INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

Post on 04-Jul-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

Transcript

INTEGRATED HEALTH MODEL

HOSPITALS & OUTPATIENT CLINICS

A DISTINCT ECOSYSTEMINTEGRATED HEALTH MODELA DISTINCT ECOSYSTEM

A DISTINCT ECOSYSTEM

PLANNING & DESIGN

MEDICAL EQUIPMENT PLANNING &

PROCUREMENT

INTEGRATION OF HOSPITAL OPERATION

KNOW-HOW

INTEGRATION OF INFORMATION

TECHNOLOGIES

CONSTRUCTION WITH MODULER SYSTEMS

PROJECT MANAGEMENT

ACIBADEM PROJECT MANAGEMENT SERVICES

2

1 TURNKEY PROJECTS

RENOVATIONPROJECTS

GLOBAL VISION

4

6DESIGN & PROJECT MANAGEMENT

INTERNATIONALDESIGN

3

MODULAR SYSTEMS5

11TURNKEY PROJECTS

ACIBADEM MASLAK PHASE 2

ACIBADEM ALTUNIZADE

ACIBADEM INTERNATIONAL

AMSTERDAM

ACIBADEM TAKSIM HOSPITAL

ACIBADEM ANKARA HOSPITAL

ACIBADEM FULYA HOSPITAL

ACIBADEM ATAKENT HOSPITAL

ACIBADEM UNIVERSITY

WORKING STRUCTURE

CLIENT REPRESENTATIVE

1 TURNKEY PROJECTS

MEP ENGINEERS

EPC CONTRACTOR

DESIGNER/ MEDICAL PLANNER

INTERIOR DESIGNER

INTEGRATED PROJECT DELIVERY

PROJECT MANAGEMENT COMPANY

MEDICAL EQ. PLANNING & PROCUREMENT

CLIENT

LOCAL AUTHORITIES

PROJECT AREA: 65.000 sqmNUMBER OF BEDS: 160PROJECT DURATION: INC PRE-CONSTRUCTION 25 MONTHS (SEPTEMBER 2016 - OCTOBER 2018)GROUNDBREAKING 20 MONTHS (FEBRUARY 2017- OCTOBER 2018)CONTRACT VALUE: 88.400.000 USD (CONSTRUCTION +MED EQ)

: 1.100 USD/m2 (CONSTRUCTION)

ACIBADEM MASLAK PHASE 2 1 TURNKEY PROJECTS

ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PROCUREMENT

PROJECT INFORMATION SCOPE OF WORKS

ACIBADEM MASLAK PHASE 2 1 TURNKEY PROJECTS

ACIBADEM MASLAK PHASE 2 1 TURNKEY PROJECTS

ACIBADEM ALTUNIZADE 1 TURNKEY PROJECTS

PROJECT AREA: 98.000 sqmNUMBER OF BEDS: 315PROJECT DURATION: INC PRE-CONSTRUCTION 36 MONTHS (APRIL 2014 – APRIL 2017)GROUNDBREAKING 24 MONTHS (APRIL 2015- APRIL 2017)CONTRACT VALUE: 172.300.000 USD (CONSTRUCTION+MED EQ)

: 1.200 USD/m2 TOTAL CONSTRUCTION

SCOPE OF WORKSPROJECT INFORMATION

ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION WITH MODULAR SYSTEMSCONSTRUCTION MANAGEMENTMEDICAL EQUIPMENT PROCUREMENT

ACIBADEM ALTUNIZADE 1 TURNKEY PROJECTS

ACIBADEM AMSTERDAM 1 TURNKEY PROJECTS

PROJECT AREA: 5.500 sqmPROJECT DURATION PHASE 1: 5 MONTHS (JULY 2018 – NOVEMBER 2018)PROJECT DURATION PHASE 2: 10 MONTHS (MARCH 2018 – JANUARY 2019)CONTRACT VALUE: PHASE 1: 7.400.000 EUR (CONSTRUCTION+MED EQ)PHASE 2: 4.300.000 EUR (CONSTRUCTION+MED EQ)

