NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 1 of 24

DIVISION 00001

34563.3.3NHS-17(28)PASQUOTANKR-3850

PROPOSAL LENGTH 1.036 KILOMETERS

TYPE OF WORK INTERCHANGE CONST, GRADING, DRAINAGE, PAVING & STR.

LOCATION US-17 & SR-1140 (OKISKO RD).

EST CONST PROGRESS.... FY-2004..49% OF BIDFY-2005..47% OF BIDFY-2006..04% OF BID

RPN 002 C200723 3 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 7,544,162.60

DATE AVAILABLE NOV 03 2003INTER COMPLETION SEP 01 2005 COMPLETE ALL WORK EXCEPT PLANTING/REFORESTATIONFINAL COMPLETION DEC 31 2005

$ TOTALS % DIFF7,669,459.48 +1.7BARNHILL CONTRACTING CO. TARBORO, NC8,204,563.15 +8.8* W. C. ENGLISH, INC. LYNCHBURG, VA

* CHANGE IMPROPERLY MADE* USED CORRECTION FLUID

9,952,783.66 +31.9R. P. C. CONTRACTING, INC. KITTY HAWK, NC

* DENOTES IRREGULAR BID

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 2 of 24

DIVISION 00003

34592.3.1STP-421(27)SAMPSONR-4031

PROPOSAL LENGTH 6.800 MILES

TYPE OF WORK MEDIAN GUARDRAIL, GUIDERAIL & SIGNING.

LOCATION US-421 & US-701 FROM US-701 BUSINESS TO SR-1934.

EST CONST PROGRESS.... FY-2004..80% OF BIDFY-2005..20% OF BID

RPN 003 C200902 1 BIDDER(S) DBE GOAL 3.00 %ESTIMATE 614,043.87

DATE AVAILABLE NOV 03 2003INTER COMPLETION COMPLETE ALL GUIDERAIL & GUARDRAIL WORK 120 DAYS AFTER STARTFINAL COMPLETION NOV 01 2004

$ TOTALS % DIFF681,613.15 +11.0ELDERLEE, INC. OAKS CORNERS, NY

PAGE: 3 OF 24 ITEM C

JULY 15 2003 LETTING

34592.3.1STP-421(27)SAMPSONR-4031RPN 004

MEDIAN GUARDRAIL, GUIDERAIL & SIGNING.

DATE AVAILABLE SEP 02 2003INTER COMPLETION COMPLETE ALL GUIDERAIL & GUARDRAIL WORK 120 DAYS AFTER STARTFINAL COMPLETION SEP 01 2004

ENGINEER’S ESTIMATE$614,043.87

$ TOTALS % DIFFELDERLEE, INC. OAKS CORNERS, NY 676,266.10 +10.1

SEPTEMBER 16 2003 LETTING

34592.3.1STP-421(27)SAMPSONR-4031RPN 003

MEDIAN GUARDRAIL, GUIDERAIL & SIGNING.

DATE AVAILABLE NOV 03 2003INTER COMPLETION COMPLETE ALL GUIDERAIL & GUARDRAIL WORK 120 DAYS AFTER STARTFINAL COMPLETION NOV 01 2004

ENGINEER’S ESTIMATE$614,043.87

$ TOTALS % DIFFELDERLEE, INC. OAKS CORNERS, NY 681,613.15 +11.0

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 4 of 24

DIVISION 00004

33087.3.2BRSTP-1426(3)HALIFAXB-3468

PROPOSAL LENGTH 0.154 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGE OVER CHOCKOYOTTE CREEK & APPROACHES SR-1426.

