : 20 TOTAL ACHIEVED : 41

SR. NO.

COURSE NO. OF TRAINEE

1 INSTRUMENT ATTANDENT CHEMICAL PLANT 017

2 MAINTANACE OF PUMP & VALVE C. P. 024

3 MECHANICAL OPERATION ATTANDENT C.P. 172

4 PROCESS ATTANDENT C.P. 158

5 SAFETY & GENERAL AWARENESS IN CH. IND. 42 (Direct exam)

Trained candidates of Industries : 371

M.E.S. SCHEME :(2008-2009)

Sr.No.

Description Expenditure (Rs.) Total

Year2005-06

Year2006-07

Year2007-08

Year2008-09

1 Instructor Training 9566 119302 26354 117996 273218

2 Salary of Contractual / Guest Faculty 13000 108324 244832 183934 550090

3 Raw Material 186298 328312 567326 548790 1630726

4 Books for the Library   95300 15138 15300 125738

5 Training Material for Trainees (Learning Resources)

36375 140400 21747 40000 238522

6 Industrial Visit of Trainees   17100 18056 18500 53656

7 Maintenance of Equipment & Repair of furniture   20000 26569 22325 68894

8 Telephone Bills & Internet connection   39800 23479 14457 77736

9 Equipment for Theory room & Office 56193 527914 100545 28455 713107

10 Seminar/Workshop   13300 3017 100250 116567

11 Environment Management Framework     36000 39650 75650

12 Any other activities as per guideline of DGET   122604 4943 142282 269829

Progress of civil work under COE

NAME OF ITI- Ankleshwar SECTOR; Chemical Progress till the Date:31-03-'08

Sr.No

Budget provision for 2007-08

Estimates of the Civil works.

Central Sharereceived Rs.

Expenditure 2005-06

Rs.in lacs

Expenditure 2006-07 Rs.in lacs

Works completed in percentage (%)

Expected date of completion of

works

        Plan NonPlan Plan NonPlan

   

1 2 3 4 5 6 7 8 9 10

1 42.61 lacs  -- 1.38 7.41 8.63 20.60 100% 38.02 lacs 

Note: Total expenditure up to Dt- 31-03-08 is 38.02 lacs.

CIVILWORKS

Note: Total expenditure up to Dt- 31-03-08 is 38.02 lacs.

38.02 lacs100%20.608.637.411.3842.61 lacsnil1

10987654321

NonPlan

PlanNonPlanPlan

Expected date of completion of

works

Works completed in percentage (%)

Expenditure2006-07

Rs.in lacs

Expenditure 2005-06 Rs.in lacs

Central SharereceivedRs.

Estimates of the Civil works.

Budget provision for 2007-08

Sr.No

NAME OF ITI- Ankleshwar SECTOR; Chemical Progress till the Date:31-03-'09

ITI –ANKLESHWAR Major Accomplishments

Successful implementation of COE concept in Chemical Sectors.

Continuous training of Staff

AFTER Motor Driving Training Centre.

Mega Apprentice Bharati Mela

15 campus interviews/placement of 278 trainees in 2006-07

12 campus interviews/placement of 121 trainees in 2007-08

10 campus interviews/placement of 399 trainees in 2008-09

Fully Equipped Placement Bureau Started at ITI Ankleshwar

Launched ITI Ankleshwar web site ( www.itiankleshwar.org.in )

top related