Introduction Of S.M.Asghar (Pvt) Limited

Post on 12-Apr-2016

33 Views

Category:

Documents

7 Downloads

Preview:

Click to see full reader

DESCRIPTION

CUSTOM CLEARANCE & LOGISTICS SERVICES PROVIDER.

Transcript

AN ISO 9001-2000 CERTIFIED COMPANY

PROUDLY AN ISO 9001:2000 CERTIFIED COMPANY

COMPANIES PROFILE

FIRMS NAME : M/s S.M.Asghar (Pvt) Limited

An ISO 9001:2000 Certified Company

COMPLETE ADDRESS : 908-910, 9th Floor, Chapal

Plaza, Hasrat Mohani Road Off I.I.Chundrigar Road Karachi. CORPORATE STATUS OF FIRM : PRIVATE LIMITED. TELEPHONE NO : 00+ 92+21+32468091 -5 FAX NO : 00+92+21+32468090. FIRMS CUSTOM HOUSE LICENCE NO : 714. (Copy Enclosed). DATE OF REGISTRATION WITH : 30-03-1980. CUSTOMS E- MAIL ADDRESS : smasghar@cyber.net.pk E- MAIL ADDRESS : info@smasghar.com.pk Web- Page : http://www.smasghar.com.pk DATE OF ISSUE OF LICENCE : 30-03-1980. NUMBER OF STAFF EMPLOYED : 20. YEAR OF ESTABLISHMENT : 1980.

PEOPLE BEHIND THE COMPANY SYED KHALID JAMAL : CHIEF EXECUTIVE.

SYED SAJID JAMAL : DIRECTOR PROJECTS & COMM DIV

SYED MOHAMMAD ALI KHALID : DIRECTOR MOHAMMAD ANWER : HEAD OF PORT OPERATIONS. MOHAMMAD FAYYAZ KHAN : INCHARGE EXPORT DIVISION MOHD SHARIF KHAN : HEAD OF CUSTOMS DIVISION. S.IMDAD ALI.ZAIDI : HEAD OF PORT QASIM DIV. MOHD SALEEM : ASST PORT OPERATION. MOHD JAVED : ASST PORT OPERATION. QAZI KHURSHID AHMED : HEAD OF AIRPORT DIV. SALEEM NOOR : ASST. AIRPORT OPERATIONS AFTAB AHMED : CO-ORDINATOR SHIPPING COMPANY SAEED KHAN : HEAD OF COMPUTER DIVISION DILSHAD A. SIDDIQUI. : MANAGER FINANCE ASIF KHAN : ASST. MANAGER FINANCE ATIA FASIAL : ASST. OFFICE CO-ORDINATOR SYED ADNAN ALI : INCHARGE GD PREPARATION (BY AIR) ASAD ABBAS : ASST.BILLINGS & ACCOUNTS MOHSIN KHAN : FIELD OFFICER. SADDAM HUSSAIN : FIELD OFFICER. SULEMAN : OFFICE PEON. USMAN GHANI : OFFICE PEON.

SECTION 1 : INTRODUCTION SECTION 2 : SCOPE OF WORK SECTION 3 : DOCUMENTATION REQUIREMENTS SECTION 4 : PROJECT REFERENCES

SECTION 5 : PICUTRE GALLARY

S.M.ASGHAR (PVT) LIMITED

908-910, 9th Floor, Chapal Plaza, Hasrat Mohani Road, Off I.I Chundrigar Road, KARACHI

We have a pleasure to give a brief introduction of our Company

M/s. S.M.Asghar (Pvt) Limited, a name famous for its credibility, reliability & commitment in this part of world.

We are proudly an ISO 9001-2000 Certified Company. We are among the few & pioneer company who got the ISO Certification in Custom Clearance in Pakistan.

With our background experience, M/s. S.M.Asghar (Pvt) Limited has been able to developed systems and a general flexibility of approach tailored & personalized solutions to our Clients most Complex Requirements that we believe is unparalleled by any competitors. Most important our customers are able to deal with an International Network who can arrange the movement and supervision of cargo from Europe, and beyond, whilst they only instruct one control office. This International Strength and wealth of experience combined with a genuinely personal approach we feel makes us a formidable contender. Our Credentials our Enthusiasm and our Track Record speak for themselves.

For over the last 15 Years, M/s. S.M.Asghar (Pvt) Limited have developed & specializes and simultaneously Transform itself into a PROJECT CLEARANCE SPECIALIST. If one can give a brief look at the Pakistan’s Most Advanced

& the Important Industrial Estate PORT BIN QASIM, by the Grace Of All Mighty Allah it is an Honor for

M/s. S.M.Asghar (Pvt) Limited to perform the Complete Custom Clearance & the Logistics Support in the form of Local Transportation to these Prestigious Projects.

We are pleased to inform you that by the Grace of All mighty Allah, currently we are Handling Projects for valuing more or less US $ 1.2 Billion Dollars. You will appreciates that in all of the Projects mentioned below we have taken various Exemptions & benefits of various SRO’s from Customer to Customer & on Project to Project Basis. With our background experience, M/s. S.M.Asghar (Pvt) Limited has successfully completed all the major & Prestigious Projects of National Importance as well as International Importance.

We on merit got the benefit of various Concessionary SRO’s & Exemptions to our valued Customer to their Entire satisfaction & without any problems and difficulty. Our team of professionals sits with the Customer prior to the start of the Project/Projects & developed systems and a general flexibility of approach tailored to our Clients most Complex of requirements. We believe that our Professional approach to our Client is unparalleled by any competitors. Few of the recent Projects & Customer References are given below, for whom we have claimed the various SRO’s & Exemptions to our valued Customer to their entire satisfaction.

