Integrated Strategic Planning in Indonesia

October 2018

© 2018 AgileAssets, Inc. All Rights Reserved

Who is AgileAssets

© 2018 AgileAssets, Inc. All Rights Reserved

© 2018 AgileAssets, Inc. All Rights Reserved

26State-Wide

Systems w/

DOTs

15International

Implementations

20Cities and

Counties 20+ years

of relationships

© 2016 AgileAssets, Inc. All Rights Reserved

Clients

© 2018 AgileAssets, Inc. All Rights Reserved

© 2016 AgileAssets, Inc. All Rights Reserved

AgileAssets US State - Department of Transport Clients

5

Wyoming DOT

West Virginia DOT

Virginia DOT

Utah DOT

Texas DOT

Oregon DOT

Oklahoma DOT North Carolina DOT

New Mexico DOT

Montana DOT

Louisiana DOTD

Kentucky

Transportation

Cabinet

Indiana DOTIdaho

Transportation

Department

Georgia DOT

Illinois DOT

California DOT

What does it look like?

© 2018 AgileAssets, Inc. All Rights Reserved

© 2016 AgileAssets, Inc. All Rights Reserved

AgileAssets Product Suite

© 2018 AgileAssets Inc. All Rights Reserved

Executive Series

Analyst Series

Manager Series

Foundation

Flexible Platform – Transportation Data,

Tools & Business Intelligence

Third-Party System Integration

Manage Work &

Create Optimum Maintenance Plans

Optimum Work Programs

Portfolio Analysis & Decision Tools

© 2016 AgileAssets, Inc. All Rights Reserved

AgileAssets Product Suite

© 2018 AgileAssets Inc. All Rights Reserved

Executive Series

Bridge

AnalystTM

Analyst Series Pavement

AnalystTM

Safety

AnalystTM

Bridge

InspectorTM

Manager Series Facilities

ManagerTM

Fleet & Equip.

ManagerTM

Maintenance

ManagerTM

Right-of-Way

ManagerTM

Sign

ManagerTM

Signal and ITS

ManagerTM

Foundation AgileAssets

API

LRS

GatewayGIS Configuration

System

AdministrationSecurity

Asset

DatabaseDashboards

Data

Warehousing

Purchasing

Systems

Materials Mgmt

Systems

LRS/GIS

Systems

ERP

SystemsFinancial

Systems

Legacy

Systems

Third-Party System Integration

Portfolio

AnalystTM

AgileAssets

SummitTM

Integrated Planning in Indonesia

© 2018 AgileAssets, Inc. All Rights Reserved

© 2016 AgileAssets, Inc. All Rights Reserved

Indonesia - Quick Facts

© 2018 AgileAssets, Inc. All Rights Reserved

14th Largest country (area) in the world (1,910,931 sq. km)

4th Largest Country (population): 261 million

17,508 Islands

Second longest coast line in the world (over 54,000 km)

15th Road Network – 517,663 km

© 2016 AgileAssets, Inc. All Rights Reserved

Indonesia Bina Marga – Public Works

© 2018 AgileAssets, Inc. All Rights Reserved

• 47,017 km (centerline) – National Roads

– Paved: 45,071 km

– Unpaved: 1,946 km

• Number of Roads:

