Garlock Expansion Joint (MSDI-P13671). Systems Design Review II January 18 th , 2013. P13671 Members. Left to Right: Allison Feinberg (Member) Sam Kulpinski (Member) Don Thompson (Member) Wayne Evans (Customer) Elspeth Ochs (Member) Joseph Harkins (Team Lead) Danny McCormick (Member) - PowerPoint PPT Presentation

Transcript

GARLOCK EXPANSION JOINT (MSDI-P13671)Systems Design Review IIJanuary 18th, 2013

Friday, January 18, 2013 P13671 - Garlock Expansion Joint 1

2

P13671 MembersLeft to Right:

Allison Feinberg (Member)

Sam Kulpinski (Member)

Don Thompson (Member)

Wayne Evans (Customer)

Elspeth Ochs (Member)

Joseph Harkins (Team Lead)

Danny McCormick (Member)

Dr. Jason Kolodziej (Faculty)

Friday, January 18, 2013 P13671 - Garlock Expansion Joint

3

Introduction to P13671

Timeframe: Winter & Spring quarter MSD

Objective: Design and build rig to test Garlock Expansion joints under high temperatures and actuation until failure while logging data

Friday, January 18, 2013 P13671 - Garlock Expansion Joint

4

Project ScheduleMajor Dates:• Detailed Design Review (DDR):

• 2012-2 Week 10 (around 2/8/13)

• Imagine RIT:• May 5, 2013

• Final Presentation:• 2012-3 Week 10 (around 5/8/13)

• Celebrate our success and graduation • After Final Presentation!

Link to our MS Project file: /public/Project Schedule.mpp

Friday, January 18, 2013 P13671 - Garlock Expansion Joint

5

Customer Needs

Friday, January 18, 2013 P13671 - Garlock Expansion Joint

6

Project Specifications

Friday, January 18, 2013 P13671 - Garlock Expansion Joint

7

House of Quality

Friday, January 18, 2013 P13671 - Garlock Expansion Joint

8

Risk Assessment

Friday, January 18, 2013 P13671 - Garlock Expansion Joint

9

Functional Decomposition

Friday, January 18, 2013 P13671 - Garlock Expansion Joint

10

CONCEPT #1Concept Generation & Selection

Friday, January 18, 2013 P13671 - Garlock Expansion Joint

11

Concept #1• Fluid with recirculation loop

Friday, January 18, 2013 P13671 - Garlock Expansion Joint

12

CONCEPT #2

Friday, January 18, 2013 P13671 - Garlock Expansion Joint

Concept Generation & Selection

13

Concept #2• Fluid without recirculation loop

Friday, January 18, 2013 P13671 - Garlock Expansion Joint

14

CONCEPT #3

Friday, January 18, 2013 P13671 - Garlock Expansion Joint

Concept Generation & Selection

15

Concept #3• Fluid: Air• Heat Source: Incoloy 840

Tubular Heating Source• Power: 10 Watt to heat 12” EJ to

400°F• Min Size: 0.43in Dia. x 4in

• Piping System• Air Accumulator

• Contained Nitrogen Accumulator

Friday, January 18, 2013 P13671 - Garlock Expansion Joint

16

Linear Actuator Options• MOOG

• -890 Series standard electric servoactuator• 150mm stroke, front flange mount, male rod end• Size 4: $5,900• Size 5: $7,900

• +Motor Controller (DS2110 servodriver): $3,000-$3,300• 150mm stroke to 300mm stroke? +$500

• THOMPSON• ECT90 Series• 6 inch stroke: (8” avail, +~$30)

• Part Number:  ECT09-I09B03PB2510-0153SJ00XX• List:  $3612.73 ea• Lead Time:  4-5 Weeks (subj. to avail.)

• EXLAR• Tritex II AC actuator part number T2X115-0601 with a 138-30

winding• http

://www.exlar.com/product_lines/23-Tritex-II-AC-Linear-Actuator• ~$4,500• Includes controller

Friday, January 18, 2013 P13671 - Garlock Expansion Joint