MOL MAKORI GAS FIELD SRO: 678(I)/2004, DT: 07-08-2004

GHAMBAT SOUTH GAS PROCESSING FACILITY (GPF II) PROJECT OF PAKISTAN PETROLEUM LIMITED (PPL)

SRO: 678(I)/2004, DT: 07-08-2004

Petrosin Ravi SRO: 678(I)/2004, DT: 07-08-2004

SHELL GAS

SRO: 678(I)/2004, DT: 07-08-2004

SHV ENERGY PAKISTAN Various Equipments & Material Including Break Bulk LPG Mixture

SRO: 678(I)/2004, DT: 07-08-2004

Expansion of Plant: RAVI GAS SRO: 678(I)/2004, DT: 07-08-2004

WEATHERFORD DRILLING SRO: 678(I)/2004, DT: 07-08-2004

Petrosin Engineering (One of the Largest Private Sector Project US $ 700 Million Dollars)

SRO: 678(I)/2004, DT: 07-08-2004

TRANSASIA REFINERY LTD (Re-Location)

(One of the Largest Private Sector Project US $ 700 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

INDUS REFINERY LTD (Re-Location)

(Another Largest Private Sector Project US $ 650 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

DESALINATION & POWER PROJECT” at DHA Karachi

(Total Cost of the Project US $ 160 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

KARACHI INTERNATIONAL CONTAINER TERMINAL LIMITED (KICTL) at Karachi

EXPANSION PROJECT & NEW GANTRY CRANE

(Total Cost of the Project US $ 400 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

MIRANI HYDRO POWER DAM PROJECT (The Project Cost US $ 80 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

SATPARA HYDRO POWER DAM PROJECT

(The Project Cost US $ 30 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

MANGLA RAISING HYDRO POWER DAM PROJECT

(The Project Cost US $ 100 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

MANGLA RAISING HYDRO POWER DAM PROJECT

(The Project Cost US $ 100 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

GOMAL ZAM HYDRO POWER DAM PROJECT

(The Project Cost US $ 100 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

DUBER KHWAR HYDRO POWER DAM PROJECT

(The Project Cost US $ 100 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

KHAN KHWAR HYDRO POWER DAM PROJECT

(The Project Cost US $ 100 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I

(The Project Cost US $ 45 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II

(The Project Cost US $ 20 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

PROGAS LPG STORAGE & HANDLING TERMIANAL (Private Sector Project US $ 50 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES

(The Second Expansion Phase Project US $ 30 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

PETROSIN ENGINEERING (Pvt) LTD

QADIRPUR 600 MMSOFD EXPANSION PROJECT (The Project Cost US $ 6 Million Dollars)

SRO: 678(I)/2004, DT: 07-08-2004

CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITED PACKAGE 8C-1, ATC COMPLEX AND FCR BUILDING FOR NEW BENAZIR

BHUTTO INTERNATIONAL AIRPORT PROJECT, ISLAMABAD (The Project Cost US $ 14 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITED

PACKAGE 01 OF AZAD JAMMU & KASHMIR URBAN DEVELOPMENT PROGRAM FOR ERRA

(The Project Cost US $ 300 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

ALSTOM PAKISTAN LIMITED FUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)

SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.

(The Project Cost US $ 20 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

ALSTOM PAKISTAN LIMITED ZHORLU WIND POWER ( Heavy Transformers)

SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.

SRO: 575(I)/2006, DT: 05-06-2006

FUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL) SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY

FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR IN PAKISTAN. (The Project Cost US $ 50 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

DESCON ENGINEERING SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 1

(The Project Cost US $ 130 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

DESCON ENGINEERING SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 2

(The Project Cost US $ 130 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

DESCON ENGINEERING SETTING UP OF COMPLETE NEW ASPHALT BUILT UNIT (ABU)

(The Project Cost US $ 30 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

VARIOUS PORTS AT KARACHI

Qasim International Container Limited (QICT) Karachi Port Trust Head office (KPT)

Pakistan International Container Limited (PICT) Karachi International Container Limited (KICT)

Among The Prestigious Projects At Port Bin Qasim Few Are Listed below

PARCO WHITE OIL PIPE LINE PROJECT BY CHINA PETROLEUM (The Contractor for PARCO Project Cost US $ 300 Million Dollars)

ICI PTA T-11 (The Largest Private Sector Project US $ 480 Million Dollars)

Engro Vopak Terminal Ltd (VCM Tank Farm)

Engro Vopak Terminal Ltd (MEG Tank Farm)

Engro Vopak Terminal Ltd (LPG Tank Farm)

Engro Vopak Terminal Ltd (PARAXYLENE Tank Farm) (Total Investment by Single Largest Group in the Private Sector over US $ 30 Million Dollars)

PROGAS LPG STORAGE & HANDLING TERMINAL (Private Sector Project US $ 50 Million Dollars)

INDUS REFINERY LIMITED (Another Largest Private Sector Project US $ 750 Million Dollars)

TRANASIA REFINERY LIMITED (Another Largest Private Sector Project US $ 800 Million Dollars)

FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES (The Second Expansion Phase Project US $ 30 Million Dollars)

CHINA HARBOR ENGINEERING (The Contractor for EVTL for the EVTL JETTY Private Sector Project US $ 4 Million Dollars)

ENGRO ASAHI POLYEMR & CHEMICALS (Another One of the Largest Private Sector Project US $ 80 Million Dollars)

FAUJI FERTILIZER BIN QASIM LTD (Handling of Break Bulk Phosphoric Acid)

LPG BREAK BULK SHIPMENT (Handling of 90% of Pakistan Break Bulk LPG Shipments at EVTL& SSGC Terminal)