SCOPE OF WORKSPROJECT INFORMATION

ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PROCUREMENT

ACIBADEM AMSTERDAM 1 TURNKEY PROJECTS

ACIBADEM TAKSIM HOSPITAL 1 TURNKEY PROJECTS

PROJECT AREA: 25.000 sqmNUMBER OF BEDS: 100PROJECT DURATION: 28 MONTHS (AUGUST 2013 – DECEMBER 2015)CONTRACT VALUE: 40.500.000 USD (CONSTRUCTION+MED EQ)

SCOPE OF WORKSPROJECT INFORMATION

ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PROCUREMENT

ACIBADEM TAKSIM HOSPITAL 1 TURNKEY PROJECTS

ACIBADEM ANKARA HOSPITAL 1 TURNKEY PROJECTS

PROJECT AREA: 10.000 sqmNUMBER OF BEDS: 100PROJECT DURATION: 30 MONTHS (MAY 2010 – DECEMBER 2012)CONTRACT VALUE: 23.000.000 USD (CONSTRUCTION+MED EQ)

SCOPE OF WORKSPROJECT INFORMATION

ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PROCUREMENT

ACIBADEM ANKARA HOSPITAL 1 TURNKEY PROJECTS

ACIBADEM FULYA HOSPITAL 1 TURNKEY PROJECTS

X

PROJECT AREA: 23.000 sqmNUMBER OF BEDS: 100PROJECT DURATION: 10 MONTHS (DECEMBER 2009 – OCTOBER 2010)CONTRACT VALUE: 16.400.000 USD (CONSTRUCTION+MED EQ)

SCOPE OF WORKSPROJECT INFORMATION

ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PROCUREMENT

ACIBADEM FULYA HOSPITAL 1 TURNKEY PROJECTS

ACIBADEM ADANA HOSPITAL 1 TURNKEY PROJECTS

PROJECT AREA: 21.000 sqmNUMBER OF BEDS: 100PROJECT DURATION: 13 MONTHS (JUNE 2009 – JULY 2010)CONTRACT VALUE: 37.000.000 USD (CONSTRUCTION+MED EQ)

SCOPE OF WORKSPROJECT INFORMATIONARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PLANNING & ROCUREMENT

ACIBADEM ATAKENT HOSPITAL 1 TURNKEY PROJECTS

PROJECT AREA: 60.000 sqmNUMBER OF BEDS: 265PROJECT DURATION: 20 MONTHS (AUGUST 2012 – MARCH 2014)CONTRACT VALUE: 86.000.000 USD (CONSTRUCTION+MED EQ)

SCOPE OF WORKSPROJECT INFORMATION

ARCHITECTURAL DESIGNPROJECT MANAGEMENT CONSTRUCTION MANAGEMENT

ACIBADEM ATAKENT HOSPITAL 1 TURNKEY PROJECTS

ACIBADEM MEHMET ALI AYDINLAR UNIVERSITY 1 TURNKEY PROJECTS

PROJECT AREA: 90.000 sqmPROJECT DURATION: 27 MONTHS (JULY 2011 – OCTOBER 2013) CONTRACT VALUE: 85.300.000 USD (CONSTRUCTION+MED EQ)

860 USD/m2 (CONSTRUCTION)

SCOPE OF WORKSPROJECT INFORMATION

ARCHITECTURAL DESIGNPROJECT MANAGEMENT CONSTRUCTION

ACIBADEM MEHMET ALI AYDINLAR UNIVERSITY 1 TURNKEY PROJECTS

2 RENOVATION PROJECTS

INTERNATIONAL HOSPITAL

ACIBADEM MASLAK 1

Project Management

(Coordination with Operational team)

2 RENOVATION PROJECTSWORKING STRUCTURE

Facility Management Team

Operational team(Medical & Administrative)

Client

Direct Link

Indirect Link

• Phasing

• Scheduling

INTERNATIONAL HOSPITAL 2 RENOVATION PROJECTS

PROJECT AREA: 19.000 sqmNUMBER OF BEDS: 113PROJECT DURATION: 25 MONTHS ( JUNE 2006-JULY 2008)CONTRACT VALUE: 10.500.000 USD

ARCHITECTURAL DESIGNFUNCTIONAL STACKINGMEDICAL PLANNINGCONSTRUCTION SCENERIO PLANNINGMEP INFRASTRUCTURE CONSTRUCTION MANAGEMENT

