GujaratNarmadaValley Fertilizers amp Chemicals Limited

(An ISO 14001 amp OHSAS 18001 Company)

PO Narmadanagar - 392 015 Dis Bharuch Gujarat India Ph (02642) 24700l 247002

Website www gnfcin

GNFCMoEFECECU2013 Date- 24062013 ByR PAD

To Hon Regional Office Western Region Kendriya Paryavaran Bhavan Link Road - 3 E - 5 Ra vi shanka r N aga r Bhopal - 462 016 (M P)

Kind Attn- Shri Dr A Mehrotra Director (S)

Sub Submission of Compliance Report of Environmental Clearances granted to Gujarat Narmada Valley Fertilizers amp Chemicals Limited (G NFC)

Ref 1) State Level Environment Impact Assessment Authority Gujarat- Environmental Clearance NoSEIAAGUJjEC5(f)107 2011 dated 09062011

Dear Sir

We have received above referre d e nvironm ental clearance from St te L v I Environment Impact Assessmen t Authority Gujar t for the Ethyl Ace tate plant

Compl ian e report of enviro nmental cl arance No SEIAA GUJ EC5(f)1072011 dated 09062011 issued by the State Level Environment Impact Assess ment Authority Guja ra t is attached herew ith as Annexu re-1 as a part of compliance to condition of environmental cJeara n e nd Environme nt Impact Assessment Notification -2006

We have al ready complied conditions of environmental clearance NoJ-110111 218 2007shylA1 (I) dated 28 0420 08 w as vali d up to 27042013 amp J-11011731 2007-IA (II) dated 19032008 was valid up to 180320 13 granted by Mo EF

Thanking YOll

Yours fa ithfully Fovarmada Valley Fertilizers amp Chemicals Ltd

S KMebta General Manager

Enc as a bove

middotGujarat Narmada Valley Fertilizers amp Chemicals Limited (An ISO 14001 amp OHSAS 18001 Company)

PO Narmadanagar - 392 015 Olst Bharuch Gujarat India Ph (02642) 247001 247002

Website www gnlcin

CC TO 1 Shri B R Naidu Hon Zonal Officer Central Pollution Control Board Parivesh Bhava n

Opp VMC w ard office No10

Subhanpura

Vado dara-39 002 3

2 Hon Member Secretary State Level Environment Impac t Assessment Authority

Gujarat Pollution Control Board

Paryava ran Bhavan

Sector-lOA Gandhin agar-3 8 20l0

3 Shri Hardik Shah Hon Member Secretary Gujarat Pollution Control Board Paryavaran Bhavan

Sector-lOA Gandhinagar-3820l0

1

Gujara l armada Valley Fertilizers amp Chemiclts Limited

24th June-2013

Compliance status report of Environmental Clearance No SEIAAGUJEC5(f)1072011 dated 09062011

SubEnvironmental Clearance for the proposed Ethyl Acetate plant (capdci~y

50OOOMTyear) within the existing complex located a t National Highvvay No8 Notified Industrial area PO Narmadanagar Bharuch by Ms Gujarat Narmada Va ll ey Fertilizers Company Limited in category Set] of schedule annexed with EIA Notification dated 14092006

SR CONDITIONS I COMPLIANCE STATUS NO

A SPECIFlC CO NDITIONS A- l WATER No ground ivater shall be used fo r th e proj ect Additional fresh water requirement of 1093 KLday for the proposed ex pansion shall be insta lled and its records shall be maintained

A di stillation column sha ll be installed to recover Complied Ethanol Ethyl Acetate amp Acetic Acid from wash Distillation column (0 3602) IS

eft1uent and the recovered Ethanol Ethyl Ace tate already installed amp commissioned middot amp Acetic Acid shall be reused in the process The for recovery of ethanol Ethyl co mpany shall continuously thrive to reduce acetate and Acetic acid from vvash recycle and reuse their treated effluent effluent

3 Additio na l was te wat r gene rati n due to the Complied p roposed expa ns io n sha ll no t exceed 503 KLday Pres ntly addit iona l waste w ater [500 KLday indu s tria I+ 3 KLday domes tic] g n ra tion from Ethyl acetate

plant is 400 KLJday 4 Out of 503 KL day of a dd iti o nal wastewa te r 100 Being complie d

KLday of cool ing tower blow down effluent shall 100 KLDay wastewater be conveyed to the Central Effluent Treatment generated from cooling tower PI nt for its reuse for gardening irriga tion bl ow down is sent to Central purpose whereas rest of wastewater quantity of Effluent Treatment Plant for its 403 KLday shall be trea ted in the proposed ETP reuse Presently proposed ETP

for EA plant is unde r ons truction stage hence wastewater generated from EA plant is partly treated at Nitro ETP facility within GNFC and rest of the wastewater is sent for treatment at ETL Ankleshwar as per the permission gra nted by GPC B on 25042013

5 The company shall provide full fled ged separate Being complied Effluen t Treatment Plant comprising of the Separate effluent treatment plant primary secondary and tertiary faciliti es for is under construction sta~~