EST CONST PROGRESS.... FY-2004..100% OF BID

RPN 004 C200688 3 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 590,717.73

DATE AVAILABLE NOV 03 2003 THRU MAR 15 2004FINAL COMPLETION 190 DAY(S) AFTER START DATE

$ TOTALS % DIFF630,432.46 +6.7ATWELL CONSTRUCTION CO., INC. GREENVILLE, NC676,817.84 +14.6S. T. WOOTEN CORPORATION WILSON, NC717,523.66 +21.5D. W. LYLE CORPORATION MCKENNEY, VA

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 5 of 24

DIVISION 00005

32964.3.2BRZ-1649(1)WAKEB-3259

PROPOSAL LENGTH 0.958 KILOMETERS

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURES.

LOCATION BRIDGE OVER TURKEY CREEK & BRIDGE OVER CRABTREE CREEK ANDAPPROACHES ON SR-1649.

EST CONST PROGRESS.... FY-2004..77% OF BIDFY-2005..23% OF BID

RPN 005 C200751 3 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 1,792,596.82

DATE AVAILABLE NOV 03 2003INTER COMPLETION NOV 15 2004 COMPLETE ALL WORK EXCEPT PLANTING/REFORESTATIONFINAL COMPLETION DEC 31 2004

$ TOTALS % DIFF1,945,002.95 +8.5S. T. WOOTEN CORPORATION WILSON, NC1,993,446.11 +11.2BLYTHE CONSTRUCTION, INC. CHARLOTTE, NC2,004,009.63 +11.8C. C. MANGUM CONTRACTORS, LLC RALEIGH, NC

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 6 of 24

DIVISION 00005

33137.3.2BRZ-2006(2)WAKEB-3529

PROPOSAL LENGTH 0.354 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGE OVER PERRY CREEK AND APPROACHES ON SR-2006.

EST CONST PROGRESS.... FY-2004..53% OF BIDFY-2005..46% OF BIDFY-2006..01% OF BID

RPN 006 C200700 1 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 1,941,001.43

DATE AVAILABLE NOV 03 2003FINAL COMPLETION JUL 15 2005

$ TOTALS % DIFF2,251,260.41 +16.0S. T. WOOTEN CORPORATION WILSON, NC

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 7 of 24

DIVISION 00005

33954.2.2STP-0520(16)WAKEE-3806AA

PROPOSAL LENGTH 2.278 MILES

TYPE OF WORK PEDESTRIAN BRIDGE.

LOCATION REEDY CREEK GREENWAY FROM NC ART MUSEUM TO MEREDITH COLLEGE INRALEIGH.

EST CONST PROGRESS.... FY-2004..77% OF BIDFY-2005..23% OF BID

RPN 007 C200769 6 BIDDER(S) DBE GOAL 3.00 %ESTIMATE 3,693,272.77

DATE AVAILABLE NOV 03 2003FINAL COMPLETION NOV 15 2004

$ TOTALS % DIFF3,811,264.00 +3.2C. C. MANGUM CONTRACTORS, LLC RALEIGH, NC4,328,502.63 +17.2S. T. WOOTEN CORPORATION WILSON, NC4,372,408.55 +18.4BLYTHE CONSTRUCTION, INC. CHARLOTTE, NC4,462,237.50 +20.8DANE CONSTRUCTION, INC. MOORESVILLE, NC4,977,224.25 +34.8* W. C. ENGLISH, INC. LYNCHBURG, VA

* CHANGE IMPROPERLY MADE* USED CORRECTION FLUID

5,757,536.85 +55.9CROWDER CONSTRUCTION COMPANY CHARLOTTE, NC

* DENOTES IRREGULAR BID

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 8 of 24

DIVISION 00006

33121.3.1BRZ-1303(4)ROBESONB-3507

PROPOSAL LENGTH 0.227 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURES.

LOCATION BRIDGES OVER LUMBER RIVER & OVERFLOW & APPROACHES ON SR-1303.