SCOPE OF WORKSPROJECT INFORMATION

INTERNATIONAL HOSPITAL 2 RENOVATION PROJECTS

PREVIOUS VIEW

NEW DESIGN

PREVIOUS VIEW

NEW DESIGN

ACIBADEM MASLAK RENOVATION 2 RENOVATION PROJECTS

PROJECT AREA: 40.000 sqmNUMBER OF BEDS: 150PROJECT DURATION: EST 23 MONTHS (JANUARY 2019-DECEMBER 2020 )

ARCHITECTURAL DESIGNMEDICAL PLANNINGCONSTRUCTION SCENERIO PLANNINGMEP INFRASTRUCTURE CONSTRUCTION MANAGEMENT

SCOPE OF WORKSPROJECT INFORMATION

DESIGN & PROJECT MANAGEMENT FOR RENOVATIONS

3

TOKUDA HOSPITAL

PANTAI AYER KEROH

AMSTERDAM SLOOTERVART

ACIBADEM KADIKÖY

Design & Project Management

Technical Office Duty on Site

Head Office Site visits by Group Managers

Local Architects & Engineers / Contractors

Direct Link

Indirect Link

Client

Operational team (Medical & Administrative)

Project Coordinatoron Site duty

Design CoordinationTeam on Site

3 DESIGN AND PROJECT MANAGEMENTWORKING STRUCTURE

Local Authorities

Medical EquipmentProcurement

Test & Validation

TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT

PROJECT AREA: 57.500 sqmNUMBER OF BEDS: 775PROJECT DURATION:

CONCEPT REVIEWMASTER PLANNINGARCHITECTURAL DESIGNMEDICAL PLANNINGCONSTRUCTION SCENERIO PLANNINGPROJECT MANAGEMENTMEDICAL EQUIPMENT PROCUREMENT

SCOPE OF WORKSPROJECT INFORMATION

MASTER RENOVATION PLAN 5 YEARS 2018- 2023 5TH. FLOOR PLAN 5 SEPTEMBER 2019 – MARCH 2020

TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT

SINGLE PATIENT ROOM – ALTERNATIVE 2SINGLE PATIENT ROOM - ALTERNATIVE I

TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT

DOUBLE PATIENT ROOM

TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT

SINGLE PATIENT ROOM – MOCK UP

TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT

DOUBLE PATIENT ROOM- MOCK UP

TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT

AS BUILT PHOTOS

TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT

AS BUILT PHOTOS

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

PROJECT AREA: 20.500 sqmNUMBER OF BEDS: 221EXPANSIONALTERNATIVE 1: 351 beds - 28 830 sqmALTERNATIVE 2: 621 beds - 40 000 sqmPROJECT DURATION: 5 MONTHS (APRIL 2013-OCTOBER 2013)

ARCHITECTURAL DESIGNFUNCTIONAL STACKINGMEDICAL PLANNINGPHASING FOR DESIGN WORKSCONSTRUCTION SCENERIO PLANNINGMEP INFRASTRUCTURE CONSTRUCTION MANAGEMENT

SCOPE OF WORKSPROJECT INFORMATION

351 BEDS

ALTERNATIVE 1 SITE PLAN

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

ALTERNATIVE DESIGN 1 (351 BEDS)

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

ALTERNATIVE DESIGN 1 (351 BEDS)

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

621 BEDS

ALTERNATIVE 2 SITE PLAN

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

ALTERNATIVE DESIGN 2 (621 BEDS)

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

ALTERNATIVE DESIGN 2 (621 BEDS)

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

ALTERNATIVE DESIGN 2 (621 BEDS)

ALTERNATIVE DESIGN 1 (351 BEDS)

