First commercial PtG-plant with biological methanation goes live
Technical forum h2fc fair14.04.2015 at Hannover Messe
© V
iess
man
n W
erke
1. Viessmann Group and MicrobEnergy GmbH
2. BioPower2Gas – Project Allendorf (Eder)
3. System operation and results
14.0
4.20
15Pa
ge 2
Mic
robE
nerg
y G
mbH
-Bi
olog
ical
met
hani
satio
n -P
tG-p
roje
ct A
llend
orf (
Eder
)
Agenda
© V
iess
man
n W
erke
Company foundation
Employees
Billion EUR turnover
Production companiesin 11 countries
Countries withsales activities and distribution partners
Branchesworldwide
Percent of turnover derived from export activities
Branches
Distribution partners
1917
2,1
11.400
55
27
74
120
14.0
4.20
15Pa
ge 3
Mic
robE
nerg
y G
mbH
-Bi
olog
ical
met
hani
satio
n -P
tG-p
roje
ct A
llend
orf (
Eder
)
Viessmann Group
© V
iess
man
n W
erke
Viessmann Group
Heating technology Industrial solutions Cooling technology
Supervisory Board
14.0
4.20
15Pa
ge 4
Mic
robE
nerg
y G
mbH
-Bi
olog
ical
met
hani
satio
n -P
tG-p
roje
ct A
llend
orf (
Eder
)
Company StructureThree company divisions
© V
iess
man
n W
erke
Established: 2012
Headquater: Schwandorf (Bavaria / Opf.)
Employees: 20
Services:
• Power-to-Gas and Biological Methanation Research
• Microbiological know-how and laboratories
• Biogas Technology Develpoment
14.0
4.20
15Pa
ge 5
Mic
robE
nerg
y G
mbH
-Bi
olog
ical
met
hani
satio
n -P
tG-p
roje
ct A
llend
orf (
Eder
)
MicrobEnergy GmbHMember of the Viessmann Group
© V
iess
man
n W
erke
Agenda
1. Viessmann Group and MicrobEnergy GmbH
2. BioPower2Gas – Project Allendorf (Eder)
3. System operation and results
14.0
4.20
15Pa
ge 6
Mic
robE
nerg
y G
mbH
-Bi
olog
ical
met
hani
satio
n -P
tG-p
roje
ct A
llend
orf (
Eder
)
© V
iess
man
n W
erke
Project BioPower2Gas
Demonstration and comparison of optimally controlable biogas technologies
01.09.2013 – 31.08.2016
7
© V
iess
man
n W
erke
Demonstration PlantFunctional Principle
14.0
4.20
15Pa
ge 8
Mic
robE
nerg
y G
mbH
-Bi
olog
ical
met
hani
satio
n -P
tG-p
roje
ct A
llend
orf (
Eder
)
Bivalent operation
Biogas Upgradingof raw biogas in order to adapt
flexibility to CHPs of biogas plants
Energy StorageOf surplus power by using
raw biogas as source for CO2
Monovalent operation
Energy Storageof surplus renewable power by using
seperated CO2 of the Biomethaneupgrading plant
BGPH
2PSA
50% CH450% CO2
95% CH4
SET3% CH4
97% CO2
95% CH4Gas grid
BGP = Biogas PlantSET = Stand-Alone-TankPSA = Pressure swing adsorption
50% CH450% CO2
95% CH4BGP
H2
Gas grid
SET
Power grid
CHP
© V
iess
man
n W
erke
Demonstration PlantPlant Design
14.0
4.20
15Pa
ge 9
Mic
robE
nerg
y G
mbH
-Bi
olog
ical
met
hani
satio
n -P
tG-p
roje
ct A
llend
orf (
Eder
)
1
4
3
2
