Transcript

Presented by: The City of Dublin | May 14, 2013

Phase 1

I-270/US33 Interchange Upgrade

Location

Dublin

To US 23/SR 315

To I-70/ Hilliard

To Marysville

Economic Influence

The Problem… Congestion & Safety

33

Meets Application Criteria

• Freight

• Improves geometry of interchange ramps

• Intermodal connector

• Removes truck bottlenecks

Funding

• Phase 1 total: $91.75 million

– TRAC application request through 2016: $46 million

– Dublin match: $17.25 million

Clear environmental

60% design for full interchange

Finalize Phase 1 design

Construction

– MORPC Attributable Funding

$7 million awarded for construction

$18 million additional being considered

Recommended Phase 1 Solution

New pavement

Pavement removed

Recommended Phase 2 Solution

Phase 1 new pavement

Phase 1 pavement removed

Phase 2 new pavement

Phase 2 pavement removed