– 3,194

• Bridges

– 27,328

© 2016 AgileAssets, Inc. All Rights Reserved

Indonesia Bina Marga – IRMS Project Timeline

© 2018 AgileAssets, Inc. All Rights Reserved

2017 2018

May

Market

Research

Octo

ber

Requirements

Novem

ber

Tender

Decem

ber

Project Award

Decem

ber

Implementation

Septe

mber

Final Training

Septe

mber

Go-Live

© 2016 AgileAssets, Inc. All Rights Reserved

IRMS Project

© 2018 AgileAssets, Inc. All Rights Reserved

Pavement

Management

System

Bridge

Management

System

Safety

Management

System

Portfolio

AgileAssets

Integrated Asset

Management

System

© 2016 AgileAssets, Inc. All Rights Reserved

Integration Between AgileAssets & ESRI - LRS

© 2018 AgileAssets, Inc. All Rights Reserved

Linear Referencing

System

© 2016 AgileAssets, Inc. All Rights Reserved

Integration Between AgileAssets & ESRI - LRS

© 2018 AgileAssets, Inc. All Rights Reserved

Linear Referencing System

© 2016 AgileAssets, Inc. All Rights Reserved

Integration Between AgileAssets & ESRI - Pavements

© 2018 AgileAssets, Inc. All Rights Reserved

Pavement Data

Pavement Analyst ™

Conditions

Inventory

Traffic

Optimized

Work

Plans

Future

Conditions

and Details

Pavement

Data Feature

Service

ETL

Pavement

Work Plans

Pavement

Future

Conditions

© 2016 AgileAssets, Inc. All Rights Reserved

Integration Between AgileAssets & ESRI - Bridges

© 2018 AgileAssets, Inc. All Rights Reserved

Bridge Data

Bridge Analyst™

Inventory

Conditions

incl.

Elements

Traffic

Optimized

Work

Plans

Future

Conditions

and Details

Bridge Data

Feature

Service

ETL

Bridge

Work Plans

Bridge Future

Conditions

© 2016 AgileAssets, Inc. All Rights Reserved

Integration Between AgileAssets & ESRI - Safety

© 2018 AgileAssets, Inc. All Rights Reserved

Safety Data

Safety Analyst™

Accident

Data

Safety

Black

Spots

Safety

Projects

Accident Data

Feature

Service

ETL

Safety Black

Spots

Safety

Projects

© 2016 AgileAssets, Inc. All Rights Reserved

Benefits to the Organization

© 2018 AgileAssets, Inc. All Rights Reserved

• Data Centric Approach – comparison of Current Work Plans versus

Optimized Work Plan

© 2016 AgileAssets, Inc. All Rights Reserved

Benefits to the Organization

© 2018 AgileAssets, Inc. All Rights Reserved

Pavement Objective:

95% IRI < 8

Current Work Plan Allocation

Optimized Work Plan Allocation

© 2016 AgileAssets, Inc. All Rights Reserved

Benefits to the Organization

© 2018 AgileAssets, Inc. All Rights Reserved

Over Allocated

Under Allocated

© 2016 AgileAssets, Inc. All Rights Reserved © 2018 AgileAssets, Inc. All Rights Reserved

Over Allocated

Under AllocatedBridge Objective:

65% Bridge Index < 2

© 2016 AgileAssets, Inc. All Rights Reserved

Benefits to the Organization

© 2018 AgileAssets, Inc. All Rights Reserved

• Data Centric Approach – comparison of Current Work Plans versus

Optimized Work Plan

• Systematic Approach – Established Processes and Engineering Rules with

Feedback Loops

© 2016 AgileAssets, Inc. All Rights Reserved

Data

Survey

Condition

Engineering

Rules

Treatments,

Pricing and

Impacts

Decision

Trees

Engineering

Rules

Scenarios

and

Trade-Off

Budgets

Stability

Commited

Multi Years

Existing

Projects

Level of

Service

Objectives

Scenario

Work Plans

Deterioration

Model

Update:

1. Treatments and Impacts

2. Decision Trees

3. Deterioration Model

1. Roughness

2. PCI

3. Lendutan

4. LHRT

5. RNI

6. BMS

7. Data Lereng

8. Data Kecelakaan

9. Foto dan Video

Adjustments

to Work

PlansExecution

IRMS V3

© 2016 AgileAssets, Inc. All Rights Reserved

Benefits to the Organization

© 2018 AgileAssets, Inc. All Rights Reserved

• Data Centric Approach – comparison of Current Work Plans versus

Optimized Work Plan

• Systematic Approach – Established Process and Engineering Rules

• Better Decisions through Better Analytics

© 2016 AgileAssets, Inc. All Rights Reserved

Better Decisions

© 2018 AgileAssets, Inc. All Rights Reserved

• Ability to run Level of Service optimization:

– Minimum Budget (and work plan) to maintain 90% of Network IRI below 8 for 10 years

Worst First

ImpossibleMulti-Constraint

Optimization

0

500

1000

1500

2000

2500

3000

3500

2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Bill

ion

sWidening

Routine Maintenance

Resurfacing

Rehabilitation

Preventive Maintenance

Minor Rehabilitation

Thanks to the team

© 2018 AgileAssets, Inc. All Rights Reserved

Gilang Widyawisaksana Dodo Suhada

Thanks to the team

© 2018 AgileAssets, Inc. All Rights Reserved

Nazib Faisal

Questions and Answers

© 2018 AgileAssets, Inc. All Rights Reserved