VCM BREAK BULK SHIPMENT (Handling of 100% of Break Bulk VCM Shipments at EVTL)

ETHYLENE BREAK BULK SHIPMENT (Handling of 100% of Break Bulk ETHELYNE Shipments at EVTL)

KARACHI INTERNATIONAL CONTAINER TERMINAL PHASE II EXPANSION PROJECT

Total Cost of the Project US $ 400 Million Dollars

Hydro Power Sector The Government of Pakistan since last 8 Years initiated few Hydropower Power & Dam Projects to overcome the Power Break down Crisis. Among these Projects of National Importance includes:-

MIRANI HYDRO POWER DAM PROJECT (The Project Cost US $ 80 Million Dollars)

SATPARA HYDRO POWER DAM PROJECT (The Project Cost US $ 30 Million Dollars)

MANGLA RAISING HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)

GOMAL ZAM HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)

DUBER KHWAR HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)

KHAN KHWAR HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)

ALAI KHWAR HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars) We have privilege to be associated in all the above Hydro Power Projects.

Beside the Hydropower Projects, the Government also encourages the other areas such as the Sea to generate Electricity, beside the supply of quality water to the people. Among them the DHA Desalination & Power Project was the only to be setup by the Private Sector.

DHA DESALINATION & POWER PROJECT (Total Cost of the Project US $ 160 Million Dollars)

This is the first ever desalination plant in history of Pakistan. It has a capacity to Desal, 3 MGD (Million Gallons Per Day) of Water, beside to Produce & Generate Electricity of a Capacity 95 MW Beside the Hydro Power Project initiated by the Government also focused on the another very important Sector which was OIL & GAS and LPG (Liquid Petroleum Gas Project)

JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I (The Project Cost US $ 80 Million Dollars)

M/s. S.M.Asghar (Pvt) Limited was awarded by the President of Pakistan for successfully and timely performance in Clearance and Logistics of JJVL Phase I Project JJVL is Pakistan’s single largest producer of Liquefied Petroleum Gas. Situated in Dei Shah Bukhari, District Hyderabad, JJVL’s Extraction Plant has a daily output of about 500 metric tonnes of LPG and 150 metric tonnes of NGL/Naphtha. JJVL accounts for about one-third of the total local LPG production of the country. JJVL processes about 200-220 million cubic feet of natural gas condensate per day piped from British Petroleum's Badin Gas Field through the Liquid Handling Facility of Sui Southern Gas Co Ltd at Jamshoro

JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II (The Project Cost US $ 20 Million Dollars)

M/s S.M.Asghar (Pvt Limited also have a privilege of Handling 02 chartered flights carrying main booster pumps weighing over 100 Tons by Air for PARCO White Oil Pipeline Project. We also have a privilege of handling one of the Heaviest and Length Wise Piece in History of Pakistan which Weights 265 M/tons and Length Approx.76 Meters.

REQUIRED FOR CUSTOM CLEARANCE

SCOPE OF WORK

BENEFIT OF VAVARIOUS CONCESSIONARY

SRO’s & EXEMPTIONS

PREPARATION BEFORE ARRIVAL OF VESSEL

Upon receipt of the written instruction from the Importer / Representatives of the Importer, we will be in close contact with the shipping Company in order to ascertain the expected arrival date ( ETA ) of the Ocean going Vessel at the Un-loading Port of the Country.

CONFIRMATION OF THE ARRIVAL

OF VESSEL:-

We shall inform the arrival and the berthing date of the vessel

to the Importer / Representatives of the Importer in order to keep a close Loop for the berthing of the vessel. CUSTOM CLEARANCE: We shall collect in full advance all the necessary documents for the onward Custom Clearance from the Importer / Representatives of the Importer when intimated and will prepare GD and all the required documents and formalities to be submitted to the related Custom Authority and Will Complete the preparation of the GD (Goods Declaration) as per Invoice, Packing List & Bill Of Lading depending on weather the Vessel has arrived and also subject to the Lodging Of Manifestation of IGM (Import General Manifest) by the Shipping Company / Shipping Agent.

OBTAINING THE DELIVERY ORDER: We shall complete all the formalities required by the relative Shipping Agent /

Main Carrier Agent/ relevant Port Authority and will obtain the Delivery Order from the Shipping Company/ OR their Agent against the presentation/ submission of Original Bill of Lading. The delivery Order's are generally issued after filing of IGM in order to ascertain the goods have not been Transshipped. NECESSARY ASSISTANCE: We shall provide all necessary Assistance and Consultancy Services Concerning Custom Clearance to the Importer / Representatives of the Importer.

AIR CARGOES:

We shall also perform the Works Related to the Air Cargo As per request of Importer / Representatives of the Importer… DELIVERY AT / TO THE PLANT SITE We shall safely Transport the Cargo by the Trucks, Trailers, Multi Axle, Low Bed OR as per the requirement & Nature of Cargo to the Warehouse or the open storage area as per the instruction of Importer / Representatives of the Importer.

CUSTOM DUTIES TAXES SRO’s AND NECESSARY

PERMITS

All the Plant, Machinery, Equipment and Parts/Spares which are imported into Pakistan shall be subject to Custom Duties and Taxes Prevailing at the time of Import.