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

RENDER

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

PH AYER KEROH - RENOVATION 3 DESIGN AND PROJECT MANAGEMENT

EXISTING WARD PHOTOS

w w w . a r c h i s t a n b u l . c o m

PH AYER KEROH - RENOVATION 3 DESIGN AND PROJECT MANAGEMENT

APM DESIGN RENDERS

PANTAI HOSPITAL AYER KEROH/DOUBLE PATIENT ROOM-831/MOCK UP

DESK/CORIAN

CORIAN/CLAY

LAMINATED

LAMICOLOR/1027W

ARPA/0028BIANCO NUBE/ERRE

ARPA/4539 OLMO MERCURIO VG/ALEVEBARRISOL LIGHTING

w w w . a r c h i s t a n b u l . c o m

MOCK UP

PH AYER KEROH - RENOVATION 3 DESIGN AND PROJECT MANAGEMENT

AMSTERDAM MC SLOOTERVART 3 DESIGN AND PROJECT MANAGEMENT

PROJECT AREA: 800 sqmNUMBER OF BEDS: 12PROJECT DURATION: 8 WEEKS

ARCHITECTURAL DESIGNFUNCTIONAL STACKINGMEDICAL PLANNING

SCOPE OF WORKSPROJECT INFORMATION

AMSTERDAM MC SLOOTERVART 3 DESIGN AND PROJECT MANAGEMENT

CONCEPT REVIEWMASTER PLANNINGARCHITECTURAL DESIGNMEDICAL PLANNINGPHASING FOR DESIGN WORKS

ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT

PREVIOUSPROJECT AREA: 17.500 sqmNUMBER OF BEDS: 112EXPANSIONPROJECT AREA: 46.000 sqm.NUMBER OF BEDS: 250

SCOPE OF WORKSPROJECT INFORMATION

PHASE 1

PHASE 1

PHASE 1

ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT

PHASE 1

PHASE 1PHASE 2

ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT

PHASE 2

PHASE 1

PHASE 1PHASE 2PHASE 3

ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT

PHASE 3

GROUND FLOOR

PHASE 1

PHASE 2

PHASE 1

PHASE 3

SERVICE

ENTRANCE

PARKING

ENTRANCEOP ENTRANCE

IP ENTRANCE

ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT

ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT

SKETCHES

ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT

EXISTING HOSPITAL PLANNED HOSPITAL

ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT

4 INTERNATIONAL DESIGN

PARKWAY YANGON

MYANMAR

MEDPARK INTERNATIONAL

MOLDOVA

MOSCOW CHILDREN

SHARJAH PRIVATE HOSPITAL

MILLENIUM HOSPITAL KAZAN

ABU DHABI TRANSPLANTATION

KIRKUK GENERAL HOSPITAL

MOSCOW CITY HOSPITAL No 71

Designer

Head Office Site visits

by Group Managers

Local Architects & Engineers / Contractors

Direct Link

Indirect Link

Client

Consultants

4 INTERNATIONAL DESIGN

Project Coordinator

On site duty

Design Coordination

Team

WORKING STRUCTURE

Local Authorities

MASTER PLANNINGARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNINGPHASING FOR DESIGN WORKS

MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

PROJECT AREA:PHASE 1- 26.000 sqmPHASE 2- 12.000 sqm

NUMBER OF BEDS:PROJECT DURATION: 3 WEEKS

SCOPE OF WORKSPROJECT INFORMATION

SITE PLAN

MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

P H A S ES & P L A N S P H A S E - 1

CONSTRUCTIONAL AREA-PHASE 1

Level

Phase

Created Area

B1 Phase 1 3,623

F1 Phase 1 4,525

F2 Phase 1 4,065

F3 Phase 1 4,511

F4 Phase 1 4,440

F5 Phase 1 1,195

F6 Phase 1 1,195

F7 Phase 1 1,195

F8 Phase 1 1,187

TOTAL AREA 25,936

MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

P H A S ES & P L A N S P H A S E - 2

CONSTRUCTIONAL AREA-PHASE 2

Level

Phase

Created Area

B1 Phase 2 1,020

F1 Phase 2 1,063

F2 Phase 2 1,094

F3 Phase 2 1,078

F4 Phase 2 1,005

F5 Phase 2 1,002

F6 Phase 2 1,004

F7 Phase 2 1,004

F8 Phase 2 1,004

F9 Phase 2 1,005

F10 Phase 2 1,004

TOTAL AREA 12,287

MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

DEPARTMENTSCHEDULE-

F1-PHASE 01

DEPARTMENT Area

ADMISSION 390 m²

CAFETERIA 387 m²

CIRCULATION 1763 m²

DIAGNOSTIC&IMAGING 698 m²