Complied Ethyl Acetate Plant is already commissioned in Novembershy2012 Prese ntly fresh water requirement is 950 KLday

~~~~fertII~~ ~ P O iii fNarmldanagar ~ 1 ~ Pinmiddot392015 III 1j Olsl Bharuch R

~ ~

~Jj 9 bull 9

G ujarat Narmada Valley Fertilizers amp Chemicals Li mi ted

6

7

8

9

10

treatment of the e ffluent from the Ethyl Acetate (EA) Plant This ETP shall be operated regularly and efficiently to achieve the GPCB norms at the outlet

The trea ted e ffluent from the EA Plant ETP shall be discharged into Bhukhi Creek through Guard Pond of the Central ETP

The unit shall provide metering facility at the inlet and outlet of the EA Plant ETP and maintain records of the same

A p rop er logbook of the EA Plant ETP ope ration also showing quality and q uantity of untreated and treated efflue nts chemicals and power consumed in treatment etc shall be maintained and shall be furnished to the GPC B from time to time The company shall develop rain water harvesting structures to harvest the runoff water The same wa ter shall be used for the various activities of the projects to conserve fresh water as well as to recha rge ground water Before rech a rging the surface run off pre treatment must be done to remove s uspend ed ma tter A-2 AIR W ter scrubb er syst m shall b provided for control of acidic vapors from the Acetic Acid Storage Ta nk Stack of adequate s tack height as per the preva iling norms shall be provided for the scrubber The scrubber shall be operated effic iently and effectively to achieve the norms p rescribed by the GPeB a t stack outlet

will be completed by Augustshy2013 Presently effluent generated from Ethyl Acetate plant is partly treated at Nitro ETP within GNFC and rest of the wastewater IS sent to ETL Ankleshwar for treatment a~ per the permIssIO n granted by Gujarat Pollution Control Boa rd on 25042013 which is valid up to 30082013 (Jetter attached as Annexure-T) Will be complied Separate effluent treatment plant is under construction stage and will be completed by Augustshy2013 After commissioning of proposed ETP effluent of EA Plant will be discharged into Bhukhi Creek through Guard Pond of the Central ET P Will be complied Metering facility at inlet and outlet of EA plant ETP will be provided by August-2013 Will be complied After ETP becomes operational Pr sen tly a ll details about effluent sent to ETL are submi tted to GPCB in the mon thly compliance report Complied Company has already developed 36 recharge wells for rainwater harvesting

Complied Water scrubber system (K-3601) is provided for control of acidic vapors from the Acetic Acid Storage Ta nk Stack of adequate stack height as per the prevailing no rms is provided for the scrubber The scrubber is operated effici ently and

Gujarat Narmada Valley Fertilizers amp Chemicals Limited

effectively to achieve the norms prescribed by the GPCB at stack outle t

11 Natura l gas (a dditi ona l 12 Nm3hr) shall be used as fu el in f1are stack of the proposed Ethyl Acetate Plant and adequate stack height as per the prevailing norms shall be provided

Complied Natural gas (additional 12 Nm3hr) is used as fuel in f1are stack of Ethyl Acetate Plant and adequate stack (X-3604) height as per the prevailing norms is provided

12 Flare stack of 59 5 meter with burner at top shall be provided for Ethyl Acetate plant

Complied Flare stack (X-3604) of 595 meter with burner at top IS

provided for Ethyl Acetate plant 13 All the vessels used in the manufacturing process

shall be closed to reduce the fugitive emission Complied All the vessels used in the manufacturing process are closed to reduce the fugitive emission

14 All the storage tanks of f1ammabletoxic chemicals shall be under negative pressure to avoid any exposure or leakage breathers nitrogen blanketing and condensers shall be provided to the s torage ta nks

Complied Condensers in vapor line amp Nitrogen blanketing are provided to the storage tanks

15 All the pumps and equip ments where there is a likelihood leakage shall be adequately equipped w ith leak detection and repair (LDAR) system The company shall provide well defined leak de tec tion and repair program fo r quantification and co ntrol o f fugi t ive emis sionleakages

Com plied Material of construction is well des igned with the material hand led and pumps are provided with mecha nical seal to avoid leakages Leakage are monitored by the online analyzers (5 nos) placed at different locations in the plant and corrective action will be taken

16 Fugitive emission in the work zone environment sha ll be monitored The emission shall be confirmed to the standard prescribed by the concerned authoritie s from time to time

Complied Online analyzers (5 nos) are installed at different locations in the plant

17 Ambien t ai r quality monitor ing shall be carried out as per the CPCB guidelines and its record shall be maintained and furnished to the SElAA amp GPCB fro m time to time If the any stage any poll utan t is found to exceed the prescribed limit necessary add itional control measures shall be p rovided immediately

Complied Ambient air quality monitoring is carried out as per the CPCB guidelines and its record is being regularly submitted to GPCB

A-3 HAZARDOUSlSOLlD WASTE 18 Th company mus t s tric tly comply w ith the rules

and regula tions wi th regards to handling and di sposa l of haza rdous was te in accordance with _

Will be Complied

_ _ ____ ____ ___ -i

Gujarat Narmada Valley Fertilizers amp Chemicals Limited

the hazardous waste (managementhandling and trans boundary movement) Rules 2008 as may be amended from time to time Authorization from the GPCB must be obtained for collectiontrea tmentstorage dis posal of hazardous w astes

19 The hazardous waste shall be stored in separated Being complied designated hazardous waste storage facility with Hazardous waste storage shed is pucca bottom and leachate collection facility under construction and will be before its disposal completed by August-20 13

20 The EA plant ETP s ludge shall be disposed at the Being complied TSDF of BElL Ankleshwar ETP sludge generated from EA

plant ETP will be sent to BElL Ankleshwar by August 201 3

21 The reactor r es idue shall be sent to the com mo n Complied hazardous waste incineration facility of BElL GNFC already have started Ankl eshwar for its disposal by incineration disposal of reactor residue by

incineration at BElL - Ankleshwar since 0405 13 as pe r process requirement

22 The records of the haza rdou s waste generated Being Complied and disposed shall be maintained as per haza rdous waste management and handling rul es

23 Used oi l waste oil shall be sold to only to the Being Complied regi tered recyclers Reused in the gasification process

of existing Ammonia plant 24shy Disca rded con tainersdru ms bagsliners sha ll be Being Complied

sold only to the registered r ecyclers after decontami na tion A-4 Safety

25 The project management shall str ictly comply Complied with the provisions made in Manufacture Storage a nd Im port of Hazardous Chemicals Rules 1989 as amended in 2000 for handling of haza rdous che micals Necessary approval s for the Go vt Authorities shall be obtained before commiss ioni ng of the pro ject if applicable

26 All necessary preca utionary measures shall be Complied taken as per the Factories Act Rules to avoid any kind of accident during storage amp handling of tOXichazardous chem icals

27 Necessa ry flameproof fittings shall be provided in Complied the wo rk area Electrical fitting are provided as

per the area classification 28 Proper ventilation shall be provided in the work Complied

a rea 29 All venting eq ui pment shall have vapour recovery Complied

ujarat Narmada Valley Fertilizers amp Chemicals Limited

system All the pumps a nd other equipments As per point no 15 and a lso where the re is a likelihood of leakages shall be provision for immediate iso lation provided with Leak Detections and Repair of such equipment is provided in (LDAR) system Provision for immediate isolation case of a leakage of such equipment in case of a leakage shall also be made The detector sensitivity shall be in ppm levels

30 The project management shall prepare a detailed Complied Disaster Management Plan (DMP) for the project Disaster Management Plan (DM P) as per the guidelines from Directorate of for the project is already included Industrial Sa fety and Health It1 existing onsite and Offsite

emergency plan of GNFC 31 Hazardous materials s torage shall be at an Being Complied

isolated designated locatio n bund dyke walls shall be provided for storage tanks for Hazardous Chemicals

32 Storage and use of haza rdous chem ica ls shall be Noted minimized to the extent possible and all necessary precautions shall be taken to mitigate th e ris k genera ted out of it

33 Storage of hazardous chemicals shall be in Complied multi p le small capacity tanks containers instead Ethyl Acetate three storage tanks of one single large capacity tank for safety of 175 m3 and one storage tank purpose of 3400 m3 capacity are installed

For raw material SDS two storage tanks each of 4207 m3 a re provided All tanks a re provided with all safety p recautions

34 AJI the storage tanks shall be fi tted with Complied I

approp riate controls to avoid any leakages Bunddyke walls shall be provided for storage tanks for hazardous chemicals Close handling sys te m for ch emical s shall be provided

35 Ha ndling a nd charging of the chemicals shall be Noted done in such a man ner that minimal huma n exposure occurs

36 Personal Protective Equipments shall be Noted provided to w orkers and its usage shall be ensured and supervised

37 Fi rst Ai d box and required Antidotes for the First Aid box is made readily chemicals used in the un it shall be made readily available No specific Antidote is available in adequate quantity available Any liquid antacid like

milk of Magnesia is a part of symptomatic treatment for any acidic substance ingestion Same is available in adequate quantity

38 Periodi c tra ini ng sha ll be im parted to all the Noted

G ujarat Narmada Valley Fertilizers amp Chemicals Li mited

workers on safe ty and heal th aspects of chemicals handling

39 Occupational health surveillance of the workers shall be done and its records shall be maintained Pre employment and periodical medical examination for all the workers shall be undertaken as per the Factories Act amp Rules

Being complied

40 Transpor tatio n of hazardous chemicals shall be done as per the provisions of the Motor Vehicle Act amp Rules

Being complied

41 All transporting routes within the factory premise shall have paved roads to minimize splashes and spillages

Complied

A-S NOISE 42 To mini mize the noise pollution the following

noise control measures shall be implemented Selection of any new plant equipment

shall be made with specifica tion of low noise levels

Manufacturerssuppliers of major noise generating machinesequipments like air compressors feeder pumps turbine generators etc shall be instructed to make required design modifications wherever possible before supply and installation to mitigate the noise generation and to comply with the nationalinternational rmiddotegulatory norms with respect to noise generat ion for individual units

Regular maintenance of machinery and vehi les shall be undertaken to reduce the noise impact

No is suppression measures such as enclosures buffers and or protective measures shall be provided

Employees shall be provided with ear protection measures like earplugs or ea rmuffs

Prope r oiling lub rica tion and preventive maintenance shall be carried out of the machineries and equ ipments to reduce nois e generation

Construction equipment generating minimum noise and vibration shall be chose n

Ear plugs andmuffs shall be made compulsory for the construction workers w orki ng near the noise generating acti vit ies machinesLeguipment

Complied

G ujarat Narmada Valley Fe r t ilizers amp Chemicals Limited

-

Vehicles and co nstruction equipment with internal combustion engmes without proper silencer shall not be allowed to operate

Construction equipment meeting the norms specified by ETP Act 1986 shall only be used

Noise control equipment and baffling shall be employed on generators especially when they are operated near the residential and sensitive areas

Noise levels shall be reduced by the use of adequate mufflers on all motorized equipment

43 The overall noise level in and around the plant area shall be kept well within the prescribed standards by providing noise control measures including acoustic insulation hoods silencers enclosures vibration dampers etc on all sources of noise generation The ambient noise levels shall confirm to the standards prescribed under the Environment (Protection) Act and Rules Workplace noise levels for workers shall be as per the Factories Act and Rules

Complied

A-6 ENERGY CONSERVATION

44 The proj ect proponent shall install energy effici ent devices and appliances conforming to th e Burea u of Energy Efficiency no rms

Complied

45 The energy audit shall be conducted at regular inte rvals and the recommendations of the audit report shall be implemented

Being complied

46 The project p roponent shall implement the a pplication of solar energy which shall be utilized as solar ligh ti ng for illumination of common areas lighting of internal roads and passages in add ition to uti liza tion of solar water heating systems

Energy savers are install ed in lighting services

47 The tra nsformers and moto rs shall mini mum effi Cie ncy of 85

have Complied Motors of EFF 1 efficiency class as per IS 12615 are used

48 Var iable freq uency d r ives shall be install ed VFDs have been ordered and its delivery are expecting shortly

49 nergy con servati on measures shall include use of electronic lighting system use of CFL tubes to min imize energy use use of p rogrammable t imers fo r pumping system and lighting water level controllers for water centralized

Complied Energy savers are installed in lighting services Instrument controllers with DCS operation

pumps are provided Centralized cooling cooling etc are prOVided

Guja rat Narmada Valley Fertilizers amp ChemicHls Limited

50 Energy saving practices as follows shall be Noted practiced

Constant monitoring of energy consumption and defining targets for energy onservation

Adjusting the setting and illumination Implemented levels to ensure minimum energy used for desired comfort level

Use of solar cells for lighting Energy savers are installed

Use of solar water heater fo r canteen amp washing area

Proper load factor shall be maintained by the unit

Provision of day light roof to utilize maximum natural light in the production plant instead of electr ical li ghting

Use of electronic ballast to save energy

Use of automatic switching system for lighting and water tank pumping system

To the maximum extent possible and technically feasible energy equipment like motors pumps air conditioning systems shall be selected

Capacitor bank installed at MRS to improve load factor Implemented

Implemented Implemented

Refer poi nt no 47 for motors

Gravity f10w shall be preferred wherever Noted possib le to save pumping energy

Promoting awareness on energy conservation Training is imparted to all the

i r in ing to s ta ff on methods of energy employe s conservation and to be vigilant for the sam e

A6 CLEANER PRODUCTION AND WASTE MINIMISATION

51 The company shall undertake the Cleaner Production Assessment study through a reputed insti tuteorganization and shall form a CP team in the company The recomm endations thereof a long w ith the compliance shall be furnished to the GPCB

It will be explored

52 The unit shall al so undertake following waste m inimization m easures a) Mete ring and control of quantities of active

ingredi en ts to minimize waste b) Us of automated and enclosed filling to

minimize s pillage c) Reuse of by-p roducts from the process as raw

materials d) Ve nting equipment through vapour recovery

sys tem

Being complied

e) Use of high pressure hoses for _e_-u_i--pm_e_n_t--shy_ _ __---t~~r~eftIle~~~_4__~-----

q~o ~rot(~_aOt Co 3 ~ W~~1f)~ _ O 0 ( Co n ~ ~ 061 III 0 shy~ ~

1~ernJ ~ ~

Gujarat Narmada Valley Fertilizers amp Chemicals Limited

clean ing to reduce wastewater generation f) Use of close feed system into batch reactors A-7 GREENBELT AND OTHER PLANTATION

53 The company shall develop green belt within the premises as per CPCB guidelines

On World Environment Dayshy2013 GNFC has planted 200 nos of trees in nearby area of Ethyl Acetate plant This is ongOing process and more plantation is planned during the year 2013-14

54 The unit shall al s o ta ke up adequate plantation at Note d suitable open land on road sides and other open areas in Bharuch GIDC nearby villages or schools in consultation with GPCB and submit an action plan for the same for next three years to the GPCB GENERAL CONDITIONS

55 In the event of failure of any pollution control system adopted by the unit the unit shall be

Note d

safely closed down and shall until the desired efficiency equipment has been achieved

not of

be restarted the control

56 The project management shall ensure that unit complies with all the environment protection meJs ures risk mitigation measures amp safeguards recommended in the EIA EMP report and as

Noted

57

58

propo sed by them

A separate Enviro nment Management Cell equ ip ped with full fledged laboratory facilities shall be set up to carry out the Environment Managemen t and Monito r ing fun ctions The funds ea rmarked for environment protection measures shall be maintained in a separate account and there shall not be any diversion of these fun ds fo r any other purpose A year-wise

Being complied

Noted

expenditure on environmental safeguards shall

59

60

be reported The company shall take up necessary socioshyecono mic upliftment activities as Corporate Soci I Responsibility and shall submit list of activi t ies with annual budget allocation to the SEIAA Pucca flooringim pervious layer shall be provided in the work a reas chemical storage area and chem ical ha ndling areas to minimize

Already s u bmitted

Complied

so il contam ination

61 Leakag s fro m the pipes pumps shall be minimal and if occurs shall b e a rrested prom ptly

Noted

62 During ma terial transfer spillages shall be Noted ~ ize~

I l 0 c~ 10 ~ l~~~~-

r gt~ ~~tl lt-~ omiddot Q ~ - ~ ~~ ~~~ Vc r

1I1lgt -Jr c ~

C ujarat Narmada Valley Fertilizers amp Chemicals Limited

avoided and garland drain be constructed to avoid mixing of accidental spillages with domes tic wastewater or storm water

63 The applicant shall also comply with any Noted additional condition that may be imposed by the SEAC or the SEIAA or any other competent authority for the purpose of the environmental protection and management

64 No further expansion of modifications in the Noted plant shall be carried out without prior approval of the MoEF jSEIAAjSEAC for clearance a fresh reference shall be made to the SEIAAjSEAC to assess the adequacy of conditions imposed and to add additional environmental protection measures req uired if any

65 The project authorities shall earmark adequate Noted fund s to implement the conditions stipulated by SEIAA as well as GPCB along with the implementation schedule for all the conditions stipulated herein The funds so provided shall not be diverted for any other purpose

66 The applicant shall inform the public that the Complied project has been accorded environmental clearance by the SEIAA and that the copies of the clearance letter are available with the GPCB and may also be seen at the website of SElAAjS EACjGPCB This shall be advertised withi n seven days fro m the date of the clearance lett r in at least two local newspapers that are widely circulated in the region one of which shall be in the Gujarati language and the other in Engli sh A copy each of the same shall be fo rward ed to the concerned Regional Office of the Mini st ry

67 It shall be mandatory for the project management Being complied to sub mit half-yearly compliance report in respect of the stipulated prior environmental clea rance terms and conditions in hard and soft copies to the regulatory authority concerned on 1st June and 1st December of ea ch calendar year

68 The pro ject authorities shall also adhere to the Noted stip ulations made by the Gujarat Pollution

69

Control Board

The project autho ri ties shall inform the GPCB Regio nal Office of MoEF and SEIAA a bout the date of financial closure and final approval of the proj ect by the concerned authorities and the date of start of the projec t

Complie d

-

G ujarat Narmada Valley Fertilizers amp hemica is Lim ited

70 The SEIAA may revoke or suspend the cleara nce if implementation of any of the above conditions is not found satis factory

Noted

71 The above cond itions sha ll be enforced inter-alia under the provision of the Water (Prevention amp Control of Pollution) Act 1974 Air (Prevention amp Control of Pollution) Act 1981 the Environment (Protection) Act 1986 Hazardous wastes (Management Handling and Transboundary Movement) Rules 2008 and the Public Liability Insurance Act 1991 along with their amendments and rules

Noted

72 Th is Environmental Clearance is valid for five years from the date of issue

Noted

t-1 11 eftoe-rGUJARAT POLLUTIO CONTROL BOARD

PARYAVARAN BHAVAN Sector 10-A Gandh inagar 382010

Phone (079) 23226295 Fax (079 ) 23232156

14 4 ~zebs ite wwwgpcbgovin

l[ct ~ 2 5 AP[ 2013

itsect)J l rs~ SG Igtft

~ iai ltA ~ Wc[1

cr1lE laiJ l lt (l- ~4

~ (l~ u-3 ( 0 9 Lt

(Ct lt- Nl -toil ~~IlNc1 uc1l oi ctl e2l[ e c1 iffi2G LC-tlcrCoj ZJlulms Jlt 1Hl2G OOILd

(( ETP ETL Afl k lesh wa r) u-Uct ~uQS( ~l 4l ~ fcr1s l c-t Sql E-cH 0Hltgttci

(-Ec4 - 9) ltgtl oil -t l ctl-OS03 0 93

lt)ETL Ankles hwar oil ltl cilO0 3093

3)JJ lfcr1uU S lt a1-uf1V-1l lt~ bl4cn-CI - 2 JJ (9 ) I D I 12193 ~ ( -lcil9009 93

0lS Vol l oll l oU Ethyl Ace la te l(loc CT CC ol l-l9il V-Il-1Clll-ll oUQC1 ~ ltgtl

l~1ltl iJ o-e sl4ltct 2l4 ~Sl-(l-l l W GE(lClrtl vTItllms JtEl 1U~Qoi CTE I CC r l-l [~ll 21 C-t ail~

licl0aj ~fWS~l middot ~Slail ~rwSlt~l -Uo-e lt l s~ (lJufl uSl l-l ratS lC-t SCllal n ct C-tl[Clll-l

~lq(middott

ltgtl -t oil tc(Q(ct -1-[ol lt9V-1lct t2U~ cuS ltgt ct oD Rt k1ci ct s oll-l tl-latl Sltl ltgttlE

~l-1ail (JY~sct ~E(Qtct -1~ atl RttlcJ ltgt oCl~ Cgt6~llqCll aj S ltgt l-1 oil ~uNci ucil at q l e w ec-t

~ill~G -t lo-eaj V-I ltlGls J l1 -1l ~n 200 KLd designa ted b lH ~ct CETP ETL Ankalesh war Uct

~rwSi~1 l- l2 ratSIC-t S Cll euro Cll ll 2 ctcat (JJll ~ wlt0 qy ctl 3 OOC lt09 3 ltgtuCll 0l llt oil

(1lcreaU ETP ~ L~ W4 ~l ~tfi ( ~ q~Cj 5[lt ct ) ltgtl-1 (GNFC Ltd) ~ l1~ otl-1qlll ltgtlQ 19

btl Y~ltl fiiZlLai des ignated Tan ker man ifest system (C-iJt (~centcJ (u~ o6Jltl~) Gps sy stem

ctltl ~ l~-ll~~lat f(lzH 01 C1Qlol cil-U tlct ~ l 0~ Annexure -A l l-ll0ol ~l~cil V-IIWoi ltgtl

l~~ ltgtl-1Ql ll ott q t3

~Slt Llt l llS per P L L Act 1991 ~ciJlci PLI iolicy iUlQqlol(8~ ltgt~ ctafloi 5C-t JJ~ lci

l~l~l ratcil ~L uU~~ ltgtl-1Cllol (()~

Cleal1 Gujarat Green Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organisa ti on

GUJARAT POLLUTIO CONTROL BOARD PA RYAVARAN BHAVAN

Sector 10-A Gandhinagar 382010 Phone (079 ) 23226295

(l t Jl v~ 6Xt~r ~~il ~~~~3~~156GPCB Gl~8ct ~ l( rtlllW ~tSltl Wpoundl ~l( cil l-llW webslfe wwwgpcbgov1n tgt1vcuol vSc ttrtl 0Ul(Dct tt~~

jc(lct J f( tt~l fa1Gi t~l V1lSoil oili 0~ CJct laquoc~aNl

~ LJ

(S1 i~l 6l ~ )

ltTtl ltS 0~ W81-lltTtl ctSl

(0l l~l - Ann xure - A

atS C1 ( CJ loil shy

9 ~l ~~ S 0(D Sl ~ J6lt lt ~~ tt~l raici ~l vUSoil (l ~v 61 ~l tH~ ctW Gl ~h ct uluct

~Fllaj I-llcC (bl sit u( ampCJlC 4l~d1 0l l~ll

( un ( ltjRc

Cleal1 Gujarat Greer~ Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organ isation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15

    middotGujarat Narmada Valley Fertilizers amp Chemicals Limited (An ISO 14001 amp OHSAS 18001 Company)

    PO Narmadanagar - 392 015 Olst Bharuch Gujarat India Ph (02642) 247001 247002

    Website www gnlcin

    CC TO 1 Shri B R Naidu Hon Zonal Officer Central Pollution Control Board Parivesh Bhava n

    Opp VMC w ard office No10

    Subhanpura

    Vado dara-39 002 3

    2 Hon Member Secretary State Level Environment Impac t Assessment Authority

    Gujarat Pollution Control Board

    Paryava ran Bhavan

    Sector-lOA Gandhin agar-3 8 20l0

    3 Shri Hardik Shah Hon Member Secretary Gujarat Pollution Control Board Paryavaran Bhavan

    Sector-lOA Gandhinagar-3820l0

    1

    Gujara l armada Valley Fertilizers amp Chemiclts Limited

    24th June-2013

    Compliance status report of Environmental Clearance No SEIAAGUJEC5(f)1072011 dated 09062011

    SubEnvironmental Clearance for the proposed Ethyl Acetate plant (capdci~y

    50OOOMTyear) within the existing complex located a t National Highvvay No8 Notified Industrial area PO Narmadanagar Bharuch by Ms Gujarat Narmada Va ll ey Fertilizers Company Limited in category Set] of schedule annexed with EIA Notification dated 14092006

    SR CONDITIONS I COMPLIANCE STATUS NO

    A SPECIFlC CO NDITIONS A- l WATER No ground ivater shall be used fo r th e proj ect Additional fresh water requirement of 1093 KLday for the proposed ex pansion shall be insta lled and its records shall be maintained

    A di stillation column sha ll be installed to recover Complied Ethanol Ethyl Acetate amp Acetic Acid from wash Distillation column (0 3602) IS

    eft1uent and the recovered Ethanol Ethyl Ace tate already installed amp commissioned middot amp Acetic Acid shall be reused in the process The for recovery of ethanol Ethyl co mpany shall continuously thrive to reduce acetate and Acetic acid from vvash recycle and reuse their treated effluent effluent

    3 Additio na l was te wat r gene rati n due to the Complied p roposed expa ns io n sha ll no t exceed 503 KLday Pres ntly addit iona l waste w ater [500 KLday indu s tria I+ 3 KLday domes tic] g n ra tion from Ethyl acetate

    plant is 400 KLJday 4 Out of 503 KL day of a dd iti o nal wastewa te r 100 Being complie d

    KLday of cool ing tower blow down effluent shall 100 KLDay wastewater be conveyed to the Central Effluent Treatment generated from cooling tower PI nt for its reuse for gardening irriga tion bl ow down is sent to Central purpose whereas rest of wastewater quantity of Effluent Treatment Plant for its 403 KLday shall be trea ted in the proposed ETP reuse Presently proposed ETP

    for EA plant is unde r ons truction stage hence wastewater generated from EA plant is partly treated at Nitro ETP facility within GNFC and rest of the wastewater is sent for treatment at ETL Ankleshwar as per the permission gra nted by GPC B on 25042013

    5 The company shall provide full fled ged separate Being complied Effluen t Treatment Plant comprising of the Separate effluent treatment plant primary secondary and tertiary faciliti es for is under construction sta~~

    Complied Ethyl Acetate Plant is already commissioned in Novembershy2012 Prese ntly fresh water requirement is 950 KLday

    ~~~~fertII~~ ~ P O iii fNarmldanagar ~ 1 ~ Pinmiddot392015 III 1j Olsl Bharuch R

    ~ ~

    ~Jj 9 bull 9

    G ujarat Narmada Valley Fertilizers amp Chemicals Li mi ted

    6

    7

    8

    9

    10

    treatment of the e ffluent from the Ethyl Acetate (EA) Plant This ETP shall be operated regularly and efficiently to achieve the GPCB norms at the outlet

    The trea ted e ffluent from the EA Plant ETP shall be discharged into Bhukhi Creek through Guard Pond of the Central ETP

    The unit shall provide metering facility at the inlet and outlet of the EA Plant ETP and maintain records of the same

    A p rop er logbook of the EA Plant ETP ope ration also showing quality and q uantity of untreated and treated efflue nts chemicals and power consumed in treatment etc shall be maintained and shall be furnished to the GPC B from time to time The company shall develop rain water harvesting structures to harvest the runoff water The same wa ter shall be used for the various activities of the projects to conserve fresh water as well as to recha rge ground water Before rech a rging the surface run off pre treatment must be done to remove s uspend ed ma tter A-2 AIR W ter scrubb er syst m shall b provided for control of acidic vapors from the Acetic Acid Storage Ta nk Stack of adequate s tack height as per the preva iling norms shall be provided for the scrubber The scrubber shall be operated effic iently and effectively to achieve the norms p rescribed by the GPeB a t stack outlet

    will be completed by Augustshy2013 Presently effluent generated from Ethyl Acetate plant is partly treated at Nitro ETP within GNFC and rest of the wastewater IS sent to ETL Ankleshwar for treatment a~ per the permIssIO n granted by Gujarat Pollution Control Boa rd on 25042013 which is valid up to 30082013 (Jetter attached as Annexure-T) Will be complied Separate effluent treatment plant is under construction stage and will be completed by Augustshy2013 After commissioning of proposed ETP effluent of EA Plant will be discharged into Bhukhi Creek through Guard Pond of the Central ET P Will be complied Metering facility at inlet and outlet of EA plant ETP will be provided by August-2013 Will be complied After ETP becomes operational Pr sen tly a ll details about effluent sent to ETL are submi tted to GPCB in the mon thly compliance report Complied Company has already developed 36 recharge wells for rainwater harvesting

    Complied Water scrubber system (K-3601) is provided for control of acidic vapors from the Acetic Acid Storage Ta nk Stack of adequate stack height as per the prevailing no rms is provided for the scrubber The scrubber is operated effici ently and

    Gujarat Narmada Valley Fertilizers amp Chemicals Limited

    effectively to achieve the norms prescribed by the GPCB at stack outle t

    11 Natura l gas (a dditi ona l 12 Nm3hr) shall be used as fu el in f1are stack of the proposed Ethyl Acetate Plant and adequate stack height as per the prevailing norms shall be provided

    Complied Natural gas (additional 12 Nm3hr) is used as fuel in f1are stack of Ethyl Acetate Plant and adequate stack (X-3604) height as per the prevailing norms is provided

    12 Flare stack of 59 5 meter with burner at top shall be provided for Ethyl Acetate plant

    Complied Flare stack (X-3604) of 595 meter with burner at top IS

    provided for Ethyl Acetate plant 13 All the vessels used in the manufacturing process

    shall be closed to reduce the fugitive emission Complied All the vessels used in the manufacturing process are closed to reduce the fugitive emission

    14 All the storage tanks of f1ammabletoxic chemicals shall be under negative pressure to avoid any exposure or leakage breathers nitrogen blanketing and condensers shall be provided to the s torage ta nks

    Complied Condensers in vapor line amp Nitrogen blanketing are provided to the storage tanks

    15 All the pumps and equip ments where there is a likelihood leakage shall be adequately equipped w ith leak detection and repair (LDAR) system The company shall provide well defined leak de tec tion and repair program fo r quantification and co ntrol o f fugi t ive emis sionleakages

    Com plied Material of construction is well des igned with the material hand led and pumps are provided with mecha nical seal to avoid leakages Leakage are monitored by the online analyzers (5 nos) placed at different locations in the plant and corrective action will be taken

    16 Fugitive emission in the work zone environment sha ll be monitored The emission shall be confirmed to the standard prescribed by the concerned authoritie s from time to time

    Complied Online analyzers (5 nos) are installed at different locations in the plant

    17 Ambien t ai r quality monitor ing shall be carried out as per the CPCB guidelines and its record shall be maintained and furnished to the SElAA amp GPCB fro m time to time If the any stage any poll utan t is found to exceed the prescribed limit necessary add itional control measures shall be p rovided immediately

    Complied Ambient air quality monitoring is carried out as per the CPCB guidelines and its record is being regularly submitted to GPCB

    A-3 HAZARDOUSlSOLlD WASTE 18 Th company mus t s tric tly comply w ith the rules

    and regula tions wi th regards to handling and di sposa l of haza rdous was te in accordance with _

    Will be Complied

    _ _ ____ ____ ___ -i

    Gujarat Narmada Valley Fertilizers amp Chemicals Limited

    the hazardous waste (managementhandling and trans boundary movement) Rules 2008 as may be amended from time to time Authorization from the GPCB must be obtained for collectiontrea tmentstorage dis posal of hazardous w astes

    19 The hazardous waste shall be stored in separated Being complied designated hazardous waste storage facility with Hazardous waste storage shed is pucca bottom and leachate collection facility under construction and will be before its disposal completed by August-20 13

    20 The EA plant ETP s ludge shall be disposed at the Being complied TSDF of BElL Ankleshwar ETP sludge generated from EA

    plant ETP will be sent to BElL Ankleshwar by August 201 3

    21 The reactor r es idue shall be sent to the com mo n Complied hazardous waste incineration facility of BElL GNFC already have started Ankl eshwar for its disposal by incineration disposal of reactor residue by

    incineration at BElL - Ankleshwar since 0405 13 as pe r process requirement

    22 The records of the haza rdou s waste generated Being Complied and disposed shall be maintained as per haza rdous waste management and handling rul es

    23 Used oi l waste oil shall be sold to only to the Being Complied regi tered recyclers Reused in the gasification process

    of existing Ammonia plant 24shy Disca rded con tainersdru ms bagsliners sha ll be Being Complied

    sold only to the registered r ecyclers after decontami na tion A-4 Safety

    25 The project management shall str ictly comply Complied with the provisions made in Manufacture Storage a nd Im port of Hazardous Chemicals Rules 1989 as amended in 2000 for handling of haza rdous che micals Necessary approval s for the Go vt Authorities shall be obtained before commiss ioni ng of the pro ject if applicable

