IRIOS (Integrated Research Input & Output System)
Post on 03-Jan-2016
16 Views
Preview:
DESCRIPTION
Transcript
IRIOS(Integrated Research Input & Output System)
London, 3rd March 2011
Aims and Objectives• Extract Project Data from RCUK SSC• Transform data to be CERIF compliant• Store on an independent server (UNIS)• Develop an interrogation tool to allow the UNIS data to be queried• Validate the data against local CRIS info from the three HEI partners• Link HEI research output data (IRs) to UNIS project data• Run a workshop to demonstrate and promote CERIF
• Overall the aim to raise awareness in the RMA and IR community of CERIF and demonstrate its usefulness in sharing research information
Partners• Sunderland
– Simon Kerridge, Kevin Ginty, Paul Cranner, Alan Woolrych, Kathleen Callender
• Glasgow– Valerie McCutcheon, Gordon Allan
• St Andrews– Anna Clements, Niall Lockhart
• NERC– Gerry Lawson
• EPSRC– Colin Haylock
• euroCRIS– Keith Jeffery
Demonstrator
• Upgrade UNIS to be CERIF compliant• Develop an adapter to allow RC project data to be imported into UNIS• Develop an interrogation tool to allow the imported data to be queried• Validate the demonstrator against local data from the three HEI
partners• Link HEI research output data to RC project data• Run a workshop to promote the demonstrator
Demonstrator will be based upon the Universities for the North East Information System (UNIS). UNIS is a collaborative project management tool used by five universities in North East England to manage reach-out activity. Key project objectives include:
General Process of Demonstrator
• Import of RC data for conversion to CERIF compliant format in UNIS
• CERIF compliant format RC data accessible to various HEI’s in UNIS (initially Sunderland, Glasgow and St Andrews) to query
• Link data from UNIS to individual HEI’s CERIF compliant IR systems
System Overview
SSC
UNIS
StA
Gla
Sund ePrints
ePrints
PURE
Browser
import
quer
y
link
link
link
Plan
WP Workpackage TitlePerson Days
Start Month
Gantt Chart
End Month
F M A M J J
1 Project Management 42 1 (Feb) 6 (Jul)
2 Requirements Analysis 42 1 (Feb) 2 (Mar)
3 Develop Wrapper (CERIF interface) 55 2 (Mar) 3 (Apr)
4 Demonstrator Development 33 3 (Apr) 4 (May)
5 Validation and Evaluation 55 5 (Jun) 6 (Jul)
6 Dissemination 36 1 (Feb) 6 (Jul)
Status• Kick off meeting (11th Feb, Sunderland)• CIT Intranet (& JISC)• Workplan finalised• Website (and JISC) and Blog setup• Informal user-group (ARMA ERA Sig)• User requirements underway• RC data being analysed• 1/6th complete!
Future Work
• Consortium Agreement [April]• Agree requirements (IRIOS & UG) [March]• Develop UNIS CERIF wrapper [April]• Develop UNIS Demonstrator [May]• Validate and Evaluate [Jul] • Workshop: 22nd July 2011, tbc
Dissemination• Project website and blog• ARMA ERA Sig [Feb]• ARMA e-newsletter [Feb]• UCISA e-newsletter [Feb]• Glasgow IR/Impact event [Feb]• euroCRIS CRIS/OA event [May]• ARMA Conference Poster [Jun]• Final workshop [Jul]
Discussion
• Questions?
• Simon Kerridge• Valerie McCutcheon• Paul Cranner