EST CONST PROGRESS.... FY-2004..40% OF BIDFY-2005..60% OF BID

RPN 008 C200706 4 BIDDER(S) DBE GOAL 9.00 %ESTIMATE 1,043,236.26

DATE AVAILABLE MAY 01 2004FINAL COMPLETION NOV 30 2004

$ TOTALS % DIFF1,057,994.60 +1.4S. T. WOOTEN CORPORATION WILSON, NC1,074,585.35 +3.0DANE CONSTRUCTION, INC. MOORESVILLE, NC1,178,405.82 +13.0CAROLINA BRIDGE COMPANY, INC. ORANGEBURG, SC1,183,838.23 +13.5DELLINGER, INC. MONROE, NC

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 9 of 24

DIVISION 00006

6R.2078STATE FUNDEDROBESON

PROPOSAL LENGTH 18.420 MILES

TYPE OF WORK MILLING, RESURFACING, SHOULDER RECONST & PVMT MARKINGS.

LOCATION 10 SECTIONS OF SECONDARY ROADS.

EST CONST PROGRESS.... FY-2004..100% OF BID

RPN 009 C200884 2 BIDDER(S) MBE GOAL 8.00 % WBE GOAL 4.00%ESTIMATE 901,726.75

DATE AVAILABLE NOV 03 2003FINAL COMPLETION JUN 01 2004

$ TOTALS % DIFF978,576.80 +8.5COASTAL CAROLINA DIVISION OF APAC-ATLANTIC, INC. KINSTON, NC984,988.10 +9.2BARNES PAVING CO., INC. LUMBERTON, NC

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 10 of 24

DIVISION 00007

33033.3.2BRZ-1921(4)ALAMANCEB-3401

PROPOSAL LENGTH 0.340 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGE OVER QUAKER CREEK AND APPROACHES ON SR-1921.

EST CONST PROGRESS.... FY-2004..80% OF BIDFY-2005..20% OF BID

RPN 010 C200733 5 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 1,085,607.87

DATE AVAILABLE NOV 03 2003FINAL COMPLETION NOV 15 2004

$ TOTALS % DIFF1,115,691.20 +2.8DELLINGER, INC. MONROE, NC1,186,741.86 +9.3DANE CONSTRUCTION, INC. MOORESVILLE, NC1,188,441.51 +9.5R. E. BURNS & SONS CO., INC. STATESVILLE, NC1,238,856.53 +14.1HAYMES BROTHERS, INC. CHATHAM, VA1,271,730.84 +17.1CAROLINA BRIDGE COMPANY, INC. ORANGEBURG, SC

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 11 of 24

DIVISION 00007

33155.3.1BRSTP-2158(2)ALAMANCEB-3601

PROPOSAL LENGTH 0.445 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGE OVER HAW RIVER AND APPROACHES ON SR-2158.

EST CONST PROGRESS.... FY-2004..49% OF BIDFY-2005..47% OF BIDFY-2006..04% OF BID

RPN 011 C200765 8 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 3,107,479.10

DATE AVAILABLE NOV 03 2003INTER COMPLETION SEP 01 2005 COMPLETE ALL WORK EXCEPT PLANTING/REFORESTATIONFINAL COMPLETION DEC 31 2005

$ TOTALS % DIFF3,038,945.12 -2.2DANE CONSTRUCTION, INC. MOORESVILLE, NC3,065,834.00 -1.3* W. C. ENGLISH, INC. LYNCHBURG, VA

* CHANGE IMPROPERLY MADE* USED CORRECTION FLUID

3,209,138.94 +3.3BLYTHE CONSTRUCTION, INC. CHARLOTTE, NC3,272,091.90 +5.3DELLINGER, INC. MONROE, NC3,291,716.61 +5.9D. W. LYLE CORPORATION MCKENNEY, VA3,312,311.97 +6.6SLOAN CONSTRUCTION CO., INC. GREENVILLE, SC3,493,203.89 +12.4TRIANGLE GRADING & PAVING, INC. BURLINGTON, NC3,668,985.32 +18.1HAYMES BROTHERS, INC. CHATHAM, VA

* DENOTES IRREGULAR BID

HIGHWAY LETTING PAGE: 12 OF 24 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ITEM C

DIVISION OF HIGHWAYSRALEIGH NCSEP 16 2003

DIVISION 00007

33088.0.1, 33083.3.1

BRZ-2819(2)GUILFORDB-3463, B-3647, B-3648

PROPOSAL LENGTH 0.642 MILES

TYPE OF WORK DESIGN BUILD / GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGES OVER SOUTH & NORTH BUFFALO CREEK & APPROACHES ON SR-2819, SR-2770 & SR-2784.

