Indtryk fra International Applied Reliability Symposium. 28-30 Marts 2012 Warsaw , Polen. 113 deltagere , heraf 4 fra Danmark. Succesful Physical Performance Management by Arkadiusz Burnos. Challenges in Utilizing CMMS Data in Asset Performance Management by Adamantios Meltor. - PowerPoint PPT Presentation

Transcript

Indtryk fra International Applied Reliability Symposium

28-30 Marts 2012

Warsaw, Polen

ARS 2012 CHS2

113 deltagere,heraf 4 fra Danmark

ARS 2012 CHS3

Challenges in Utilizing CMMS Data in Asset Performance Management by Adamantios Meltor

Succesful Physical Performance Management by Arkadiusz Burnos

ARS 2012 CHS4

•Root Cause Analysis

•Risk Assesment

•Response

ARS 2012 CHS5

“Dagens “historietime”

•Crow AMSAA) Model

Main Results: Growth rate; Demonstrated MTBF;Goodness-of-Fit Test; Confidence Intervals.

Benyttes i U.S. DoD military handbooks MIL-HDBK-189

•Crow Projection model

De kloge ord her:I test skal der skelnes mellem fejl der skyldes “arvede fejl” og fejl der skyldes ting der kan ændres

ARS 2012 CHS6

Split failure by country: Cars in

India do not have the same

mission profile as cars

in Europe.

ARS 2012 CHS7

• LCD TV Failure rate prediction for new designs is VITALLYIMPORTANT to understand if profit can be achieved from LowMargin, High Volume products.•In Europe average cost per failure including logistics cost > $150. (selling price ~ $300)

ARS 2012 CHS8

…fortsat

Ongoing Reliability Test

Accelerated Life TestingField Return Rate

Yield data

ARS 2012 CHS9

Spørgsmål?

?