Fairfax County Transportation Advisory Commission: Dulles Rail Phase I Bus Service Plan

Post on 25-May-2015

877 Views

Category:

News & Politics

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Fairfax County Transportation Advisory Commission: Dulles Rail Phase I Bus Service Plan July 17, 2012

Transcript

County of Fairfax, Virginia

Department of Transportation

Dulles Rail Phase IBus Service Plan

Fairfax County

Transportation Advisory Commission

July 17, 2012

County of Fairfax, Virginia

Department of Transportation 2

Dulles Rail Bus Service Plan

•Based on recommendations from Fairfax County’s Transit Development Plan (TDP) and defined by two different components:

– The realignment, enhancement and addition of new feeder service to the new rail stations within Reston, McLean, Vienna and Tysons Corner;

– The implementation of a five-route circulator bus system within Tysons Corner.

County of Fairfax, Virginia

Department of Transportation 3

Dulles Rail Bus Service Plan• The complete plan proposes to

– Modify approximately• 22 Connector Routes• 8 Metrobus Routes

– Create up to six new feeder routes to new stations in Tysons Corner

– Eliminate nine Connector routes that will be duplicated by new bus service and/or Silver Line service

– Establish a five route internal circulator bus system in Tysons Corner (Silver Line Circulator)

County of Fairfax, Virginia

Tysons Corner

• Proposed New Connector Routes:– Silver Line Connector (SLC)

• SLC East (Via Jones Branch)• SLC West• SLC Beltway• SLC Central • SLC Greensboro

Department of Transportation 4

County of Fairfax, Virginia

Tysons: Conceptual Silver Line Connector Routes

5

County of Fairfax, Virginia

Tysons Corner• Route modifications

– Routes 401/402: Springfield-Tysons via Gallows Road

– Route 574: Reston to Tysons via Baron Cameron and Leesburg Pike

– Route 981: Tysons to Dulles Airport

• Route Eliminations– Routes 425, 427: Service from West Falls

Church Metro Station to Tysons CornerDepartment of Transportation

6

County of Fairfax, Virginia

McLean• Proposed New Connector Routes

– Route 434: Kirby Road• Kirby Road, Great Falls St to West Falls Church Metro Station

– Route 731: McLean Feeder• Lewinsville Road, Chain Bridge Road, CIA to Tysons Corner

– Route 732: Wolf Trap Shuttle• Trap Road, Leesburg Pike to Spring Hill Metro Station

– Route 733: Northern McLean Feeder• Central McLean, Churchill Road to Tysons Corner Metro

Station

– Leesburg Pike ShuttlesDepartment of Transportation

7

County of Fairfax, Virginia

Vienna Route Modifications

• Modifications– Route 462: Vienna, Park Street, Dunn Loring

Metro Station– Route 463: Vienna, Navy Federal, Dunn

Loring Metro Station

Routes will be modified to serve the Tysons Corner Metrorail Station

Department of Transportation 8

County of Fairfax, Virginia

Reston and Herndon• Modifications and enhancements

– Routes: 552, 553, 554, 557, 585: North and South Reston to West Falls Church

– Routes : 950, 980: Herndon to West Falls Church

– RIBS 1, 2, 3, 4, 5: Reston Internal Bus System

Department of Transportation 9

County of Fairfax, Virginia

Reston and Herndon• New Routes

– Route 959: Sunrise Valley/Sunset Hills Circulator

• Eliminations – Route 505: West Falls Church to Reston via Sunset

Hills– Route 551: South Reston to West Falls Church – Route 555: Sunset Hills P&R to West Falls Church– Routes 595, 597: Reston to the Pentagon/Crystal City– Routes: 951, 952: Reverse commute service between

West Falls Church and Reston Department of Transportation

10

County of Fairfax, Virginia

WMATA Metrobus Modifications

– Route 2T: Tysons Corner, Dunn Loring, Vienna– Route 3T: Pimmit Hills, Magarity Road, Griffith Road

to West Falls Church Metro Stn.– Routes 15 K & L: Chain Bridge Road, CIA via Chain

Bridge Rd to Rosslyn Metro Stn– Route 15M: George Mason, Tysons Corner– Routes 23A, B & T: McLean, Crystal City– Route 28A & X: Leesburg Pike

Department of Transportation 11

County of Fairfax, Virginia

TimelineFall 2013: Meeting with Board Members

January - June 2013: Meetings with various community groups, stakeholder groups and hold public meetings

July/August 2013: Board approval of plan

September – December 2013: Marketing and implementation

Department of Transportation 12

County of Fairfax, Virginia

The Circulator SystemLONG RANGE (2050) Planning study to support Tysons Corner redevelopment and rezoning process

– Design circulator system to support goal of maximizing transit trips/minimizing auto trips

•Identify needed transit preferential treatments – Support a reliable and effective circulator system– Identify required expansion of right of way – may

require additional adjacent land •Silver Line Connector ridership will help determine long term alignment for the CirculatorDepartment of Transportation

13

County of Fairfax, Virginia

Questions?

Department of Transportation 14

top related