Dissemination Workshop at SkopjeSeptember 20, 2007
Basis of Report
• Scoping mission in December 1-5, 2006• Main Mission in Feb 12-23, 2007• Grateful for support from Ministry of
Finance( including Department of Budget, Treasury, Internal Audit, International Finance, Public Procurement Bureau), Complaints Committee, Ministry of Education and Science, Health Insurance Fund, Economic Chambers and others
• Grateful for input from SIGMA and comments from European Commission
Objectives of CFA
• Provide updated assessment of Fiduciary Progress since 2002/2003
• Assist the government in its commitment to Public Financial Management (PFM) reforms to secure more efficient and effective use of public sector resources
• Help government measure progress in procurement reform by comparing operations with international standards including EU Acquis Communautarie
• Assess fiduciary risk • Assist government prioritize action on PFM
reforms
Procurement- Progress since CPAR 2002
• In March 2004, New Public Procurement Law enacted- substantially in line with the then best practices;
• In 2005 government adopted comprehensive implementing regulation and promulgated Standard Bidding Documents;
• Government established a state administrative body for public procurement within Ministry of Finance;
• Procurement training through EC CARDS Project
Public Procurement- Findings
• PPL of 2004 lacks key features of EU procurement( now taken care of by the proposed PPL)
• Lack of clarity on features like defense procurement, method of procurement, prequalification ( the new law is expected to bring clarity)
• Absence of Independent Complaint Review Body • Several Administrative Barriers in PPL of
2004( improvements expected in the new law)- created problem in efficient procurement in HIF
• Implementation is the key- the new legislation may bring in marginal improvements in overall public procurement system , but serious deficiencies in implementation needs to be handled on priority
• Implementation capacity is weak in ministries like MOES
Public Procurement Findings
• A national public procurement information system is required to monitor performance indicators and to identify trends
• Need to carry forward recent Electronic Government procurement initiatives- required to raise standards of transparency in government, reduce the opportunities and incentives for fraud and corruption, and improve equity and distributional efficiency
• Need to enlist support from private sector representatives of suppliers and contractors and civil society to enable an open and competitive market place
• Need to reduce instances of complaint by following procurement rules
Framework of Current Assessment of National Procurement System
• Use of a Base Line Indicator (BLI) tool for Assessment of Procurement Systems based on OECD/DAC / World Bank( Version July 17, 2006)
• BLIs present a “snapshot” comparison of the actual system against the international standards.
• BLI focus is on national system covering four
pillars ( comprising 12 indicators and 54 sub-indicators)
• Compliance/Performance Indicators (CPIs) deal with how the system operates by examining samples of procurement transactions– This report does not cover CPIs due to lack of data
Procurement – Base-Line Indicators
• Pillar I: Legislative Framework; Pillar II: Institutional and Management Capacity; Pillar III: Procurement Operations and Market Practices; and Pillar IV: Integrity and transparency of Public Procurement System
• Scores under each sub-indicator ranges between 0 to 3. A score 3 means full compliance
• For the purpose of presentation scores averaged and the figure in the next slides conveys Macedonian Public Procurement System in terms of 4 pillars and 12 indicators
• Scores on four pillars are: Pillar I( 2.0); Pillar II(1.7); Pillar III(1.4); and Pillar IV(1.5)
• Pillar I is elaborated and explained on 2 indicators and 12 sub-indicators
Procurement Performance by Pillars
0.0
0.5
1.0
1.5
2.0
2.5
3.0
Legislative Framework
Institutional &
Mngmt Capacity
Proc Operations & Markets
Integrity &
Transparency
[Country Score]Maximum
Procurement Performance by Indicators
0.0
0.5
1.0
1.5
2.0
2.5
3.0
Legislative Framework
Regulations
Mainstreamed
Regulatory Body
Institutional
Capacity
Efficiency
Functional Market
Dispute Resolution
Audit Systems
Appeals
Mechanism
Info Access
Anticorrution
Measures
[Country Score] Max
Methodology for legal assessment of procurement
• Area of study: procurement law, secondary regulation;
• Use of the OECD/DAC methodology;• Pillar 1: Regulatory framework• 2 legal indicators• 14 sub-indicators
• References: international standards (UNCITRAL model law)
Indicator 1: compliance of Procurement Law with agreed standards
Scope of the law
Procurement methods
Advertisement and time limits
Rules for participation
Tender specifications
Evaluation and award method
Bid submission
8
sub-indicators
Complaints
Indicator 2: Implementing regulations and documentation
Implementing regulations
6
sub-indicators
Model tender documents
Procedures for prequalification
Regulation on consultants
User guide or manual
General conditions of contract
Indicator 1: Procurement Law
PUBLIC PROCUREMENT LAW
of March 2004
(Official Gazette of the Republic of Macedonia, N°19/2004)
New draft public procurement law prepared by PPB in July 2007 not the subject to CFA
Indicator 1: Legislative and Regulatory Framework
Scope of the lawMain procuring entities & types of contracts covered by the law
questions raised on defense items* and positive list adopted by PM
*addressed in the new draft procurement law
Procurement methodsOpen competitive method is the standard procurement method;
Non competitive methods under listed conditions
Conditions associated with non competitive methods are sometimes too loose*
Advertisement & time limits
Adequate advertising, sufficient time limits for bid submission, & publication of contract awards
Indicator 1: Procurement Law
Rules for participation
Tender & specifications
Administrative barriers to participation (licenses, proof of solvency) may limit participation of potential bidders, restrict competition and raise government contract prices*
*addressed in the new draft procurement law