EST CONST PROGRESS…. FY-2004..47% OF BIDFY-2005..45% OF BIDFY-2006..08% OF BID

RPN 023 C200748 3 BIDDERS DBE GOAL 10.00%ESTIMATE 3,846,500.00

DATE AVAILABLE NOV 03 2003FINAL COMPLETION OCT 15 2005

$ TOTALS % DIFFSMITH-ROWE MOUNT AIRY, NC 4,037,624.61 +5.0S. T. WOOTEN WILSON, NC 4,648,000.00 +20.8CROWDER CONST CO CHARLOTTE, NC 4,900,000.00 +27.4

QUALITY ADJUSTED PRICE RANKING

PROPOSAL TECH QUALITY LINE ITEM QUALITY LINE ITEM ADJUSTED SCORE CREDIT % #2 AMT VALUE #1 AMT PRICE

(CONT AWD BASIS)

SMITH-ROWE 84 11.67 3,053,747.82 356,372.37 983,876.79 3,681,252.24S. T. WOOTEN 88 15.00 3,871,000.00 580,650.00 777,000.00 4,067,350.00CROWDER 89 15.83 4,300,000.00 680,690.00 600,000.00 4,219,310.00

PROPOSAL PROPOSED COMPLETION DATE

SMITH-ROWE JUN 15 2004S. T. WOOTEN APR 01 2005CROWDER CONST CO NOV 12 2004

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 13 of 24

DIVISION 00007

34293.3.1ITS-32NC(001)ALAMANCE, GUILFORDM-351

PROPOSAL LENGTH 10.750 MILES

TYPE OF WORK ITS.

LOCATION I-85 / I-40 CORRIDOR INTEGRATION OF TRIAD REGIONAL TMC & CITY OFBURLINGTON'S REGIONAL CAMERA SYSTEM.

EST CONST PROGRESS.... FY-2004..89% OF BIDFY-2005..11% OF BID

RPN 012 C200770 5 BIDDER(S) DBE GOAL 0.00 %ESTIMATE 980,370.00

DATE AVAILABLE NOV 03 2003FINAL COMPLETION SEP 01 2004

$ TOTALS % DIFF762,762.00 -22.2TRAFFIC CONTROL DEVICES, INC. ALTAMONTE SPRNGS, FL823,567.13 -16.0WORLD FIBER TECHNOLOGIES, INC. ALPHARETTA, GA854,792.59 -12.8* VIASYS SERVICES, INC. LAKELAND, FL

* BID EXECUTED IMPROPERLY* SEAL NOT LEGIBLE

891,968.00 -9.0TRANS TECH ELECTRIC, L. P. SOUTH BEND, IN996,996.96 +1.7MASTEC NORTH AMERICA, INC. WOODSTOCK, GA

* DENOTES IRREGULAR BID

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 14 of 24

DIVISION 00007

36483, 36484STATE FUNDEDALAMANCE, GUILFORD

PROPOSAL LENGTH 2.738 MILES

TYPE OF WORK GRADING, MILLING, RESURFACING & GUARDRAIL.

LOCATION US-70 FROM WEST OF WESTBROOK AVE TO NC-100 AND SR-2748 AT THEINTERSECTION WITH US-70.