The Duties and Taxes concerns with the Custom Authorities as per Pakistan Custom Tariff includes:-

Custom Duty/Duties From 5% Minimum To 20% Maximum Sales Tax/Taxes 17 % Income Tax/Taxes 5.5%

The Taxes Concerns with the Port Authorities:- Port Wharfage Port Demurrage Weighment Charges (If any) (for Products like Pipes of Iron/Steel/Coil-Bar)

There Are Two Major Ports in Karachi Namely as below: Karachi Port Port Bin Qasim Karachi Port is Further Divided into 02 Parts, namely;

1) EAST WHARF:

a) Pakistan Container Terminal (PICT) Private Terminal b) KPT owns few Berths such as Berth No 1 Open, Shed No 02, Shed No

03, Berth No 04 Open, Berth 10, 11, 12,13,14,15,16 And 17.

c) Ghass Bunder, For Launches, Steamer and Boats

2) WEST WHARF:

a) Karachi International Container Terminal Ltd (KICT) b) KPT owns few Berths such as Berth Namely 18, 19, 20, 21, 22, 23, 24

And 25 c) Berth Number 25 is for Heavy Lift Cargo that has On Shore Heavy

Crane for capacity 50 M/Tons. For Containerized Cargo the various Yards/Ports are charging different Handling Charges/Lifting Charges/Examination Charges/RD/Seal Breaking Charges/Yard Storage Charges. Please note that for all the above mentioned charges the relevant Port /Yard will issue Receipts for the relevant charges. Excise Taxes @ 0.91-0.95% on Import Value/Assessed Value/ Appraise Value by the Customs or any other Charges / Taxes prevailing at

the time of Import shall be Paid by the I m p o r t e r immediately before the Clearance of the Consignments from the Port. Further the completion of GD’s (Bill of Entry) and other Custom formalities are subject to the Final Assessment / Valuation / Any SRO Benefits / PCT confirmation and also the Container / Marks & Number. Any discrepancy or mistake or dispute arising due to Invoice/ Packing List /

Bill of Lading OR any other relevant documents submitted by the Importer, will may render in delay to clear the consignment.

SUBMITTAL OF SHIPPING GUARANTEE

BOND IN ABSENCE OF ORIGINAL BILL OF LADING

If there is a delay in the arrival of the Original Bill of Lading, can cause a delay in getting the Goods/ Cargo release of the from the Port premises/Yard. A Shipping Guarantee Letter/Bond for the said Bill of Lading would be therefore required by the shipping company in order to issue the Delivery Order. It shall be discussed and settle before arrival of the vessel. We will provide all necessary assistance and advice for the Shipping

Guarantee to the Importer / Representatives of the Importer.

During the Unloading of the Break Bulk/ loose Cargo from the vessel There are chances of getting the goods Damage OR in case we find any Loss of Goods and or the Goods already Damage on or after its receiving

We shall report to the Importer / Representatives of the Importer or Arrange a joint survey as soon as possible. Marine/Transit insurance

Shall be arranged by Importer / Representatives of the Importer, from Place of Origin up to the Plant Site.

METHOD STATEMENT

Newly Implemented Web-Based One Customs WeBoc) SYSTEM

At the present there are 02 procedures for Custom Clearance:-

Under this newly implemented procedure if the Vessel is berthed at any of the below Ports i.e. Karachi Port Trust (KPT) Karachi International Container Terminal (KICTL) Pakistan International Container Terminal (PICTL) Qasim International Container Terminal (QICTL Port Qasim) Air Freight Unit (AFU) FCL/LCL/Loose/Break Bulk Goods Declaration (GD) is prepared on Line Under the New WeBOC System (Via Electronic Mail Data Transfer System). The G.D (Goods Declaration) is prepared in accordance with the declaration of the Importer and the documents provided by the Importer i.e. Commercial Invoice, Bill of Landing and the Packing List. Thereafter the G.D is submitted to the Custom for Assessment on Line.

WEB BASED ONE CUSTOM (WeBOC)

* The amount of Custom Duties & Taxes and the Sindh Infra Structure

Fee (CESS) has to be paid in advance as per the Importer declaration. * If the assessment by the WeBOC is done as per the declaration of

Importer, than the G.D is processed and the Importer can take the delivery of the goods, after the payment of all the necessary Port Dues & Excise Tax.

In case the goods have been processed under WeBOC SYSTEM does not accept the Importer Declaration, than the Importer may asked for additional Duties & Taxes or If the Importer wants to Contest with the views of the Customs than they can go for appeal & meet the Senior Custom Officials along with the relevant Documents & Proof to justify their claims. The Custom Authorities may differ in three basic ways: 1) Disagreement in the PCT OR HS Code Classification. 2) Not Extending the Benefit of the Claimed Benefit/SRO. 3) Disagreement with the Valuation. The GD is Prepared and filed Online (Via Electronic Filling),

as per declaration of the Importer.

If Customs satisfy with all the 03 criteria’s mentioned above i.e. PCT SRO Valuation

The GD is than completed by the Concerned Group. The Importer has to than pay the Applicable Duties & Taxes after that the GD is forwarded to the Port side for Examination after which the Importer can

take the Delivery of the goods after the payment necessary Port Dues.

* If Customs do not satisfy with all the 03 Criteria’s mentioned above

i.e.

PCT SRO Valuation

Than the GD is forwarded to the Port Side for Physical Examination to check the goods are in conformity to the declaration of the Importer & under the light of Examination Report GD will be completed by the concerned Group in the Custom House.