    26 All necessary preca utionary measures shall be Complied taken as per the Factories Act Rules to avoid any kind of accident during storage amp handling of tOXichazardous chem icals

    27 Necessa ry flameproof fittings shall be provided in Complied the wo rk area Electrical fitting are provided as

    per the area classification 28 Proper ventilation shall be provided in the work Complied

    a rea 29 All venting eq ui pment shall have vapour recovery Complied

    ujarat Narmada Valley Fertilizers amp Chemicals Limited

    system All the pumps a nd other equipments As per point no 15 and a lso where the re is a likelihood of leakages shall be provision for immediate iso lation provided with Leak Detections and Repair of such equipment is provided in (LDAR) system Provision for immediate isolation case of a leakage of such equipment in case of a leakage shall also be made The detector sensitivity shall be in ppm levels

    30 The project management shall prepare a detailed Complied Disaster Management Plan (DMP) for the project Disaster Management Plan (DM P) as per the guidelines from Directorate of for the project is already included Industrial Sa fety and Health It1 existing onsite and Offsite

    emergency plan of GNFC 31 Hazardous materials s torage shall be at an Being Complied

    isolated designated locatio n bund dyke walls shall be provided for storage tanks for Hazardous Chemicals

    32 Storage and use of haza rdous chem ica ls shall be Noted minimized to the extent possible and all necessary precautions shall be taken to mitigate th e ris k genera ted out of it

    33 Storage of hazardous chemicals shall be in Complied multi p le small capacity tanks containers instead Ethyl Acetate three storage tanks of one single large capacity tank for safety of 175 m3 and one storage tank purpose of 3400 m3 capacity are installed

    For raw material SDS two storage tanks each of 4207 m3 a re provided All tanks a re provided with all safety p recautions

    34 AJI the storage tanks shall be fi tted with Complied I

    approp riate controls to avoid any leakages Bunddyke walls shall be provided for storage tanks for hazardous chemicals Close handling sys te m for ch emical s shall be provided

    35 Ha ndling a nd charging of the chemicals shall be Noted done in such a man ner that minimal huma n exposure occurs

    36 Personal Protective Equipments shall be Noted provided to w orkers and its usage shall be ensured and supervised

    37 Fi rst Ai d box and required Antidotes for the First Aid box is made readily chemicals used in the un it shall be made readily available No specific Antidote is available in adequate quantity available Any liquid antacid like

    milk of Magnesia is a part of symptomatic treatment for any acidic substance ingestion Same is available in adequate quantity

    38 Periodi c tra ini ng sha ll be im parted to all the Noted

    G ujarat Narmada Valley Fertilizers amp Chemicals Li mited

    workers on safe ty and heal th aspects of chemicals handling

    39 Occupational health surveillance of the workers shall be done and its records shall be maintained Pre employment and periodical medical examination for all the workers shall be undertaken as per the Factories Act amp Rules

    Being complied

    40 Transpor tatio n of hazardous chemicals shall be done as per the provisions of the Motor Vehicle Act amp Rules

    Being complied

    41 All transporting routes within the factory premise shall have paved roads to minimize splashes and spillages

    Complied

    A-S NOISE 42 To mini mize the noise pollution the following

    noise control measures shall be implemented Selection of any new plant equipment

    shall be made with specifica tion of low noise levels

    Manufacturerssuppliers of major noise generating machinesequipments like air compressors feeder pumps turbine generators etc shall be instructed to make required design modifications wherever possible before supply and installation to mitigate the noise generation and to comply with the nationalinternational rmiddotegulatory norms with respect to noise generat ion for individual units

    Regular maintenance of machinery and vehi les shall be undertaken to reduce the noise impact

    No is suppression measures such as enclosures buffers and or protective measures shall be provided

    Employees shall be provided with ear protection measures like earplugs or ea rmuffs

    Prope r oiling lub rica tion and preventive maintenance shall be carried out of the machineries and equ ipments to reduce nois e generation

    Construction equipment generating minimum noise and vibration shall be chose n

    Ear plugs andmuffs shall be made compulsory for the construction workers w orki ng near the noise generating acti vit ies machinesLeguipment

    Complied

    G ujarat Narmada Valley Fe r t ilizers amp Chemicals Limited

    -

    Vehicles and co nstruction equipment with internal combustion engmes without proper silencer shall not be allowed to operate

    Construction equipment meeting the norms specified by ETP Act 1986 shall only be used

    Noise control equipment and baffling shall be employed on generators especially when they are operated near the residential and sensitive areas

    Noise levels shall be reduced by the use of adequate mufflers on all motorized equipment

    43 The overall noise level in and around the plant area shall be kept well within the prescribed standards by providing noise control measures including acoustic insulation hoods silencers enclosures vibration dampers etc on all sources of noise generation The ambient noise levels shall confirm to the standards prescribed under the Environment (Protection) Act and Rules Workplace noise levels for workers shall be as per the Factories Act and Rules

    Complied

    A-6 ENERGY CONSERVATION

    44 The proj ect proponent shall install energy effici ent devices and appliances conforming to th e Burea u of Energy Efficiency no rms

    Complied

    45 The energy audit shall be conducted at regular inte rvals and the recommendations of the audit report shall be implemented

    Being complied

    46 The project p roponent shall implement the a pplication of solar energy which shall be utilized as solar ligh ti ng for illumination of common areas lighting of internal roads and passages in add ition to uti liza tion of solar water heating systems

    Energy savers are install ed in lighting services

    47 The tra nsformers and moto rs shall mini mum effi Cie ncy of 85

    have Complied Motors of EFF 1 efficiency class as per IS 12615 are used

    48 Var iable freq uency d r ives shall be install ed VFDs have been ordered and its delivery are expecting shortly

    49 nergy con servati on measures shall include use of electronic lighting system use of CFL tubes to min imize energy use use of p rogrammable t imers fo r pumping system and lighting water level controllers for water centralized

    Complied Energy savers are installed in lighting services Instrument controllers with DCS operation

    pumps are provided Centralized cooling cooling etc are prOVided

    Guja rat Narmada Valley Fertilizers amp ChemicHls Limited

    50 Energy saving practices as follows shall be Noted practiced

    Constant monitoring of energy consumption and defining targets for energy onservation

    Adjusting the setting and illumination Implemented levels to ensure minimum energy used for desired comfort level

    Use of solar cells for lighting Energy savers are installed

    Use of solar water heater fo r canteen amp washing area

    Proper load factor shall be maintained by the unit

    Provision of day light roof to utilize maximum natural light in the production plant instead of electr ical li ghting

    Use of electronic ballast to save energy

    Use of automatic switching system for lighting and water tank pumping system

    To the maximum extent possible and technically feasible energy equipment like motors pumps air conditioning systems shall be selected

    Capacitor bank installed at MRS to improve load factor Implemented

    Implemented Implemented

    Refer poi nt no 47 for motors

    Gravity f10w shall be preferred wherever Noted possib le to save pumping energy

    Promoting awareness on energy conservation Training is imparted to all the

    i r in ing to s ta ff on methods of energy employe s conservation and to be vigilant for the sam e

    A6 CLEANER PRODUCTION AND WASTE MINIMISATION

    51 The company shall undertake the Cleaner Production Assessment study through a reputed insti tuteorganization and shall form a CP team in the company The recomm endations thereof a long w ith the compliance shall be furnished to the GPCB

    It will be explored

    52 The unit shall al so undertake following waste m inimization m easures a) Mete ring and control of quantities of active

    ingredi en ts to minimize waste b) Us of automated and enclosed filling to

    minimize s pillage c) Reuse of by-p roducts from the process as raw

    materials d) Ve nting equipment through vapour recovery

    sys tem

    Being complied

    e) Use of high pressure hoses for _e_-u_i--pm_e_n_t--shy_ _ __---t~~r~eftIle~~~_4__~-----

    q~o ~rot(~_aOt Co 3 ~ W~~1f)~ _ O 0 ( Co n ~ ~ 061 III 0 shy~ ~

    1~ernJ ~ ~

    Gujarat Narmada Valley Fertilizers amp Chemicals Limited

    clean ing to reduce wastewater generation f) Use of close feed system into batch reactors A-7 GREENBELT AND OTHER PLANTATION

    53 The company shall develop green belt within the premises as per CPCB guidelines

    On World Environment Dayshy2013 GNFC has planted 200 nos of trees in nearby area of Ethyl Acetate plant This is ongOing process and more plantation is planned during the year 2013-14

    54 The unit shall al s o ta ke up adequate plantation at Note d suitable open land on road sides and other open areas in Bharuch GIDC nearby villages or schools in consultation with GPCB and submit an action plan for the same for next three years to the GPCB GENERAL CONDITIONS

    55 In the event of failure of any pollution control system adopted by the unit the unit shall be

    Note d

    safely closed down and shall until the desired efficiency equipment has been achieved

    not of

    be restarted the control

    56 The project management shall ensure that unit complies with all the environment protection meJs ures risk mitigation measures amp safeguards recommended in the EIA EMP report and as

    Noted

    57

    58

    propo sed by them

    A separate Enviro nment Management Cell equ ip ped with full fledged laboratory facilities shall be set up to carry out the Environment Managemen t and Monito r ing fun ctions The funds ea rmarked for environment protection measures shall be maintained in a separate account and there shall not be any diversion of these fun ds fo r any other purpose A year-wise

    Being complied

    Noted

    expenditure on environmental safeguards shall

    59

    60

    be reported The company shall take up necessary socioshyecono mic upliftment activities as Corporate Soci I Responsibility and shall submit list of activi t ies with annual budget allocation to the SEIAA Pucca flooringim pervious layer shall be provided in the work a reas chemical storage area and chem ical ha ndling areas to minimize

    Already s u bmitted

    Complied

    so il contam ination

    61 Leakag s fro m the pipes pumps shall be minimal and if occurs shall b e a rrested prom ptly

    Noted

    62 During ma terial transfer spillages shall be Noted ~ ize~

    I l 0 c~ 10 ~ l~~~~-

    r gt~ ~~tl lt-~ omiddot Q ~ - ~ ~~ ~~~ Vc r

    1I1lgt -Jr c ~

    C ujarat Narmada Valley Fertilizers amp Chemicals Limited

    avoided and garland drain be constructed to avoid mixing of accidental spillages with domes tic wastewater or storm water

    63 The applicant shall also comply with any Noted additional condition that may be imposed by the SEAC or the SEIAA or any other competent authority for the purpose of the environmental protection and management

    64 No further expansion of modifications in the Noted plant shall be carried out without prior approval of the MoEF jSEIAAjSEAC for clearance a fresh reference shall be made to the SEIAAjSEAC to assess the adequacy of conditions imposed and to add additional environmental protection measures req uired if any

    65 The project authorities shall earmark adequate Noted fund s to implement the conditions stipulated by SEIAA as well as GPCB along with the implementation schedule for all the conditions stipulated herein The funds so provided shall not be diverted for any other purpose

    66 The applicant shall inform the public that the Complied project has been accorded environmental clearance by the SEIAA and that the copies of the clearance letter are available with the GPCB and may also be seen at the website of SElAAjS EACjGPCB This shall be advertised withi n seven days fro m the date of the clearance lett r in at least two local newspapers that are widely circulated in the region one of which shall be in the Gujarati language and the other in Engli sh A copy each of the same shall be fo rward ed to the concerned Regional Office of the Mini st ry

    67 It shall be mandatory for the project management Being complied to sub mit half-yearly compliance report in respect of the stipulated prior environmental clea rance terms and conditions in hard and soft copies to the regulatory authority concerned on 1st June and 1st December of ea ch calendar year

    68 The pro ject authorities shall also adhere to the Noted stip ulations made by the Gujarat Pollution

    69

    Control Board

    The project autho ri ties shall inform the GPCB Regio nal Office of MoEF and SEIAA a bout the date of financial closure and final approval of the proj ect by the concerned authorities and the date of start of the projec t

    Complie d

    -

    G ujarat Narmada Valley Fertilizers amp hemica is Lim ited

    70 The SEIAA may revoke or suspend the cleara nce if implementation of any of the above conditions is not found satis factory

    Noted

    71 The above cond itions sha ll be enforced inter-alia under the provision of the Water (Prevention amp Control of Pollution) Act 1974 Air (Prevention amp Control of Pollution) Act 1981 the Environment (Protection) Act 1986 Hazardous wastes (Management Handling and Transboundary Movement) Rules 2008 and the Public Liability Insurance Act 1991 along with their amendments and rules

    Noted

    72 Th is Environmental Clearance is valid for five years from the date of issue

    Noted

    t-1 11 eftoe-rGUJARAT POLLUTIO CONTROL BOARD

    PARYAVARAN BHAVAN Sector 10-A Gandh inagar 382010

    Phone (079) 23226295 Fax (079 ) 23232156

    14 4 ~zebs ite wwwgpcbgovin

    l[ct ~ 2 5 AP[ 2013

    itsect)J l rs~ SG Igtft

    ~ iai ltA ~ Wc[1

    cr1lE laiJ l lt (l- ~4

    ~ (l~ u-3 ( 0 9 Lt

    (Ct lt- Nl -toil ~~IlNc1 uc1l oi ctl e2l[ e c1 iffi2G LC-tlcrCoj ZJlulms Jlt 1Hl2G OOILd

    (( ETP ETL Afl k lesh wa r) u-Uct ~uQS( ~l 4l ~ fcr1s l c-t Sql E-cH 0Hltgttci

    (-Ec4 - 9) ltgtl oil -t l ctl-OS03 0 93

    lt)ETL Ankles hwar oil ltl cilO0 3093

    3)JJ lfcr1uU S lt a1-uf1V-1l lt~ bl4cn-CI - 2 JJ (9 ) I D I 12193 ~ ( -lcil9009 93

    0lS Vol l oll l oU Ethyl Ace la te l(loc CT CC ol l-l9il V-Il-1Clll-ll oUQC1 ~ ltgtl

    l~1ltl iJ o-e sl4ltct 2l4 ~Sl-(l-l l W GE(lClrtl vTItllms JtEl 1U~Qoi CTE I CC r l-l [~ll 21 C-t ail~

    licl0aj ~fWS~l middot ~Slail ~rwSlt~l -Uo-e lt l s~ (lJufl uSl l-l ratS lC-t SCllal n ct C-tl[Clll-l

    ~lq(middott

    ltgtl -t oil tc(Q(ct -1-[ol lt9V-1lct t2U~ cuS ltgt ct oD Rt k1ci ct s oll-l tl-latl Sltl ltgttlE

    ~l-1ail (JY~sct ~E(Qtct -1~ atl RttlcJ ltgt oCl~ Cgt6~llqCll aj S ltgt l-1 oil ~uNci ucil at q l e w ec-t

    ~ill~G -t lo-eaj V-I ltlGls J l1 -1l ~n 200 KLd designa ted b lH ~ct CETP ETL Ankalesh war Uct

    ~rwSi~1 l- l2 ratSIC-t S Cll euro Cll ll 2 ctcat (JJll ~ wlt0 qy ctl 3 OOC lt09 3 ltgtuCll 0l llt oil

    (1lcreaU ETP ~ L~ W4 ~l ~tfi ( ~ q~Cj 5[lt ct ) ltgtl-1 (GNFC Ltd) ~ l1~ otl-1qlll ltgtlQ 19

    btl Y~ltl fiiZlLai des ignated Tan ker man ifest system (C-iJt (~centcJ (u~ o6Jltl~) Gps sy stem

    ctltl ~ l~-ll~~lat f(lzH 01 C1Qlol cil-U tlct ~ l 0~ Annexure -A l l-ll0ol ~l~cil V-IIWoi ltgtl

    l~~ ltgtl-1Ql ll ott q t3

    ~Slt Llt l llS per P L L Act 1991 ~ciJlci PLI iolicy iUlQqlol(8~ ltgt~ ctafloi 5C-t JJ~ lci

    l~l~l ratcil ~L uU~~ ltgtl-1Cllol (()~

    Cleal1 Gujarat Green Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organisa ti on

    GUJARAT POLLUTIO CONTROL BOARD PA RYAVARAN BHAVAN

    Sector 10-A Gandhinagar 382010 Phone (079 ) 23226295

    (l t Jl v~ 6Xt~r ~~il ~~~~3~~156GPCB Gl~8ct ~ l( rtlllW ~tSltl Wpoundl ~l( cil l-llW webslfe wwwgpcbgov1n tgt1vcuol vSc ttrtl 0Ul(Dct tt~~

    jc(lct J f( tt~l fa1Gi t~l V1lSoil oili 0~ CJct laquoc~aNl

    ~ LJ

    (S1 i~l 6l ~ )

    ltTtl ltS 0~ W81-lltTtl ctSl

    (0l l~l - Ann xure - A

    atS C1 ( CJ loil shy

    9 ~l ~~ S 0(D Sl ~ J6lt lt ~~ tt~l raici ~l vUSoil (l ~v 61 ~l tH~ ctW Gl ~h ct uluct

    ~Fllaj I-llcC (bl sit u( ampCJlC 4l~d1 0l l~ll

    ( un ( ltjRc

    Cleal1 Gujarat Greer~ Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organ isation

    • 1
    • 2
    • 3
    • 4
    • 5
    • 6
    • 7
    • 8
    • 9
    • 10
    • 11
    • 12
    • 13
    • 14
    • 15

      1

      Gujara l armada Valley Fertilizers amp Chemiclts Limited

      24th June-2013

      Compliance status report of Environmental Clearance No SEIAAGUJEC5(f)1072011 dated 09062011

      SubEnvironmental Clearance for the proposed Ethyl Acetate plant (capdci~y

      50OOOMTyear) within the existing complex located a t National Highvvay No8 Notified Industrial area PO Narmadanagar Bharuch by Ms Gujarat Narmada Va ll ey Fertilizers Company Limited in category Set] of schedule annexed with EIA Notification dated 14092006

      SR CONDITIONS I COMPLIANCE STATUS NO

      A SPECIFlC CO NDITIONS A- l WATER No ground ivater shall be used fo r th e proj ect Additional fresh water requirement of 1093 KLday for the proposed ex pansion shall be insta lled and its records shall be maintained

      A di stillation column sha ll be installed to recover Complied Ethanol Ethyl Acetate amp Acetic Acid from wash Distillation column (0 3602) IS

      eft1uent and the recovered Ethanol Ethyl Ace tate already installed amp commissioned middot amp Acetic Acid shall be reused in the process The for recovery of ethanol Ethyl co mpany shall continuously thrive to reduce acetate and Acetic acid from vvash recycle and reuse their treated effluent effluent

      3 Additio na l was te wat r gene rati n due to the Complied p roposed expa ns io n sha ll no t exceed 503 KLday Pres ntly addit iona l waste w ater [500 KLday indu s tria I+ 3 KLday domes tic] g n ra tion from Ethyl acetate

      plant is 400 KLJday 4 Out of 503 KL day of a dd iti o nal wastewa te r 100 Being complie d

      KLday of cool ing tower blow down effluent shall 100 KLDay wastewater be conveyed to the Central Effluent Treatment generated from cooling tower PI nt for its reuse for gardening irriga tion bl ow down is sent to Central purpose whereas rest of wastewater quantity of Effluent Treatment Plant for its 403 KLday shall be trea ted in the proposed ETP reuse Presently proposed ETP

      for EA plant is unde r ons truction stage hence wastewater generated from EA plant is partly treated at Nitro ETP facility within GNFC and rest of the wastewater is sent for treatment at ETL Ankleshwar as per the permission gra nted by GPC B on 25042013

      5 The company shall provide full fled ged separate Being complied Effluen t Treatment Plant comprising of the Separate effluent treatment plant primary secondary and tertiary faciliti es for is under construction sta~~

      Complied Ethyl Acetate Plant is already commissioned in Novembershy2012 Prese ntly fresh water requirement is 950 KLday

      ~~~~fertII~~ ~ P O iii fNarmldanagar ~ 1 ~ Pinmiddot392015 III 1j Olsl Bharuch R

      ~ ~

      ~Jj 9 bull 9

      G ujarat Narmada Valley Fertilizers amp Chemicals Li mi ted

      6

      7

      8

      9

      10

      treatment of the e ffluent from the Ethyl Acetate (EA) Plant This ETP shall be operated regularly and efficiently to achieve the GPCB norms at the outlet

      The trea ted e ffluent from the EA Plant ETP shall be discharged into Bhukhi Creek through Guard Pond of the Central ETP

      The unit shall provide metering facility at the inlet and outlet of the EA Plant ETP and maintain records of the same

      A p rop er logbook of the EA Plant ETP ope ration also showing quality and q uantity of untreated and treated efflue nts chemicals and power consumed in treatment etc shall be maintained and shall be furnished to the GPC B from time to time The company shall develop rain water harvesting structures to harvest the runoff water The same wa ter shall be used for the various activities of the projects to conserve fresh water as well as to recha rge ground water Before rech a rging the surface run off pre treatment must be done to remove s uspend ed ma tter A-2 AIR W ter scrubb er syst m shall b provided for control of acidic vapors from the Acetic Acid Storage Ta nk Stack of adequate s tack height as per the preva iling norms shall be provided for the scrubber The scrubber shall be operated effic iently and effectively to achieve the norms p rescribed by the GPeB a t stack outlet

      will be completed by Augustshy2013 Presently effluent generated from Ethyl Acetate plant is partly treated at Nitro ETP within GNFC and rest of the wastewater IS sent to ETL Ankleshwar for treatment a~ per the permIssIO n granted by Gujarat Pollution Control Boa rd on 25042013 which is valid up to 30082013 (Jetter attached as Annexure-T) Will be complied Separate effluent treatment plant is under construction stage and will be completed by Augustshy2013 After commissioning of proposed ETP effluent of EA Plant will be discharged into Bhukhi Creek through Guard Pond of the Central ET P Will be complied Metering facility at inlet and outlet of EA plant ETP will be provided by August-2013 Will be complied After ETP becomes operational Pr sen tly a ll details about effluent sent to ETL are submi tted to GPCB in the mon thly compliance report Complied Company has already developed 36 recharge wells for rainwater harvesting

      Complied Water scrubber system (K-3601) is provided for control of acidic vapors from the Acetic Acid Storage Ta nk Stack of adequate stack height as per the prevailing no rms is provided for the scrubber The scrubber is operated effici ently and

      Gujarat Narmada Valley Fertilizers amp Chemicals Limited

      effectively to achieve the norms prescribed by the GPCB at stack outle t

      11 Natura l gas (a dditi ona l 12 Nm3hr) shall be used as fu el in f1are stack of the proposed Ethyl Acetate Plant and adequate stack height as per the prevailing norms shall be provided

      Complied Natural gas (additional 12 Nm3hr) is used as fuel in f1are stack of Ethyl Acetate Plant and adequate stack (X-3604) height as per the prevailing norms is provided

      12 Flare stack of 59 5 meter with burner at top shall be provided for Ethyl Acetate plant

      Complied Flare stack (X-3604) of 595 meter with burner at top IS

      provided for Ethyl Acetate plant 13 All the vessels used in the manufacturing process

      shall be closed to reduce the fugitive emission Complied All the vessels used in the manufacturing process are closed to reduce the fugitive emission

      14 All the storage tanks of f1ammabletoxic chemicals shall be under negative pressure to avoid any exposure or leakage breathers nitrogen blanketing and condensers shall be provided to the s torage ta nks

      Complied Condensers in vapor line amp Nitrogen blanketing are provided to the storage tanks

      15 All the pumps and equip ments where there is a likelihood leakage shall be adequately equipped w ith leak detection and repair (LDAR) system The company shall provide well defined leak de tec tion and repair program fo r quantification and co ntrol o f fugi t ive emis sionleakages

      Com plied Material of construction is well des igned with the material hand led and pumps are provided with mecha nical seal to avoid leakages Leakage are monitored by the online analyzers (5 nos) placed at different locations in the plant and corrective action will be taken

      16 Fugitive emission in the work zone environment sha ll be monitored The emission shall be confirmed to the standard prescribed by the concerned authoritie s from time to time

      Complied Online analyzers (5 nos) are installed at different locations in the plant

      17 Ambien t ai r quality monitor ing shall be carried out as per the CPCB guidelines and its record shall be maintained and furnished to the SElAA amp GPCB fro m time to time If the any stage any poll utan t is found to exceed the prescribed limit necessary add itional control measures shall be p rovided immediately

      Complied Ambient air quality monitoring is carried out as per the CPCB guidelines and its record is being regularly submitted to GPCB

      A-3 HAZARDOUSlSOLlD WASTE 18 Th company mus t s tric tly comply w ith the rules

      and regula tions wi th regards to handling and di sposa l of haza rdous was te in accordance with _

      Will be Complied

      _ _ ____ ____ ___ -i

      Gujarat Narmada Valley Fertilizers amp Chemicals Limited

      the hazardous waste (managementhandling and trans boundary movement) Rules 2008 as may be amended from time to time Authorization from the GPCB must be obtained for collectiontrea tmentstorage dis posal of hazardous w astes

      19 The hazardous waste shall be stored in separated Being complied designated hazardous waste storage facility with Hazardous waste storage shed is pucca bottom and leachate collection facility under construction and will be before its disposal completed by August-20 13

      20 The EA plant ETP s ludge shall be disposed at the Being complied TSDF of BElL Ankleshwar ETP sludge generated from EA

      plant ETP will be sent to BElL Ankleshwar by August 201 3

      21 The reactor r es idue shall be sent to the com mo n Complied hazardous waste incineration facility of BElL GNFC already have started Ankl eshwar for its disposal by incineration disposal of reactor residue by

      incineration at BElL - Ankleshwar since 0405 13 as pe r process requirement

      22 The records of the haza rdou s waste generated Being Complied and disposed shall be maintained as per haza rdous waste management and handling rul es

      23 Used oi l waste oil shall be sold to only to the Being Complied regi tered recyclers Reused in the gasification process

      of existing Ammonia plant 24shy Disca rded con tainersdru ms bagsliners sha ll be Being Complied

      sold only to the registered r ecyclers after decontami na tion A-4 Safety

      25 The project management shall str ictly comply Complied with the provisions made in Manufacture Storage a nd Im port of Hazardous Chemicals Rules 1989 as amended in 2000 for handling of haza rdous che micals Necessary approval s for the Go vt Authorities shall be obtained before commiss ioni ng of the pro ject if applicable

      26 All necessary preca utionary measures shall be Complied taken as per the Factories Act Rules to avoid any kind of accident during storage amp handling of tOXichazardous chem icals

      27 Necessa ry flameproof fittings shall be provided in Complied the wo rk area Electrical fitting are provided as

      per the area classification 28 Proper ventilation shall be provided in the work Complied

      a rea 29 All venting eq ui pment shall have vapour recovery Complied

      ujarat Narmada Valley Fertilizers amp Chemicals Limited

      system All the pumps a nd other equipments As per point no 15 and a lso where the re is a likelihood of leakages shall be provision for immediate iso lation provided with Leak Detections and Repair of such equipment is provided in (LDAR) system Provision for immediate isolation case of a leakage of such equipment in case of a leakage shall also be made The detector sensitivity shall be in ppm levels

      30 The project management shall prepare a detailed Complied Disaster Management Plan (DMP) for the project Disaster Management Plan (DM P) as per the guidelines from Directorate of for the project is already included Industrial Sa fety and Health It1 existing onsite and Offsite

      emergency plan of GNFC 31 Hazardous materials s torage shall be at an Being Complied

      isolated designated locatio n bund dyke walls shall be provided for storage tanks for Hazardous Chemicals

      32 Storage and use of haza rdous chem ica ls shall be Noted minimized to the extent possible and all necessary precautions shall be taken to mitigate th e ris k genera ted out of it

      33 Storage of hazardous chemicals shall be in Complied multi p le small capacity tanks containers instead Ethyl Acetate three storage tanks of one single large capacity tank for safety of 175 m3 and one storage tank purpose of 3400 m3 capacity are installed

      For raw material SDS two storage tanks each of 4207 m3 a re provided All tanks a re provided with all safety p recautions

      34 AJI the storage tanks shall be fi tted with Complied I

      approp riate controls to avoid any leakages Bunddyke walls shall be provided for storage tanks for hazardous chemicals Close handling sys te m for ch emical s shall be provided

      35 Ha ndling a nd charging of the chemicals shall be Noted done in such a man ner that minimal huma n exposure occurs

      36 Personal Protective Equipments shall be Noted provided to w orkers and its usage shall be ensured and supervised

      37 Fi rst Ai d box and required Antidotes for the First Aid box is made readily chemicals used in the un it shall be made readily available No specific Antidote is available in adequate quantity available Any liquid antacid like

      milk of Magnesia is a part of symptomatic treatment for any acidic substance ingestion Same is available in adequate quantity

      38 Periodi c tra ini ng sha ll be im parted to all the Noted

      G ujarat Narmada Valley Fertilizers amp Chemicals Li mited

      workers on safe ty and heal th aspects of chemicals handling

      39 Occupational health surveillance of the workers shall be done and its records shall be maintained Pre employment and periodical medical examination for all the workers shall be undertaken as per the Factories Act amp Rules

      Being complied

      40 Transpor tatio n of hazardous chemicals shall be done as per the provisions of the Motor Vehicle Act amp Rules

      Being complied

      41 All transporting routes within the factory premise shall have paved roads to minimize splashes and spillages

      Complied

      A-S NOISE 42 To mini mize the noise pollution the following

      noise control measures shall be implemented Selection of any new plant equipment

      shall be made with specifica tion of low noise levels

      Manufacturerssuppliers of major noise generating machinesequipments like air compressors feeder pumps turbine generators etc shall be instructed to make required design modifications wherever possible before supply and installation to mitigate the noise generation and to comply with the nationalinternational rmiddotegulatory norms with respect to noise generat ion for individual units

      Regular maintenance of machinery and vehi les shall be undertaken to reduce the noise impact

      No is suppression measures such as enclosures buffers and or protective measures shall be provided

      Employees shall be provided with ear protection measures like earplugs or ea rmuffs

      Prope r oiling lub rica tion and preventive maintenance shall be carried out of the machineries and equ ipments to reduce nois e generation

      Construction equipment generating minimum noise and vibration shall be chose n

      Ear plugs andmuffs shall be made compulsory for the construction workers w orki ng near the noise generating acti vit ies machinesLeguipment

      Complied

      G ujarat Narmada Valley Fe r t ilizers amp Chemicals Limited

      -

      Vehicles and co nstruction equipment with internal combustion engmes without proper silencer shall not be allowed to operate

      Construction equipment meeting the norms specified by ETP Act 1986 shall only be used

      Noise control equipment and baffling shall be employed on generators especially when they are operated near the residential and sensitive areas

      Noise levels shall be reduced by the use of adequate mufflers on all motorized equipment

      43 The overall noise level in and around the plant area shall be kept well within the prescribed standards by providing noise control measures including acoustic insulation hoods silencers enclosures vibration dampers etc on all sources of noise generation The ambient noise levels shall confirm to the standards prescribed under the Environment (Protection) Act and Rules Workplace noise levels for workers shall be as per the Factories Act and Rules

      Complied

      A-6 ENERGY CONSERVATION

      44 The proj ect proponent shall install energy effici ent devices and appliances conforming to th e Burea u of Energy Efficiency no rms

      Complied

      45 The energy audit shall be conducted at regular inte rvals and the recommendations of the audit report shall be implemented

      Being complied

      46 The project p roponent shall implement the a pplication of solar energy which shall be utilized as solar ligh ti ng for illumination of common areas lighting of internal roads and passages in add ition to uti liza tion of solar water heating systems

      Energy savers are install ed in lighting services

      47 The tra nsformers and moto rs shall mini mum effi Cie ncy of 85

