FOR CONTINUATION REFER TO DRG M003 · for continuation refer to drg m003 t p01for initial design review jem 19-07-17 ak 19-07-17 ip for continuation refer to drg m003 19-07-17 detail
Post on 24-Jun-2020
7 Views
Preview:
Transcript
NOTES
c
Kier copyright
Drawing Title
Project Name
Client
Internal Project Number
Original SizeScale
Author Checked Approved
Revision
Status
A1
RIBA Stage
Date of First Issue
Issuing Office Telephone
STEVENAGE 0161 344 8731
Originator Volume Level Type Role NumberProject
Version
Drawn
& Date
Checked
& Date
Approved
& Date
Amendment
Agnieszka.Kaminiarz@kier.co.uk
1078782-060-001
CAMBRIDGESHIRE COUNTY COUNCIL
WESTWOOD PRIMARY SCHOOL
PROPOSED SCHOOL HEATING
LAYOUT 1 OF 3
1:50 4
07-2017 JEM/AK AK IP
Westwood-KWS-02-00-DR-M-001
D1
P01
This drawing is not to be scaled. All dimensions to be
checked on site and any discrepancies to be reported to the
Kier office. All material is produced on behalf
of Kier Business Services. All drawings to be read in
conjunction with specification where applicable.
© Kier Business Services
Based upon the ordnance Survey map with the permission
of the Controller of Her Majesty's Stationery Office.
© Crown Copyright Licence No. LA076 49X.
AREA OF WORKS
SCALE:- 1:500
1
AREA OF WORKS '1'
SCALE:- 1:50
LEGEND:-
UNDERFLOOR HEATING SYSTEM TO CONTROL
ZONE 1
UNDERFLOOR HEATING SYSTEM TO CONTROL
ZONE 2
TEMPERATURE SENSOR
ABBREVIATIONS :-
HTG = HEATING
F&R = FLOW AND RETURN
IV = ISOLATION VALVE
CS = COMMISSIONING STATION
DTLL = DROP TO LOW LEVEL
M = MANIFOLD
UFH = UNDERFLOOR HEATING
SPECIFICATION NOTES:-
1. THIS DRAWING TO BE READ IN CONJUNCTION WITH THE MECHANICAL
SERVICES SPECIFICATION.
2. ALL NEW HIGH LEVEL PIPEWORK TO BE INSULATED, INCLUDING PIPES
HIGHLIGHTED IN THE CEILING VOID SPACES, CLASSROOMS AND STORE
ROOMS. INSULATION SHALL BE PHENOLIC FOAM. EXPOSED HIGH LEVEL
PIPES ARE TO BE FINISHED WITH A WHITE ISOGENOPAK COVER, THE
INSULATION WILL BE FULLY LABELLED WITH FUNCTION OF PIPE, IE, 'VT HTG
FLOW' INCLUDING DIRECTIONAL ARROWS.
3. INSULATION THICKNESS TO BE AS PER THE TABLES SHOWN IN THE
SPECIFICATION.
4. NEW PIPEWORK TO BE INSTALLED AND CO-ORDINATED IN SYMPATHY WITH
THE BUILDING INTERNAL FABRIC AND OTHER INTERNAL SERVICES
INCLUDING THE ELECTRICAL INSTALLATION.
5. UPON COMPLETION THE WHOLE OF THE NEW PIPE INSTALLATION IS TO BE
PRESSURE TESTED AND COMMISSIONED IN ACCORDANCE WITH THE
SPECIFICATION.
6. UPON COMPLETION, THE NEW PIPEWORK INSTALLATION IS TO BE
PRESSURE TESTED TO A MINIMUM OF 6 BAR. REFER TO THE SPECIFICATION
FOR DETAILS.
7. THE CONTRACTOR SHALL INSTALL ALL THE NEW HEATING AND DOMESTIC
WATER PIPEWORK FITTINGS BRACKETS ETC.
8. THE MAIN CONTRACTOR SHALL UNDERTAKE ALL THE NECESSARY
BUILDER'S WORK REQUIRED TO FULLY INSTALL THE MECHANICAL
INSTALLATION INDICATED ON THE DRAWING. MECHANICAL CONTRACTOR
SHALL PROVIDE FULL BUILDING WORK DETAILS TO ALLOW THE MAIN
CONTRACTOR TO UNDERTAKE THIS ITEM OF WORK .
9. ALL LOW POINTS TO BE FITTED WITH DRAIN OFF VALVES.
10. ALL HIGH POINTS SHALL BE FITTED WITH AUTOMATIC AIR VENTS.
11. THE WHOLE OF THE NEW INSTALLATION IS TO BE TESTED AND
COMMISSIONED IN ACCORDANCE WITH THE SPECIFICATION.
12. THE UNDERFLOOR HEATING SYSTEM SHALL BE SUPPLIED AND INSTALLED
BY A SPECIALIST INSTALLER WHO SHALL BE EMPLOYED BY THE
MECHANICAL CONTRACTOR REFER TO THE SPECIFICATION FOR DETAILS
13. THE CONTRACTOR SHALL INCLUDE ALL THE NECESSARY SUPPORT
BRACKETING REQUIRED TO COMPLETE THE WHOLE INSTALLATION. THE
SUPPORT BRACKETING SYSTEM SHOULD BE BASED ON "UNISTRUT" RAIL
SYSTEM FOR ALL HIGH LEVEL PIPEWORK WITH STUD IRON & RING CLIPS.
