Celeste Boccieri-Werner Vice President
Matrix Design Group
Introduction
• Celeste Werner, AICP
Vice President
– Matrix Design Group
Director of Planning
– 30+ years experience
– 6 years experience on Guam
– Matrix office in Tamuning
Working with…
• Guam Dept. of Land
Management (DLM)
• Guam Environmental
Protection Agency (GEPA)
• Guam Dept. of Public Works
(DPW)
• Guam Coastal Management
Program (CMP)
• Guam Department of
Agriculture (DoA)
• Guam Waterworks Authority
(GWA)
• Guam SHPO
• Guam Dept. of Health and
Social Services (DPHSS)
• Guam Bureau of Statistics
and Plans (BSP)
• Guam Power Authority (GPA)
• Guam Water Authority (GWA)
• Guam Fire Dept. (GFD)
• Guam Police Dept. (GPD)
• Guam Memorial Hospital
Authority
• Guam Port Authority (GPA)
• Guam Visitors Bureau (GVB)
Matrix Design Group – Guam Experience
Advisory Consulting Team
• Environmental Advisory Services
• Fiscal-Financial Services
• Socioeconomic Impact Assessment
• Compatibility Planning Services
• Capacity Enhancement Building Initiative
• Health & Social Services Strategic Plan
• Medical Services Delivery Plan
• Zero Waste Plan
Matrix Design Group – Moving Forward
• Guam Economic
Development Authority
(GEDA)
• Hagåtña Restoration and
Redevelopment
Authority (HRRA)
Imagine Hagåtña Hinåssu Hagåtña
Hagåtña Restoration and
Redevelopment Authority (HRRA)
Restoration and Redevelopment:
• Alteration
• Improvement
• Modernization
• Reconstruction
• Rehabilitation
Hagåtña Master Plan
The revitalization of the capital and cultural center,
the “Heart of Guam” – the City of Hagåtña
Chamorro Village
Agana Mall
Adelup
Hagåtña -- the “heart” of Guam and the Chamorro People
Investing in Success
• GovGuam is leading the charge to
reinvestment in Hagåtña
• Hotel Occupancy Tax Bond
– Plasa de España Restoration
May 2014
– Santos Latte Park Renovation
Jan. 2015
– Chamorro Village Pedestrian Improvements
Feb. 2015
– Guam Museum
July 2015
– Guam Fisherman’s Market Construction
Late-2015
– Hagåtña Tennis Court / Pool Improvements
Late-2015
Investing in Success - Infrastructure
• Minondo Bridge Update
Mid-2012
• Hagåtña Bridge Update
July 2014
• Santo Papa Bridge Update
Late-2015
• Water and Wastewater
System Improvements
On-going
Imagine Hagåtña
• Underground Relocation of Electrical Power $18.0 M
• Relocation of Sewer Treatment $100 M
• Guam Museum Renewable Power $0.5 M
• Hagåtña Green Street Lighting Project $1.2 M
• Paseo De Susana PDD Canoe House $0.7 M
• Nieves M. Flores Memorial Library Expansion $15.0 M
• The Great Seal Of Guam Park Project $2.5 M
• The Heritage Trail Enhancement $0.5 M
• Hagåtña Central Park Redevelopment Project $4.0 M
• Hagåtña Bay Recreational Area I Development $1.2 M
• Hagåtña Bay Recreational Area II Development $1.5 M
• Hagåtña Bay Waterfront Development $4.5 M
• Hagåtña River Channel & River-walk Project $38.0 M
• Hagåtña Land Reclamation Project $50.0 M
• Nuestra Senora de Soledad Avenue Completion $1.8 M
• Parking Meter System Feasibility Study $0.2 M
• Hagåtña Transit Hub Development Project $8.0 M
• Hagåtña Car Park Development Project $24.0 M
• Wireless Hotspot Hagåtña 0.9 M
• Water Line Upgrades $10.0 M
• Sewer Line Upgrades $10.0 M
• Right Lane Expansion of O'Brien Drive West $3.0 M
• GovGuam Office Building $15.0 M
• Gov. Manuel F. Guerrero Building Construction $15.0 M
• Paseo Stadium Redevelopment $41.2 M
…and more
• Chamorro Village Expansion $2.8 M
• Governor’s Palace Reconstruction $4.5 M
• Governor’s Palace Annex Reconstruction $5.0 M
• Plaza De España Garrison Reconstruction $5.0 M
• Plaza De España Almacen Reconstruction $1.8 M
• Chamorro Village Improvements $17.2 M
• Guam Museum Arboretum and Repository $3.8 M
• Governor's Farm & Garden Redevelopment $0.6 M
• Hagåtña Neighborhood Revitalization Initiative $2.3 M
• Guam Museum $27.0 M
• Chamorro Village Pedestrian Improvements $1.0 M
• Plasa de España Restoration $3.1 M
• Santos Latte Park Renovation $0.3 M
• Guam Fisherman’s Market Construction $7.0 M
• Hagåtña Tennis Court / Pool Improvements $0.7 M
• Hagåtña Village Signage $0.1 M
• Guam Congress Session Hall Restoration $8.0 M
Imagine Hagåtña -- Economic Development Projects
Investing in Hagåtña’s future
These on-going and
proposed projects total over
$400 million in investment
Hagåtña Master Plan
At its core, a plan to reestablish the capital city as the cultural, social, economic and government center of activity for Guam and the region
Waterfront District
Mixed Use Residential
Hagåtña River District Capital &
Cultural District
Mixed Use Commercial
Culture - Chamorro Village
• Cultural attraction
• Important marketplace and
commercial center
• Revitalization and expansion
potential
Culture - Guam Museum
• New museum underway –
Opens July 2015
• Key cultural and revitalization
project
Culture – Heritage Trail
Social - Housing
• Opportunity to provide mixed
use housing in vibrant
downtown area
• Working to reduce the flood
footprint (FEMA)
• Flood protection will allow
new development areas
• Riverwalk potential
Economic - Rediscovering Hagåtña River
Economic - Waterfront
Marina Expansion
Fisherman’s Co-op Land Reclamation Project
Economic - Commercial Space
• Integrating commercial
and public spaces
• Excellent street visibility
• Off-street parking
• Transit integration
• Potential for:
– Office space
– Retail space
– Tourism
Government – Capital
Reestablish Hagåtña as Guam’s Capital
Judicial Legislative Executive
Hagåtña Master Plan
At its core, a plan to reestablish the capital city as the cultural, social, economic and government center of activity for Guam and the region
This is just a part of our overall
program to realize the decades-
old dream to rebuild our capital
city to the social, cultural,
economic & government center
of activity it once was.
Eddie Baza Calvo
Governor of Guam