Tender documentation is described in the law and conditions for technical specifications indicated
General Conditions of contract not apparently included; equivalence for reference to technical standards not clearly stated*
Indicator 1: Procurement Law
Evaluation and award method
Award to the lowest price or the most economically bids
Award criteria expressed in points or in monetary terms
Award method should depend on the nature of the contract procured; award based on points should refer to a mechanism (secondary regulation) ensuring
an objective and transparent award process
Bid submission
Public bid opening, rejection of bids with incomplete doc., proceeding is pursued when at least 2 valid bids submitted
Upfront rejection of bids for incompleteness should be avoided and proceeding should be continued even when only 1 valid bid has been submitted
Indicator 1: Procurement Law
Complaint mechanism
Independent Panel reviewing bidder complaints on the procurement process
Complaints open to all participants and bidders of a bidding process
Complaints not limited only to award decisions & apparent suspension when complaint filed
The Independent Panel is not a permanent institution lacking resources and means to properly handle complaints*
*addressed in the new draft procurement law
Indicator 2: Implementing regulations &
documentation
Implementing regulations
Model tender documents
Procedures for prequalification
Existence of implementing regulations defining processes and procedures not described in higher legislation
Existing standard tender documentation for the procurement of goods, services, and works
Procedures for clarification need more clarity and certainty to ensure a level playing field for all*
*addressed in the new draft procurement law
Consultant services
User guide or manual
General conditions of contract
Indicator 2: Implementing regulations &
documentation
No specific procedures and evaluation method for consultant services
A guide for public procurement as well as a web site are available to the public and the private sector
General Conditions of Contract are available for the most common types of contract and are posted on the Web
Public Procurement- Key Recommendations
• Change the legal framework to comply with EU Requirement
• Strengthen the framework for procurement planning
• Improved Delegation in Ministries• Establish an Effective and Independent
Complaints Review Body • Improve Compliance with procurement Laws
and Regulations- Ex post Review by Internal Audit
Public Procurement- Key recommendation
• Implement a continuous and rigorous program on training
• Establish and maintain a system of national procurement statistics to monitor performance
• Publish complete and timely information on website of PPB on contract awards consistent with EU model
• Design special measures to prevent fraud and corruption in procurement
Progress since CFAA of 2003
• Several studies conducted by IMF and EC since the latest Bank-led analysis of the PFM in 2003
• Ministry of Finance has exerted considerable effort to improve its core budgeting, reporting, internal control, and internal auditing
• Donor assistance to the external audit office helped to implement far-reaching changes, bringing its practice more in line with accepted international practice
• EC has assumed the major responsibility for further upgrading of the public internal financial control systems
• Previous issues with EBFs solved and HIF FM practices improved considerably
Education Issues
• Significant shortcomings in the compliance and proper utilization of the core PFM systems and procedures
• Problems in the budgeting process, internal financial controls, and audit follow-up
• Key financial control processes are not followed – as documented in SAO and internal audit reports
HIF Issues
• Ensure more consistent compliance with rules and regulations
• Ensure further improvements in the efficient utilization of public resources, for example in the procurement of drugs
• Positive trend with management team committed to improved accountability
• Full assessment of the results of reforms on budgeting and internal control systems to be planned in 2009
Main FM Recommendations
• MOES to address major internal control weaknesses (diagnosis by external audit, written procedures, delegation, approval)- immediate
• HIF to consolidate its progress on FM (review 2009, immediate ICB improvements, improved prequalification process, supported by IA) - medium-term
• Plan a long-term transition to Internationally agreed financial reporting standards - long-term
• Continue the speedy development of the internal audit (develop IA community and continue aggressive training, focus on large value procurement audits) - immediate
• SAO to improve reporting and work with ACC and others in the fight against corruption - immediate
PEFA: Public Expenditure and Financial; Accountability
• Measure PFM performance over time using agreed indicators while comparing with best practice
• Assist a fiduciary risk analysis and support decisions from donors on budget support
• Score A to D
• Methodology available on www.pefa.org
Macedonia- PFM System at a Glance
0.0
0.5
1.0
1.5
2.0
2.5
3.0
Budget Credibility
Expenditure Arrears
Cash Management
Procurement Controls &Effectiveness
Internal ControlsAccounting & Reporting
Internal Audit
External Audit
Legislative Oversight
Macedonia
Max
MMacedonia
Credibility of Budget: Scores
A
AStock and monitoring of expenditure payment arrears
4
AAggregate revenue outturn compared to approved budget
3
Composition of expend. outturn compared to approved budget
2
AAggregate Expenditure Outturn compared to approved budget
1
Budget Credibility
SCOREINDICATOR
Predictability and control in budget execution: scores
16 Effectiveness of cash flow planning, mgt. & monitoring
B+
17 Recording & management of cash balances, debt and guarantees
A
18 Effectiveness of payroll controls C+
19 Competition, value for money and controls in procurement
D+
20 Effectiveness of internal controls B
21 Effectiveness of internal audit C
Accounting, recording and reportingExternal scrutiny and audit: scores
Next Steps / Q&A/Websites
• MOF to form a steering committee to monitor the implementation of the recommendations
• Q&A• Websites