      have Complied Motors of EFF 1 efficiency class as per IS 12615 are used

      48 Var iable freq uency d r ives shall be install ed VFDs have been ordered and its delivery are expecting shortly

      49 nergy con servati on measures shall include use of electronic lighting system use of CFL tubes to min imize energy use use of p rogrammable t imers fo r pumping system and lighting water level controllers for water centralized

      Complied Energy savers are installed in lighting services Instrument controllers with DCS operation

      pumps are provided Centralized cooling cooling etc are prOVided

      Guja rat Narmada Valley Fertilizers amp ChemicHls Limited

      50 Energy saving practices as follows shall be Noted practiced

      Constant monitoring of energy consumption and defining targets for energy onservation

      Adjusting the setting and illumination Implemented levels to ensure minimum energy used for desired comfort level

      Use of solar cells for lighting Energy savers are installed

      Use of solar water heater fo r canteen amp washing area

      Proper load factor shall be maintained by the unit

      Provision of day light roof to utilize maximum natural light in the production plant instead of electr ical li ghting

      Use of electronic ballast to save energy

      Use of automatic switching system for lighting and water tank pumping system

      To the maximum extent possible and technically feasible energy equipment like motors pumps air conditioning systems shall be selected

      Capacitor bank installed at MRS to improve load factor Implemented

      Implemented Implemented

      Refer poi nt no 47 for motors

      Gravity f10w shall be preferred wherever Noted possib le to save pumping energy

      Promoting awareness on energy conservation Training is imparted to all the

      i r in ing to s ta ff on methods of energy employe s conservation and to be vigilant for the sam e

      A6 CLEANER PRODUCTION AND WASTE MINIMISATION

      51 The company shall undertake the Cleaner Production Assessment study through a reputed insti tuteorganization and shall form a CP team in the company The recomm endations thereof a long w ith the compliance shall be furnished to the GPCB

      It will be explored

      52 The unit shall al so undertake following waste m inimization m easures a) Mete ring and control of quantities of active

      ingredi en ts to minimize waste b) Us of automated and enclosed filling to

      minimize s pillage c) Reuse of by-p roducts from the process as raw

      materials d) Ve nting equipment through vapour recovery

      sys tem

      Being complied

      e) Use of high pressure hoses for _e_-u_i--pm_e_n_t--shy_ _ __---t~~r~eftIle~~~_4__~-----

      q~o ~rot(~_aOt Co 3 ~ W~~1f)~ _ O 0 ( Co n ~ ~ 061 III 0 shy~ ~

      1~ernJ ~ ~

      Gujarat Narmada Valley Fertilizers amp Chemicals Limited

      clean ing to reduce wastewater generation f) Use of close feed system into batch reactors A-7 GREENBELT AND OTHER PLANTATION

      53 The company shall develop green belt within the premises as per CPCB guidelines

      On World Environment Dayshy2013 GNFC has planted 200 nos of trees in nearby area of Ethyl Acetate plant This is ongOing process and more plantation is planned during the year 2013-14

      54 The unit shall al s o ta ke up adequate plantation at Note d suitable open land on road sides and other open areas in Bharuch GIDC nearby villages or schools in consultation with GPCB and submit an action plan for the same for next three years to the GPCB GENERAL CONDITIONS

      55 In the event of failure of any pollution control system adopted by the unit the unit shall be

      Note d

      safely closed down and shall until the desired efficiency equipment has been achieved

      not of

      be restarted the control

      56 The project management shall ensure that unit complies with all the environment protection meJs ures risk mitigation measures amp safeguards recommended in the EIA EMP report and as

      Noted

      57

      58

      propo sed by them

      A separate Enviro nment Management Cell equ ip ped with full fledged laboratory facilities shall be set up to carry out the Environment Managemen t and Monito r ing fun ctions The funds ea rmarked for environment protection measures shall be maintained in a separate account and there shall not be any diversion of these fun ds fo r any other purpose A year-wise

      Being complied

      Noted

      expenditure on environmental safeguards shall

      59

      60

      be reported The company shall take up necessary socioshyecono mic upliftment activities as Corporate Soci I Responsibility and shall submit list of activi t ies with annual budget allocation to the SEIAA Pucca flooringim pervious layer shall be provided in the work a reas chemical storage area and chem ical ha ndling areas to minimize

      Already s u bmitted

      Complied

      so il contam ination

      61 Leakag s fro m the pipes pumps shall be minimal and if occurs shall b e a rrested prom ptly

      Noted

      62 During ma terial transfer spillages shall be Noted ~ ize~

      I l 0 c~ 10 ~ l~~~~-

      r gt~ ~~tl lt-~ omiddot Q ~ - ~ ~~ ~~~ Vc r

      1I1lgt -Jr c ~

      C ujarat Narmada Valley Fertilizers amp Chemicals Limited

      avoided and garland drain be constructed to avoid mixing of accidental spillages with domes tic wastewater or storm water

      63 The applicant shall also comply with any Noted additional condition that may be imposed by the SEAC or the SEIAA or any other competent authority for the purpose of the environmental protection and management

      64 No further expansion of modifications in the Noted plant shall be carried out without prior approval of the MoEF jSEIAAjSEAC for clearance a fresh reference shall be made to the SEIAAjSEAC to assess the adequacy of conditions imposed and to add additional environmental protection measures req uired if any

      65 The project authorities shall earmark adequate Noted fund s to implement the conditions stipulated by SEIAA as well as GPCB along with the implementation schedule for all the conditions stipulated herein The funds so provided shall not be diverted for any other purpose

      66 The applicant shall inform the public that the Complied project has been accorded environmental clearance by the SEIAA and that the copies of the clearance letter are available with the GPCB and may also be seen at the website of SElAAjS EACjGPCB This shall be advertised withi n seven days fro m the date of the clearance lett r in at least two local newspapers that are widely circulated in the region one of which shall be in the Gujarati language and the other in Engli sh A copy each of the same shall be fo rward ed to the concerned Regional Office of the Mini st ry

      67 It shall be mandatory for the project management Being complied to sub mit half-yearly compliance report in respect of the stipulated prior environmental clea rance terms and conditions in hard and soft copies to the regulatory authority concerned on 1st June and 1st December of ea ch calendar year

      68 The pro ject authorities shall also adhere to the Noted stip ulations made by the Gujarat Pollution

      69

      Control Board

      The project autho ri ties shall inform the GPCB Regio nal Office of MoEF and SEIAA a bout the date of financial closure and final approval of the proj ect by the concerned authorities and the date of start of the projec t

      Complie d

      -

      G ujarat Narmada Valley Fertilizers amp hemica is Lim ited

      70 The SEIAA may revoke or suspend the cleara nce if implementation of any of the above conditions is not found satis factory

      Noted

      71 The above cond itions sha ll be enforced inter-alia under the provision of the Water (Prevention amp Control of Pollution) Act 1974 Air (Prevention amp Control of Pollution) Act 1981 the Environment (Protection) Act 1986 Hazardous wastes (Management Handling and Transboundary Movement) Rules 2008 and the Public Liability Insurance Act 1991 along with their amendments and rules

      Noted

      72 Th is Environmental Clearance is valid for five years from the date of issue

      Noted

      t-1 11 eftoe-rGUJARAT POLLUTIO CONTROL BOARD

      PARYAVARAN BHAVAN Sector 10-A Gandh inagar 382010

      Phone (079) 23226295 Fax (079 ) 23232156

      14 4 ~zebs ite wwwgpcbgovin

      l[ct ~ 2 5 AP[ 2013

      itsect)J l rs~ SG Igtft

      ~ iai ltA ~ Wc[1

      cr1lE laiJ l lt (l- ~4

      ~ (l~ u-3 ( 0 9 Lt

      (Ct lt- Nl -toil ~~IlNc1 uc1l oi ctl e2l[ e c1 iffi2G LC-tlcrCoj ZJlulms Jlt 1Hl2G OOILd

      (( ETP ETL Afl k lesh wa r) u-Uct ~uQS( ~l 4l ~ fcr1s l c-t Sql E-cH 0Hltgttci

      (-Ec4 - 9) ltgtl oil -t l ctl-OS03 0 93

      lt)ETL Ankles hwar oil ltl cilO0 3093

      3)JJ lfcr1uU S lt a1-uf1V-1l lt~ bl4cn-CI - 2 JJ (9 ) I D I 12193 ~ ( -lcil9009 93

      0lS Vol l oll l oU Ethyl Ace la te l(loc CT CC ol l-l9il V-Il-1Clll-ll oUQC1 ~ ltgtl

      l~1ltl iJ o-e sl4ltct 2l4 ~Sl-(l-l l W GE(lClrtl vTItllms JtEl 1U~Qoi CTE I CC r l-l [~ll 21 C-t ail~

      licl0aj ~fWS~l middot ~Slail ~rwSlt~l -Uo-e lt l s~ (lJufl uSl l-l ratS lC-t SCllal n ct C-tl[Clll-l

      ~lq(middott

      ltgtl -t oil tc(Q(ct -1-[ol lt9V-1lct t2U~ cuS ltgt ct oD Rt k1ci ct s oll-l tl-latl Sltl ltgttlE

      ~l-1ail (JY~sct ~E(Qtct -1~ atl RttlcJ ltgt oCl~ Cgt6~llqCll aj S ltgt l-1 oil ~uNci ucil at q l e w ec-t

      ~ill~G -t lo-eaj V-I ltlGls J l1 -1l ~n 200 KLd designa ted b lH ~ct CETP ETL Ankalesh war Uct

      ~rwSi~1 l- l2 ratSIC-t S Cll euro Cll ll 2 ctcat (JJll ~ wlt0 qy ctl 3 OOC lt09 3 ltgtuCll 0l llt oil

      (1lcreaU ETP ~ L~ W4 ~l ~tfi ( ~ q~Cj 5[lt ct ) ltgtl-1 (GNFC Ltd) ~ l1~ otl-1qlll ltgtlQ 19

      btl Y~ltl fiiZlLai des ignated Tan ker man ifest system (C-iJt (~centcJ (u~ o6Jltl~) Gps sy stem

      ctltl ~ l~-ll~~lat f(lzH 01 C1Qlol cil-U tlct ~ l 0~ Annexure -A l l-ll0ol ~l~cil V-IIWoi ltgtl

      l~~ ltgtl-1Ql ll ott q t3

      ~Slt Llt l llS per P L L Act 1991 ~ciJlci PLI iolicy iUlQqlol(8~ ltgt~ ctafloi 5C-t JJ~ lci

      l~l~l ratcil ~L uU~~ ltgtl-1Cllol (()~

      Cleal1 Gujarat Green Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organisa ti on

      GUJARAT POLLUTIO CONTROL BOARD PA RYAVARAN BHAVAN

      Sector 10-A Gandhinagar 382010 Phone (079 ) 23226295

      (l t Jl v~ 6Xt~r ~~il ~~~~3~~156GPCB Gl~8ct ~ l( rtlllW ~tSltl Wpoundl ~l( cil l-llW webslfe wwwgpcbgov1n tgt1vcuol vSc ttrtl 0Ul(Dct tt~~

      jc(lct J f( tt~l fa1Gi t~l V1lSoil oili 0~ CJct laquoc~aNl

      ~ LJ

      (S1 i~l 6l ~ )

      ltTtl ltS 0~ W81-lltTtl ctSl

      (0l l~l - Ann xure - A

      atS C1 ( CJ loil shy

      9 ~l ~~ S 0(D Sl ~ J6lt lt ~~ tt~l raici ~l vUSoil (l ~v 61 ~l tH~ ctW Gl ~h ct uluct

      ~Fllaj I-llcC (bl sit u( ampCJlC 4l~d1 0l l~ll

      ( un ( ltjRc

      Cleal1 Gujarat Greer~ Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organ isation

      • 1
      • 2
      • 3
      • 4
      • 5
      • 6
      • 7
      • 8
      • 9
      • 10
      • 11
      • 12
      • 13
      • 14
      • 15

        G ujarat Narmada Valley Fertilizers amp Chemicals Li mi ted

        6

        7

        8

        9

        10

        treatment of the e ffluent from the Ethyl Acetate (EA) Plant This ETP shall be operated regularly and efficiently to achieve the GPCB norms at the outlet

        The trea ted e ffluent from the EA Plant ETP shall be discharged into Bhukhi Creek through Guard Pond of the Central ETP

        The unit shall provide metering facility at the inlet and outlet of the EA Plant ETP and maintain records of the same

        A p rop er logbook of the EA Plant ETP ope ration also showing quality and q uantity of untreated and treated efflue nts chemicals and power consumed in treatment etc shall be maintained and shall be furnished to the GPC B from time to time The company shall develop rain water harvesting structures to harvest the runoff water The same wa ter shall be used for the various activities of the projects to conserve fresh water as well as to recha rge ground water Before rech a rging the surface run off pre treatment must be done to remove s uspend ed ma tter A-2 AIR W ter scrubb er syst m shall b provided for control of acidic vapors from the Acetic Acid Storage Ta nk Stack of adequate s tack height as per the preva iling norms shall be provided for the scrubber The scrubber shall be operated effic iently and effectively to achieve the norms p rescribed by the GPeB a t stack outlet

        will be completed by Augustshy2013 Presently effluent generated from Ethyl Acetate plant is partly treated at Nitro ETP within GNFC and rest of the wastewater IS sent to ETL Ankleshwar for treatment a~ per the permIssIO n granted by Gujarat Pollution Control Boa rd on 25042013 which is valid up to 30082013 (Jetter attached as Annexure-T) Will be complied Separate effluent treatment plant is under construction stage and will be completed by Augustshy2013 After commissioning of proposed ETP effluent of EA Plant will be discharged into Bhukhi Creek through Guard Pond of the Central ET P Will be complied Metering facility at inlet and outlet of EA plant ETP will be provided by August-2013 Will be complied After ETP becomes operational Pr sen tly a ll details about effluent sent to ETL are submi tted to GPCB in the mon thly compliance report Complied Company has already developed 36 recharge wells for rainwater harvesting

        Complied Water scrubber system (K-3601) is provided for control of acidic vapors from the Acetic Acid Storage Ta nk Stack of adequate stack height as per the prevailing no rms is provided for the scrubber The scrubber is operated effici ently and

        Gujarat Narmada Valley Fertilizers amp Chemicals Limited

        effectively to achieve the norms prescribed by the GPCB at stack outle t

        11 Natura l gas (a dditi ona l 12 Nm3hr) shall be used as fu el in f1are stack of the proposed Ethyl Acetate Plant and adequate stack height as per the prevailing norms shall be provided

        Complied Natural gas (additional 12 Nm3hr) is used as fuel in f1are stack of Ethyl Acetate Plant and adequate stack (X-3604) height as per the prevailing norms is provided

        12 Flare stack of 59 5 meter with burner at top shall be provided for Ethyl Acetate plant

        Complied Flare stack (X-3604) of 595 meter with burner at top IS

        provided for Ethyl Acetate plant 13 All the vessels used in the manufacturing process

        shall be closed to reduce the fugitive emission Complied All the vessels used in the manufacturing process are closed to reduce the fugitive emission

        14 All the storage tanks of f1ammabletoxic chemicals shall be under negative pressure to avoid any exposure or leakage breathers nitrogen blanketing and condensers shall be provided to the s torage ta nks

        Complied Condensers in vapor line amp Nitrogen blanketing are provided to the storage tanks

        15 All the pumps and equip ments where there is a likelihood leakage shall be adequately equipped w ith leak detection and repair (LDAR) system The company shall provide well defined leak de tec tion and repair program fo r quantification and co ntrol o f fugi t ive emis sionleakages

        Com plied Material of construction is well des igned with the material hand led and pumps are provided with mecha nical seal to avoid leakages Leakage are monitored by the online analyzers (5 nos) placed at different locations in the plant and corrective action will be taken

        16 Fugitive emission in the work zone environment sha ll be monitored The emission shall be confirmed to the standard prescribed by the concerned authoritie s from time to time

        Complied Online analyzers (5 nos) are installed at different locations in the plant

        17 Ambien t ai r quality monitor ing shall be carried out as per the CPCB guidelines and its record shall be maintained and furnished to the SElAA amp GPCB fro m time to time If the any stage any poll utan t is found to exceed the prescribed limit necessary add itional control measures shall be p rovided immediately

        Complied Ambient air quality monitoring is carried out as per the CPCB guidelines and its record is being regularly submitted to GPCB

        A-3 HAZARDOUSlSOLlD WASTE 18 Th company mus t s tric tly comply w ith the rules

        and regula tions wi th regards to handling and di sposa l of haza rdous was te in accordance with _

        Will be Complied

        _ _ ____ ____ ___ -i

        Gujarat Narmada Valley Fertilizers amp Chemicals Limited

        the hazardous waste (managementhandling and trans boundary movement) Rules 2008 as may be amended from time to time Authorization from the GPCB must be obtained for collectiontrea tmentstorage dis posal of hazardous w astes

        19 The hazardous waste shall be stored in separated Being complied designated hazardous waste storage facility with Hazardous waste storage shed is pucca bottom and leachate collection facility under construction and will be before its disposal completed by August-20 13

        20 The EA plant ETP s ludge shall be disposed at the Being complied TSDF of BElL Ankleshwar ETP sludge generated from EA

        plant ETP will be sent to BElL Ankleshwar by August 201 3

        21 The reactor r es idue shall be sent to the com mo n Complied hazardous waste incineration facility of BElL GNFC already have started Ankl eshwar for its disposal by incineration disposal of reactor residue by

        incineration at BElL - Ankleshwar since 0405 13 as pe r process requirement

        22 The records of the haza rdou s waste generated Being Complied and disposed shall be maintained as per haza rdous waste management and handling rul es

        23 Used oi l waste oil shall be sold to only to the Being Complied regi tered recyclers Reused in the gasification process

        of existing Ammonia plant 24shy Disca rded con tainersdru ms bagsliners sha ll be Being Complied

        sold only to the registered r ecyclers after decontami na tion A-4 Safety

        25 The project management shall str ictly comply Complied with the provisions made in Manufacture Storage a nd Im port of Hazardous Chemicals Rules 1989 as amended in 2000 for handling of haza rdous che micals Necessary approval s for the Go vt Authorities shall be obtained before commiss ioni ng of the pro ject if applicable

        26 All necessary preca utionary measures shall be Complied taken as per the Factories Act Rules to avoid any kind of accident during storage amp handling of tOXichazardous chem icals

        27 Necessa ry flameproof fittings shall be provided in Complied the wo rk area Electrical fitting are provided as

        per the area classification 28 Proper ventilation shall be provided in the work Complied

        a rea 29 All venting eq ui pment shall have vapour recovery Complied

        ujarat Narmada Valley Fertilizers amp Chemicals Limited

        system All the pumps a nd other equipments As per point no 15 and a lso where the re is a likelihood of leakages shall be provision for immediate iso lation provided with Leak Detections and Repair of such equipment is provided in (LDAR) system Provision for immediate isolation case of a leakage of such equipment in case of a leakage shall also be made The detector sensitivity shall be in ppm levels

        30 The project management shall prepare a detailed Complied Disaster Management Plan (DMP) for the project Disaster Management Plan (DM P) as per the guidelines from Directorate of for the project is already included Industrial Sa fety and Health It1 existing onsite and Offsite

        emergency plan of GNFC 31 Hazardous materials s torage shall be at an Being Complied

        isolated designated locatio n bund dyke walls shall be provided for storage tanks for Hazardous Chemicals

        32 Storage and use of haza rdous chem ica ls shall be Noted minimized to the extent possible and all necessary precautions shall be taken to mitigate th e ris k genera ted out of it

        33 Storage of hazardous chemicals shall be in Complied multi p le small capacity tanks containers instead Ethyl Acetate three storage tanks of one single large capacity tank for safety of 175 m3 and one storage tank purpose of 3400 m3 capacity are installed

        For raw material SDS two storage tanks each of 4207 m3 a re provided All tanks a re provided with all safety p recautions

        34 AJI the storage tanks shall be fi tted with Complied I

        approp riate controls to avoid any leakages Bunddyke walls shall be provided for storage tanks for hazardous chemicals Close handling sys te m for ch emical s shall be provided

        35 Ha ndling a nd charging of the chemicals shall be Noted done in such a man ner that minimal huma n exposure occurs

        36 Personal Protective Equipments shall be Noted provided to w orkers and its usage shall be ensured and supervised

        37 Fi rst Ai d box and required Antidotes for the First Aid box is made readily chemicals used in the un it shall be made readily available No specific Antidote is available in adequate quantity available Any liquid antacid like

        milk of Magnesia is a part of symptomatic treatment for any acidic substance ingestion Same is available in adequate quantity

        38 Periodi c tra ini ng sha ll be im parted to all the Noted

        G ujarat Narmada Valley Fertilizers amp Chemicals Li mited

        workers on safe ty and heal th aspects of chemicals handling

        39 Occupational health surveillance of the workers shall be done and its records shall be maintained Pre employment and periodical medical examination for all the workers shall be undertaken as per the Factories Act amp Rules

        Being complied

        40 Transpor tatio n of hazardous chemicals shall be done as per the provisions of the Motor Vehicle Act amp Rules

        Being complied

        41 All transporting routes within the factory premise shall have paved roads to minimize splashes and spillages

        Complied

        A-S NOISE 42 To mini mize the noise pollution the following

        noise control measures shall be implemented Selection of any new plant equipment

        shall be made with specifica tion of low noise levels

        Manufacturerssuppliers of major noise generating machinesequipments like air compressors feeder pumps turbine generators etc shall be instructed to make required design modifications wherever possible before supply and installation to mitigate the noise generation and to comply with the nationalinternational rmiddotegulatory norms with respect to noise generat ion for individual units

        Regular maintenance of machinery and vehi les shall be undertaken to reduce the noise impact

        No is suppression measures such as enclosures buffers and or protective measures shall be provided

        Employees shall be provided with ear protection measures like earplugs or ea rmuffs

        Prope r oiling lub rica tion and preventive maintenance shall be carried out of the machineries and equ ipments to reduce nois e generation

        Construction equipment generating minimum noise and vibration shall be chose n

        Ear plugs andmuffs shall be made compulsory for the construction workers w orki ng near the noise generating acti vit ies machinesLeguipment

        Complied

        G ujarat Narmada Valley Fe r t ilizers amp Chemicals Limited

        -

        Vehicles and co nstruction equipment with internal combustion engmes without proper silencer shall not be allowed to operate

        Construction equipment meeting the norms specified by ETP Act 1986 shall only be used

        Noise control equipment and baffling shall be employed on generators especially when they are operated near the residential and sensitive areas

        Noise levels shall be reduced by the use of adequate mufflers on all motorized equipment

        43 The overall noise level in and around the plant area shall be kept well within the prescribed standards by providing noise control measures including acoustic insulation hoods silencers enclosures vibration dampers etc on all sources of noise generation The ambient noise levels shall confirm to the standards prescribed under the Environment (Protection) Act and Rules Workplace noise levels for workers shall be as per the Factories Act and Rules

        Complied

        A-6 ENERGY CONSERVATION

        44 The proj ect proponent shall install energy effici ent devices and appliances conforming to th e Burea u of Energy Efficiency no rms

        Complied

        45 The energy audit shall be conducted at regular inte rvals and the recommendations of the audit report shall be implemented

        Being complied

        46 The project p roponent shall implement the a pplication of solar energy which shall be utilized as solar ligh ti ng for illumination of common areas lighting of internal roads and passages in add ition to uti liza tion of solar water heating systems

        Energy savers are install ed in lighting services

        47 The tra nsformers and moto rs shall mini mum effi Cie ncy of 85

        have Complied Motors of EFF 1 efficiency class as per IS 12615 are used

        48 Var iable freq uency d r ives shall be install ed VFDs have been ordered and its delivery are expecting shortly

        49 nergy con servati on measures shall include use of electronic lighting system use of CFL tubes to min imize energy use use of p rogrammable t imers fo r pumping system and lighting water level controllers for water centralized

        Complied Energy savers are installed in lighting services Instrument controllers with DCS operation

        pumps are provided Centralized cooling cooling etc are prOVided

        Guja rat Narmada Valley Fertilizers amp ChemicHls Limited

        50 Energy saving practices as follows shall be Noted practiced

        Constant monitoring of energy consumption and defining targets for energy onservation

        Adjusting the setting and illumination Implemented levels to ensure minimum energy used for desired comfort level

        Use of solar cells for lighting Energy savers are installed

        Use of solar water heater fo r canteen amp washing area

        Proper load factor shall be maintained by the unit

        Provision of day light roof to utilize maximum natural light in the production plant instead of electr ical li ghting

        Use of electronic ballast to save energy

        Use of automatic switching system for lighting and water tank pumping system

        To the maximum extent possible and technically feasible energy equipment like motors pumps air conditioning systems shall be selected

        Capacitor bank installed at MRS to improve load factor Implemented

        Implemented Implemented

        Refer poi nt no 47 for motors

        Gravity f10w shall be preferred wherever Noted possib le to save pumping energy

        Promoting awareness on energy conservation Training is imparted to all the

        i r in ing to s ta ff on methods of energy employe s conservation and to be vigilant for the sam e

        A6 CLEANER PRODUCTION AND WASTE MINIMISATION

        51 The company shall undertake the Cleaner Production Assessment study through a reputed insti tuteorganization and shall form a CP team in the company The recomm endations thereof a long w ith the compliance shall be furnished to the GPCB

        It will be explored

        52 The unit shall al so undertake following waste m inimization m easures a) Mete ring and control of quantities of active

        ingredi en ts to minimize waste b) Us of automated and enclosed filling to

        minimize s pillage c) Reuse of by-p roducts from the process as raw

        materials d) Ve nting equipment through vapour recovery

        sys tem

        Being complied

        e) Use of high pressure hoses for _e_-u_i--pm_e_n_t--shy_ _ __---t~~r~eftIle~~~_4__~-----

        q~o ~rot(~_aOt Co 3 ~ W~~1f)~ _ O 0 ( Co n ~ ~ 061 III 0 shy~ ~

        1~ernJ ~ ~

        Gujarat Narmada Valley Fertilizers amp Chemicals Limited

        clean ing to reduce wastewater generation f) Use of close feed system into batch reactors A-7 GREENBELT AND OTHER PLANTATION

        53 The company shall develop green belt within the premises as per CPCB guidelines

        On World Environment Dayshy2013 GNFC has planted 200 nos of trees in nearby area of Ethyl Acetate plant This is ongOing process and more plantation is planned during the year 2013-14

        54 The unit shall al s o ta ke up adequate plantation at Note d suitable open land on road sides and other open areas in Bharuch GIDC nearby villages or schools in consultation with GPCB and submit an action plan for the same for next three years to the GPCB GENERAL CONDITIONS

        55 In the event of failure of any pollution control system adopted by the unit the unit shall be

        Note d

        safely closed down and shall until the desired efficiency equipment has been achieved

        not of

        be restarted the control

        56 The project management shall ensure that unit complies with all the environment protection meJs ures risk mitigation measures amp safeguards recommended in the EIA EMP report and as

        Noted

        57

        58

        propo sed by them

        A separate Enviro nment Management Cell equ ip ped with full fledged laboratory facilities shall be set up to carry out the Environment Managemen t and Monito r ing fun ctions The funds ea rmarked for environment protection measures shall be maintained in a separate account and there shall not be any diversion of these fun ds fo r any other purpose A year-wise

        Being complied

        Noted

        expenditure on environmental safeguards shall

        59

        60

        be reported The company shall take up necessary socioshyecono mic upliftment activities as Corporate Soci I Responsibility and shall submit list of activi t ies with annual budget allocation to the SEIAA Pucca flooringim pervious layer shall be provided in the work a reas chemical storage area and chem ical ha ndling areas to minimize

        Already s u bmitted

        Complied

        so il contam ination

        61 Leakag s fro m the pipes pumps shall be minimal and if occurs shall b e a rrested prom ptly

        Noted

        62 During ma terial transfer spillages shall be Noted ~ ize~

        I l 0 c~ 10 ~ l~~~~-

        r gt~ ~~tl lt-~ omiddot Q ~ - ~ ~~ ~~~ Vc r

        1I1lgt -Jr c ~

        C ujarat Narmada Valley Fertilizers amp Chemicals Limited

        avoided and garland drain be constructed to avoid mixing of accidental spillages with domes tic wastewater or storm water

        63 The applicant shall also comply with any Noted additional condition that may be imposed by the SEAC or the SEIAA or any other competent authority for the purpose of the environmental protection and management

        64 No further expansion of modifications in the Noted plant shall be carried out without prior approval of the MoEF jSEIAAjSEAC for clearance a fresh reference shall be made to the SEIAAjSEAC to assess the adequacy of conditions imposed and to add additional environmental protection measures req uired if any

        65 The project authorities shall earmark adequate Noted fund s to implement the conditions stipulated by SEIAA as well as GPCB along with the implementation schedule for all the conditions stipulated herein The funds so provided shall not be diverted for any other purpose

        66 The applicant shall inform the public that the Complied project has been accorded environmental clearance by the SEIAA and that the copies of the clearance letter are available with the GPCB and may also be seen at the website of SElAAjS EACjGPCB This shall be advertised withi n seven days fro m the date of the clearance lett r in at least two local newspapers that are widely circulated in the region one of which shall be in the Gujarati language and the other in Engli sh A copy each of the same shall be fo rward ed to the concerned Regional Office of the Mini st ry

        67 It shall be mandatory for the project management Being complied to sub mit half-yearly compliance report in respect of the stipulated prior environmental clea rance terms and conditions in hard and soft copies to the regulatory authority concerned on 1st June and 1st December of ea ch calendar year

        68 The pro ject authorities shall also adhere to the Noted stip ulations made by the Gujarat Pollution

        69

        Control Board

        The project autho ri ties shall inform the GPCB Regio nal Office of MoEF and SEIAA a bout the date of financial closure and final approval of the proj ect by the concerned authorities and the date of start of the projec t

        Complie d

        -

        G ujarat Narmada Valley Fertilizers amp hemica is Lim ited

        70 The SEIAA may revoke or suspend the cleara nce if implementation of any of the above conditions is not found satis factory

        Noted

        71 The above cond itions sha ll be enforced inter-alia under the provision of the Water (Prevention amp Control of Pollution) Act 1974 Air (Prevention amp Control of Pollution) Act 1981 the Environment (Protection) Act 1986 Hazardous wastes (Management Handling and Transboundary Movement) Rules 2008 and the Public Liability Insurance Act 1991 along with their amendments and rules

        Noted

        72 Th is Environmental Clearance is valid for five years from the date of issue

        Noted

        t-1 11 eftoe-rGUJARAT POLLUTIO CONTROL BOARD

        PARYAVARAN BHAVAN Sector 10-A Gandh inagar 382010

        Phone (079) 23226295 Fax (079 ) 23232156

        14 4 ~zebs ite wwwgpcbgovin

        l[ct ~ 2 5 AP[ 2013

        itsect)J l rs~ SG Igtft

        ~ iai ltA ~ Wc[1

        cr1lE laiJ l lt (l- ~4

        ~ (l~ u-3 ( 0 9 Lt

        (Ct lt- Nl -toil ~~IlNc1 uc1l oi ctl e2l[ e c1 iffi2G LC-tlcrCoj ZJlulms Jlt 1Hl2G OOILd

        (( ETP ETL Afl k lesh wa r) u-Uct ~uQS( ~l 4l ~ fcr1s l c-t Sql E-cH 0Hltgttci