EMERGENCY 476 m²

HEALTH SCREENING 163 m²

LABORATORIES 185 m²

PHARMACY 58 m²

WET AREA 120 m²

Grand total 4240 m²

F 1 – P H A S E - 1

MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

B - B S EC T I O N

PATIENT WARD

ICU

CONSULT ROOMS

EMERGENCY DIAGNOSTIC &

IMAGING

D&L

OPERATING UNITS

CONSULT ROOMS

DIAGNOSTIC &

IMAGING

NICU

OPERATING UNITS

CONSULT ROOMS

NUCLEAR MEDECINE

DIALYSIS

CCU

CONSULT ROOMS

PATIENT WARD

PATIENT WARD

PATIENT WARD

CHEMO &DIALYSIS

PATIENT WARD

PATIENT WARD

PATIENT WARD

PATIENT WARD

PATIENT WARD

PATIENT WARD

BB

MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

MEDPARK MOLDOVA INTERNATIONAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

PROJECT AREA: 8. 000 sqmNUMBER OF BEDS: 60 PROJECT DURATION: 1 MONTHS

SCOPE OF WORKSPROJECT INFORMATION

CONCEPT REVIEW AND MASTER PLANNING ARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING

MEDPARK MOLDOVA INTERNATIONAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

MEDPARK MOLDOVA INTERNATIONAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

PROJECT AREA: 80.000 sqmNUMBER OF BEDS: 400PROJECT DURATION: 1 MONTH

SCOPE OF WORKSPROJECT INFORMATION

MOSCOW CHILDREN 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

MASTER PLANNING ARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING

PROJECT AREA: 60.000 sqmNUMBER OF BEDS: 125PROJECT DURATION: SEPTEMBER –NOVEMBER 2018 (3 MONTHS)

SCOPE OF WORKSPROJECT INFORMATION

SHARJAH PRIVATE HOSPITAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

FEASBILITY STUDIESARCHITECTURAL CONCEPT & PRELIMINARY DESIGNINTERIOR CONCEPT DESIGN

DESIGN CONSULTANCY MEDICAL EQUIPMENT PLANNING

PROJECT AREA: 33.000 sqmNUMBER OF BEDS: 100PROJECT DURATION: 3 MONTHS

SCOPE OF WORKSPROJECT INFORMATION

MILLENIUM KAZAN 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

MILLENIUM KAZAN 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

PROJECT AREA: 32.000 sqmNUMBER OF BEDS: 20 BMTPROJECT DURATION: MAY – JUNE 2018 (2 MONTHS)

SCOPE OF WORKSPROJECT INFORMATION

ABU DHABI TRANSPLANTATION 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

MASTER PLANNINGARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING

ABU DHABI TRANSPLANTATION 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

PHASE - 1

ABU DHABI TRANSPLANTATION 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

PHASE - 2

ABU DHABI TRANSPLANTATION 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

PHASE - 3

PROJECT AREA: 72.000 sqmNUMBER OF BEDS: 400PROJECT DURATION: 10 MONTHS (FEBRUARY 2012 – DECEMBER 2012)

KIRKUK GENERAL HOSPITAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SCOPE OF WORKSPROJECT INFORMATION

MASTER PLANNINGARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING

PROJECT AREA: 60.000 sqmNUMBER OF BEDS: 300PROJECT DURATION: 10 MONTHS (FEBRUARY 2012 – DECEMBER 2012)

KERBELA GENERAL HOSPITAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SCOPE OF WORKSPROJECT INFORMATION

MASTER PLANNINGARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING

PROJECT AREA: 30.000 sqmNUMBER OF BEDS: 150PROJECT DURATION: 10 MONTHS (JANUARY 2012 – JUNE 2012)

MOSUL GENERAL HOSPITAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SCOPE OF WORKSPROJECT INFORMATION

MASTER PLANNINGARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING

MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

PROJECT AREA: 125.000 sqmNUMBER OF BEDS: 400PROJECT DURATION: 8 MONTHS (FEBRUARY 2014 – OCTOBER 2014)