(1) PEM-electrolyzer(2) Biological methanation (5m³-tank)(3) Process and system control(4) Measuring and mechanical process technology
© V
iess
man
n W
erke
Demonstration PlantPlant Design PEM-electrolyzer
14.0
4.20
15Pa
ge 1
0
Mic
robE
nerg
y G
mbH
-Bi
olog
ical
met
hani
satio
n -P
tG-p
roje
ct A
llend
orf (
Eder
)
rectifier
2x 150 kW Stack
1/3 MW Stack
control
H2- buffer
O2- separator
Process air
Water treatment
Phase I 60 Nm³/h H2 (5,4 kg/h) 2 stacks á 150kWPhase II +60 Nm³/h H2 1/3 MW-stackSystem pressure 40 barCurrent density 3.000 mA/cm²
© V
iess
man
n W
erke
Demonstration PlantLocation biogas plant Allendorf (Eder)
14.0
4.20
15Pa
ge 1
1
Mic
robE
nerg
y G
mbH
-Bi
olog
ical
met
hani
satio
n -P
tG-p
roje
ct A
llend
orf (
Eder
)
© V
iess
man
n W
erke
Demonstration PlantRun-in phase
14.0
4.20
15Pa
ge 1
2
Mic
robE
nerg
y G
mbH
-Bi
olog
ical
met
hani
satio
n -P
tG-p
roje
ct A
llend
orf (
Eder
)
© V
iess
man
n W
erke
Agenda
1. Viessmann Group and MicrobEnergy GmbH
2. BioPower2Gas – Project Allendorf (Eder)
3. System operation and results
14.0
4.20
15Pa
ge 1
3
Mic
robE
nerg
y G
mbH
-Bi
olog
ical
met
hani
satio
n -P
tG-p
roje
ct A
llend
orf (
Eder
)
© V
iess
man
n W
erke
Demonstration PlantInjection of biologically produced methane into gasgrid
14.0
4.20
15Pa
ge 1
4
Mic
robE
nerg
y G
mbH
-Bi
olog
ical
met
hani
satio
n -P
tG-p
roje
ct A
llend
orf (
Eder
)
Input
Flow H2
Flow CO2
OutputQuality
cCH4
cH2
Output
Flow Product
cH2 0,8%
cH4 96%
fH2 15Nm³/h
First injectioninto
national gas grid
02.03.2015
© V
iess
man
n W
erke
Demonstration PlantGreenhouse gas reduction potential
14.0
4.20
15Pa
ge 1
5
Mic
robE
nerg
y G
mbH
-Bi
olog
ical
met
hani
satio
n -P
tG-p
roje
ct A
llend
orf (
Eder
)
© V
iess
man
n W
erke
Demonstration PlantCertification and gas sales
14.0
4.20
15Pa
ge 1
6
Mic
robE
nerg
y G
mbH
-Bi
olog
ical
met
hani
satio
n -P
tG-p
roje
ct A
llend
orf (
Eder
)
Modell proWindgasSource: Greenpeace Energy
Source: Erdgas Mobil Source: Audi
Heat Market Biofuel Market Fleet Emissions
© V
iess
man
n W
erke
first-time gas injection into natural gas grid 2nd March 2015
finishing certification April 2015
plant tours available from April 2015
Contact details:
Thomas HellerTechnical project leader
MicrobEnergy GmbH
Bayernwerk 892421 Schwandorf
phone: +49 (0)9431 751-190fax: +49 (0)9431 751-5190mobile: +49 (0)151 195 55 230e-mail: thomas.heller@microbenergy.comweb: www.microbenergy.com
14.0
4.20
15Pa
ge 1
7
Mic
robE
nerg
y G
mbH
-Bi
olog
ical
met
hani
satio
n -P
tG-p
roje
ct A
llend
orf (
Eder
)
Demonstration PlantProject Schedule
© V
iess
man
n W
erke
14.0
4.20
15Pa
ge 1
8
Mic
robE
nerg
y G
mbH
-Bi
olog
ical
met
hani
satio
n -P
tG-p
roje
ct A
llend
orf (
Eder
)
top related