14. ALL LOW LEVEL PIPEWORK SHALL BE SUPPORTED USING MANUFACTURED
SCHOOLBOARD PATTERN STAND OFF CLIPS SUITABLE FOR MAPRESS
CARBON STEEL INSTALLATIONS.
15. MECHANICAL CONTRACTOR TO NOTE - THE PIPEWORK LOCATIONS,
POSITIONS, ETC, ARE INDICATIVE OF THE DESIGN INTENT. THE FINAL PIPE
LOCATION AND FIXING POSITIONS MUST BE AGREED WITH THE CONTRACT
ADMINISTRATOR PRIOR TO THE INSTALLATION.
16. HEATING UNDERFLOOR MANIFOLD CIRCUITS TO BE CONTROLLED BY THE
NEW BMS CONTROL SYSTEM. THIS SHALL INCLUDE THE SUPPLY AND
INSTALLATION OF ALL THE ROOM TEMPERATURE SENSORS AND
ASSOCIATED CONTROL BMS MANIFOLD 'OUTSTATIONS' AND
INTERCONNECTING WIRING.
17. FOR FULL DETAILS OF THE BMS CONTROL SYSTEM DESCRIPTION AND
STRATEGY REFER TO THE SCHEMATIC DRAWINGS AND THE SPECIFICATION.
NOTE - ALL PIPES PASSING THROUGH WALLS AND CEILINGS/FLOORS SHALL BE
SLEEVED AND USING A MATCHING PIPE ONE SIZE LARGER THAN THE SERVICE
PIPE. THE PIPE AND SLEEVE SHALL BE SEALED WITH APPROVED FIRE
RETARDANT SEALANT. ALL PIPES SHALL BE FITTED WITH THE CORRECTLY
SIZED, MANUFACTURED CHROME PLATED WALL/FLOOR COVER PLATES.
FOR CONTINUATION REFER TO DRG M003
T
FOR INITIAL DESIGN REVIEWP01
JEM
19-07-17
AK
19-07-17
IP
19-07-17
FO
R C
ON
TIN
UA
TIO
N R
EF
ER
T
O D
RG
M
00
3
DETAIL '2'
TYPICAL MANIFOLD DETAIL
NOT TO SCALE
DETAIL '1'
TYPICAL AUTRON RADIATOR DETAIL
NOT TO SCALE
RADIATOR EQUIPMENT SCHEDULE
ITEM
REF:
LOCATION MANUFACTURER MODEL
REQ'D
OUTPUT (kW)
PROPOSED
OUTPUT (kW)
CASE HEIGHT
(mm)
CASE DEPTH
(mm)
CASE
LENGTH(mm)
COMMENTS
R-01
006 SCHOOL
BUSINESS MANAGER
CONTOUR / AUTRON
5H2W
SOVEREIGN A 2.13 2.329 475 145 1892
R-02 05 REPRO
CONTOUR / AUTRON
5H2W
SOVEREIGN A 1.44 1.481 475 145 1210
R-03 04 MI ROOM
CONTOUR / AUTRON
5H2W
SOVEREIGN A 1.10 1.200 475 145 1072
R-04A 02 FOYER
CONTOUR / AUTRON
5H2W
SOVEREIGN A
4.86
2.897 625 145 2096
R-04B 02 FOYER
CONTOUR / AUTRON
5H2W
SOVEREIGN A 2.272 625 145 1688
R-05 08 PPA ROOM
CONTOUR / AUTRON
5H2W
SOVEREIGN A 3.84 3.837 625 145 2710
R-06 10 CARETAKER
CONTOUR / AUTRON
5H2W
SOVEREIGN A 0.56 0.635 475 145 663
R-07 11 UNISEX TOILET
CONTOUR / AUTRON
5H2W
SOVEREIGN A 0.38 0.635 475 145 663
R-08 36 BOYS TOILET
CONTOUR / AUTRON
5H2W
SOVEREIGN A 1.90 2.048 475 145 1688
ER-01 39 KITCHEN LOBBY
ELITE HEATERS - LST
ELECTRIC RADIATOR
3140 ITC 1.00 1.500 300 - 1400 ITC MANUAL DAILY TIMER
ER-02 KITCHEN TOILET
ELITE HEATERS - LST
ELECTRIC RADIATOR
3100 ITC 0.90 0.900 300 - 1000 ITC MANUAL DAILY TIMER
ER-03 41 GROUP ROOM
ELITE HEATERS - LST
ELECTRIC RADIATOR
3140 ITC 1.00 1.500 300 - 1400 ITC MANUAL DAILY TIMER
NOTE:-
ALL AUTRON RADIATORS SHALL BE PROVIDED WITH INDIVIDUAL SUITABLE DANFOSS TRV & VK4 VALVE SETS PROVIDED BY THE MANUFACTURER. THE VALVE HEAD IS TO BE POSITIONED ON THE FRONT OF THE
CASING END PANELS. EACH EMITTER NEEDS TO BE SUITABLE FOR ISOLATION FOR MAINTENANCE AS PER MANUFACTURER RECOMMENDATIONS.
CASING LENGTHS ARE BASED ON THE FRONT OF THE CASING.
M&E SUB-CONTRACTOR SHALL EMPLOY UNDERFLOOR HEATING
SPECIALIST CONTRACTOR TO DESIGN, MANUFACTURE AND INSTALL
UNDERFLOOR HEATING TO ALL HATCHED AREAS. THE SYSTEM SHALL
INCORPORATE ALL PIPEWORK. MANIFOLDS, SENSORS AND CONTROLS.
THE SYSTEM SHALL BE CAPABLE OF CONTROLLING EACH OCCUPIED
AREA SEPARATELY