The following documents are required generally by the customs for processing the B/E for the Cargo arriving at Sea Port. I Original Invoice showing complete description of the goods with value

of the each individual item II Detail Packing List showing complete Description, Quantity Gross

Wt, Net Wt, Ullage Certificate. III Original Bill of Lading duly endorsed at the backside in our Favor. IV Certificate of Origin V All Govt. Sanctions, Authorization from Government Agencies if any VII Original Letter of Credit VIII Sales Tax Registration Certificate IX Import Registration X National Tax No Certificate Copy XI WeBOC Registration (User ID & Pass Word)

Any other document that may be requested by the Custom to verify the

declaration of Importer

The following documents are required generally by the customs for processing the B/E for the Cargo arriving at Air Port. I Original Invoice showing complete description of the goods with

value of the each individual item II Detail Packing List showing complete Description, Quantity, Numbers

of Packages, Gross Wt, Net Wt. and Size of the Packages in Cu Meter III Original Airway Bill IV Certificate of Origin V Complete Catalogue/Drawing for Machinery & Equipment. VI All Govt. Sanctions, Authorization from Government Agencies

if any VII Original Letter of Credit VII WeBOC Registration (User ID & Pass Word) Any other document that may be requested by the Custom to verify the

declaration of Importer

Further to the above there may be delays in Clearance due to following reasons:- I Non availability of the Original Documents, such as BL II Delay in meeting Custom Queries. III Strikes / Weather, Act of God, Force Major Etc IV Delays due to Non-availability of concerned officers. V Delays in receipts of payments VI Delays due to the Non-fulfillment of Shipping Companies VII Delays due to Non-availability of Trucks / Trailer

POSSBLE DELAYS

PREVIOUS

PROJECTS

HANDLED

.

CLIENTS PROJECTS * M/S ICI PAKISTAN LTD. C/o TRANSCAR PROJECTS LTD

ICI PTA PROJECT PORT QASIM * M/S ENGRO PAKTANK TERMINAL.

CHEMICAL STORAGE TERMINAL * M/S NOEL LGA (GERMANY)

LPG EXPANSION & MARKETING * M/S ENGRO ASAHI POLYMER & CHEMICALS.

ENGRO PVC PLANT PROJECT

* M/s TEKSER INSAAT SAANAYI

CHASMA RIGHT BANK C-65

* M/S FMC. (MARINE LOADING ARM) FOTCO OIL TERMINAL BIN QASIM * M/S SECA PAKISTAN.

KHI - HYDERABAD BY PASS * M/S TRANSCAR PROJECTS LTD.

DHABEJI PUMPING STATION W-19 * M/S TRANSCAR PROJECTS LTD.

NORTH EAST KARACHI STATION W-18

CLIENTS PROJECTS

* M/S CHINA GUANGXI CORPORATION PATFEEDER CANAL PROJECT * M/S CHINA DONGFANG CORPORATION SEWERAGE TREATMENT PROJECT * M/S CHINA PETROLEUM KORANGI SEWERAGE TREATMENT * M/S CHINA YUNNAN CORPORATION

KPT JINNAH BRIDGE PHASE II * M/S CHINA NATIONAL ELECTRIC WIRE & CABLES QUEENS ROAD POWER STATION * M/S CHINA HARBOR ENGINEERING JETTY FOR ENGRO PAKTANK * M/S IJM / IGI JOINT VENTURE.

LBOD SANGHAR PROJECTS * M/S LIFE LINE (Pvt) LTD.

DHURNAL LPG GAS EXPANSION PROJECT

* M/S ENGRO PAKTANK TERMINAL.

LPG TERMINAL AT BIN QASIM

CLIENTS PROJECTS

* M/S ENGRO PAKTANK TERMINAL

VCM TERMINAL HANDLING PROJECT * M/S HYUNDAI CORP KHI OFFICE.

K.E.S.C HIGH TENSION CABLE PROJ.

* M/S HYDERABAD DEVELOPMENT AUTHORITY.

MACHINERY UNDER SPANISH GRANT * M/S CHINA YUNNAN CORPORATION.

MALDIVE SPARLIAMENT BUILDING

* M/S CHINA NATIONAL CHEM ENGG CORP. SUB CONTRACTOR FOR DONGFANG S2 PROJECT * ENGRO ASAHI TRADING (PVT) LTD EXPORT OF PVC WORLD WIDE

CLIENTS PROJECTS

* M/S DESCON ENGINEERING WORKED FOR NUMBER OF PROJECTS 1) EPTL FOR LPG TERMINAL 2) EPTL FOR VCM PROJECT 3) EVTL FOR MEG PROJECT

4) FOR PARCO MID COUNTRY REFINERY

5) LASMO OIL BHIT GAS FIELD PROJECT US $ 6.5 Million Dollars

* M/S BI - WATER INTERNATIONAL KARACHI WATER & SEWERAGE BOARD HUB & PIPRI PROJECT FUNDED BY ADB £ 15.8 Million Sterling * M/S HYUNDAI HIDCO HAKAS JV

EXPORT OF HEAVY DREDGING MACHINERY US $ 2.5 Million Dollars * M/S AL - NOOR SUGAR MILLS LTD

MDF BOARD FIBRE BUILDING BOARD PLANT (LASSANI)

CLIENTS PROJECTS

* PROCTER & GAMMBLE PAKISTAN SOAP CAPACITY EXPANSION PLANT.

US $ 4.5 Million Dollars * M/S ENGRO PAKTANK TERMINAL.