        (-Ec4 - 9) ltgtl oil -t l ctl-OS03 0 93

        lt)ETL Ankles hwar oil ltl cilO0 3093

        3)JJ lfcr1uU S lt a1-uf1V-1l lt~ bl4cn-CI - 2 JJ (9 ) I D I 12193 ~ ( -lcil9009 93

        0lS Vol l oll l oU Ethyl Ace la te l(loc CT CC ol l-l9il V-Il-1Clll-ll oUQC1 ~ ltgtl

        l~1ltl iJ o-e sl4ltct 2l4 ~Sl-(l-l l W GE(lClrtl vTItllms JtEl 1U~Qoi CTE I CC r l-l [~ll 21 C-t ail~

        licl0aj ~fWS~l middot ~Slail ~rwSlt~l -Uo-e lt l s~ (lJufl uSl l-l ratS lC-t SCllal n ct C-tl[Clll-l

        ~lq(middott

        ltgtl -t oil tc(Q(ct -1-[ol lt9V-1lct t2U~ cuS ltgt ct oD Rt k1ci ct s oll-l tl-latl Sltl ltgttlE

        ~l-1ail (JY~sct ~E(Qtct -1~ atl RttlcJ ltgt oCl~ Cgt6~llqCll aj S ltgt l-1 oil ~uNci ucil at q l e w ec-t

        ~ill~G -t lo-eaj V-I ltlGls J l1 -1l ~n 200 KLd designa ted b lH ~ct CETP ETL Ankalesh war Uct

        ~rwSi~1 l- l2 ratSIC-t S Cll euro Cll ll 2 ctcat (JJll ~ wlt0 qy ctl 3 OOC lt09 3 ltgtuCll 0l llt oil

        (1lcreaU ETP ~ L~ W4 ~l ~tfi ( ~ q~Cj 5[lt ct ) ltgtl-1 (GNFC Ltd) ~ l1~ otl-1qlll ltgtlQ 19

        btl Y~ltl fiiZlLai des ignated Tan ker man ifest system (C-iJt (~centcJ (u~ o6Jltl~) Gps sy stem

        ctltl ~ l~-ll~~lat f(lzH 01 C1Qlol cil-U tlct ~ l 0~ Annexure -A l l-ll0ol ~l~cil V-IIWoi ltgtl

        l~~ ltgtl-1Ql ll ott q t3

        ~Slt Llt l llS per P L L Act 1991 ~ciJlci PLI iolicy iUlQqlol(8~ ltgt~ ctafloi 5C-t JJ~ lci

        l~l~l ratcil ~L uU~~ ltgtl-1Cllol (()~

        Cleal1 Gujarat Green Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organisa ti on

        GUJARAT POLLUTIO CONTROL BOARD PA RYAVARAN BHAVAN

        Sector 10-A Gandhinagar 382010 Phone (079 ) 23226295

        (l t Jl v~ 6Xt~r ~~il ~~~~3~~156GPCB Gl~8ct ~ l( rtlllW ~tSltl Wpoundl ~l( cil l-llW webslfe wwwgpcbgov1n tgt1vcuol vSc ttrtl 0Ul(Dct tt~~

        jc(lct J f( tt~l fa1Gi t~l V1lSoil oili 0~ CJct laquoc~aNl

        ~ LJ

        (S1 i~l 6l ~ )

        ltTtl ltS 0~ W81-lltTtl ctSl

        (0l l~l - Ann xure - A

        atS C1 ( CJ loil shy

        9 ~l ~~ S 0(D Sl ~ J6lt lt ~~ tt~l raici ~l vUSoil (l ~v 61 ~l tH~ ctW Gl ~h ct uluct

        ~Fllaj I-llcC (bl sit u( ampCJlC 4l~d1 0l l~ll

        ( un ( ltjRc

        Cleal1 Gujarat Greer~ Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organ isation

        • 1
        • 2
        • 3
        • 4
        • 5
        • 6
        • 7
        • 8
        • 9
        • 10
        • 11
        • 12
        • 13
        • 14
        • 15

          Gujarat Narmada Valley Fertilizers amp Chemicals Limited

          effectively to achieve the norms prescribed by the GPCB at stack outle t

          11 Natura l gas (a dditi ona l 12 Nm3hr) shall be used as fu el in f1are stack of the proposed Ethyl Acetate Plant and adequate stack height as per the prevailing norms shall be provided

          Complied Natural gas (additional 12 Nm3hr) is used as fuel in f1are stack of Ethyl Acetate Plant and adequate stack (X-3604) height as per the prevailing norms is provided

          12 Flare stack of 59 5 meter with burner at top shall be provided for Ethyl Acetate plant

          Complied Flare stack (X-3604) of 595 meter with burner at top IS

          provided for Ethyl Acetate plant 13 All the vessels used in the manufacturing process

          shall be closed to reduce the fugitive emission Complied All the vessels used in the manufacturing process are closed to reduce the fugitive emission

          14 All the storage tanks of f1ammabletoxic chemicals shall be under negative pressure to avoid any exposure or leakage breathers nitrogen blanketing and condensers shall be provided to the s torage ta nks

          Complied Condensers in vapor line amp Nitrogen blanketing are provided to the storage tanks

          15 All the pumps and equip ments where there is a likelihood leakage shall be adequately equipped w ith leak detection and repair (LDAR) system The company shall provide well defined leak de tec tion and repair program fo r quantification and co ntrol o f fugi t ive emis sionleakages

          Com plied Material of construction is well des igned with the material hand led and pumps are provided with mecha nical seal to avoid leakages Leakage are monitored by the online analyzers (5 nos) placed at different locations in the plant and corrective action will be taken

          16 Fugitive emission in the work zone environment sha ll be monitored The emission shall be confirmed to the standard prescribed by the concerned authoritie s from time to time

          Complied Online analyzers (5 nos) are installed at different locations in the plant

          17 Ambien t ai r quality monitor ing shall be carried out as per the CPCB guidelines and its record shall be maintained and furnished to the SElAA amp GPCB fro m time to time If the any stage any poll utan t is found to exceed the prescribed limit necessary add itional control measures shall be p rovided immediately

          Complied Ambient air quality monitoring is carried out as per the CPCB guidelines and its record is being regularly submitted to GPCB

          A-3 HAZARDOUSlSOLlD WASTE 18 Th company mus t s tric tly comply w ith the rules

          and regula tions wi th regards to handling and di sposa l of haza rdous was te in accordance with _

          Will be Complied

          _ _ ____ ____ ___ -i

          Gujarat Narmada Valley Fertilizers amp Chemicals Limited

          the hazardous waste (managementhandling and trans boundary movement) Rules 2008 as may be amended from time to time Authorization from the GPCB must be obtained for collectiontrea tmentstorage dis posal of hazardous w astes

          19 The hazardous waste shall be stored in separated Being complied designated hazardous waste storage facility with Hazardous waste storage shed is pucca bottom and leachate collection facility under construction and will be before its disposal completed by August-20 13

          20 The EA plant ETP s ludge shall be disposed at the Being complied TSDF of BElL Ankleshwar ETP sludge generated from EA

          plant ETP will be sent to BElL Ankleshwar by August 201 3

          21 The reactor r es idue shall be sent to the com mo n Complied hazardous waste incineration facility of BElL GNFC already have started Ankl eshwar for its disposal by incineration disposal of reactor residue by

          incineration at BElL - Ankleshwar since 0405 13 as pe r process requirement

          22 The records of the haza rdou s waste generated Being Complied and disposed shall be maintained as per haza rdous waste management and handling rul es

          23 Used oi l waste oil shall be sold to only to the Being Complied regi tered recyclers Reused in the gasification process

          of existing Ammonia plant 24shy Disca rded con tainersdru ms bagsliners sha ll be Being Complied

          sold only to the registered r ecyclers after decontami na tion A-4 Safety

          25 The project management shall str ictly comply Complied with the provisions made in Manufacture Storage a nd Im port of Hazardous Chemicals Rules 1989 as amended in 2000 for handling of haza rdous che micals Necessary approval s for the Go vt Authorities shall be obtained before commiss ioni ng of the pro ject if applicable

          26 All necessary preca utionary measures shall be Complied taken as per the Factories Act Rules to avoid any kind of accident during storage amp handling of tOXichazardous chem icals

          27 Necessa ry flameproof fittings shall be provided in Complied the wo rk area Electrical fitting are provided as

          per the area classification 28 Proper ventilation shall be provided in the work Complied

          a rea 29 All venting eq ui pment shall have vapour recovery Complied

          ujarat Narmada Valley Fertilizers amp Chemicals Limited

          system All the pumps a nd other equipments As per point no 15 and a lso where the re is a likelihood of leakages shall be provision for immediate iso lation provided with Leak Detections and Repair of such equipment is provided in (LDAR) system Provision for immediate isolation case of a leakage of such equipment in case of a leakage shall also be made The detector sensitivity shall be in ppm levels

          30 The project management shall prepare a detailed Complied Disaster Management Plan (DMP) for the project Disaster Management Plan (DM P) as per the guidelines from Directorate of for the project is already included Industrial Sa fety and Health It1 existing onsite and Offsite

          emergency plan of GNFC 31 Hazardous materials s torage shall be at an Being Complied

          isolated designated locatio n bund dyke walls shall be provided for storage tanks for Hazardous Chemicals

          32 Storage and use of haza rdous chem ica ls shall be Noted minimized to the extent possible and all necessary precautions shall be taken to mitigate th e ris k genera ted out of it

          33 Storage of hazardous chemicals shall be in Complied multi p le small capacity tanks containers instead Ethyl Acetate three storage tanks of one single large capacity tank for safety of 175 m3 and one storage tank purpose of 3400 m3 capacity are installed

          For raw material SDS two storage tanks each of 4207 m3 a re provided All tanks a re provided with all safety p recautions

          34 AJI the storage tanks shall be fi tted with Complied I

          approp riate controls to avoid any leakages Bunddyke walls shall be provided for storage tanks for hazardous chemicals Close handling sys te m for ch emical s shall be provided

          35 Ha ndling a nd charging of the chemicals shall be Noted done in such a man ner that minimal huma n exposure occurs

          36 Personal Protective Equipments shall be Noted provided to w orkers and its usage shall be ensured and supervised

          37 Fi rst Ai d box and required Antidotes for the First Aid box is made readily chemicals used in the un it shall be made readily available No specific Antidote is available in adequate quantity available Any liquid antacid like

          milk of Magnesia is a part of symptomatic treatment for any acidic substance ingestion Same is available in adequate quantity

          38 Periodi c tra ini ng sha ll be im parted to all the Noted

          G ujarat Narmada Valley Fertilizers amp Chemicals Li mited

          workers on safe ty and heal th aspects of chemicals handling

          39 Occupational health surveillance of the workers shall be done and its records shall be maintained Pre employment and periodical medical examination for all the workers shall be undertaken as per the Factories Act amp Rules

          Being complied

          40 Transpor tatio n of hazardous chemicals shall be done as per the provisions of the Motor Vehicle Act amp Rules

          Being complied

          41 All transporting routes within the factory premise shall have paved roads to minimize splashes and spillages

          Complied

          A-S NOISE 42 To mini mize the noise pollution the following

          noise control measures shall be implemented Selection of any new plant equipment

          shall be made with specifica tion of low noise levels

          Manufacturerssuppliers of major noise generating machinesequipments like air compressors feeder pumps turbine generators etc shall be instructed to make required design modifications wherever possible before supply and installation to mitigate the noise generation and to comply with the nationalinternational rmiddotegulatory norms with respect to noise generat ion for individual units

          Regular maintenance of machinery and vehi les shall be undertaken to reduce the noise impact

          No is suppression measures such as enclosures buffers and or protective measures shall be provided

          Employees shall be provided with ear protection measures like earplugs or ea rmuffs

          Prope r oiling lub rica tion and preventive maintenance shall be carried out of the machineries and equ ipments to reduce nois e generation

          Construction equipment generating minimum noise and vibration shall be chose n

          Ear plugs andmuffs shall be made compulsory for the construction workers w orki ng near the noise generating acti vit ies machinesLeguipment

          Complied

          G ujarat Narmada Valley Fe r t ilizers amp Chemicals Limited

          -

          Vehicles and co nstruction equipment with internal combustion engmes without proper silencer shall not be allowed to operate

          Construction equipment meeting the norms specified by ETP Act 1986 shall only be used

          Noise control equipment and baffling shall be employed on generators especially when they are operated near the residential and sensitive areas

          Noise levels shall be reduced by the use of adequate mufflers on all motorized equipment

          43 The overall noise level in and around the plant area shall be kept well within the prescribed standards by providing noise control measures including acoustic insulation hoods silencers enclosures vibration dampers etc on all sources of noise generation The ambient noise levels shall confirm to the standards prescribed under the Environment (Protection) Act and Rules Workplace noise levels for workers shall be as per the Factories Act and Rules

          Complied

          A-6 ENERGY CONSERVATION

          44 The proj ect proponent shall install energy effici ent devices and appliances conforming to th e Burea u of Energy Efficiency no rms

          Complied

          45 The energy audit shall be conducted at regular inte rvals and the recommendations of the audit report shall be implemented

          Being complied

          46 The project p roponent shall implement the a pplication of solar energy which shall be utilized as solar ligh ti ng for illumination of common areas lighting of internal roads and passages in add ition to uti liza tion of solar water heating systems

          Energy savers are install ed in lighting services

          47 The tra nsformers and moto rs shall mini mum effi Cie ncy of 85

          have Complied Motors of EFF 1 efficiency class as per IS 12615 are used

          48 Var iable freq uency d r ives shall be install ed VFDs have been ordered and its delivery are expecting shortly

          49 nergy con servati on measures shall include use of electronic lighting system use of CFL tubes to min imize energy use use of p rogrammable t imers fo r pumping system and lighting water level controllers for water centralized

          Complied Energy savers are installed in lighting services Instrument controllers with DCS operation

          pumps are provided Centralized cooling cooling etc are prOVided

          Guja rat Narmada Valley Fertilizers amp ChemicHls Limited

          50 Energy saving practices as follows shall be Noted practiced

          Constant monitoring of energy consumption and defining targets for energy onservation

          Adjusting the setting and illumination Implemented levels to ensure minimum energy used for desired comfort level

          Use of solar cells for lighting Energy savers are installed

          Use of solar water heater fo r canteen amp washing area

          Proper load factor shall be maintained by the unit

          Provision of day light roof to utilize maximum natural light in the production plant instead of electr ical li ghting

          Use of electronic ballast to save energy

          Use of automatic switching system for lighting and water tank pumping system

          To the maximum extent possible and technically feasible energy equipment like motors pumps air conditioning systems shall be selected

          Capacitor bank installed at MRS to improve load factor Implemented

          Implemented Implemented

          Refer poi nt no 47 for motors

          Gravity f10w shall be preferred wherever Noted possib le to save pumping energy

          Promoting awareness on energy conservation Training is imparted to all the

          i r in ing to s ta ff on methods of energy employe s conservation and to be vigilant for the sam e

          A6 CLEANER PRODUCTION AND WASTE MINIMISATION

          51 The company shall undertake the Cleaner Production Assessment study through a reputed insti tuteorganization and shall form a CP team in the company The recomm endations thereof a long w ith the compliance shall be furnished to the GPCB

          It will be explored

          52 The unit shall al so undertake following waste m inimization m easures a) Mete ring and control of quantities of active

          ingredi en ts to minimize waste b) Us of automated and enclosed filling to

          minimize s pillage c) Reuse of by-p roducts from the process as raw

          materials d) Ve nting equipment through vapour recovery

          sys tem

          Being complied

          e) Use of high pressure hoses for _e_-u_i--pm_e_n_t--shy_ _ __---t~~r~eftIle~~~_4__~-----

          q~o ~rot(~_aOt Co 3 ~ W~~1f)~ _ O 0 ( Co n ~ ~ 061 III 0 shy~ ~

          1~ernJ ~ ~

          Gujarat Narmada Valley Fertilizers amp Chemicals Limited

          clean ing to reduce wastewater generation f) Use of close feed system into batch reactors A-7 GREENBELT AND OTHER PLANTATION

          53 The company shall develop green belt within the premises as per CPCB guidelines

          On World Environment Dayshy2013 GNFC has planted 200 nos of trees in nearby area of Ethyl Acetate plant This is ongOing process and more plantation is planned during the year 2013-14

          54 The unit shall al s o ta ke up adequate plantation at Note d suitable open land on road sides and other open areas in Bharuch GIDC nearby villages or schools in consultation with GPCB and submit an action plan for the same for next three years to the GPCB GENERAL CONDITIONS

          55 In the event of failure of any pollution control system adopted by the unit the unit shall be

          Note d

          safely closed down and shall until the desired efficiency equipment has been achieved

          not of

          be restarted the control

          56 The project management shall ensure that unit complies with all the environment protection meJs ures risk mitigation measures amp safeguards recommended in the EIA EMP report and as

          Noted

          57

          58

          propo sed by them

          A separate Enviro nment Management Cell equ ip ped with full fledged laboratory facilities shall be set up to carry out the Environment Managemen t and Monito r ing fun ctions The funds ea rmarked for environment protection measures shall be maintained in a separate account and there shall not be any diversion of these fun ds fo r any other purpose A year-wise

          Being complied

          Noted

          expenditure on environmental safeguards shall

          59

          60

          be reported The company shall take up necessary socioshyecono mic upliftment activities as Corporate Soci I Responsibility and shall submit list of activi t ies with annual budget allocation to the SEIAA Pucca flooringim pervious layer shall be provided in the work a reas chemical storage area and chem ical ha ndling areas to minimize

          Already s u bmitted

          Complied

          so il contam ination

          61 Leakag s fro m the pipes pumps shall be minimal and if occurs shall b e a rrested prom ptly

          Noted

          62 During ma terial transfer spillages shall be Noted ~ ize~

          I l 0 c~ 10 ~ l~~~~-

          r gt~ ~~tl lt-~ omiddot Q ~ - ~ ~~ ~~~ Vc r

          1I1lgt -Jr c ~

          C ujarat Narmada Valley Fertilizers amp Chemicals Limited

          avoided and garland drain be constructed to avoid mixing of accidental spillages with domes tic wastewater or storm water

          63 The applicant shall also comply with any Noted additional condition that may be imposed by the SEAC or the SEIAA or any other competent authority for the purpose of the environmental protection and management

          64 No further expansion of modifications in the Noted plant shall be carried out without prior approval of the MoEF jSEIAAjSEAC for clearance a fresh reference shall be made to the SEIAAjSEAC to assess the adequacy of conditions imposed and to add additional environmental protection measures req uired if any

          65 The project authorities shall earmark adequate Noted fund s to implement the conditions stipulated by SEIAA as well as GPCB along with the implementation schedule for all the conditions stipulated herein The funds so provided shall not be diverted for any other purpose

          66 The applicant shall inform the public that the Complied project has been accorded environmental clearance by the SEIAA and that the copies of the clearance letter are available with the GPCB and may also be seen at the website of SElAAjS EACjGPCB This shall be advertised withi n seven days fro m the date of the clearance lett r in at least two local newspapers that are widely circulated in the region one of which shall be in the Gujarati language and the other in Engli sh A copy each of the same shall be fo rward ed to the concerned Regional Office of the Mini st ry

          67 It shall be mandatory for the project management Being complied to sub mit half-yearly compliance report in respect of the stipulated prior environmental clea rance terms and conditions in hard and soft copies to the regulatory authority concerned on 1st June and 1st December of ea ch calendar year

          68 The pro ject authorities shall also adhere to the Noted stip ulations made by the Gujarat Pollution

          69

          Control Board

          The project autho ri ties shall inform the GPCB Regio nal Office of MoEF and SEIAA a bout the date of financial closure and final approval of the proj ect by the concerned authorities and the date of start of the projec t

          Complie d

          -

          G ujarat Narmada Valley Fertilizers amp hemica is Lim ited

          70 The SEIAA may revoke or suspend the cleara nce if implementation of any of the above conditions is not found satis factory

          Noted

          71 The above cond itions sha ll be enforced inter-alia under the provision of the Water (Prevention amp Control of Pollution) Act 1974 Air (Prevention amp Control of Pollution) Act 1981 the Environment (Protection) Act 1986 Hazardous wastes (Management Handling and Transboundary Movement) Rules 2008 and the Public Liability Insurance Act 1991 along with their amendments and rules

          Noted

          72 Th is Environmental Clearance is valid for five years from the date of issue

          Noted

          t-1 11 eftoe-rGUJARAT POLLUTIO CONTROL BOARD

          PARYAVARAN BHAVAN Sector 10-A Gandh inagar 382010

          Phone (079) 23226295 Fax (079 ) 23232156

          14 4 ~zebs ite wwwgpcbgovin

          l[ct ~ 2 5 AP[ 2013

          itsect)J l rs~ SG Igtft

          ~ iai ltA ~ Wc[1

          cr1lE laiJ l lt (l- ~4

          ~ (l~ u-3 ( 0 9 Lt

          (Ct lt- Nl -toil ~~IlNc1 uc1l oi ctl e2l[ e c1 iffi2G LC-tlcrCoj ZJlulms Jlt 1Hl2G OOILd

          (( ETP ETL Afl k lesh wa r) u-Uct ~uQS( ~l 4l ~ fcr1s l c-t Sql E-cH 0Hltgttci

          (-Ec4 - 9) ltgtl oil -t l ctl-OS03 0 93

          lt)ETL Ankles hwar oil ltl cilO0 3093

          3)JJ lfcr1uU S lt a1-uf1V-1l lt~ bl4cn-CI - 2 JJ (9 ) I D I 12193 ~ ( -lcil9009 93

          0lS Vol l oll l oU Ethyl Ace la te l(loc CT CC ol l-l9il V-Il-1Clll-ll oUQC1 ~ ltgtl

          l~1ltl iJ o-e sl4ltct 2l4 ~Sl-(l-l l W GE(lClrtl vTItllms JtEl 1U~Qoi CTE I CC r l-l [~ll 21 C-t ail~

          licl0aj ~fWS~l middot ~Slail ~rwSlt~l -Uo-e lt l s~ (lJufl uSl l-l ratS lC-t SCllal n ct C-tl[Clll-l

          ~lq(middott

          ltgtl -t oil tc(Q(ct -1-[ol lt9V-1lct t2U~ cuS ltgt ct oD Rt k1ci ct s oll-l tl-latl Sltl ltgttlE

          ~l-1ail (JY~sct ~E(Qtct -1~ atl RttlcJ ltgt oCl~ Cgt6~llqCll aj S ltgt l-1 oil ~uNci ucil at q l e w ec-t

          ~ill~G -t lo-eaj V-I ltlGls J l1 -1l ~n 200 KLd designa ted b lH ~ct CETP ETL Ankalesh war Uct

          ~rwSi~1 l- l2 ratSIC-t S Cll euro Cll ll 2 ctcat (JJll ~ wlt0 qy ctl 3 OOC lt09 3 ltgtuCll 0l llt oil

          (1lcreaU ETP ~ L~ W4 ~l ~tfi ( ~ q~Cj 5[lt ct ) ltgtl-1 (GNFC Ltd) ~ l1~ otl-1qlll ltgtlQ 19

          btl Y~ltl fiiZlLai des ignated Tan ker man ifest system (C-iJt (~centcJ (u~ o6Jltl~) Gps sy stem

          ctltl ~ l~-ll~~lat f(lzH 01 C1Qlol cil-U tlct ~ l 0~ Annexure -A l l-ll0ol ~l~cil V-IIWoi ltgtl

          l~~ ltgtl-1Ql ll ott q t3

          ~Slt Llt l llS per P L L Act 1991 ~ciJlci PLI iolicy iUlQqlol(8~ ltgt~ ctafloi 5C-t JJ~ lci

          l~l~l ratcil ~L uU~~ ltgtl-1Cllol (()~

          Cleal1 Gujarat Green Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organisa ti on

          GUJARAT POLLUTIO CONTROL BOARD PA RYAVARAN BHAVAN

          Sector 10-A Gandhinagar 382010 Phone (079 ) 23226295

          (l t Jl v~ 6Xt~r ~~il ~~~~3~~156GPCB Gl~8ct ~ l( rtlllW ~tSltl Wpoundl ~l( cil l-llW webslfe wwwgpcbgov1n tgt1vcuol vSc ttrtl 0Ul(Dct tt~~

          jc(lct J f( tt~l fa1Gi t~l V1lSoil oili 0~ CJct laquoc~aNl

          ~ LJ

          (S1 i~l 6l ~ )

          ltTtl ltS 0~ W81-lltTtl ctSl

          (0l l~l - Ann xure - A

          atS C1 ( CJ loil shy

          9 ~l ~~ S 0(D Sl ~ J6lt lt ~~ tt~l raici ~l vUSoil (l ~v 61 ~l tH~ ctW Gl ~h ct uluct

          ~Fllaj I-llcC (bl sit u( ampCJlC 4l~d1 0l l~ll

          ( un ( ltjRc

          Cleal1 Gujarat Greer~ Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organ isation

          • 1
          • 2
          • 3
          • 4
          • 5
          • 6
          • 7
          • 8
          • 9
          • 10
          • 11
          • 12
          • 13
          • 14
          • 15

            Gujarat Narmada Valley Fertilizers amp Chemicals Limited

            the hazardous waste (managementhandling and trans boundary movement) Rules 2008 as may be amended from time to time Authorization from the GPCB must be obtained for collectiontrea tmentstorage dis posal of hazardous w astes

            19 The hazardous waste shall be stored in separated Being complied designated hazardous waste storage facility with Hazardous waste storage shed is pucca bottom and leachate collection facility under construction and will be before its disposal completed by August-20 13

            20 The EA plant ETP s ludge shall be disposed at the Being complied TSDF of BElL Ankleshwar ETP sludge generated from EA

            plant ETP will be sent to BElL Ankleshwar by August 201 3

            21 The reactor r es idue shall be sent to the com mo n Complied hazardous waste incineration facility of BElL GNFC already have started Ankl eshwar for its disposal by incineration disposal of reactor residue by

            incineration at BElL - Ankleshwar since 0405 13 as pe r process requirement

            22 The records of the haza rdou s waste generated Being Complied and disposed shall be maintained as per haza rdous waste management and handling rul es

            23 Used oi l waste oil shall be sold to only to the Being Complied regi tered recyclers Reused in the gasification process

            of existing Ammonia plant 24shy Disca rded con tainersdru ms bagsliners sha ll be Being Complied

            sold only to the registered r ecyclers after decontami na tion A-4 Safety

            25 The project management shall str ictly comply Complied with the provisions made in Manufacture Storage a nd Im port of Hazardous Chemicals Rules 1989 as amended in 2000 for handling of haza rdous che micals Necessary approval s for the Go vt Authorities shall be obtained before commiss ioni ng of the pro ject if applicable

            26 All necessary preca utionary measures shall be Complied taken as per the Factories Act Rules to avoid any kind of accident during storage amp handling of tOXichazardous chem icals

            27 Necessa ry flameproof fittings shall be provided in Complied the wo rk area Electrical fitting are provided as

            per the area classification 28 Proper ventilation shall be provided in the work Complied

            a rea 29 All venting eq ui pment shall have vapour recovery Complied

            ujarat Narmada Valley Fertilizers amp Chemicals Limited

            system All the pumps a nd other equipments As per point no 15 and a lso where the re is a likelihood of leakages shall be provision for immediate iso lation provided with Leak Detections and Repair of such equipment is provided in (LDAR) system Provision for immediate isolation case of a leakage of such equipment in case of a leakage shall also be made The detector sensitivity shall be in ppm levels

            30 The project management shall prepare a detailed Complied Disaster Management Plan (DMP) for the project Disaster Management Plan (DM P) as per the guidelines from Directorate of for the project is already included Industrial Sa fety and Health It1 existing onsite and Offsite

            emergency plan of GNFC 31 Hazardous materials s torage shall be at an Being Complied

            isolated designated locatio n bund dyke walls shall be provided for storage tanks for Hazardous Chemicals

            32 Storage and use of haza rdous chem ica ls shall be Noted minimized to the extent possible and all necessary precautions shall be taken to mitigate th e ris k genera ted out of it

            33 Storage of hazardous chemicals shall be in Complied multi p le small capacity tanks containers instead Ethyl Acetate three storage tanks of one single large capacity tank for safety of 175 m3 and one storage tank purpose of 3400 m3 capacity are installed

            For raw material SDS two storage tanks each of 4207 m3 a re provided All tanks a re provided with all safety p recautions

            34 AJI the storage tanks shall be fi tted with Complied I

            approp riate controls to avoid any leakages Bunddyke walls shall be provided for storage tanks for hazardous chemicals Close handling sys te m for ch emical s shall be provided

            35 Ha ndling a nd charging of the chemicals shall be Noted done in such a man ner that minimal huma n exposure occurs

            36 Personal Protective Equipments shall be Noted provided to w orkers and its usage shall be ensured and supervised

            37 Fi rst Ai d box and required Antidotes for the First Aid box is made readily chemicals used in the un it shall be made readily available No specific Antidote is available in adequate quantity available Any liquid antacid like

            milk of Magnesia is a part of symptomatic treatment for any acidic substance ingestion Same is available in adequate quantity

            38 Periodi c tra ini ng sha ll be im parted to all the Noted

            G ujarat Narmada Valley Fertilizers amp Chemicals Li mited

            workers on safe ty and heal th aspects of chemicals handling

            39 Occupational health surveillance of the workers shall be done and its records shall be maintained Pre employment and periodical medical examination for all the workers shall be undertaken as per the Factories Act amp Rules

            Being complied

            40 Transpor tatio n of hazardous chemicals shall be done as per the provisions of the Motor Vehicle Act amp Rules

            Being complied

            41 All transporting routes within the factory premise shall have paved roads to minimize splashes and spillages

            Complied

            A-S NOISE 42 To mini mize the noise pollution the following

            noise control measures shall be implemented Selection of any new plant equipment

            shall be made with specifica tion of low noise levels

            Manufacturerssuppliers of major noise generating machinesequipments like air compressors feeder pumps turbine generators etc shall be instructed to make required design modifications wherever possible before supply and installation to mitigate the noise generation and to comply with the nationalinternational rmiddotegulatory norms with respect to noise generat ion for individual units

            Regular maintenance of machinery and vehi les shall be undertaken to reduce the noise impact

            No is suppression measures such as enclosures buffers and or protective measures shall be provided

            Employees shall be provided with ear protection measures like earplugs or ea rmuffs

            Prope r oiling lub rica tion and preventive maintenance shall be carried out of the machineries and equ ipments to reduce nois e generation

            Construction equipment generating minimum noise and vibration shall be chose n

            Ear plugs andmuffs shall be made compulsory for the construction workers w orki ng near the noise generating acti vit ies machinesLeguipment

            Complied

            G ujarat Narmada Valley Fe r t ilizers amp Chemicals Limited

            -

            Vehicles and co nstruction equipment with internal combustion engmes without proper silencer shall not be allowed to operate

            Construction equipment meeting the norms specified by ETP Act 1986 shall only be used

            Noise control equipment and baffling shall be employed on generators especially when they are operated near the residential and sensitive areas

            Noise levels shall be reduced by the use of adequate mufflers on all motorized equipment

            43 The overall noise level in and around the plant area shall be kept well within the prescribed standards by providing noise control measures including acoustic insulation hoods silencers enclosures vibration dampers etc on all sources of noise generation The ambient noise levels shall confirm to the standards prescribed under the Environment (Protection) Act and Rules Workplace noise levels for workers shall be as per the Factories Act and Rules

            Complied

            A-6 ENERGY CONSERVATION

            44 The proj ect proponent shall install energy effici ent devices and appliances conforming to th e Burea u of Energy Efficiency no rms

            Complied