EST CONST PROGRESS.... FY-2004..64% OF BIDFY-2005..36% OF BID

RPN 013 C200879 2 BIDDER(S) MBE GOAL 5.00 % WBE GOAL 3.00%ESTIMATE 777,683.80

DATE AVAILABLE APR 01 2004FINAL COMPLETION SEP 30 2004

$ TOTALS % DIFF849,688.71 +9.3LARCO CONSTRUCTION, A DIV. OF NELLO L. TEER CO. WINSTON-SALEM, N955,455.01 +22.9THOMPSON ARTHUR DIVISION OF APAC-ATLANTIC, INC. GREENSBORO, N

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 15 of 24

DIVISION 00008

33180.3.1BRZ-1009(12)CHATHAMB-3632

PROPOSAL LENGTH 0.179 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGE OVER BEAR CREEK AND APPROACHES ON SR-1009.

EST CONST PROGRESS.... FY-2004..80% OF BIDFY-2005..20% OF BID

RPN 014 C200766 5 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 655,676.60

DATE AVAILABLE NOV 03 2003FINAL COMPLETION NOV 01 2004

$ TOTALS % DIFF681,656.26 +4.0DANE CONSTRUCTION, INC. MOORESVILLE, NC705,924.15 +7.7S. T. WOOTEN CORPORATION WILSON, NC713,421.62 +8.8R. E. BURNS & SONS CO., INC. STATESVILLE, NC733,049.46 +11.8CROWDER CONSTRUCTION COMPANY CHARLOTTE, NC821,993.50 +25.4DELLINGER, INC. MONROE, NC

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 16 of 24

DIVISION 00009

32951.3.2BRSTP-2200(2)ROWANB-3236

PROPOSAL LENGTH 0.161 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGE OVER NORFOLK SOUTHERN CORPORATION & APPROACHES ON SR-2200(EAST INNES ST).

EST CONST PROGRESS.... FY-2004..92% OF BIDFY-2005..08% OF BID

RPN 015 C200492 2 BIDDER(S) DBE GOAL 5.00 %ESTIMATE 1,950,410.66

DATE AVAILABLE NOV 03 2003 THRU FEB 15 2004FINAL COMPLETION 285 DAY(S) AFTER START DATE

$ TOTALS % DIFF2,156,192.35 +10.6* W. C. ENGLISH, INC. LYNCHBURG, VA

* CHANGE IMPROPERLY MADE* USED CORRECTION FLUID

2,523,842.33 +29.4DANE CONSTRUCTION, INC. MOORESVILLE, NC

* DENOTES IRREGULAR BID

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 17 of 24

DIVISION 00009

34931.3.2STATE FUNDEDDAVIDSONU-3336

PROPOSAL LENGTH 0.582 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & SIGNALS.

LOCATION SR-2185 (JULIAN AVE) FROM EAST HOLLY HILL RD TO MULTI-LANE SECTION ATWARNER ST IN THOMASVILLE.

EST CONST PROGRESS.... FY-2004..77% OF BIDFY-2005..23% OF BID

RPN 016 C200771 5 BIDDER(S) MBE GOAL 5.00 % WBE GOAL 3.00%ESTIMATE 1,336,914.23

DATE AVAILABLE FEB 15 2004FINAL COMPLETION OCT 01 2004

$ TOTALS % DIFF1,411,078.47 +5.5LYNN THOMAS GRADING, INC. POLKTON, NC1,524,893.80 +14.1LARCO CONSTRUCTION, A DIV. OF NELLO L. TEER CO. WINSTON-SALEM, N1,550,317.58 +16.0THOMPSON ARTHUR DIVISION OF APAC-ATLANTIC, INC. GREENSBORO, N1,811,595.09 +35.5* YATES CONSTRUCTION CO., INC. STOKESDALE, NC

* BOND EXECUTED IMPROPERLY* COUNTY NAME INCORRECT

1,878,731.13 +40.5TRIANGLE GRADING & PAVING, INC. BURLINGTON, NC

* DENOTES IRREGULAR BID

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 18 of 24

DIVISION 00009

36364.2.1IMS-85-3(180)88RANDOLPH, DAVIDSONI-4740

PROPOSAL LENGTH 16.560 MILES

TYPE OF WORK MILLING, RESURFACING & SHOULDER DRAINAGE.