CHEMICAL STORAGE TERMINAL US $ 5.5 Million Dollars * M/S SHV ENERGY PAKISTAN

GAS EXPANSION PROJECT US & 1.5 Million Dollars * M/S TEKSER INSAAT SANAYI VE TICCARRET

CHASMA RIGHT BANK CANNAL PROJECT C- 65 US $ 260 Million Dollars

BREAK BULK

LIQUID CHEMICALS &

PETROCHEMICALS HANDLING

PROJECTS IN HAND

* SHV ENERGY LIMITED LIQUIFIED PETROLEUM GAS (LPG)

IN BULK OF VARIOUS PARCELS * JAMSHORO JOINT VENTURE LIMITED

LIQUIFIED PETROLEUM GAS (LPG) IN BULK OF VARIOUS PARCELS * AFTAB TRADERS

LIQUIFIED PETROLEUM GAS (LPG) IN BULK OF VARIOUS PARCELS * CRESS LPG LIQUIFIED PETROLEUM GAS (LPG) IN BULK OF VARIOUS PARCELS * RELIANCE CONSULTANCY

LIQUIFIED PETROLEUM GAS (LPG) IN BULK OF VARIOUS PARCELS * ENGRO POLYMER & CHEMICAL LIMITED

VINYL CHLORIDE (VCM) IN BULK OF VARIOUS PARCELS

EDC IN BULK OF VARIOUS PARCELS

CAUSTIC SODA IN BULK

ETHELYNE IN BULK OF VARIOUS PARCELS

UNDER GOING

PROJECTS

IN HAND

* M/S ENGRO FOODS LIMITED

1) LAUNCHING & SETTING UP A COMPLETE STATE OF AN ART OF O'MORE ICE CREAM PLANT

2) BRAND NEW STATE OF AN ART ENGRO RICE &

PAR BOILING PLANT

3) EXPANSION OF EXISTING DAIRY MILK PLANT. (OLPER'S MILK)

* M/s. FOUNDATION ENERGY LIMITED-1

SETTING UP A STATE OF AN ART WIND POWER PROJECT OF A CAPACITY 49.50 MW AT JHAMPIR, SINDH PROVINCE

* M/s. FOUNDATION ENERGY LIMITED-II

SETTING UP A STATE OF AN ART WIND POWER PROJECT OF A CAPACITY 49.50 MW AT JHAMPIR, SINDH PROVINCE

* M/S. PAK ARAB REFINERY LIMITED

SETTING UP A COMPLETE BRAND NEW ASPHALT BUILT UNIT (ABU UNIT)

* ENGRO POLYMER TRADING LIMITED

EXPORT OF PVC RESIN (SABZ BRAND) WORLD WIDE APPROXIMATE EXPORT IN M/TONS 2500 PER MONTH

* M/s. CIVIL AVIATION AUTHORITY

SETTING UP A BRAND NEW BENAZIR BHUTTO INTERNATIONAL AIRPORT, ISLAMABAD, and PACKAGE 06 REFUEL HYDRANT SYSTEM.

KARKEY PAKISTAN POWER SHIP & OIL SUPPLY TANKER

VARIOUS OTHER PROJECTS OF NATIONAL IMPORTANCE

INCLUDING HYDRO, SEWERAGE WATER TREATMENT, DAMS

CHEMICAL INDUSTRY OIL & GAS SECTOR

* M/S CHINA SINOHYDRO CORPORATION

1) GOMAL ZAM DAM HYDRO POWER

2) DUBAR KHAWAR DAM HYDRO POWER

3) KHAN KHAWAR DAM 4) KWSB K-III * M/S. INDUS REFINERY LIMITED. HI-TECH 100,000 BPSD OIL REFINERY

ON RELOCATION BASIS * M/S. JAMSHORO JOINT VENTURE

LPG EXTRACTION PLANT

* M/S. PETROSIN RAVI ENGINEERING

OIL & GAS PROJECTS LTD.

* M/S. SHELL GAS LPG PAKISTAN LTD

LPG PROJECTS / LPG GAS

* M/S. BI-WATER INTERNATIONAL

KARACHI WATER & SEWERAGE BOARD HUB & PIPRI PUMPING STATION PROJECT

* M/S. DESCON ENGINEERING LTD (HYDRO POWER PROJECTS) 1) SATPARA DAM PROJECT

2) MIRANI DAM PROJECT

3) MANGLA RAISING PROJECT

4) TUNSA BARRAGE PROJECT

5) HYDERABAD WATER TREATMENT PROJECT.

* M/S. FAUJI FERTILIZER BIN QASIM LTD BREAK BULK HANDLING OF PHOSPHORIC ACID * M/S. ENGRO ASAHI POLYMER AND CHEMICAL LTD. V.C.M / MACHINERY & EQUIPMENT / EXPORT * M/S. DHA COGEN LTD.

DESALINATION / POWER PROJECT

* M/S. BAHRIA TOWN HOUSING & INFRASTRUCTURE P ROJECT

RE-LOCATION OF PLANT & MACHINERY FOR PRE- FABRICATING HOUSING

* AREVA T&D PAKISTAN (PVT) LTD. 132 KV GRID STATION AT CREEK CITY, DHA * KHALID RAUF & CO., (PVT) LTD. INFRASTRUCTURE PROJECTS LAHORE RING ROAD

HYDROPOWER PROJECTS

From our background experience, strength & experiences from

industrial development projects, S.M.Asghar (Pvt) Limited

has rapidly established itself as a key player in infrastructure

projects.

We successfully did the Custom Clearance & In-land

Transportation jobs of large-scale projects like dams, barrages,

highways and housing complexes.

We hold the distinction of being the first ever local company to

do the 07 Major Hydropower Projects Simultaneously of National

Importance in Pakistan

HYDROPOWER

PROJECT Taunsa Barrage Rehabilitation And

Modernization

Location: Taunsa Pakistan

Year Of Project March 2006-2007

Cost Of Project US $ 140 Million Dollars

Completion : May 2008

HYDROPOWER

PROJECT MANGLA DAM RAISING PROJECT

LOCATION Mangla

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION

COST OF

PROJECT

US $ 140 Million Dollars

Expected

Completion

Date:

September 20 2007

HYDROPOWER

PROJECT. SATPARA DAM HYDROPOWER

PROJECT LOCATION PAKISTAN

NATURE OF JOB CUSTOM CLERANCE & INLAND TRANSPORTATION.