            45 The energy audit shall be conducted at regular inte rvals and the recommendations of the audit report shall be implemented

            Being complied

            46 The project p roponent shall implement the a pplication of solar energy which shall be utilized as solar ligh ti ng for illumination of common areas lighting of internal roads and passages in add ition to uti liza tion of solar water heating systems

            Energy savers are install ed in lighting services

            47 The tra nsformers and moto rs shall mini mum effi Cie ncy of 85

            have Complied Motors of EFF 1 efficiency class as per IS 12615 are used

            48 Var iable freq uency d r ives shall be install ed VFDs have been ordered and its delivery are expecting shortly

            49 nergy con servati on measures shall include use of electronic lighting system use of CFL tubes to min imize energy use use of p rogrammable t imers fo r pumping system and lighting water level controllers for water centralized

            Complied Energy savers are installed in lighting services Instrument controllers with DCS operation

            pumps are provided Centralized cooling cooling etc are prOVided

            Guja rat Narmada Valley Fertilizers amp ChemicHls Limited

            50 Energy saving practices as follows shall be Noted practiced

            Constant monitoring of energy consumption and defining targets for energy onservation

            Adjusting the setting and illumination Implemented levels to ensure minimum energy used for desired comfort level

            Use of solar cells for lighting Energy savers are installed

            Use of solar water heater fo r canteen amp washing area

            Proper load factor shall be maintained by the unit

            Provision of day light roof to utilize maximum natural light in the production plant instead of electr ical li ghting

            Use of electronic ballast to save energy

            Use of automatic switching system for lighting and water tank pumping system

            To the maximum extent possible and technically feasible energy equipment like motors pumps air conditioning systems shall be selected

            Capacitor bank installed at MRS to improve load factor Implemented

            Implemented Implemented

            Refer poi nt no 47 for motors

            Gravity f10w shall be preferred wherever Noted possib le to save pumping energy

            Promoting awareness on energy conservation Training is imparted to all the

            i r in ing to s ta ff on methods of energy employe s conservation and to be vigilant for the sam e

            A6 CLEANER PRODUCTION AND WASTE MINIMISATION

            51 The company shall undertake the Cleaner Production Assessment study through a reputed insti tuteorganization and shall form a CP team in the company The recomm endations thereof a long w ith the compliance shall be furnished to the GPCB

            It will be explored

            52 The unit shall al so undertake following waste m inimization m easures a) Mete ring and control of quantities of active

            ingredi en ts to minimize waste b) Us of automated and enclosed filling to

            minimize s pillage c) Reuse of by-p roducts from the process as raw

            materials d) Ve nting equipment through vapour recovery

            sys tem

            Being complied

            e) Use of high pressure hoses for _e_-u_i--pm_e_n_t--shy_ _ __---t~~r~eftIle~~~_4__~-----

            q~o ~rot(~_aOt Co 3 ~ W~~1f)~ _ O 0 ( Co n ~ ~ 061 III 0 shy~ ~

            1~ernJ ~ ~

            Gujarat Narmada Valley Fertilizers amp Chemicals Limited

            clean ing to reduce wastewater generation f) Use of close feed system into batch reactors A-7 GREENBELT AND OTHER PLANTATION

            53 The company shall develop green belt within the premises as per CPCB guidelines

            On World Environment Dayshy2013 GNFC has planted 200 nos of trees in nearby area of Ethyl Acetate plant This is ongOing process and more plantation is planned during the year 2013-14

            54 The unit shall al s o ta ke up adequate plantation at Note d suitable open land on road sides and other open areas in Bharuch GIDC nearby villages or schools in consultation with GPCB and submit an action plan for the same for next three years to the GPCB GENERAL CONDITIONS

            55 In the event of failure of any pollution control system adopted by the unit the unit shall be

            Note d

            safely closed down and shall until the desired efficiency equipment has been achieved

            not of

            be restarted the control

            56 The project management shall ensure that unit complies with all the environment protection meJs ures risk mitigation measures amp safeguards recommended in the EIA EMP report and as

            Noted

            57

            58

            propo sed by them

            A separate Enviro nment Management Cell equ ip ped with full fledged laboratory facilities shall be set up to carry out the Environment Managemen t and Monito r ing fun ctions The funds ea rmarked for environment protection measures shall be maintained in a separate account and there shall not be any diversion of these fun ds fo r any other purpose A year-wise

            Being complied

            Noted

            expenditure on environmental safeguards shall

            59

            60

            be reported The company shall take up necessary socioshyecono mic upliftment activities as Corporate Soci I Responsibility and shall submit list of activi t ies with annual budget allocation to the SEIAA Pucca flooringim pervious layer shall be provided in the work a reas chemical storage area and chem ical ha ndling areas to minimize

            Already s u bmitted

            Complied

            so il contam ination

            61 Leakag s fro m the pipes pumps shall be minimal and if occurs shall b e a rrested prom ptly

            Noted

            62 During ma terial transfer spillages shall be Noted ~ ize~

            I l 0 c~ 10 ~ l~~~~-

            r gt~ ~~tl lt-~ omiddot Q ~ - ~ ~~ ~~~ Vc r

            1I1lgt -Jr c ~

            C ujarat Narmada Valley Fertilizers amp Chemicals Limited

            avoided and garland drain be constructed to avoid mixing of accidental spillages with domes tic wastewater or storm water

            63 The applicant shall also comply with any Noted additional condition that may be imposed by the SEAC or the SEIAA or any other competent authority for the purpose of the environmental protection and management

            64 No further expansion of modifications in the Noted plant shall be carried out without prior approval of the MoEF jSEIAAjSEAC for clearance a fresh reference shall be made to the SEIAAjSEAC to assess the adequacy of conditions imposed and to add additional environmental protection measures req uired if any

            65 The project authorities shall earmark adequate Noted fund s to implement the conditions stipulated by SEIAA as well as GPCB along with the implementation schedule for all the conditions stipulated herein The funds so provided shall not be diverted for any other purpose

            66 The applicant shall inform the public that the Complied project has been accorded environmental clearance by the SEIAA and that the copies of the clearance letter are available with the GPCB and may also be seen at the website of SElAAjS EACjGPCB This shall be advertised withi n seven days fro m the date of the clearance lett r in at least two local newspapers that are widely circulated in the region one of which shall be in the Gujarati language and the other in Engli sh A copy each of the same shall be fo rward ed to the concerned Regional Office of the Mini st ry

            67 It shall be mandatory for the project management Being complied to sub mit half-yearly compliance report in respect of the stipulated prior environmental clea rance terms and conditions in hard and soft copies to the regulatory authority concerned on 1st June and 1st December of ea ch calendar year

            68 The pro ject authorities shall also adhere to the Noted stip ulations made by the Gujarat Pollution

            69

            Control Board

            The project autho ri ties shall inform the GPCB Regio nal Office of MoEF and SEIAA a bout the date of financial closure and final approval of the proj ect by the concerned authorities and the date of start of the projec t

            Complie d

            -

            G ujarat Narmada Valley Fertilizers amp hemica is Lim ited

            70 The SEIAA may revoke or suspend the cleara nce if implementation of any of the above conditions is not found satis factory

            Noted

            71 The above cond itions sha ll be enforced inter-alia under the provision of the Water (Prevention amp Control of Pollution) Act 1974 Air (Prevention amp Control of Pollution) Act 1981 the Environment (Protection) Act 1986 Hazardous wastes (Management Handling and Transboundary Movement) Rules 2008 and the Public Liability Insurance Act 1991 along with their amendments and rules

            Noted

            72 Th is Environmental Clearance is valid for five years from the date of issue

            Noted

            t-1 11 eftoe-rGUJARAT POLLUTIO CONTROL BOARD

            PARYAVARAN BHAVAN Sector 10-A Gandh inagar 382010

            Phone (079) 23226295 Fax (079 ) 23232156

            14 4 ~zebs ite wwwgpcbgovin

            l[ct ~ 2 5 AP[ 2013

            itsect)J l rs~ SG Igtft

            ~ iai ltA ~ Wc[1

            cr1lE laiJ l lt (l- ~4

            ~ (l~ u-3 ( 0 9 Lt

            (Ct lt- Nl -toil ~~IlNc1 uc1l oi ctl e2l[ e c1 iffi2G LC-tlcrCoj ZJlulms Jlt 1Hl2G OOILd

            (( ETP ETL Afl k lesh wa r) u-Uct ~uQS( ~l 4l ~ fcr1s l c-t Sql E-cH 0Hltgttci

            (-Ec4 - 9) ltgtl oil -t l ctl-OS03 0 93

            lt)ETL Ankles hwar oil ltl cilO0 3093

            3)JJ lfcr1uU S lt a1-uf1V-1l lt~ bl4cn-CI - 2 JJ (9 ) I D I 12193 ~ ( -lcil9009 93

            0lS Vol l oll l oU Ethyl Ace la te l(loc CT CC ol l-l9il V-Il-1Clll-ll oUQC1 ~ ltgtl

            l~1ltl iJ o-e sl4ltct 2l4 ~Sl-(l-l l W GE(lClrtl vTItllms JtEl 1U~Qoi CTE I CC r l-l [~ll 21 C-t ail~

            licl0aj ~fWS~l middot ~Slail ~rwSlt~l -Uo-e lt l s~ (lJufl uSl l-l ratS lC-t SCllal n ct C-tl[Clll-l

            ~lq(middott

            ltgtl -t oil tc(Q(ct -1-[ol lt9V-1lct t2U~ cuS ltgt ct oD Rt k1ci ct s oll-l tl-latl Sltl ltgttlE

            ~l-1ail (JY~sct ~E(Qtct -1~ atl RttlcJ ltgt oCl~ Cgt6~llqCll aj S ltgt l-1 oil ~uNci ucil at q l e w ec-t

            ~ill~G -t lo-eaj V-I ltlGls J l1 -1l ~n 200 KLd designa ted b lH ~ct CETP ETL Ankalesh war Uct

            ~rwSi~1 l- l2 ratSIC-t S Cll euro Cll ll 2 ctcat (JJll ~ wlt0 qy ctl 3 OOC lt09 3 ltgtuCll 0l llt oil

            (1lcreaU ETP ~ L~ W4 ~l ~tfi ( ~ q~Cj 5[lt ct ) ltgtl-1 (GNFC Ltd) ~ l1~ otl-1qlll ltgtlQ 19

            btl Y~ltl fiiZlLai des ignated Tan ker man ifest system (C-iJt (~centcJ (u~ o6Jltl~) Gps sy stem

            ctltl ~ l~-ll~~lat f(lzH 01 C1Qlol cil-U tlct ~ l 0~ Annexure -A l l-ll0ol ~l~cil V-IIWoi ltgtl

            l~~ ltgtl-1Ql ll ott q t3

            ~Slt Llt l llS per P L L Act 1991 ~ciJlci PLI iolicy iUlQqlol(8~ ltgt~ ctafloi 5C-t JJ~ lci

            l~l~l ratcil ~L uU~~ ltgtl-1Cllol (()~

            Cleal1 Gujarat Green Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organisa ti on

            GUJARAT POLLUTIO CONTROL BOARD PA RYAVARAN BHAVAN

            Sector 10-A Gandhinagar 382010 Phone (079 ) 23226295

            (l t Jl v~ 6Xt~r ~~il ~~~~3~~156GPCB Gl~8ct ~ l( rtlllW ~tSltl Wpoundl ~l( cil l-llW webslfe wwwgpcbgov1n tgt1vcuol vSc ttrtl 0Ul(Dct tt~~

            jc(lct J f( tt~l fa1Gi t~l V1lSoil oili 0~ CJct laquoc~aNl

            ~ LJ

            (S1 i~l 6l ~ )

            ltTtl ltS 0~ W81-lltTtl ctSl

            (0l l~l - Ann xure - A

            atS C1 ( CJ loil shy

            9 ~l ~~ S 0(D Sl ~ J6lt lt ~~ tt~l raici ~l vUSoil (l ~v 61 ~l tH~ ctW Gl ~h ct uluct

            ~Fllaj I-llcC (bl sit u( ampCJlC 4l~d1 0l l~ll

            ( un ( ltjRc

            Cleal1 Gujarat Greer~ Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organ isation

            • 1
            • 2
            • 3
            • 4
            • 5
            • 6
            • 7
            • 8
            • 9
            • 10
            • 11
            • 12
            • 13
            • 14
            • 15

              ujarat Narmada Valley Fertilizers amp Chemicals Limited

              system All the pumps a nd other equipments As per point no 15 and a lso where the re is a likelihood of leakages shall be provision for immediate iso lation provided with Leak Detections and Repair of such equipment is provided in (LDAR) system Provision for immediate isolation case of a leakage of such equipment in case of a leakage shall also be made The detector sensitivity shall be in ppm levels

              30 The project management shall prepare a detailed Complied Disaster Management Plan (DMP) for the project Disaster Management Plan (DM P) as per the guidelines from Directorate of for the project is already included Industrial Sa fety and Health It1 existing onsite and Offsite

              emergency plan of GNFC 31 Hazardous materials s torage shall be at an Being Complied

              isolated designated locatio n bund dyke walls shall be provided for storage tanks for Hazardous Chemicals

              32 Storage and use of haza rdous chem ica ls shall be Noted minimized to the extent possible and all necessary precautions shall be taken to mitigate th e ris k genera ted out of it

              33 Storage of hazardous chemicals shall be in Complied multi p le small capacity tanks containers instead Ethyl Acetate three storage tanks of one single large capacity tank for safety of 175 m3 and one storage tank purpose of 3400 m3 capacity are installed

              For raw material SDS two storage tanks each of 4207 m3 a re provided All tanks a re provided with all safety p recautions

              34 AJI the storage tanks shall be fi tted with Complied I

              approp riate controls to avoid any leakages Bunddyke walls shall be provided for storage tanks for hazardous chemicals Close handling sys te m for ch emical s shall be provided

              35 Ha ndling a nd charging of the chemicals shall be Noted done in such a man ner that minimal huma n exposure occurs

              36 Personal Protective Equipments shall be Noted provided to w orkers and its usage shall be ensured and supervised

              37 Fi rst Ai d box and required Antidotes for the First Aid box is made readily chemicals used in the un it shall be made readily available No specific Antidote is available in adequate quantity available Any liquid antacid like

              milk of Magnesia is a part of symptomatic treatment for any acidic substance ingestion Same is available in adequate quantity

              38 Periodi c tra ini ng sha ll be im parted to all the Noted

              G ujarat Narmada Valley Fertilizers amp Chemicals Li mited

              workers on safe ty and heal th aspects of chemicals handling

              39 Occupational health surveillance of the workers shall be done and its records shall be maintained Pre employment and periodical medical examination for all the workers shall be undertaken as per the Factories Act amp Rules

              Being complied

              40 Transpor tatio n of hazardous chemicals shall be done as per the provisions of the Motor Vehicle Act amp Rules

              Being complied

              41 All transporting routes within the factory premise shall have paved roads to minimize splashes and spillages

              Complied

              A-S NOISE 42 To mini mize the noise pollution the following

              noise control measures shall be implemented Selection of any new plant equipment

              shall be made with specifica tion of low noise levels

              Manufacturerssuppliers of major noise generating machinesequipments like air compressors feeder pumps turbine generators etc shall be instructed to make required design modifications wherever possible before supply and installation to mitigate the noise generation and to comply with the nationalinternational rmiddotegulatory norms with respect to noise generat ion for individual units

              Regular maintenance of machinery and vehi les shall be undertaken to reduce the noise impact

              No is suppression measures such as enclosures buffers and or protective measures shall be provided

              Employees shall be provided with ear protection measures like earplugs or ea rmuffs

              Prope r oiling lub rica tion and preventive maintenance shall be carried out of the machineries and equ ipments to reduce nois e generation

              Construction equipment generating minimum noise and vibration shall be chose n

              Ear plugs andmuffs shall be made compulsory for the construction workers w orki ng near the noise generating acti vit ies machinesLeguipment

              Complied

              G ujarat Narmada Valley Fe r t ilizers amp Chemicals Limited

              -

              Vehicles and co nstruction equipment with internal combustion engmes without proper silencer shall not be allowed to operate

              Construction equipment meeting the norms specified by ETP Act 1986 shall only be used

              Noise control equipment and baffling shall be employed on generators especially when they are operated near the residential and sensitive areas

              Noise levels shall be reduced by the use of adequate mufflers on all motorized equipment

              43 The overall noise level in and around the plant area shall be kept well within the prescribed standards by providing noise control measures including acoustic insulation hoods silencers enclosures vibration dampers etc on all sources of noise generation The ambient noise levels shall confirm to the standards prescribed under the Environment (Protection) Act and Rules Workplace noise levels for workers shall be as per the Factories Act and Rules

              Complied

              A-6 ENERGY CONSERVATION

              44 The proj ect proponent shall install energy effici ent devices and appliances conforming to th e Burea u of Energy Efficiency no rms

              Complied

              45 The energy audit shall be conducted at regular inte rvals and the recommendations of the audit report shall be implemented

              Being complied

              46 The project p roponent shall implement the a pplication of solar energy which shall be utilized as solar ligh ti ng for illumination of common areas lighting of internal roads and passages in add ition to uti liza tion of solar water heating systems

              Energy savers are install ed in lighting services

              47 The tra nsformers and moto rs shall mini mum effi Cie ncy of 85

              have Complied Motors of EFF 1 efficiency class as per IS 12615 are used

              48 Var iable freq uency d r ives shall be install ed VFDs have been ordered and its delivery are expecting shortly

              49 nergy con servati on measures shall include use of electronic lighting system use of CFL tubes to min imize energy use use of p rogrammable t imers fo r pumping system and lighting water level controllers for water centralized

              Complied Energy savers are installed in lighting services Instrument controllers with DCS operation

              pumps are provided Centralized cooling cooling etc are prOVided

              Guja rat Narmada Valley Fertilizers amp ChemicHls Limited

              50 Energy saving practices as follows shall be Noted practiced

              Constant monitoring of energy consumption and defining targets for energy onservation

              Adjusting the setting and illumination Implemented levels to ensure minimum energy used for desired comfort level

              Use of solar cells for lighting Energy savers are installed

              Use of solar water heater fo r canteen amp washing area

              Proper load factor shall be maintained by the unit

              Provision of day light roof to utilize maximum natural light in the production plant instead of electr ical li ghting

              Use of electronic ballast to save energy

              Use of automatic switching system for lighting and water tank pumping system

              To the maximum extent possible and technically feasible energy equipment like motors pumps air conditioning systems shall be selected

              Capacitor bank installed at MRS to improve load factor Implemented

              Implemented Implemented

              Refer poi nt no 47 for motors

              Gravity f10w shall be preferred wherever Noted possib le to save pumping energy

              Promoting awareness on energy conservation Training is imparted to all the

              i r in ing to s ta ff on methods of energy employe s conservation and to be vigilant for the sam e

              A6 CLEANER PRODUCTION AND WASTE MINIMISATION

              51 The company shall undertake the Cleaner Production Assessment study through a reputed insti tuteorganization and shall form a CP team in the company The recomm endations thereof a long w ith the compliance shall be furnished to the GPCB

              It will be explored

              52 The unit shall al so undertake following waste m inimization m easures a) Mete ring and control of quantities of active

              ingredi en ts to minimize waste b) Us of automated and enclosed filling to

              minimize s pillage c) Reuse of by-p roducts from the process as raw

              materials d) Ve nting equipment through vapour recovery

              sys tem

              Being complied

              e) Use of high pressure hoses for _e_-u_i--pm_e_n_t--shy_ _ __---t~~r~eftIle~~~_4__~-----

              q~o ~rot(~_aOt Co 3 ~ W~~1f)~ _ O 0 ( Co n ~ ~ 061 III 0 shy~ ~

              1~ernJ ~ ~

              Gujarat Narmada Valley Fertilizers amp Chemicals Limited

              clean ing to reduce wastewater generation f) Use of close feed system into batch reactors A-7 GREENBELT AND OTHER PLANTATION

              53 The company shall develop green belt within the premises as per CPCB guidelines

              On World Environment Dayshy2013 GNFC has planted 200 nos of trees in nearby area of Ethyl Acetate plant This is ongOing process and more plantation is planned during the year 2013-14

              54 The unit shall al s o ta ke up adequate plantation at Note d suitable open land on road sides and other open areas in Bharuch GIDC nearby villages or schools in consultation with GPCB and submit an action plan for the same for next three years to the GPCB GENERAL CONDITIONS

              55 In the event of failure of any pollution control system adopted by the unit the unit shall be

              Note d

              safely closed down and shall until the desired efficiency equipment has been achieved

              not of

              be restarted the control

              56 The project management shall ensure that unit complies with all the environment protection meJs ures risk mitigation measures amp safeguards recommended in the EIA EMP report and as

              Noted

              57

              58

              propo sed by them

              A separate Enviro nment Management Cell equ ip ped with full fledged laboratory facilities shall be set up to carry out the Environment Managemen t and Monito r ing fun ctions The funds ea rmarked for environment protection measures shall be maintained in a separate account and there shall not be any diversion of these fun ds fo r any other purpose A year-wise

              Being complied

              Noted

              expenditure on environmental safeguards shall

              59

              60

              be reported The company shall take up necessary socioshyecono mic upliftment activities as Corporate Soci I Responsibility and shall submit list of activi t ies with annual budget allocation to the SEIAA Pucca flooringim pervious layer shall be provided in the work a reas chemical storage area and chem ical ha ndling areas to minimize

              Already s u bmitted

              Complied

              so il contam ination

              61 Leakag s fro m the pipes pumps shall be minimal and if occurs shall b e a rrested prom ptly

              Noted

              62 During ma terial transfer spillages shall be Noted ~ ize~

              I l 0 c~ 10 ~ l~~~~-

              r gt~ ~~tl lt-~ omiddot Q ~ - ~ ~~ ~~~ Vc r

              1I1lgt -Jr c ~

              C ujarat Narmada Valley Fertilizers amp Chemicals Limited

              avoided and garland drain be constructed to avoid mixing of accidental spillages with domes tic wastewater or storm water

              63 The applicant shall also comply with any Noted additional condition that may be imposed by the SEAC or the SEIAA or any other competent authority for the purpose of the environmental protection and management

              64 No further expansion of modifications in the Noted plant shall be carried out without prior approval of the MoEF jSEIAAjSEAC for clearance a fresh reference shall be made to the SEIAAjSEAC to assess the adequacy of conditions imposed and to add additional environmental protection measures req uired if any

              65 The project authorities shall earmark adequate Noted fund s to implement the conditions stipulated by SEIAA as well as GPCB along with the implementation schedule for all the conditions stipulated herein The funds so provided shall not be diverted for any other purpose

              66 The applicant shall inform the public that the Complied project has been accorded environmental clearance by the SEIAA and that the copies of the clearance letter are available with the GPCB and may also be seen at the website of SElAAjS EACjGPCB This shall be advertised withi n seven days fro m the date of the clearance lett r in at least two local newspapers that are widely circulated in the region one of which shall be in the Gujarati language and the other in Engli sh A copy each of the same shall be fo rward ed to the concerned Regional Office of the Mini st ry

              67 It shall be mandatory for the project management Being complied to sub mit half-yearly compliance report in respect of the stipulated prior environmental clea rance terms and conditions in hard and soft copies to the regulatory authority concerned on 1st June and 1st December of ea ch calendar year

              68 The pro ject authorities shall also adhere to the Noted stip ulations made by the Gujarat Pollution

              69

              Control Board

              The project autho ri ties shall inform the GPCB Regio nal Office of MoEF and SEIAA a bout the date of financial closure and final approval of the proj ect by the concerned authorities and the date of start of the projec t

              Complie d

              -

              G ujarat Narmada Valley Fertilizers amp hemica is Lim ited

              70 The SEIAA may revoke or suspend the cleara nce if implementation of any of the above conditions is not found satis factory

              Noted

              71 The above cond itions sha ll be enforced inter-alia under the provision of the Water (Prevention amp Control of Pollution) Act 1974 Air (Prevention amp Control of Pollution) Act 1981 the Environment (Protection) Act 1986 Hazardous wastes (Management Handling and Transboundary Movement) Rules 2008 and the Public Liability Insurance Act 1991 along with their amendments and rules

              Noted

              72 Th is Environmental Clearance is valid for five years from the date of issue

              Noted

              t-1 11 eftoe-rGUJARAT POLLUTIO CONTROL BOARD

              PARYAVARAN BHAVAN Sector 10-A Gandh inagar 382010

              Phone (079) 23226295 Fax (079 ) 23232156

              14 4 ~zebs ite wwwgpcbgovin

              l[ct ~ 2 5 AP[ 2013

              itsect)J l rs~ SG Igtft

              ~ iai ltA ~ Wc[1

              cr1lE laiJ l lt (l- ~4

              ~ (l~ u-3 ( 0 9 Lt

              (Ct lt- Nl -toil ~~IlNc1 uc1l oi ctl e2l[ e c1 iffi2G LC-tlcrCoj ZJlulms Jlt 1Hl2G OOILd

              (( ETP ETL Afl k lesh wa r) u-Uct ~uQS( ~l 4l ~ fcr1s l c-t Sql E-cH 0Hltgttci

              (-Ec4 - 9) ltgtl oil -t l ctl-OS03 0 93

              lt)ETL Ankles hwar oil ltl cilO0 3093

              3)JJ lfcr1uU S lt a1-uf1V-1l lt~ bl4cn-CI - 2 JJ (9 ) I D I 12193 ~ ( -lcil9009 93

              0lS Vol l oll l oU Ethyl Ace la te l(loc CT CC ol l-l9il V-Il-1Clll-ll oUQC1 ~ ltgtl

              l~1ltl iJ o-e sl4ltct 2l4 ~Sl-(l-l l W GE(lClrtl vTItllms JtEl 1U~Qoi CTE I CC r l-l [~ll 21 C-t ail~

              licl0aj ~fWS~l middot ~Slail ~rwSlt~l -Uo-e lt l s~ (lJufl uSl l-l ratS lC-t SCllal n ct C-tl[Clll-l

              ~lq(middott

              ltgtl -t oil tc(Q(ct -1-[ol lt9V-1lct t2U~ cuS ltgt ct oD Rt k1ci ct s oll-l tl-latl Sltl ltgttlE

              ~l-1ail (JY~sct ~E(Qtct -1~ atl RttlcJ ltgt oCl~ Cgt6~llqCll aj S ltgt l-1 oil ~uNci ucil at q l e w ec-t

              ~ill~G -t lo-eaj V-I ltlGls J l1 -1l ~n 200 KLd designa ted b lH ~ct CETP ETL Ankalesh war Uct

              ~rwSi~1 l- l2 ratSIC-t S Cll euro Cll ll 2 ctcat (JJll ~ wlt0 qy ctl 3 OOC lt09 3 ltgtuCll 0l llt oil

              (1lcreaU ETP ~ L~ W4 ~l ~tfi ( ~ q~Cj 5[lt ct ) ltgtl-1 (GNFC Ltd) ~ l1~ otl-1qlll ltgtlQ 19

              btl Y~ltl fiiZlLai des ignated Tan ker man ifest system (C-iJt (~centcJ (u~ o6Jltl~) Gps sy stem

              ctltl ~ l~-ll~~lat f(lzH 01 C1Qlol cil-U tlct ~ l 0~ Annexure -A l l-ll0ol ~l~cil V-IIWoi ltgtl

              l~~ ltgtl-1Ql ll ott q t3

              ~Slt Llt l llS per P L L Act 1991 ~ciJlci PLI iolicy iUlQqlol(8~ ltgt~ ctafloi 5C-t JJ~ lci

              l~l~l ratcil ~L uU~~ ltgtl-1Cllol (()~

              Cleal1 Gujarat Green Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organisa ti on

              GUJARAT POLLUTIO CONTROL BOARD PA RYAVARAN BHAVAN

              Sector 10-A Gandhinagar 382010 Phone (079 ) 23226295

              (l t Jl v~ 6Xt~r ~~il ~~~~3~~156GPCB Gl~8ct ~ l( rtlllW ~tSltl Wpoundl ~l( cil l-llW webslfe wwwgpcbgov1n tgt1vcuol vSc ttrtl 0Ul(Dct tt~~

              jc(lct J f( tt~l fa1Gi t~l V1lSoil oili 0~ CJct laquoc~aNl

              ~ LJ

              (S1 i~l 6l ~ )

              ltTtl ltS 0~ W81-lltTtl ctSl

              (0l l~l - Ann xure - A

              atS C1 ( CJ loil shy

              9 ~l ~~ S 0(D Sl ~ J6lt lt ~~ tt~l raici ~l vUSoil (l ~v 61 ~l tH~ ctW Gl ~h ct uluct

              ~Fllaj I-llcC (bl sit u( ampCJlC 4l~d1 0l l~ll

              ( un ( ltjRc

              Cleal1 Gujarat Greer~ Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organ isation

              • 1
              • 2
              • 3
              • 4
              • 5
              • 6
              • 7
              • 8
              • 9
              • 10
              • 11
              • 12
              • 13
              • 14
              • 15

                G ujarat Narmada Valley Fertilizers amp Chemicals Li mited

                workers on safe ty and heal th aspects of chemicals handling

                39 Occupational health surveillance of the workers shall be done and its records shall be maintained Pre employment and periodical medical examination for all the workers shall be undertaken as per the Factories Act amp Rules

                Being complied

                40 Transpor tatio n of hazardous chemicals shall be done as per the provisions of the Motor Vehicle Act amp Rules

                Being complied

                41 All transporting routes within the factory premise shall have paved roads to minimize splashes and spillages

                Complied

                A-S NOISE 42 To mini mize the noise pollution the following

                noise control measures shall be implemented Selection of any new plant equipment

                shall be made with specifica tion of low noise levels

                Manufacturerssuppliers of major noise generating machinesequipments like air compressors feeder pumps turbine generators etc shall be instructed to make required design modifications wherever possible before supply and installation to mitigate the noise generation and to comply with the nationalinternational rmiddotegulatory norms with respect to noise generat ion for individual units

                Regular maintenance of machinery and vehi les shall be undertaken to reduce the noise impact

                No is suppression measures such as enclosures buffers and or protective measures shall be provided

                Employees shall be provided with ear protection measures like earplugs or ea rmuffs

                Prope r oiling lub rica tion and preventive maintenance shall be carried out of the machineries and equ ipments to reduce nois e generation

                Construction equipment generating minimum noise and vibration shall be chose n

                Ear plugs andmuffs shall be made compulsory for the construction workers w orki ng near the noise generating acti vit ies machinesLeguipment

                Complied

                G ujarat Narmada Valley Fe r t ilizers amp Chemicals Limited

                -

                Vehicles and co nstruction equipment with internal combustion engmes without proper silencer shall not be allowed to operate

                Construction equipment meeting the norms specified by ETP Act 1986 shall only be used

                Noise control equipment and baffling shall be employed on generators especially when they are operated near the residential and sensitive areas

                Noise levels shall be reduced by the use of adequate mufflers on all motorized equipment