SCOPE OF WORKSPROJECT INFORMATIONMASTER PLANNING ARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING

MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN SITE - 1

MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN SITE - 1

MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN SITE - 1

SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SITE PLAN PHASE I

SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SITE PLAN PHASE II

1 ST FLOOR

SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

5-6-7 TH FLOOR

SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SITE PLAN

SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

1 ST FLOOR

SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

5 MODULAR SYSTEMS

ACIBADEM MASLAK 1 & 2

ACIBADEM ALTUNIZADE

ACIBADEM INTERNATIONAL

AMSTERDAM

ACIBADEM TAKSIM

ACIBADEM UNIVERSITY

ACIBADEM ATAKENT

UNIVERSAL H – BANJA

LUKA

Designer

Local Architects & Engineers / Contractors

Direct Link

Indirect Link

Client

Consultants

WORKING STRUCTURE

Local Authorities

5 MODULAR SYSTEMS

Modular SystemsSolution Partner

Design

Production

Installation

DurabilityModularity

Flexibility

Aesthetics

Hygienic

Fast and Easy Installation

Upgradeability

SOLUTIONS 5 MODULAR SYSTEMS

OPERATING ROOM (HYBRIT) 5 MODULAR SYSTEMS

OPERATING ROOM (HALL) 5 MODULAR SYSTEMS

OPERATING ROOM (HALL) 5 MODULAR SYSTEMS

OPERATING UNİT 5 MODULAR SYSTEMS

OPERATING ROOM 5 MODULAR SYSTEMS

DELIVERY ROOM 5 MODULAR SYSTEMS

DELIVERY ROOM 5 MODULAR SYSTEMS

GMP LABORATORY 5 MODULAR SYSTEMS

GMP LABORATORY 5 MODULAR SYSTEMS

GLOBAL VISION6

ST.PETERSBURG MMC

Medical Solution Partner

Designer, Local Architects & Engineers / Contractors

Consultants

Direct Link

Indirect Link

Client

6 GLOBAL VISIONWORKING STRUCTURE

Technological Solution Partners

Operational team (Medical & Administrative)

MASTER PLANNINGARCHITECTURAL DESIGNMEDICAL PLANNINGINTERIOR CONCEPT DESIGNMEDICAL EQUIPMENT PLANNINGMEP PROJECTSDESIGN CONSULTANCY

ST.PETERSBURG MMC 6 GLOBAL VISION

PROJECT AREA: 200.000 sqmNUMBER OF BEDS: 485PROJECT DURATION: NOVEMBER 2018- EST 2019

SCOPE OF WORKS

ONCOLOGY

CENTER

SPORTS MEDICINE

& REHABILITATION

CENTER

TECHNICAL

AREA

BOARDING

HOUSE

TRAINING

CENTER ADMINISTRATIVE

OFFICESMAIN HOSPITAL CYCLOTRON

PLANT

NUCLEAR

MEDICINE

SCOPE OF WORKSPROJECT INFORMATION

MAIN HOSPITAL VIEW - 1

ST.PETERSBURG MMC 6 GLOBAL VISION

MAIN HOSPITAL VIEW - 2

ST.PETERSBURG MMC 6 GLOBAL VISION

ONCOLOGY CENTER

ST.PETERSBURG MMC 6 GLOBAL VISION

TRAINING CENTER, SPORTS MEDICINE & REHABILITATION CENTER

ST.PETERSBURG MMC 6 GLOBAL VISION

MEDICATION & SUPPLY MANAGEMENT SYSTEM LABORATORY SERVICES

LAUNDRY MANAGEMENT

FOOD MANAGEMENTMODULAR WALL SYSTEMS

WASTE MANAGEMENT

CONSULTANCY ON TECHNOLOGICAL SOLUTIONS ST.PETERSBURG MMC 6 GLOBAL VISION

AGV (AUTOMATED GUIDED VEHICLE) - ROBOT IT BASED PROJECT SOLUTIONS

ST.PETERSBURG MMC 6 GLOBAL VISIONCONSULTANCY FOR TECHNOLOGICAL SOLUTIONS

3D MAQUETTE ST.PETERSBURG MMC 6 GLOBAL VISION

THANK YOU

top related