Indonesia's Experimental Power Reactor

Project

In Indonesia, we call it RDE a 'Reaktor Daya Eksperimental'

Topan Setiadipura@Idaho National Laboratory (INL)Idaho Falls, Idaho, US.

Review:

●Indonesia and HTGR●RDE Project●(part of) R&D to support for RDE Project

IAEA TC Meeting 1995

3

4

IAEA TC Meeting 1995

Local policy for HTGR development...

6/9/15 5

HTGR Tools

6/9/15 6

HTGR ToolsFrom #1 PEBBED publication at 2002:

6/9/15 7

HTGR Tools (Personal Perspective)

PRECDirect Equilibrium Calculation

(Sekimoto et.al, 1987)

PRECDirect Equilibrium Calculation

for OTTO Cycle(Sekimoto et.al, 1987) PREC2

FD Computational Improvement of PREC

(Obara et.al, 1991)

BATAN-MPASSExtend PREC Method for

MULTIPASS Cycle(Liem P.H., 1993) MCPBR

Use MC method for OTTO Cycle Analysis

including running-in and equilibrium phase.

(Setiadipura T and Obara T, 2014)

RDE Project

Reactor Type: Act. No 10/1997 dan PP 2/2014

Power Reactor

Non­Power Reactor

Commercial

Non­Commercial

Commercial

Non­Commercial

Non­Commercial: BATANCommercial : State­Own­Company, Private Company

Impact of RDE

Electricity

Heat Applicat

ion

R&D on HTGR

RDE will produce electricity . 

RDE

RDE will be used in the R&D of nuclear­heat cogeneration.

RDE will be used as R&D facility for HTGR technology for further design and contruction development in Indonesia.

RDE Project Plan

6/9/15Badan Tenaga Nuklir Nasional

11

6/10/15Badan Tenaga Nuklir Nasional 12

Future RDE Utilization Plan in Indonesia

Wilayah Pengembangan 

HTGR/SMR(Komersialisasi 

RDE)

Wilayah Pengembangan 

PLTN Besar

Kepadatan Penduduk

RDE will become one of “NPP Model” in Indonesia with huge demand for electricity and/ heat application.

6/9/15Badan Tenaga Nuklir Nasional 13

Tahun

2015 2016 2017 2018 2019

Engineering DesignKontrak

RDE Project Schedule

2020

Engineering, Procurement and Construction (EPC)

Construction Permit

Process

2021

Site Permit Process

Construction Management

OUT PUT:1. Feasibility Study2. Conceptual Design4. Safety Analysis Report [SAR}5. Front­End­Engineering­Design [FEED]6.  EPC Tender Document

Pengawas

Progress of the Project

1.We finish compiling the RDE Requirement then include as TOR for RDE's Basic Engineering Design Package (BEDP) work.

2.Currently we are working with Consultant for the BEDP of RDE, which should be finish in 2015.

3.Site Evaluation Program is in progress as part of Site Permit application to regulatory body.

4.The consultant (called RENUKO) is a consortium:. Rekayasa Engineering (Indonesian EPC Company). Kogas Driyap Consultant (Indonesian Technical

Consultant). NUKEM Gmbh. (German Company which own by

ROSATOM)

Basemap:Worldview­225/08/2013

Lokasi Lintang Bujur

Desa Muncul Desa Kranggan, Kec. Situ, Kota Tangerang Selatan, Banten

6° 21' 26" LS 106° 39' 37" BT

Site Location

General Specification of RDE

- HTGR type Pebble Bed Reactor (PBR)

- Refere to the HTR-Module design.

 RDE Fuel : Pebble Fuel

- HTGR tipe Pebble Bed Reactor (PBR)

- Mengacu pada desain HTR-Module Jerman.

General Specification of  RDE

Safety Feature(1): ControlInherently the core able to control unepected increase of

fission reaction rate.

6/9/15 19

HTR-Module Siemens Design

Safety Feature(2): CoolingIn the case of accident, it able to transfer heat outside

only by natural mechanism.

6/9/15 20

rcore

Safety Feature (3): Contain

Low radiactive release to the environment even in the most severe accident.

6/9/15 21

R&D to support RDE Project

RDE Program 2015 - 2019

RDE Construction Tools Development HTGR Design Study

Parallel Computing Study

Tools for HTR Design and Safety

Analysis

Nuclear Data Related

Neutronic Core Analysis

Core Heat and Flow AnalysisTRISO Fuel

Performance Analysis

Dispersion Analysis

Uncertainty and Sensitivity Analysis

Tools Development Plan

● Currently, we are in a very early phase of the development with young but enthusiast team.

● Looking forward to have a cooperation with other research center. INL is one of the highest priority.

PEBBED code:- for 'comparative tools' in RDE project. (main tools is belong to the consultant of RDE's BDEP project.- tools for HTR design for beyond RDE.- platform for Pebble Bed Reactor tools development.

Thank You