                43 The overall noise level in and around the plant area shall be kept well within the prescribed standards by providing noise control measures including acoustic insulation hoods silencers enclosures vibration dampers etc on all sources of noise generation The ambient noise levels shall confirm to the standards prescribed under the Environment (Protection) Act and Rules Workplace noise levels for workers shall be as per the Factories Act and Rules

                Complied

                A-6 ENERGY CONSERVATION

                44 The proj ect proponent shall install energy effici ent devices and appliances conforming to th e Burea u of Energy Efficiency no rms

                Complied

                45 The energy audit shall be conducted at regular inte rvals and the recommendations of the audit report shall be implemented

                Being complied

                46 The project p roponent shall implement the a pplication of solar energy which shall be utilized as solar ligh ti ng for illumination of common areas lighting of internal roads and passages in add ition to uti liza tion of solar water heating systems

                Energy savers are install ed in lighting services

                47 The tra nsformers and moto rs shall mini mum effi Cie ncy of 85

                have Complied Motors of EFF 1 efficiency class as per IS 12615 are used

                48 Var iable freq uency d r ives shall be install ed VFDs have been ordered and its delivery are expecting shortly

                49 nergy con servati on measures shall include use of electronic lighting system use of CFL tubes to min imize energy use use of p rogrammable t imers fo r pumping system and lighting water level controllers for water centralized

                Complied Energy savers are installed in lighting services Instrument controllers with DCS operation

                pumps are provided Centralized cooling cooling etc are prOVided

                Guja rat Narmada Valley Fertilizers amp ChemicHls Limited

                50 Energy saving practices as follows shall be Noted practiced

                Constant monitoring of energy consumption and defining targets for energy onservation

                Adjusting the setting and illumination Implemented levels to ensure minimum energy used for desired comfort level

                Use of solar cells for lighting Energy savers are installed

                Use of solar water heater fo r canteen amp washing area

                Proper load factor shall be maintained by the unit

                Provision of day light roof to utilize maximum natural light in the production plant instead of electr ical li ghting

                Use of electronic ballast to save energy

                Use of automatic switching system for lighting and water tank pumping system

                To the maximum extent possible and technically feasible energy equipment like motors pumps air conditioning systems shall be selected

                Capacitor bank installed at MRS to improve load factor Implemented

                Implemented Implemented

                Refer poi nt no 47 for motors

                Gravity f10w shall be preferred wherever Noted possib le to save pumping energy

                Promoting awareness on energy conservation Training is imparted to all the

                i r in ing to s ta ff on methods of energy employe s conservation and to be vigilant for the sam e

                A6 CLEANER PRODUCTION AND WASTE MINIMISATION

                51 The company shall undertake the Cleaner Production Assessment study through a reputed insti tuteorganization and shall form a CP team in the company The recomm endations thereof a long w ith the compliance shall be furnished to the GPCB

                It will be explored

                52 The unit shall al so undertake following waste m inimization m easures a) Mete ring and control of quantities of active

                ingredi en ts to minimize waste b) Us of automated and enclosed filling to

                minimize s pillage c) Reuse of by-p roducts from the process as raw

                materials d) Ve nting equipment through vapour recovery

                sys tem

                Being complied

                e) Use of high pressure hoses for _e_-u_i--pm_e_n_t--shy_ _ __---t~~r~eftIle~~~_4__~-----

                q~o ~rot(~_aOt Co 3 ~ W~~1f)~ _ O 0 ( Co n ~ ~ 061 III 0 shy~ ~

                1~ernJ ~ ~

                Gujarat Narmada Valley Fertilizers amp Chemicals Limited

                clean ing to reduce wastewater generation f) Use of close feed system into batch reactors A-7 GREENBELT AND OTHER PLANTATION

                53 The company shall develop green belt within the premises as per CPCB guidelines

                On World Environment Dayshy2013 GNFC has planted 200 nos of trees in nearby area of Ethyl Acetate plant This is ongOing process and more plantation is planned during the year 2013-14

                54 The unit shall al s o ta ke up adequate plantation at Note d suitable open land on road sides and other open areas in Bharuch GIDC nearby villages or schools in consultation with GPCB and submit an action plan for the same for next three years to the GPCB GENERAL CONDITIONS

                55 In the event of failure of any pollution control system adopted by the unit the unit shall be

                Note d

                safely closed down and shall until the desired efficiency equipment has been achieved

                not of

                be restarted the control

                56 The project management shall ensure that unit complies with all the environment protection meJs ures risk mitigation measures amp safeguards recommended in the EIA EMP report and as

                Noted

                57

                58

                propo sed by them

                A separate Enviro nment Management Cell equ ip ped with full fledged laboratory facilities shall be set up to carry out the Environment Managemen t and Monito r ing fun ctions The funds ea rmarked for environment protection measures shall be maintained in a separate account and there shall not be any diversion of these fun ds fo r any other purpose A year-wise

                Being complied

                Noted

                expenditure on environmental safeguards shall

                59

                60

                be reported The company shall take up necessary socioshyecono mic upliftment activities as Corporate Soci I Responsibility and shall submit list of activi t ies with annual budget allocation to the SEIAA Pucca flooringim pervious layer shall be provided in the work a reas chemical storage area and chem ical ha ndling areas to minimize

                Already s u bmitted

                Complied

                so il contam ination

                61 Leakag s fro m the pipes pumps shall be minimal and if occurs shall b e a rrested prom ptly

                Noted

                62 During ma terial transfer spillages shall be Noted ~ ize~

                I l 0 c~ 10 ~ l~~~~-

                r gt~ ~~tl lt-~ omiddot Q ~ - ~ ~~ ~~~ Vc r

                1I1lgt -Jr c ~

                C ujarat Narmada Valley Fertilizers amp Chemicals Limited

                avoided and garland drain be constructed to avoid mixing of accidental spillages with domes tic wastewater or storm water

                63 The applicant shall also comply with any Noted additional condition that may be imposed by the SEAC or the SEIAA or any other competent authority for the purpose of the environmental protection and management

                64 No further expansion of modifications in the Noted plant shall be carried out without prior approval of the MoEF jSEIAAjSEAC for clearance a fresh reference shall be made to the SEIAAjSEAC to assess the adequacy of conditions imposed and to add additional environmental protection measures req uired if any

                65 The project authorities shall earmark adequate Noted fund s to implement the conditions stipulated by SEIAA as well as GPCB along with the implementation schedule for all the conditions stipulated herein The funds so provided shall not be diverted for any other purpose

                66 The applicant shall inform the public that the Complied project has been accorded environmental clearance by the SEIAA and that the copies of the clearance letter are available with the GPCB and may also be seen at the website of SElAAjS EACjGPCB This shall be advertised withi n seven days fro m the date of the clearance lett r in at least two local newspapers that are widely circulated in the region one of which shall be in the Gujarati language and the other in Engli sh A copy each of the same shall be fo rward ed to the concerned Regional Office of the Mini st ry

                67 It shall be mandatory for the project management Being complied to sub mit half-yearly compliance report in respect of the stipulated prior environmental clea rance terms and conditions in hard and soft copies to the regulatory authority concerned on 1st June and 1st December of ea ch calendar year

                68 The pro ject authorities shall also adhere to the Noted stip ulations made by the Gujarat Pollution

                69

                Control Board

                The project autho ri ties shall inform the GPCB Regio nal Office of MoEF and SEIAA a bout the date of financial closure and final approval of the proj ect by the concerned authorities and the date of start of the projec t

                Complie d

                -

                G ujarat Narmada Valley Fertilizers amp hemica is Lim ited

                70 The SEIAA may revoke or suspend the cleara nce if implementation of any of the above conditions is not found satis factory

                Noted

                71 The above cond itions sha ll be enforced inter-alia under the provision of the Water (Prevention amp Control of Pollution) Act 1974 Air (Prevention amp Control of Pollution) Act 1981 the Environment (Protection) Act 1986 Hazardous wastes (Management Handling and Transboundary Movement) Rules 2008 and the Public Liability Insurance Act 1991 along with their amendments and rules

                Noted

                72 Th is Environmental Clearance is valid for five years from the date of issue

                Noted

                t-1 11 eftoe-rGUJARAT POLLUTIO CONTROL BOARD

                PARYAVARAN BHAVAN Sector 10-A Gandh inagar 382010

                Phone (079) 23226295 Fax (079 ) 23232156

                14 4 ~zebs ite wwwgpcbgovin

                l[ct ~ 2 5 AP[ 2013

                itsect)J l rs~ SG Igtft

                ~ iai ltA ~ Wc[1

                cr1lE laiJ l lt (l- ~4

                ~ (l~ u-3 ( 0 9 Lt

                (Ct lt- Nl -toil ~~IlNc1 uc1l oi ctl e2l[ e c1 iffi2G LC-tlcrCoj ZJlulms Jlt 1Hl2G OOILd

                (( ETP ETL Afl k lesh wa r) u-Uct ~uQS( ~l 4l ~ fcr1s l c-t Sql E-cH 0Hltgttci

                (-Ec4 - 9) ltgtl oil -t l ctl-OS03 0 93

                lt)ETL Ankles hwar oil ltl cilO0 3093

                3)JJ lfcr1uU S lt a1-uf1V-1l lt~ bl4cn-CI - 2 JJ (9 ) I D I 12193 ~ ( -lcil9009 93

                0lS Vol l oll l oU Ethyl Ace la te l(loc CT CC ol l-l9il V-Il-1Clll-ll oUQC1 ~ ltgtl

                l~1ltl iJ o-e sl4ltct 2l4 ~Sl-(l-l l W GE(lClrtl vTItllms JtEl 1U~Qoi CTE I CC r l-l [~ll 21 C-t ail~

                licl0aj ~fWS~l middot ~Slail ~rwSlt~l -Uo-e lt l s~ (lJufl uSl l-l ratS lC-t SCllal n ct C-tl[Clll-l

                ~lq(middott

                ltgtl -t oil tc(Q(ct -1-[ol lt9V-1lct t2U~ cuS ltgt ct oD Rt k1ci ct s oll-l tl-latl Sltl ltgttlE

                ~l-1ail (JY~sct ~E(Qtct -1~ atl RttlcJ ltgt oCl~ Cgt6~llqCll aj S ltgt l-1 oil ~uNci ucil at q l e w ec-t

                ~ill~G -t lo-eaj V-I ltlGls J l1 -1l ~n 200 KLd designa ted b lH ~ct CETP ETL Ankalesh war Uct

                ~rwSi~1 l- l2 ratSIC-t S Cll euro Cll ll 2 ctcat (JJll ~ wlt0 qy ctl 3 OOC lt09 3 ltgtuCll 0l llt oil

                (1lcreaU ETP ~ L~ W4 ~l ~tfi ( ~ q~Cj 5[lt ct ) ltgtl-1 (GNFC Ltd) ~ l1~ otl-1qlll ltgtlQ 19

                btl Y~ltl fiiZlLai des ignated Tan ker man ifest system (C-iJt (~centcJ (u~ o6Jltl~) Gps sy stem

                ctltl ~ l~-ll~~lat f(lzH 01 C1Qlol cil-U tlct ~ l 0~ Annexure -A l l-ll0ol ~l~cil V-IIWoi ltgtl

                l~~ ltgtl-1Ql ll ott q t3

                ~Slt Llt l llS per P L L Act 1991 ~ciJlci PLI iolicy iUlQqlol(8~ ltgt~ ctafloi 5C-t JJ~ lci

                l~l~l ratcil ~L uU~~ ltgtl-1Cllol (()~

                Cleal1 Gujarat Green Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organisa ti on

                GUJARAT POLLUTIO CONTROL BOARD PA RYAVARAN BHAVAN

                Sector 10-A Gandhinagar 382010 Phone (079 ) 23226295

                (l t Jl v~ 6Xt~r ~~il ~~~~3~~156GPCB Gl~8ct ~ l( rtlllW ~tSltl Wpoundl ~l( cil l-llW webslfe wwwgpcbgov1n tgt1vcuol vSc ttrtl 0Ul(Dct tt~~

                jc(lct J f( tt~l fa1Gi t~l V1lSoil oili 0~ CJct laquoc~aNl

                ~ LJ

                (S1 i~l 6l ~ )

                ltTtl ltS 0~ W81-lltTtl ctSl

                (0l l~l - Ann xure - A

                atS C1 ( CJ loil shy

                9 ~l ~~ S 0(D Sl ~ J6lt lt ~~ tt~l raici ~l vUSoil (l ~v 61 ~l tH~ ctW Gl ~h ct uluct

                ~Fllaj I-llcC (bl sit u( ampCJlC 4l~d1 0l l~ll

                ( un ( ltjRc

                Cleal1 Gujarat Greer~ Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organ isation

                • 1
                • 2
                • 3
                • 4
                • 5
                • 6
                • 7
                • 8
                • 9
                • 10
                • 11
                • 12
                • 13
                • 14
                • 15

                  G ujarat Narmada Valley Fe r t ilizers amp Chemicals Limited

                  -

                  Vehicles and co nstruction equipment with internal combustion engmes without proper silencer shall not be allowed to operate

                  Construction equipment meeting the norms specified by ETP Act 1986 shall only be used

                  Noise control equipment and baffling shall be employed on generators especially when they are operated near the residential and sensitive areas

                  Noise levels shall be reduced by the use of adequate mufflers on all motorized equipment

                  43 The overall noise level in and around the plant area shall be kept well within the prescribed standards by providing noise control measures including acoustic insulation hoods silencers enclosures vibration dampers etc on all sources of noise generation The ambient noise levels shall confirm to the standards prescribed under the Environment (Protection) Act and Rules Workplace noise levels for workers shall be as per the Factories Act and Rules

                  Complied

                  A-6 ENERGY CONSERVATION

                  44 The proj ect proponent shall install energy effici ent devices and appliances conforming to th e Burea u of Energy Efficiency no rms

                  Complied

                  45 The energy audit shall be conducted at regular inte rvals and the recommendations of the audit report shall be implemented

                  Being complied

                  46 The project p roponent shall implement the a pplication of solar energy which shall be utilized as solar ligh ti ng for illumination of common areas lighting of internal roads and passages in add ition to uti liza tion of solar water heating systems

                  Energy savers are install ed in lighting services

                  47 The tra nsformers and moto rs shall mini mum effi Cie ncy of 85

                  have Complied Motors of EFF 1 efficiency class as per IS 12615 are used

                  48 Var iable freq uency d r ives shall be install ed VFDs have been ordered and its delivery are expecting shortly

                  49 nergy con servati on measures shall include use of electronic lighting system use of CFL tubes to min imize energy use use of p rogrammable t imers fo r pumping system and lighting water level controllers for water centralized

                  Complied Energy savers are installed in lighting services Instrument controllers with DCS operation

                  pumps are provided Centralized cooling cooling etc are prOVided

                  Guja rat Narmada Valley Fertilizers amp ChemicHls Limited

                  50 Energy saving practices as follows shall be Noted practiced

                  Constant monitoring of energy consumption and defining targets for energy onservation

                  Adjusting the setting and illumination Implemented levels to ensure minimum energy used for desired comfort level

                  Use of solar cells for lighting Energy savers are installed

                  Use of solar water heater fo r canteen amp washing area

                  Proper load factor shall be maintained by the unit

                  Provision of day light roof to utilize maximum natural light in the production plant instead of electr ical li ghting

                  Use of electronic ballast to save energy

                  Use of automatic switching system for lighting and water tank pumping system

                  To the maximum extent possible and technically feasible energy equipment like motors pumps air conditioning systems shall be selected

                  Capacitor bank installed at MRS to improve load factor Implemented

                  Implemented Implemented

                  Refer poi nt no 47 for motors

                  Gravity f10w shall be preferred wherever Noted possib le to save pumping energy

                  Promoting awareness on energy conservation Training is imparted to all the

                  i r in ing to s ta ff on methods of energy employe s conservation and to be vigilant for the sam e

                  A6 CLEANER PRODUCTION AND WASTE MINIMISATION

                  51 The company shall undertake the Cleaner Production Assessment study through a reputed insti tuteorganization and shall form a CP team in the company The recomm endations thereof a long w ith the compliance shall be furnished to the GPCB

                  It will be explored

                  52 The unit shall al so undertake following waste m inimization m easures a) Mete ring and control of quantities of active

                  ingredi en ts to minimize waste b) Us of automated and enclosed filling to

                  minimize s pillage c) Reuse of by-p roducts from the process as raw

                  materials d) Ve nting equipment through vapour recovery

                  sys tem

                  Being complied

                  e) Use of high pressure hoses for _e_-u_i--pm_e_n_t--shy_ _ __---t~~r~eftIle~~~_4__~-----

                  q~o ~rot(~_aOt Co 3 ~ W~~1f)~ _ O 0 ( Co n ~ ~ 061 III 0 shy~ ~

                  1~ernJ ~ ~

                  Gujarat Narmada Valley Fertilizers amp Chemicals Limited

                  clean ing to reduce wastewater generation f) Use of close feed system into batch reactors A-7 GREENBELT AND OTHER PLANTATION

                  53 The company shall develop green belt within the premises as per CPCB guidelines

                  On World Environment Dayshy2013 GNFC has planted 200 nos of trees in nearby area of Ethyl Acetate plant This is ongOing process and more plantation is planned during the year 2013-14

                  54 The unit shall al s o ta ke up adequate plantation at Note d suitable open land on road sides and other open areas in Bharuch GIDC nearby villages or schools in consultation with GPCB and submit an action plan for the same for next three years to the GPCB GENERAL CONDITIONS

                  55 In the event of failure of any pollution control system adopted by the unit the unit shall be

                  Note d

                  safely closed down and shall until the desired efficiency equipment has been achieved

                  not of

                  be restarted the control

                  56 The project management shall ensure that unit complies with all the environment protection meJs ures risk mitigation measures amp safeguards recommended in the EIA EMP report and as

                  Noted

                  57

                  58

                  propo sed by them

                  A separate Enviro nment Management Cell equ ip ped with full fledged laboratory facilities shall be set up to carry out the Environment Managemen t and Monito r ing fun ctions The funds ea rmarked for environment protection measures shall be maintained in a separate account and there shall not be any diversion of these fun ds fo r any other purpose A year-wise

                  Being complied

                  Noted

                  expenditure on environmental safeguards shall

                  59

                  60

                  be reported The company shall take up necessary socioshyecono mic upliftment activities as Corporate Soci I Responsibility and shall submit list of activi t ies with annual budget allocation to the SEIAA Pucca flooringim pervious layer shall be provided in the work a reas chemical storage area and chem ical ha ndling areas to minimize

                  Already s u bmitted

                  Complied

                  so il contam ination

                  61 Leakag s fro m the pipes pumps shall be minimal and if occurs shall b e a rrested prom ptly

                  Noted

                  62 During ma terial transfer spillages shall be Noted ~ ize~

                  I l 0 c~ 10 ~ l~~~~-

                  r gt~ ~~tl lt-~ omiddot Q ~ - ~ ~~ ~~~ Vc r

                  1I1lgt -Jr c ~

                  C ujarat Narmada Valley Fertilizers amp Chemicals Limited

                  avoided and garland drain be constructed to avoid mixing of accidental spillages with domes tic wastewater or storm water

                  63 The applicant shall also comply with any Noted additional condition that may be imposed by the SEAC or the SEIAA or any other competent authority for the purpose of the environmental protection and management

                  64 No further expansion of modifications in the Noted plant shall be carried out without prior approval of the MoEF jSEIAAjSEAC for clearance a fresh reference shall be made to the SEIAAjSEAC to assess the adequacy of conditions imposed and to add additional environmental protection measures req uired if any

                  65 The project authorities shall earmark adequate Noted fund s to implement the conditions stipulated by SEIAA as well as GPCB along with the implementation schedule for all the conditions stipulated herein The funds so provided shall not be diverted for any other purpose

                  66 The applicant shall inform the public that the Complied project has been accorded environmental clearance by the SEIAA and that the copies of the clearance letter are available with the GPCB and may also be seen at the website of SElAAjS EACjGPCB This shall be advertised withi n seven days fro m the date of the clearance lett r in at least two local newspapers that are widely circulated in the region one of which shall be in the Gujarati language and the other in Engli sh A copy each of the same shall be fo rward ed to the concerned Regional Office of the Mini st ry

                  67 It shall be mandatory for the project management Being complied to sub mit half-yearly compliance report in respect of the stipulated prior environmental clea rance terms and conditions in hard and soft copies to the regulatory authority concerned on 1st June and 1st December of ea ch calendar year

                  68 The pro ject authorities shall also adhere to the Noted stip ulations made by the Gujarat Pollution

                  69

                  Control Board

                  The project autho ri ties shall inform the GPCB Regio nal Office of MoEF and SEIAA a bout the date of financial closure and final approval of the proj ect by the concerned authorities and the date of start of the projec t

                  Complie d

                  -

                  G ujarat Narmada Valley Fertilizers amp hemica is Lim ited

                  70 The SEIAA may revoke or suspend the cleara nce if implementation of any of the above conditions is not found satis factory

                  Noted

                  71 The above cond itions sha ll be enforced inter-alia under the provision of the Water (Prevention amp Control of Pollution) Act 1974 Air (Prevention amp Control of Pollution) Act 1981 the Environment (Protection) Act 1986 Hazardous wastes (Management Handling and Transboundary Movement) Rules 2008 and the Public Liability Insurance Act 1991 along with their amendments and rules

                  Noted

                  72 Th is Environmental Clearance is valid for five years from the date of issue

                  Noted

                  t-1 11 eftoe-rGUJARAT POLLUTIO CONTROL BOARD

                  PARYAVARAN BHAVAN Sector 10-A Gandh inagar 382010

                  Phone (079) 23226295 Fax (079 ) 23232156

                  14 4 ~zebs ite wwwgpcbgovin

                  l[ct ~ 2 5 AP[ 2013

                  itsect)J l rs~ SG Igtft

                  ~ iai ltA ~ Wc[1

                  cr1lE laiJ l lt (l- ~4

                  ~ (l~ u-3 ( 0 9 Lt

                  (Ct lt- Nl -toil ~~IlNc1 uc1l oi ctl e2l[ e c1 iffi2G LC-tlcrCoj ZJlulms Jlt 1Hl2G OOILd

                  (( ETP ETL Afl k lesh wa r) u-Uct ~uQS( ~l 4l ~ fcr1s l c-t Sql E-cH 0Hltgttci

                  (-Ec4 - 9) ltgtl oil -t l ctl-OS03 0 93

                  lt)ETL Ankles hwar oil ltl cilO0 3093

                  3)JJ lfcr1uU S lt a1-uf1V-1l lt~ bl4cn-CI - 2 JJ (9 ) I D I 12193 ~ ( -lcil9009 93

                  0lS Vol l oll l oU Ethyl Ace la te l(loc CT CC ol l-l9il V-Il-1Clll-ll oUQC1 ~ ltgtl

                  l~1ltl iJ o-e sl4ltct 2l4 ~Sl-(l-l l W GE(lClrtl vTItllms JtEl 1U~Qoi CTE I CC r l-l [~ll 21 C-t ail~

                  licl0aj ~fWS~l middot ~Slail ~rwSlt~l -Uo-e lt l s~ (lJufl uSl l-l ratS lC-t SCllal n ct C-tl[Clll-l

                  ~lq(middott

                  ltgtl -t oil tc(Q(ct -1-[ol lt9V-1lct t2U~ cuS ltgt ct oD Rt k1ci ct s oll-l tl-latl Sltl ltgttlE

                  ~l-1ail (JY~sct ~E(Qtct -1~ atl RttlcJ ltgt oCl~ Cgt6~llqCll aj S ltgt l-1 oil ~uNci ucil at q l e w ec-t

                  ~ill~G -t lo-eaj V-I ltlGls J l1 -1l ~n 200 KLd designa ted b lH ~ct CETP ETL Ankalesh war Uct

                  ~rwSi~1 l- l2 ratSIC-t S Cll euro Cll ll 2 ctcat (JJll ~ wlt0 qy ctl 3 OOC lt09 3 ltgtuCll 0l llt oil

                  (1lcreaU ETP ~ L~ W4 ~l ~tfi ( ~ q~Cj 5[lt ct ) ltgtl-1 (GNFC Ltd) ~ l1~ otl-1qlll ltgtlQ 19

                  btl Y~ltl fiiZlLai des ignated Tan ker man ifest system (C-iJt (~centcJ (u~ o6Jltl~) Gps sy stem

                  ctltl ~ l~-ll~~lat f(lzH 01 C1Qlol cil-U tlct ~ l 0~ Annexure -A l l-ll0ol ~l~cil V-IIWoi ltgtl

                  l~~ ltgtl-1Ql ll ott q t3

                  ~Slt Llt l llS per P L L Act 1991 ~ciJlci PLI iolicy iUlQqlol(8~ ltgt~ ctafloi 5C-t JJ~ lci

                  l~l~l ratcil ~L uU~~ ltgtl-1Cllol (()~

                  Cleal1 Gujarat Green Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organisa ti on

                  GUJARAT POLLUTIO CONTROL BOARD PA RYAVARAN BHAVAN

                  Sector 10-A Gandhinagar 382010 Phone (079 ) 23226295

                  (l t Jl v~ 6Xt~r ~~il ~~~~3~~156GPCB Gl~8ct ~ l( rtlllW ~tSltl Wpoundl ~l( cil l-llW webslfe wwwgpcbgov1n tgt1vcuol vSc ttrtl 0Ul(Dct tt~~

                  jc(lct J f( tt~l fa1Gi t~l V1lSoil oili 0~ CJct laquoc~aNl

                  ~ LJ

                  (S1 i~l 6l ~ )

                  ltTtl ltS 0~ W81-lltTtl ctSl

                  (0l l~l - Ann xure - A

                  atS C1 ( CJ loil shy

                  9 ~l ~~ S 0(D Sl ~ J6lt lt ~~ tt~l raici ~l vUSoil (l ~v 61 ~l tH~ ctW Gl ~h ct uluct

                  ~Fllaj I-llcC (bl sit u( ampCJlC 4l~d1 0l l~ll

                  ( un ( ltjRc

                  Cleal1 Gujarat Greer~ Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organ isation

                  • 1
                  • 2
                  • 3
                  • 4
                  • 5
                  • 6
                  • 7
                  • 8
                  • 9
                  • 10
                  • 11
                  • 12
                  • 13
                  • 14
                  • 15

                    Guja rat Narmada Valley Fertilizers amp ChemicHls Limited

                    50 Energy saving practices as follows shall be Noted practiced

                    Constant monitoring of energy consumption and defining targets for energy onservation

                    Adjusting the setting and illumination Implemented levels to ensure minimum energy used for desired comfort level

                    Use of solar cells for lighting Energy savers are installed

                    Use of solar water heater fo r canteen amp washing area

                    Proper load factor shall be maintained by the unit

                    Provision of day light roof to utilize maximum natural light in the production plant instead of electr ical li ghting

                    Use of electronic ballast to save energy

                    Use of automatic switching system for lighting and water tank pumping system

                    To the maximum extent possible and technically feasible energy equipment like motors pumps air conditioning systems shall be selected

                    Capacitor bank installed at MRS to improve load factor Implemented

                    Implemented Implemented

                    Refer poi nt no 47 for motors

                    Gravity f10w shall be preferred wherever Noted possib le to save pumping energy

                    Promoting awareness on energy conservation Training is imparted to all the

                    i r in ing to s ta ff on methods of energy employe s conservation and to be vigilant for the sam e

                    A6 CLEANER PRODUCTION AND WASTE MINIMISATION

                    51 The company shall undertake the Cleaner Production Assessment study through a reputed insti tuteorganization and shall form a CP team in the company The recomm endations thereof a long w ith the compliance shall be furnished to the GPCB

                    It will be explored

                    52 The unit shall al so undertake following waste m inimization m easures a) Mete ring and control of quantities of active

                    ingredi en ts to minimize waste b) Us of automated and enclosed filling to

                    minimize s pillage c) Reuse of by-p roducts from the process as raw

                    materials d) Ve nting equipment through vapour recovery

                    sys tem

                    Being complied

                    e) Use of high pressure hoses for _e_-u_i--pm_e_n_t--shy_ _ __---t~~r~eftIle~~~_4__~-----

                    q~o ~rot(~_aOt Co 3 ~ W~~1f)~ _ O 0 ( Co n ~ ~ 061 III 0 shy~ ~

                    1~ernJ ~ ~

                    Gujarat Narmada Valley Fertilizers amp Chemicals Limited

                    clean ing to reduce wastewater generation f) Use of close feed system into batch reactors A-7 GREENBELT AND OTHER PLANTATION

                    53 The company shall develop green belt within the premises as per CPCB guidelines

                    On World Environment Dayshy2013 GNFC has planted 200 nos of trees in nearby area of Ethyl Acetate plant This is ongOing process and more plantation is planned during the year 2013-14

                    54 The unit shall al s o ta ke up adequate plantation at Note d suitable open land on road sides and other open areas in Bharuch GIDC nearby villages or schools in consultation with GPCB and submit an action plan for the same for next three years to the GPCB GENERAL CONDITIONS

                    55 In the event of failure of any pollution control system adopted by the unit the unit shall be

                    Note d

                    safely closed down and shall until the desired efficiency equipment has been achieved

                    not of

                    be restarted the control

                    56 The project management shall ensure that unit complies with all the environment protection meJs ures risk mitigation measures amp safeguards recommended in the EIA EMP report and as

                    Noted

                    57

                    58

                    propo sed by them

                    A separate Enviro nment Management Cell equ ip ped with full fledged laboratory facilities shall be set up to carry out the Environment Managemen t and Monito r ing fun ctions The funds ea rmarked for environment protection measures shall be maintained in a separate account and there shall not be any diversion of these fun ds fo r any other purpose A year-wise

                    Being complied

                    Noted

                    expenditure on environmental safeguards shall

                    59

                    60

                    be reported The company shall take up necessary socioshyecono mic upliftment activities as Corporate Soci I Responsibility and shall submit list of activi t ies with annual budget allocation to the SEIAA Pucca flooringim pervious layer shall be provided in the work a reas chemical storage area and chem ical ha ndling areas to minimize

                    Already s u bmitted

                    Complied

                    so il contam ination

                    61 Leakag s fro m the pipes pumps shall be minimal and if occurs shall b e a rrested prom ptly

                    Noted

                    62 During ma terial transfer spillages shall be Noted ~ ize~

                    I l 0 c~ 10 ~ l~~~~-

                    r gt~ ~~tl lt-~ omiddot Q ~ - ~ ~~ ~~~ Vc r

                    1I1lgt -Jr c ~

                    C ujarat Narmada Valley Fertilizers amp Chemicals Limited

