1

GOALS for Today’s presentation2

Sycamore Community Schools: Engagement / Master Plan - Schedule

3

Engagement: The Numbers

Oct 2018

5

Oct 2018

6

7

5 master plan options

8

9

10

11

12

13

14

$ Cost Estimate (revised)

15

$ Funding Scenario

16

17

18

Sycamore HS scope of work19

• Full renovation of 1st and 2nd floor academic spaces• Relocate and renovate music spaces• Relocate and renovate administrative office• Updated finishes throughout athletic spaces• Full renovation of locker rooms and group restrooms• Full renovation of kitchen• Sycamore Stadium at HS with grandstands, turf,

concessions, home and visitor locker rooms.• Soft Costs include the following:

• A/E Fees• Legal • Insurance• Printing• Construction Testing• Survey• Permits

Sycamore HS cost analysis20