LOCATION I-85 FROM I-85 / I-85 BUS SPLIT TO NC-64 & FROM NC-109 IN DAVIDSON COUNTY TOUS-311 IN RANDOLPH COUNTY.

EST CONST PROGRESS.... FY-2004..84% OF BIDFY-2005..16% OF BID

RPN 017 C200870 2 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 7,581,802.19

DATE AVAILABLE NOV 03 2003FINAL COMPLETION SEP 30 2004

$ TOTALS % DIFF9,854,447.40 +30.0THOMPSON ARTHUR DIVISION OF APAC-ATLANTIC, INC. GREENSBORO, N

10,231,739.41 +35.0BLYTHE CONSTRUCTION, INC. CHARLOTTE, NC

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 19 of 24

DIVISION 00009

36365.2.1IMS-40-3(99)180DAVIE, FORSYTHI-4741

PROPOSAL LENGTH 2.590 MILES

TYPE OF WORK MILLING, RESURFACING & SLAB REPLACEMENT.

LOCATION I-40 FROM WEST OF NC-801 IN DAVIE COUNTY TO WEST OF SR-1101 (HARPER RD)IN FORSYTH COUNTY.

EST CONST PROGRESS.... FY-2004..68% OF BIDFY-2005..32% OF BID

RPN 018 C200871 2 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 1,521,761.16

DATE AVAILABLE MAR 15 2004FINAL COMPLETION SEP 30 2004

$ TOTALS % DIFF1,546,201.17 +1.6THOMPSON ARTHUR DIVISION OF APAC-ATLANTIC, INC. GREENSBORO, N1,613,341.40 +6.0LARCO CONSTRUCTION, A DIV. OF NELLO L. TEER CO. WINSTON-SALEM, N

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 20 of 24

DIVISION 00011

36677STATE FUNDEDALLEGHANY

PROPOSAL LENGTH 7.000 MILES

TYPE OF WORK MILLING, RESURFACING, SHLD RECONST, GDRL & PVT MARKINGS.

LOCATION NC-18 FROM SR-1151 TO NC-88.

EST CONST PROGRESS.... FY-2004..86% OF BIDFY-2005..14% OF BID

RPN 019 C200898 1 BIDDER(S) MBE GOAL 5.00 % WBE GOAL 3.00%ESTIMATE 1,636,373.70

DATE AVAILABLE APR 05 2004FINAL COMPLETION AUG 01 2004

$ TOTALS % DIFF1,669,171.00 +2.0JAMES R. VANNOY & SONS CONST. JEFFERSON, NC

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 21 of 24

DIVISION 00011

32868.3.3BRSTP-16(26)ASHEB-3106

PROPOSAL LENGTH 0.516 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGE OVER SR-1539 & NORTH FORK NEW RIVER & APPROACHES ON NC-16.

EST CONST PROGRESS.... FY-2004..45% OF BIDFY-2005..46% OF BIDFY-2006..09% OF BID

RPN 020 C200762 6 BIDDER(S) DBE GOAL 7.00 %ESTIMATE 5,689,181.47

DATE AVAILABLE NOV 03 2003 THRU JUN 01 2004FINAL COMPLETION SEE BELOW

$ TOTALS % DIFF5,515,264.94 -3.1DLB, INC. D/B/A DLB, INC., (OF VA.) HILLSVILLE, VA5,892,192.20 +3.6CROWDER CONSTRUCTION COMPANY CHARLOTTE, NC6,098,614.47 +7.2MILLER STRUCTURES, INC. MARION, NC6,117,256.83 +7.5* W. C. ENGLISH, INC. LYNCHBURG, VA