                    avoided and garland drain be constructed to avoid mixing of accidental spillages with domes tic wastewater or storm water

                    63 The applicant shall also comply with any Noted additional condition that may be imposed by the SEAC or the SEIAA or any other competent authority for the purpose of the environmental protection and management

                    64 No further expansion of modifications in the Noted plant shall be carried out without prior approval of the MoEF jSEIAAjSEAC for clearance a fresh reference shall be made to the SEIAAjSEAC to assess the adequacy of conditions imposed and to add additional environmental protection measures req uired if any

                    65 The project authorities shall earmark adequate Noted fund s to implement the conditions stipulated by SEIAA as well as GPCB along with the implementation schedule for all the conditions stipulated herein The funds so provided shall not be diverted for any other purpose

                    66 The applicant shall inform the public that the Complied project has been accorded environmental clearance by the SEIAA and that the copies of the clearance letter are available with the GPCB and may also be seen at the website of SElAAjS EACjGPCB This shall be advertised withi n seven days fro m the date of the clearance lett r in at least two local newspapers that are widely circulated in the region one of which shall be in the Gujarati language and the other in Engli sh A copy each of the same shall be fo rward ed to the concerned Regional Office of the Mini st ry

                    67 It shall be mandatory for the project management Being complied to sub mit half-yearly compliance report in respect of the stipulated prior environmental clea rance terms and conditions in hard and soft copies to the regulatory authority concerned on 1st June and 1st December of ea ch calendar year

                    68 The pro ject authorities shall also adhere to the Noted stip ulations made by the Gujarat Pollution

                    69

                    Control Board

                    The project autho ri ties shall inform the GPCB Regio nal Office of MoEF and SEIAA a bout the date of financial closure and final approval of the proj ect by the concerned authorities and the date of start of the projec t

                    Complie d

                    -

                    G ujarat Narmada Valley Fertilizers amp hemica is Lim ited

                    70 The SEIAA may revoke or suspend the cleara nce if implementation of any of the above conditions is not found satis factory

                    Noted

                    71 The above cond itions sha ll be enforced inter-alia under the provision of the Water (Prevention amp Control of Pollution) Act 1974 Air (Prevention amp Control of Pollution) Act 1981 the Environment (Protection) Act 1986 Hazardous wastes (Management Handling and Transboundary Movement) Rules 2008 and the Public Liability Insurance Act 1991 along with their amendments and rules

                    Noted

                    72 Th is Environmental Clearance is valid for five years from the date of issue

                    Noted

                    t-1 11 eftoe-rGUJARAT POLLUTIO CONTROL BOARD

                    PARYAVARAN BHAVAN Sector 10-A Gandh inagar 382010

                    Phone (079) 23226295 Fax (079 ) 23232156

                    14 4 ~zebs ite wwwgpcbgovin

                    l[ct ~ 2 5 AP[ 2013

                    itsect)J l rs~ SG Igtft

                    ~ iai ltA ~ Wc[1

                    cr1lE laiJ l lt (l- ~4

                    ~ (l~ u-3 ( 0 9 Lt

                    (Ct lt- Nl -toil ~~IlNc1 uc1l oi ctl e2l[ e c1 iffi2G LC-tlcrCoj ZJlulms Jlt 1Hl2G OOILd

                    (( ETP ETL Afl k lesh wa r) u-Uct ~uQS( ~l 4l ~ fcr1s l c-t Sql E-cH 0Hltgttci

                    (-Ec4 - 9) ltgtl oil -t l ctl-OS03 0 93

                    lt)ETL Ankles hwar oil ltl cilO0 3093

                    3)JJ lfcr1uU S lt a1-uf1V-1l lt~ bl4cn-CI - 2 JJ (9 ) I D I 12193 ~ ( -lcil9009 93

                    0lS Vol l oll l oU Ethyl Ace la te l(loc CT CC ol l-l9il V-Il-1Clll-ll oUQC1 ~ ltgtl

                    l~1ltl iJ o-e sl4ltct 2l4 ~Sl-(l-l l W GE(lClrtl vTItllms JtEl 1U~Qoi CTE I CC r l-l [~ll 21 C-t ail~

                    licl0aj ~fWS~l middot ~Slail ~rwSlt~l -Uo-e lt l s~ (lJufl uSl l-l ratS lC-t SCllal n ct C-tl[Clll-l

                    ~lq(middott

                    ltgtl -t oil tc(Q(ct -1-[ol lt9V-1lct t2U~ cuS ltgt ct oD Rt k1ci ct s oll-l tl-latl Sltl ltgttlE

                    ~l-1ail (JY~sct ~E(Qtct -1~ atl RttlcJ ltgt oCl~ Cgt6~llqCll aj S ltgt l-1 oil ~uNci ucil at q l e w ec-t

                    ~ill~G -t lo-eaj V-I ltlGls J l1 -1l ~n 200 KLd designa ted b lH ~ct CETP ETL Ankalesh war Uct

                    ~rwSi~1 l- l2 ratSIC-t S Cll euro Cll ll 2 ctcat (JJll ~ wlt0 qy ctl 3 OOC lt09 3 ltgtuCll 0l llt oil

                    (1lcreaU ETP ~ L~ W4 ~l ~tfi ( ~ q~Cj 5[lt ct ) ltgtl-1 (GNFC Ltd) ~ l1~ otl-1qlll ltgtlQ 19

                    btl Y~ltl fiiZlLai des ignated Tan ker man ifest system (C-iJt (~centcJ (u~ o6Jltl~) Gps sy stem

                    ctltl ~ l~-ll~~lat f(lzH 01 C1Qlol cil-U tlct ~ l 0~ Annexure -A l l-ll0ol ~l~cil V-IIWoi ltgtl

                    l~~ ltgtl-1Ql ll ott q t3

                    ~Slt Llt l llS per P L L Act 1991 ~ciJlci PLI iolicy iUlQqlol(8~ ltgt~ ctafloi 5C-t JJ~ lci

                    l~l~l ratcil ~L uU~~ ltgtl-1Cllol (()~

                    Cleal1 Gujarat Green Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organisa ti on

                    GUJARAT POLLUTIO CONTROL BOARD PA RYAVARAN BHAVAN

                    Sector 10-A Gandhinagar 382010 Phone (079 ) 23226295

                    (l t Jl v~ 6Xt~r ~~il ~~~~3~~156GPCB Gl~8ct ~ l( rtlllW ~tSltl Wpoundl ~l( cil l-llW webslfe wwwgpcbgov1n tgt1vcuol vSc ttrtl 0Ul(Dct tt~~

                    jc(lct J f( tt~l fa1Gi t~l V1lSoil oili 0~ CJct laquoc~aNl

                    ~ LJ

                    (S1 i~l 6l ~ )

                    ltTtl ltS 0~ W81-lltTtl ctSl

                    (0l l~l - Ann xure - A

                    atS C1 ( CJ loil shy

                    9 ~l ~~ S 0(D Sl ~ J6lt lt ~~ tt~l raici ~l vUSoil (l ~v 61 ~l tH~ ctW Gl ~h ct uluct

                    ~Fllaj I-llcC (bl sit u( ampCJlC 4l~d1 0l l~ll

                    ( un ( ltjRc

                    Cleal1 Gujarat Greer~ Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organ isation

                    • 1
                    • 2
                    • 3
                    • 4
                    • 5
                    • 6
                    • 7
                    • 8
                    • 9
                    • 10
                    • 11
                    • 12
                    • 13
                    • 14
                    • 15

                      Gujarat Narmada Valley Fertilizers amp Chemicals Limited

                      clean ing to reduce wastewater generation f) Use of close feed system into batch reactors A-7 GREENBELT AND OTHER PLANTATION

                      53 The company shall develop green belt within the premises as per CPCB guidelines

                      On World Environment Dayshy2013 GNFC has planted 200 nos of trees in nearby area of Ethyl Acetate plant This is ongOing process and more plantation is planned during the year 2013-14

                      54 The unit shall al s o ta ke up adequate plantation at Note d suitable open land on road sides and other open areas in Bharuch GIDC nearby villages or schools in consultation with GPCB and submit an action plan for the same for next three years to the GPCB GENERAL CONDITIONS

                      55 In the event of failure of any pollution control system adopted by the unit the unit shall be

                      Note d

                      safely closed down and shall until the desired efficiency equipment has been achieved

                      not of

                      be restarted the control

                      56 The project management shall ensure that unit complies with all the environment protection meJs ures risk mitigation measures amp safeguards recommended in the EIA EMP report and as

                      Noted

                      57

                      58

                      propo sed by them

                      A separate Enviro nment Management Cell equ ip ped with full fledged laboratory facilities shall be set up to carry out the Environment Managemen t and Monito r ing fun ctions The funds ea rmarked for environment protection measures shall be maintained in a separate account and there shall not be any diversion of these fun ds fo r any other purpose A year-wise

                      Being complied

                      Noted

                      expenditure on environmental safeguards shall

                      59

                      60

                      be reported The company shall take up necessary socioshyecono mic upliftment activities as Corporate Soci I Responsibility and shall submit list of activi t ies with annual budget allocation to the SEIAA Pucca flooringim pervious layer shall be provided in the work a reas chemical storage area and chem ical ha ndling areas to minimize

                      Already s u bmitted

                      Complied

                      so il contam ination

                      61 Leakag s fro m the pipes pumps shall be minimal and if occurs shall b e a rrested prom ptly

                      Noted

                      62 During ma terial transfer spillages shall be Noted ~ ize~

                      I l 0 c~ 10 ~ l~~~~-

                      r gt~ ~~tl lt-~ omiddot Q ~ - ~ ~~ ~~~ Vc r

                      1I1lgt -Jr c ~

                      C ujarat Narmada Valley Fertilizers amp Chemicals Limited

                      avoided and garland drain be constructed to avoid mixing of accidental spillages with domes tic wastewater or storm water

                      63 The applicant shall also comply with any Noted additional condition that may be imposed by the SEAC or the SEIAA or any other competent authority for the purpose of the environmental protection and management

                      64 No further expansion of modifications in the Noted plant shall be carried out without prior approval of the MoEF jSEIAAjSEAC for clearance a fresh reference shall be made to the SEIAAjSEAC to assess the adequacy of conditions imposed and to add additional environmental protection measures req uired if any

                      65 The project authorities shall earmark adequate Noted fund s to implement the conditions stipulated by SEIAA as well as GPCB along with the implementation schedule for all the conditions stipulated herein The funds so provided shall not be diverted for any other purpose

                      66 The applicant shall inform the public that the Complied project has been accorded environmental clearance by the SEIAA and that the copies of the clearance letter are available with the GPCB and may also be seen at the website of SElAAjS EACjGPCB This shall be advertised withi n seven days fro m the date of the clearance lett r in at least two local newspapers that are widely circulated in the region one of which shall be in the Gujarati language and the other in Engli sh A copy each of the same shall be fo rward ed to the concerned Regional Office of the Mini st ry

                      67 It shall be mandatory for the project management Being complied to sub mit half-yearly compliance report in respect of the stipulated prior environmental clea rance terms and conditions in hard and soft copies to the regulatory authority concerned on 1st June and 1st December of ea ch calendar year

                      68 The pro ject authorities shall also adhere to the Noted stip ulations made by the Gujarat Pollution

                      69

                      Control Board

                      The project autho ri ties shall inform the GPCB Regio nal Office of MoEF and SEIAA a bout the date of financial closure and final approval of the proj ect by the concerned authorities and the date of start of the projec t

                      Complie d

                      -

                      G ujarat Narmada Valley Fertilizers amp hemica is Lim ited

                      70 The SEIAA may revoke or suspend the cleara nce if implementation of any of the above conditions is not found satis factory

                      Noted

                      71 The above cond itions sha ll be enforced inter-alia under the provision of the Water (Prevention amp Control of Pollution) Act 1974 Air (Prevention amp Control of Pollution) Act 1981 the Environment (Protection) Act 1986 Hazardous wastes (Management Handling and Transboundary Movement) Rules 2008 and the Public Liability Insurance Act 1991 along with their amendments and rules

                      Noted

                      72 Th is Environmental Clearance is valid for five years from the date of issue

                      Noted

                      t-1 11 eftoe-rGUJARAT POLLUTIO CONTROL BOARD

                      PARYAVARAN BHAVAN Sector 10-A Gandh inagar 382010

                      Phone (079) 23226295 Fax (079 ) 23232156

                      14 4 ~zebs ite wwwgpcbgovin

                      l[ct ~ 2 5 AP[ 2013

                      itsect)J l rs~ SG Igtft

                      ~ iai ltA ~ Wc[1

                      cr1lE laiJ l lt (l- ~4

                      ~ (l~ u-3 ( 0 9 Lt

                      (Ct lt- Nl -toil ~~IlNc1 uc1l oi ctl e2l[ e c1 iffi2G LC-tlcrCoj ZJlulms Jlt 1Hl2G OOILd

                      (( ETP ETL Afl k lesh wa r) u-Uct ~uQS( ~l 4l ~ fcr1s l c-t Sql E-cH 0Hltgttci

                      (-Ec4 - 9) ltgtl oil -t l ctl-OS03 0 93

                      lt)ETL Ankles hwar oil ltl cilO0 3093

                      3)JJ lfcr1uU S lt a1-uf1V-1l lt~ bl4cn-CI - 2 JJ (9 ) I D I 12193 ~ ( -lcil9009 93

                      0lS Vol l oll l oU Ethyl Ace la te l(loc CT CC ol l-l9il V-Il-1Clll-ll oUQC1 ~ ltgtl

                      l~1ltl iJ o-e sl4ltct 2l4 ~Sl-(l-l l W GE(lClrtl vTItllms JtEl 1U~Qoi CTE I CC r l-l [~ll 21 C-t ail~

                      licl0aj ~fWS~l middot ~Slail ~rwSlt~l -Uo-e lt l s~ (lJufl uSl l-l ratS lC-t SCllal n ct C-tl[Clll-l

                      ~lq(middott

                      ltgtl -t oil tc(Q(ct -1-[ol lt9V-1lct t2U~ cuS ltgt ct oD Rt k1ci ct s oll-l tl-latl Sltl ltgttlE

                      ~l-1ail (JY~sct ~E(Qtct -1~ atl RttlcJ ltgt oCl~ Cgt6~llqCll aj S ltgt l-1 oil ~uNci ucil at q l e w ec-t

                      ~ill~G -t lo-eaj V-I ltlGls J l1 -1l ~n 200 KLd designa ted b lH ~ct CETP ETL Ankalesh war Uct

                      ~rwSi~1 l- l2 ratSIC-t S Cll euro Cll ll 2 ctcat (JJll ~ wlt0 qy ctl 3 OOC lt09 3 ltgtuCll 0l llt oil

                      (1lcreaU ETP ~ L~ W4 ~l ~tfi ( ~ q~Cj 5[lt ct ) ltgtl-1 (GNFC Ltd) ~ l1~ otl-1qlll ltgtlQ 19

                      btl Y~ltl fiiZlLai des ignated Tan ker man ifest system (C-iJt (~centcJ (u~ o6Jltl~) Gps sy stem

                      ctltl ~ l~-ll~~lat f(lzH 01 C1Qlol cil-U tlct ~ l 0~ Annexure -A l l-ll0ol ~l~cil V-IIWoi ltgtl

                      l~~ ltgtl-1Ql ll ott q t3

                      ~Slt Llt l llS per P L L Act 1991 ~ciJlci PLI iolicy iUlQqlol(8~ ltgt~ ctafloi 5C-t JJ~ lci

                      l~l~l ratcil ~L uU~~ ltgtl-1Cllol (()~

                      Cleal1 Gujarat Green Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organisa ti on

                      GUJARAT POLLUTIO CONTROL BOARD PA RYAVARAN BHAVAN

                      Sector 10-A Gandhinagar 382010 Phone (079 ) 23226295

                      (l t Jl v~ 6Xt~r ~~il ~~~~3~~156GPCB Gl~8ct ~ l( rtlllW ~tSltl Wpoundl ~l( cil l-llW webslfe wwwgpcbgov1n tgt1vcuol vSc ttrtl 0Ul(Dct tt~~

                      jc(lct J f( tt~l fa1Gi t~l V1lSoil oili 0~ CJct laquoc~aNl

                      ~ LJ

                      (S1 i~l 6l ~ )

                      ltTtl ltS 0~ W81-lltTtl ctSl

                      (0l l~l - Ann xure - A

                      atS C1 ( CJ loil shy

                      9 ~l ~~ S 0(D Sl ~ J6lt lt ~~ tt~l raici ~l vUSoil (l ~v 61 ~l tH~ ctW Gl ~h ct uluct

                      ~Fllaj I-llcC (bl sit u( ampCJlC 4l~d1 0l l~ll

                      ( un ( ltjRc

                      Cleal1 Gujarat Greer~ Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organ isation

                      • 1
                      • 2
                      • 3
                      • 4
                      • 5
                      • 6
                      • 7
                      • 8
                      • 9
                      • 10
                      • 11
                      • 12
                      • 13
                      • 14
                      • 15

                        C ujarat Narmada Valley Fertilizers amp Chemicals Limited

                        avoided and garland drain be constructed to avoid mixing of accidental spillages with domes tic wastewater or storm water

                        63 The applicant shall also comply with any Noted additional condition that may be imposed by the SEAC or the SEIAA or any other competent authority for the purpose of the environmental protection and management

                        64 No further expansion of modifications in the Noted plant shall be carried out without prior approval of the MoEF jSEIAAjSEAC for clearance a fresh reference shall be made to the SEIAAjSEAC to assess the adequacy of conditions imposed and to add additional environmental protection measures req uired if any

                        65 The project authorities shall earmark adequate Noted fund s to implement the conditions stipulated by SEIAA as well as GPCB along with the implementation schedule for all the conditions stipulated herein The funds so provided shall not be diverted for any other purpose

                        66 The applicant shall inform the public that the Complied project has been accorded environmental clearance by the SEIAA and that the copies of the clearance letter are available with the GPCB and may also be seen at the website of SElAAjS EACjGPCB This shall be advertised withi n seven days fro m the date of the clearance lett r in at least two local newspapers that are widely circulated in the region one of which shall be in the Gujarati language and the other in Engli sh A copy each of the same shall be fo rward ed to the concerned Regional Office of the Mini st ry

                        67 It shall be mandatory for the project management Being complied to sub mit half-yearly compliance report in respect of the stipulated prior environmental clea rance terms and conditions in hard and soft copies to the regulatory authority concerned on 1st June and 1st December of ea ch calendar year

                        68 The pro ject authorities shall also adhere to the Noted stip ulations made by the Gujarat Pollution

                        69

                        Control Board

                        The project autho ri ties shall inform the GPCB Regio nal Office of MoEF and SEIAA a bout the date of financial closure and final approval of the proj ect by the concerned authorities and the date of start of the projec t

                        Complie d

                        -

                        G ujarat Narmada Valley Fertilizers amp hemica is Lim ited

                        70 The SEIAA may revoke or suspend the cleara nce if implementation of any of the above conditions is not found satis factory

                        Noted

                        71 The above cond itions sha ll be enforced inter-alia under the provision of the Water (Prevention amp Control of Pollution) Act 1974 Air (Prevention amp Control of Pollution) Act 1981 the Environment (Protection) Act 1986 Hazardous wastes (Management Handling and Transboundary Movement) Rules 2008 and the Public Liability Insurance Act 1991 along with their amendments and rules

                        Noted

                        72 Th is Environmental Clearance is valid for five years from the date of issue

                        Noted

                        t-1 11 eftoe-rGUJARAT POLLUTIO CONTROL BOARD

                        PARYAVARAN BHAVAN Sector 10-A Gandh inagar 382010

                        Phone (079) 23226295 Fax (079 ) 23232156

                        14 4 ~zebs ite wwwgpcbgovin

                        l[ct ~ 2 5 AP[ 2013

                        itsect)J l rs~ SG Igtft

                        ~ iai ltA ~ Wc[1

                        cr1lE laiJ l lt (l- ~4

                        ~ (l~ u-3 ( 0 9 Lt

                        (Ct lt- Nl -toil ~~IlNc1 uc1l oi ctl e2l[ e c1 iffi2G LC-tlcrCoj ZJlulms Jlt 1Hl2G OOILd

                        (( ETP ETL Afl k lesh wa r) u-Uct ~uQS( ~l 4l ~ fcr1s l c-t Sql E-cH 0Hltgttci

                        (-Ec4 - 9) ltgtl oil -t l ctl-OS03 0 93

                        lt)ETL Ankles hwar oil ltl cilO0 3093

                        3)JJ lfcr1uU S lt a1-uf1V-1l lt~ bl4cn-CI - 2 JJ (9 ) I D I 12193 ~ ( -lcil9009 93

                        0lS Vol l oll l oU Ethyl Ace la te l(loc CT CC ol l-l9il V-Il-1Clll-ll oUQC1 ~ ltgtl

                        l~1ltl iJ o-e sl4ltct 2l4 ~Sl-(l-l l W GE(lClrtl vTItllms JtEl 1U~Qoi CTE I CC r l-l [~ll 21 C-t ail~

                        licl0aj ~fWS~l middot ~Slail ~rwSlt~l -Uo-e lt l s~ (lJufl uSl l-l ratS lC-t SCllal n ct C-tl[Clll-l

                        ~lq(middott

                        ltgtl -t oil tc(Q(ct -1-[ol lt9V-1lct t2U~ cuS ltgt ct oD Rt k1ci ct s oll-l tl-latl Sltl ltgttlE

                        ~l-1ail (JY~sct ~E(Qtct -1~ atl RttlcJ ltgt oCl~ Cgt6~llqCll aj S ltgt l-1 oil ~uNci ucil at q l e w ec-t

                        ~ill~G -t lo-eaj V-I ltlGls J l1 -1l ~n 200 KLd designa ted b lH ~ct CETP ETL Ankalesh war Uct

                        ~rwSi~1 l- l2 ratSIC-t S Cll euro Cll ll 2 ctcat (JJll ~ wlt0 qy ctl 3 OOC lt09 3 ltgtuCll 0l llt oil

                        (1lcreaU ETP ~ L~ W4 ~l ~tfi ( ~ q~Cj 5[lt ct ) ltgtl-1 (GNFC Ltd) ~ l1~ otl-1qlll ltgtlQ 19

                        btl Y~ltl fiiZlLai des ignated Tan ker man ifest system (C-iJt (~centcJ (u~ o6Jltl~) Gps sy stem

                        ctltl ~ l~-ll~~lat f(lzH 01 C1Qlol cil-U tlct ~ l 0~ Annexure -A l l-ll0ol ~l~cil V-IIWoi ltgtl

                        l~~ ltgtl-1Ql ll ott q t3

                        ~Slt Llt l llS per P L L Act 1991 ~ciJlci PLI iolicy iUlQqlol(8~ ltgt~ ctafloi 5C-t JJ~ lci

                        l~l~l ratcil ~L uU~~ ltgtl-1Cllol (()~

                        Cleal1 Gujarat Green Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organisa ti on

                        GUJARAT POLLUTIO CONTROL BOARD PA RYAVARAN BHAVAN

                        Sector 10-A Gandhinagar 382010 Phone (079 ) 23226295

                        (l t Jl v~ 6Xt~r ~~il ~~~~3~~156GPCB Gl~8ct ~ l( rtlllW ~tSltl Wpoundl ~l( cil l-llW webslfe wwwgpcbgov1n tgt1vcuol vSc ttrtl 0Ul(Dct tt~~

                        jc(lct J f( tt~l fa1Gi t~l V1lSoil oili 0~ CJct laquoc~aNl

                        ~ LJ

                        (S1 i~l 6l ~ )

                        ltTtl ltS 0~ W81-lltTtl ctSl

                        (0l l~l - Ann xure - A

                        atS C1 ( CJ loil shy

                        9 ~l ~~ S 0(D Sl ~ J6lt lt ~~ tt~l raici ~l vUSoil (l ~v 61 ~l tH~ ctW Gl ~h ct uluct

                        ~Fllaj I-llcC (bl sit u( ampCJlC 4l~d1 0l l~ll

                        ( un ( ltjRc

                        Cleal1 Gujarat Greer~ Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organ isation

                        • 1
                        • 2
                        • 3
                        • 4
                        • 5
                        • 6
                        • 7
                        • 8
                        • 9
                        • 10
                        • 11
                        • 12
                        • 13
                        • 14
                        • 15

                          G ujarat Narmada Valley Fertilizers amp hemica is Lim ited

                          70 The SEIAA may revoke or suspend the cleara nce if implementation of any of the above conditions is not found satis factory

                          Noted

                          71 The above cond itions sha ll be enforced inter-alia under the provision of the Water (Prevention amp Control of Pollution) Act 1974 Air (Prevention amp Control of Pollution) Act 1981 the Environment (Protection) Act 1986 Hazardous wastes (Management Handling and Transboundary Movement) Rules 2008 and the Public Liability Insurance Act 1991 along with their amendments and rules

                          Noted

                          72 Th is Environmental Clearance is valid for five years from the date of issue

                          Noted

                          t-1 11 eftoe-rGUJARAT POLLUTIO CONTROL BOARD

                          PARYAVARAN BHAVAN Sector 10-A Gandh inagar 382010

                          Phone (079) 23226295 Fax (079 ) 23232156

                          14 4 ~zebs ite wwwgpcbgovin

                          l[ct ~ 2 5 AP[ 2013

                          itsect)J l rs~ SG Igtft

                          ~ iai ltA ~ Wc[1

                          cr1lE laiJ l lt (l- ~4

                          ~ (l~ u-3 ( 0 9 Lt

                          (Ct lt- Nl -toil ~~IlNc1 uc1l oi ctl e2l[ e c1 iffi2G LC-tlcrCoj ZJlulms Jlt 1Hl2G OOILd

                          (( ETP ETL Afl k lesh wa r) u-Uct ~uQS( ~l 4l ~ fcr1s l c-t Sql E-cH 0Hltgttci

                          (-Ec4 - 9) ltgtl oil -t l ctl-OS03 0 93

                          lt)ETL Ankles hwar oil ltl cilO0 3093

                          3)JJ lfcr1uU S lt a1-uf1V-1l lt~ bl4cn-CI - 2 JJ (9 ) I D I 12193 ~ ( -lcil9009 93

                          0lS Vol l oll l oU Ethyl Ace la te l(loc CT CC ol l-l9il V-Il-1Clll-ll oUQC1 ~ ltgtl

                          l~1ltl iJ o-e sl4ltct 2l4 ~Sl-(l-l l W GE(lClrtl vTItllms JtEl 1U~Qoi CTE I CC r l-l [~ll 21 C-t ail~

                          licl0aj ~fWS~l middot ~Slail ~rwSlt~l -Uo-e lt l s~ (lJufl uSl l-l ratS lC-t SCllal n ct C-tl[Clll-l

                          ~lq(middott

                          ltgtl -t oil tc(Q(ct -1-[ol lt9V-1lct t2U~ cuS ltgt ct oD Rt k1ci ct s oll-l tl-latl Sltl ltgttlE

                          ~l-1ail (JY~sct ~E(Qtct -1~ atl RttlcJ ltgt oCl~ Cgt6~llqCll aj S ltgt l-1 oil ~uNci ucil at q l e w ec-t

                          ~ill~G -t lo-eaj V-I ltlGls J l1 -1l ~n 200 KLd designa ted b lH ~ct CETP ETL Ankalesh war Uct

                          ~rwSi~1 l- l2 ratSIC-t S Cll euro Cll ll 2 ctcat (JJll ~ wlt0 qy ctl 3 OOC lt09 3 ltgtuCll 0l llt oil

                          (1lcreaU ETP ~ L~ W4 ~l ~tfi ( ~ q~Cj 5[lt ct ) ltgtl-1 (GNFC Ltd) ~ l1~ otl-1qlll ltgtlQ 19

                          btl Y~ltl fiiZlLai des ignated Tan ker man ifest system (C-iJt (~centcJ (u~ o6Jltl~) Gps sy stem

                          ctltl ~ l~-ll~~lat f(lzH 01 C1Qlol cil-U tlct ~ l 0~ Annexure -A l l-ll0ol ~l~cil V-IIWoi ltgtl

                          l~~ ltgtl-1Ql ll ott q t3

                          ~Slt Llt l llS per P L L Act 1991 ~ciJlci PLI iolicy iUlQqlol(8~ ltgt~ ctafloi 5C-t JJ~ lci

                          l~l~l ratcil ~L uU~~ ltgtl-1Cllol (()~

                          Cleal1 Gujarat Green Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organisa ti on

                          GUJARAT POLLUTIO CONTROL BOARD PA RYAVARAN BHAVAN

                          Sector 10-A Gandhinagar 382010 Phone (079 ) 23226295

                          (l t Jl v~ 6Xt~r ~~il ~~~~3~~156GPCB Gl~8ct ~ l( rtlllW ~tSltl Wpoundl ~l( cil l-llW webslfe wwwgpcbgov1n tgt1vcuol vSc ttrtl 0Ul(Dct tt~~

                          jc(lct J f( tt~l fa1Gi t~l V1lSoil oili 0~ CJct laquoc~aNl

                          ~ LJ

                          (S1 i~l 6l ~ )

                          ltTtl ltS 0~ W81-lltTtl ctSl

                          (0l l~l - Ann xure - A

                          atS C1 ( CJ loil shy

                          9 ~l ~~ S 0(D Sl ~ J6lt lt ~~ tt~l raici ~l vUSoil (l ~v 61 ~l tH~ ctW Gl ~h ct uluct

                          ~Fllaj I-llcC (bl sit u( ampCJlC 4l~d1 0l l~ll

                          ( un ( ltjRc

                          Cleal1 Gujarat Greer~ Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organ isation

                          • 1
                          • 2
                          • 3
                          • 4
                          • 5
                          • 6
                          • 7
                          • 8
                          • 9
                          • 10
                          • 11
                          • 12
                          • 13
                          • 14
                          • 15

                            t-1 11 eftoe-rGUJARAT POLLUTIO CONTROL BOARD

                            PARYAVARAN BHAVAN Sector 10-A Gandh inagar 382010

                            Phone (079) 23226295 Fax (079 ) 23232156

                            14 4 ~zebs ite wwwgpcbgovin

                            l[ct ~ 2 5 AP[ 2013

                            itsect)J l rs~ SG Igtft

                            ~ iai ltA ~ Wc[1

                            cr1lE laiJ l lt (l- ~4

                            ~ (l~ u-3 ( 0 9 Lt

                            (Ct lt- Nl -toil ~~IlNc1 uc1l oi ctl e2l[ e c1 iffi2G LC-tlcrCoj ZJlulms Jlt 1Hl2G OOILd

                            (( ETP ETL Afl k lesh wa r) u-Uct ~uQS( ~l 4l ~ fcr1s l c-t Sql E-cH 0Hltgttci

                            (-Ec4 - 9) ltgtl oil -t l ctl-OS03 0 93

                            lt)ETL Ankles hwar oil ltl cilO0 3093

                            3)JJ lfcr1uU S lt a1-uf1V-1l lt~ bl4cn-CI - 2 JJ (9 ) I D I 12193 ~ ( -lcil9009 93

                            0lS Vol l oll l oU Ethyl Ace la te l(loc CT CC ol l-l9il V-Il-1Clll-ll oUQC1 ~ ltgtl

                            l~1ltl iJ o-e sl4ltct 2l4 ~Sl-(l-l l W GE(lClrtl vTItllms JtEl 1U~Qoi CTE I CC r l-l [~ll 21 C-t ail~

                            licl0aj ~fWS~l middot ~Slail ~rwSlt~l -Uo-e lt l s~ (lJufl uSl l-l ratS lC-t SCllal n ct C-tl[Clll-l

                            ~lq(middott

                            ltgtl -t oil tc(Q(ct -1-[ol lt9V-1lct t2U~ cuS ltgt ct oD Rt k1ci ct s oll-l tl-latl Sltl ltgttlE

                            ~l-1ail (JY~sct ~E(Qtct -1~ atl RttlcJ ltgt oCl~ Cgt6~llqCll aj S ltgt l-1 oil ~uNci ucil at q l e w ec-t

                            ~ill~G -t lo-eaj V-I ltlGls J l1 -1l ~n 200 KLd designa ted b lH ~ct CETP ETL Ankalesh war Uct

                            ~rwSi~1 l- l2 ratSIC-t S Cll euro Cll ll 2 ctcat (JJll ~ wlt0 qy ctl 3 OOC lt09 3 ltgtuCll 0l llt oil

                            (1lcreaU ETP ~ L~ W4 ~l ~tfi ( ~ q~Cj 5[lt ct ) ltgtl-1 (GNFC Ltd) ~ l1~ otl-1qlll ltgtlQ 19

                            btl Y~ltl fiiZlLai des ignated Tan ker man ifest system (C-iJt (~centcJ (u~ o6Jltl~) Gps sy stem

                            ctltl ~ l~-ll~~lat f(lzH 01 C1Qlol cil-U tlct ~ l 0~ Annexure -A l l-ll0ol ~l~cil V-IIWoi ltgtl

                            l~~ ltgtl-1Ql ll ott q t3

                            ~Slt Llt l llS per P L L Act 1991 ~ciJlci PLI iolicy iUlQqlol(8~ ltgt~ ctafloi 5C-t JJ~ lci

                            l~l~l ratcil ~L uU~~ ltgtl-1Cllol (()~

                            Cleal1 Gujarat Green Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organisa ti on

                            GUJARAT POLLUTIO CONTROL BOARD PA RYAVARAN BHAVAN

                            Sector 10-A Gandhinagar 382010 Phone (079 ) 23226295

                            (l t Jl v~ 6Xt~r ~~il ~~~~3~~156GPCB Gl~8ct ~ l( rtlllW ~tSltl Wpoundl ~l( cil l-llW webslfe wwwgpcbgov1n tgt1vcuol vSc ttrtl 0Ul(Dct tt~~

                            jc(lct J f( tt~l fa1Gi t~l V1lSoil oili 0~ CJct laquoc~aNl

                            ~ LJ

                            (S1 i~l 6l ~ )

                            ltTtl ltS 0~ W81-lltTtl ctSl

                            (0l l~l - Ann xure - A

                            atS C1 ( CJ loil shy

                            9 ~l ~~ S 0(D Sl ~ J6lt lt ~~ tt~l raici ~l vUSoil (l ~v 61 ~l tH~ ctW Gl ~h ct uluct

                            ~Fllaj I-llcC (bl sit u( ampCJlC 4l~d1 0l l~ll

                            ( un ( ltjRc

                            Cleal1 Gujarat Greer~ Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organ isation

                            • 1
                            • 2
                            • 3
                            • 4
                            • 5
                            • 6
                            • 7
                            • 8
                            • 9
                            • 10
                            • 11
                            • 12
                            • 13
                            • 14
                            • 15

                              GUJARAT POLLUTIO CONTROL BOARD PA RYAVARAN BHAVAN

                              Sector 10-A Gandhinagar 382010 Phone (079 ) 23226295

                              (l t Jl v~ 6Xt~r ~~il ~~~~3~~156GPCB Gl~8ct ~ l( rtlllW ~tSltl Wpoundl ~l( cil l-llW webslfe wwwgpcbgov1n tgt1vcuol vSc ttrtl 0Ul(Dct tt~~

                              jc(lct J f( tt~l fa1Gi t~l V1lSoil oili 0~ CJct laquoc~aNl

                              ~ LJ

                              (S1 i~l 6l ~ )

                              ltTtl ltS 0~ W81-lltTtl ctSl

                              (0l l~l - Ann xure - A

                              atS C1 ( CJ loil shy

                              9 ~l ~~ S 0(D Sl ~ J6lt lt ~~ tt~l raici ~l vUSoil (l ~v 61 ~l tH~ ctW Gl ~h ct uluct

                              ~Fllaj I-llcC (bl sit u( ampCJlC 4l~d1 0l l~ll

                              ( un ( ltjRc

                              Cleal1 Gujarat Greer~ Gujarat ISO - 9001 - 2008 amp ISO - 14001 - 2004 Certified Organ isation