COST OF

PROJECT

US $ 140 Million Dollars

Completion : March 2007

Project Name Kachhi Canal Project

Contract # KC-03

Location: Taunsa Barrage – Kot Addu

NATURE OF JOB CUSTOM CLEARANCE & INLAND

TRANSPORTATION.

COST OF

PROJECT

US $ 65 MILLION DOLLARS

Completion: January 2009

Project Name GOMAL ZAM

HYDROPOWER PROJECT

CLIENT CHINA SIOHYDRO CORPORATION

NATURE OF

JOB

CUSTOM CLEARANCE & INLAND

TRANSPORTATION.

COST OF

PROJECT

US $ 220 MILLION DOLLARS

Completion: 4 YEARS

Project Name Duber Khwar

Location:

The project located on river Duber Khwar, right

bank tributary of Indus river near Patan in NWFP

at a distance 265 Km from Islamabad.

NATURE OF JOB CUSTOM CLEARANCE & INLAND

TRANSPORTATION.

COST OF PROJECT US$ 109 million

Completion: 4 YEARS

Location: Allai Khwar

Hydropower Plant The Project is located on Allai Khwar River, Left Tributary of River Indus near Besham in NWFP, 245 km from Islamabad.

NATURE OF JOB CUSTOM CLEARANCE & INLAND

TRANSPORTATION.

COST OF PROJECT US$ 110 million

Completion: 4 YEARS

Project Name MIRANI DAM

Location: In the Dasht River Basin about 30 miles (48 km)

West of Turbat Town in Makran Div of

Baluchistan.

NATURE OF JOB CUSTOM CLEARANCE & INLAND

TRANSPORTATION.

COST OF

PROJECT

US$ 120 million

Completion: 4 YEARS

LPG Storage & Handling Facilities

Project Name ENGRO PAKTANK

LPG TERMINAL

Location: EASTERN INDUSTRIAL ESTATE PORT QASIM

NATURE OF JOB CUSTOM CLEARANCE & INLAND

TRANSPORTATION.

COST OF PROJECT US$ 10 million

CAPACITY 4,500 METRIC TONES OF LPG

LPG BULLETS 10 LPG bullets

Completion: 1997 -98

Integrated Bulk Liquid Chemical Terminal Storage & Handling Facilities

Project Name ENGRO PAKTANK VCM TERMINAL

Location: EASTERN INDUSTRIAL ESTATE PORT QASIM

NATURE OF JOB CUSTOM CLEARANCE & INLAND

TRANSPORTATION.

CAPACITY 41,000 CUBIC METER STORAGE FACILITY

SPHERICAL TANK 2 SPHERICAL TANK

Completion: 1997 -98

In the first phase EPTL constructed facilities for the integrated bulk liquid Chemical and Storage Terminal the first phase comprised construction of 41,000 cubic meter of storage facility the cost of first phase of the Project was US $ 60 million the tank farm is situated on reclaimed land in the PQA.

PARAXYLENE ACETIC ACID PHOSPHORIC ACID (HANDLING ONLY) VINYL CHLORIDE MONOMER ACRYLONITRILE LIQUEFIED PETROLEUM GAS MONO ETHYLENE GLYCOL

Project Name ENGRO ASAHI POLYMER & CHEMICALS LIMITED

Location: EASTERN INDUSTRIAL ESTATE PORT QASIM

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 80 million

CAPACITY 100,000 (TPA) PVC MANUFACTURING PLANT

CLIENT ENGRO ASAHI POLYMER & CHEMICALS LTD

Completion: 1999-2000

Engro Asahi Polymer & Chemicals Limited (EAPCL or the company) is a joint Venture between Engro Chemical Pakistan Ltd. (ECPL) and Mitsubishi Corporation (Japan), each with an 80% and 20% shareholding, respectively EAPCL is the only PVC manufacturer in Pakistan with a Capacity Of 100,000tons per annum (TPA) and its operations are located at Port Qasim Karachi. Its plant was commissioned in November 14, 1999.

Engro Asahi Polymer & Chemicals Limited

ICI T11 PTA Plant Project Name

ICI PTA T11 PLANT

Location: EASTERN INDUSTRIAL ESTATE PORT QASIM

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 480 million

CLIENT TRANSCAR PROJECTS UK/ FOOSTER WHEELER UK

Completion:

1998

PARCO Mid Country Refinery (100, 000 BPD)

Project Name

PAK ARAB REFINERY COMPANY

Location: MULTAN, PAKISTAN

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 80 million

CLIENT DESCON ENGINEERING

Completion: 1998

JAMSHORO JOINT VENTURE LIMITED SINGLE LARGEST LPG EXTRACTION PLANT

Project Name

JAMSHORO JOINT VENTURE LIMITED

Location: JAMSHORO, SINDH

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 80 million

CLIENT ASSOCIATED GROUP

Completion: 2005

-------

INDUS REFINERY LIMITED PAKISTAN SECOND LARGEST REFINERY

Project Name

IRL is a 100,000 bpd or 4.95 million metric tons per

annum complex fuels refinery. It will be the sixth

petroleum refinery in Pakistan and the country’s

largest refinery.

Location: PORT QASIM INDUSTRIAL ESTATE

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 700 million

CLIENT INDUS REFINERY LIMITED

Completion: UNDER CONSTRUCTION

RELOCATION OF 100,000 BARRELS CAPACITY REFINERY

PETRO CANADA REFINERY TO PAKISTAN PORT QASIM

TRANSASIA REFINERY LIMITED PAKISTAN SECOND LARGEST REFINERY

Project Name

TRL is a 100,000 bpd or 4.00 million metric tons per

annum complex fuels refinery. It will be the state of an

Art petroleum refinery in Pakistan and will be one of

the country’s largest refinery.