* CHANGE IMPROPERLY MADE* USED CORRECTION FLUID

6,220,980.93 +9.3DANE CONSTRUCTION, INC. MOORESVILLE, NC6,868,193.11 +20.7JAMES R. VANNOY & SONS CONST. JEFFERSON, NC

* DENOTES IRREGULAR BID

SUMMARY OF BIDS FOR CONTRACT C200762 WITH THE CONTRACT TIME BEING BID BY EACH BIDDER

DAILY COST = $1,500.00 / DAY

MAXIMUM NUMBER OF DAYS ALLOWED = 727CONTRACT TIME

(CALENDAR DAYS)CONTRACT

AWARD BASISACTUAL CONTRACT

AMOUNT

ESTIMATED 727 5,689,181.47 4,598,681.47DLB, INC. D/B/A DLB, INC., (OF VA.) 605 5,515,264.94 4,607,764.94CROWDER CONSTRUCTIONCOMPANY

440 5,892,192.20 5,232,192.20

MILLER STRUCTURES, INC. 600 6,098,614.47 5,198,614.47W. C. ENGLISH, INC. 677 6,117,256.83 5,101,756.83DANE CONSTRUCTION, INC. 700 6,220,980.93 5,170,980.93

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 22 of 24

SUMMARY OF BIDS FOR CONTRACT C200762 WITH THE CONTRACT TIME BEING BID BY EACH BIDDER

DAILY COST = $1,500.00 / DAY

MAXIMUM NUMBER OF DAYS ALLOWED = 727CONTRACT TIME

(CALENDAR DAYS)CONTRACT

AWARD BASISACTUAL CONTRACT

AMOUNT

ESTIMATED 727 5,689,181.47 4,598,681.47JAMES R. VANNOY & SONS CONST. 727 6,868,193.11 5,777,693.11*ACTUAL CONTRACT AMOUNT = CONTRACT AWARD BASIS - (CONTRACT TIME) (DAILY COSTS)

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 23 of 24

DIVISION 00013

35006.3.1NHS-19(15)BUNCOMBE, MADISONU-4005

PROPOSAL LENGTH 17.199 MILES

TYPE OF WORK MEDIAN GUARDRAIL & GUIDERAIL.

LOCATION US-19/23 FROM I-240 TO SR-1768 (EXIT 132).

EST CONST PROGRESS.... FY-2003..100% OF BID

RPN 021 C200772 2 BIDDER(S) DBE GOAL 5.00 %ESTIMATE 1,480,187.00

DATE AVAILABLE NOV 03 2003FINAL COMPLETION JUL 01 2004

$ TOTALS % DIFF1,270,263.50 -14.2* BAGWELL FENCE COMPANY, INC. SPARTANBURG, SC

* BID EXECUTED IMPROPERLY* COMPANY NAME OMITTED

1,354,402.50 -8.5ELDERLEE, INC. OAKS CORNERS, NY

* DENOTES IRREGULAR BID

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 24 of 24

DIVISION 00014

33001.3.2BRSTP-19(14)HAYWOODB-3340

PROPOSAL LENGTH 0.464 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGE OVER RICHLAND CREEK & APPROACHES ON US-19.

EST CONST PROGRESS.... FY-2004..19% OF BIDFY-2005..52% OF BIDFY-2006..29% OF BID

RPN 022 C200763 2 BIDDER(S) DBE GOAL 9.00 %ESTIMATE 2,955,982.67

DATE AVAILABLE MAR 15 2004FINAL COMPLETION JUN 30 2006

$ TOTALS % DIFF2,994,640.53 +1.3TAYLOR & MURPHY CONSTRUCTION CO., INC. ASHEVILLE, NC3,421,871.74 +15.8MILLER STRUCTURES, INC. MARION, NC

ESTIMATE TOTAL 52,726,688.68

LETTING TOTAL 55,929,231.11 +6.1