Location: PORT QASIM INDUSTRIAL ESTATE

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 700 million

CLIENT TRANSASIA REFINERY LIMITED

Completion: UNDER CONSTRUCTION

TRANASIA REFINERY LIMITED

WIND POWER PROJECTS

FAUJI FERTILIZER ENERGY COMPNAY LIMITED (FFCEL) 49.5 MW WIND ENERGY PROJECT AT JHAMPIR,

KARACHI

Project Name

FFCEL WIND ENERGY PROJECT OF CAPACITY 49.5 MW

Location: JHAMPIR, NEAR THATTA

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 110 million

CLIENT DESCON ENGINEERING LIMITED

Completion: ALREADY COMPLETED

Project Name

ASPHALT BUILT UNIT PROJECT (ABU)

FOR PARCO

Location: PARCO MID COUNTRY REFINERY, MULTAN

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 30 Million

Completion: DECEMBER 2012

Project Name

49.5 MW FOUNDATION WIND ENERGY-1 PROJECT

Location: JHAMPIR, KARACHI

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 130 Million

Completion: SEPTEMBER 2014

Project Name

49.5 MW FOUNDATION WIND ENERGY-II (Pvt) Ltd.

PROJECT

Location: JHAMPIR, KARACHI

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 130 Million

Completion: SEPTEMBER 2014

Project Name

NEW KHANKI BARRAGE HYDROPOWER PROJECT

Location: RIVER CHENAB, DISTT GUJRANWALA

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 70 Million

Completion: SEPTEMBER 2016

Project Name

ASPHALT BUILT UNIT PROJECT (ABU) FOR PARCO

Location: PARCO MID COUNTRY REFINERY, MULTAN

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 30 Million

Completion: DECEMBER 2012

Project Name

METRO HABIB CASH & CARRY PAKISTAN (PVT) LTD

Location: HEAD OFFICE THOKAR NIAZ BAIG, MULTAN RD, LHR.

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 3.4

Completion: STILL UNDERGOING

DHA DESALINATION PLANT 3 MIGD & 94 MW POWER PLANT KARACHI

Project Name

DHA DESALINATION & POWER PLANT

PAKISTAN FIRST EVER SEA DESALINATION

& POWER PLANT

Location: DHA, PHASE VIII. KARACHI

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 130 million

CLIENT DHA COGEN LIMITED (DCL)

Completion: UNDER CONSTRUCTION

TOTAL VALUE OF L/C ESTABLISHED: Siemens AG Germany $ 41,400,000 $ 33,120,000 Siemens AG Germany € 6,550,000 € 5,240,000 Alfa Laval AS Copenhagen € 15,165,300 € 12,132,241 Lincas Electro Vertibas € 295,500 € 236,390

KARACHI INTERNATIONAL CONTAINER TERMINAL (KICTL) KARACHI

Project Name

KARACHI INTERNATIONAL CONTAINER

TERMINAL (KICTL)

PHASE III EXPANSION PROJECT

Location: WEST WHARF ROAD, KARACHI

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 400 million

CLIENT KICTL PAKISTAN

Completion: UNDER CONSTRUCTION

BAHRIA TOWN (PVT) LIMITED RAWALPINDI

Project Name

BAHRIA TOWN (Pvt) LIMITED

AWAMI VILLAS PROJECT.

TOTAL # OF VILLAS 8000

Location: RAWALPINDI, PAKISTAN

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 120 million

CLIENT BAHRIA TOWN (Pvt) LIMITED

Completion: UNDER CONSTRUCTION/ PROGRESS

HEALTH, SAFETY AND ENVIRONMENT

S.M.Asghar (Pvt) Limited believes that

ACCIDENTS DON’T JUST happen, they’re caused, and it is the duty of the Company to remove and minimize all possible causes of Accidents.

We at S.M.Asghar (Pvt) Limited takes preliminary guide to the recognition of potential hazards to the following.

M O S T - S A F E - P L A C E S M MACHINERY : Sources of Mechanical Power O OPENINGS : Pits, Sumps, Ducts & Drains S STACKS : Stores Materials, Raw & Process. T TOOLS : All type of Tools.

S A F E - P L A C E S

S STRUCTURE : Floors, Walls, Ceilings, Road A ATMOSPHERE : Dust, gases, fumes & Spray. F FIRE : Fire Points & Fire Exits. E ELECTRICITY : Wires, Cables, Switches. P PRESSURE VESSEL : Boilers & Compressors L LADDERS : Steps, trestles & Scaffolds A ATTIRE : Protective Clothing, Helmets C CRANES : Hoist, Derricks & Ropes / Hooks E EXPLOSIVES : Flammable Liquids, LPG, Radioactive.

S For SIGNALS : Warning Light, Telephone Buzzers.

As a Company Policy we take care of our Employee to the best Standards because Employees are Our Assets.

We provide following safety Equipments to our Port staff such as :

Safety Belts : They are provided to the Staff who Works On the Ship /Vessel (VCM/LPG)

Emergency Lights : In case of Night Delivery at the Port

Premise/ Highways

Safety Helmets : At time of delivery at the Port Area

During Loading/ Unloading Heavy Machineries/ Hazardous Cargo

Safety Boots : At the Ship Derricks & the Port Premises

Safety Glasses : They are provided to the Staff who

Work on the Ship /Vessel.

HEAVY & SUPER HEAVY LIFT TRANSPORTATION EXPERIENCE

WE CALLED THIS AS ABNORMAL LOADS

top related