Erickson Air-Crane Company Brochure
Post on 30-Mar-2016
215 Views
Preview:
DESCRIPTION
Transcript
PROTECT
savEsave lives
PROTECT REsOuRCEs
When lives are on the line
When land and property are in jeopardy
Northern Greece Fire 2007 Lillooet, British Columbia, Canada Fire 2010
01
BuILD
REsPECT
PROTECTPROTECT REsOuRCEs
REsPECT ThE EnvIROnmEnT
BuILD ThE fuTuRE
Griffith Park, Los Angeles, California Hydromulch Hyatt Regency, 38 Floors, Chicago, Illinois, HVAC Placement
Protecting and restoring the landscape
Raising tomorrow's infrastructure
www.ericksonaircrane.com
02
Since beginning operations in 1971, it has been Erickson's primary mission to save lives and protect resources. Over the course of 40 years Erickson has accumulated over 300,000 flight hours operating the Aircrane and currently operates the largest fleet of S-64 helicopters in the world. As we look to the future, Erickson is pleased to provide customers with cost effective and environmentally-sensitive "Green" aviation solutions to meet fire fighting, disaster relief, construction, and natural resource harvesting needs.
Examples of Erickson’s Recent Customers:
United States Forest Service •Korea Forest Service •Corpo Forestale dello Stato - Italy •National Aerial Fire Fighting Center - Australia •
Fire Fighting Powerline Construction Oil & GasSan Diego Gas & Electric •Quanta Services •Terna - Italy •Bonneville Power Administration •
REPSOL Peru •HRT Brazil •Shell Malaysia •Exxon Mobile •
NASA •Vestas •U.S. Army Corps of Engineers •The Boeing Company •
Erickson Operates Worldwide:Italy •Greece •Turkey •France •Sweden •
South Korea •Australia •Brunei •Indonesia •Malaysia •Papua New Guinea •
Canada •United States •Mexico •Brazil •Peru •Ecuador •
about Erickson air-Crane
03
Ability to operate anytime, anywhere the need arises
REPSOL Peru •HRT Brazil •Shell Malaysia •Exxon Mobile •
Moapa Reservation, Nevada, Broadcast Tower Malaysia, Single Stem HarvestingKetchikan, Alaska, Transmission Line Project
Erickson Aircrane Incident Response Systems (AIRS)
Manitoba, Canada, Transmission Line Construction
04
Operational flexibility
www.ericksonaircrane.com
Hi-Rise Firefighting - Ability to reach fires beyond conventional methods •
Urban Interface - Fight fires that threaten homes and lives •
Debris Removal - Clear access for Search and Rescue (SAR) •
Emergency Assistance - Mobile hospital and critical equipment transportation •
Victim Rescue - Evacuation and transportation •
Erickson’s Aircrane Incident Response Systems (AIRS)
Richland, Washington, Vehicle Removal from Stream
Los Angeles, California Fire
Water Cannon Can Reach Hi-Rise Fires Rescue Basket Can Evacuate People from Hi-Rise Roof Tops
05
save lives
Forest Fire Suppression - 2,650 gallon / 10,000 litre tank capacity •
Hi-Rise Fire Suppression - Water cannon delivers 300 gallons / 1,130 litres per minute •
Hydroseeding - Jumpstart re-vegitation to prevent erosion •
Levee Repair - Sandbag and rock delivery •
Wenatchee, Washington Fire
Medford, Oregon, Water Cannon Demonstration Griffith Park, Los Angeles, California Hydromulch Mt. St. Helens, Washington, Water Shed Restoration
Protect Resources
06
www.ericksonaircrane.com
Vancouver, Canada, Low Impact Timber Harvesting Port Arthur, Texas, Caisson Placement Quartz Hill, Ketchikan, Alaska, Heavy Equipment Transport
07
Respect the environmentReduce Footprint - Minimal infrastructure requirements •
Roadless Delivery - Moving equipment and supplies to remote areas •
Sustainable Forestry - Low impact selective tree harvesting •
Endangered Species Protection - Watershed restoration and stream habitat improvements •
Precision Heavy Lift with millimeter tolerancesOil Rigs •
Oil & Gas Pipeline •
Antenna Towers •
HVAC •
Powerline •
Wind Turbine •
Livonia, Michigan, HVAC Placement
U.S. Capitol Building, Statue of Freedom Replacement
Shell Malaysia, Flare Tip ReplacementBonneville Power Administration, Path 15 Construction
08
Build the Future
www.ericksonaircrane.com
Water Tank Capacity ............ •
Water Cannon Delivery ....... •
Flight Crew ............................. •
Precision Lift Crew .............. +1 •
09
Maximum Gross Weight ........... •
Maximum Hook Weight ............ •
Maximum Cruise Speed .......... •
Power Plant ................................. •
S-64F Specifications47,000 lbs (21,320 kg)25,000 lbs (11,340 kg)104 kts (192 km / hr)2 Pratt and Whitney JFD12A-5A, 9,600 Combined Shaft Horsepower
2,650 gal (10,000 lt)300 gal (1,350 lt) / min2
FAA Part 141 and EASA approved flight training facility •
Manufacturer supplied maintenance training •
Training available at customer’s site •
Exclusive holder of Type Certificate (TC) and •
Production Certificate (PC) for the S-64 HelicopterComplete global logistics, operational, and spare •
parts supportIntegrated Maintenance, Repair and Overhaul facility •
Oregon Manufacturing Facility, S-64 Aircranes in Final Assembly
Pilot Training
Maintenance Training10
Manufacturing Training
www.ericksonaircrane.com
rotor head
engines
cockpit
For sales inquiries contact:
ERICKSON AIR-CRANE INCORPORATED Corporate Headquarters 5550 SW Macadam Avenue, Suite 200 Portland, Oregon 97239 USA t // +1.503.505.5800 e // marketing@ericksonaircrane.com
International Partners:
CANADIAN AIR-CRANE LTD. 7293 Wilson Avenue, Delta BC V4G 1E5, Canada t// 604.940.1715 f// 604.940.1735
EUROPEAN AIR-CRANE SRL Via Lorenzo il Magnifico, 26/50129 Florence, Italy t// 39.055.47.6462 f// 39.055.46.1715
ERICKSON AIR-CRANE MALAYSIA Bay 4, Terminal 2, MASB Hangar,PMM Box 399, Locked Bag No. 2Pusat Mel Miri, 9800, Miri, Sarawak, Malaysia t// 60.85.616.250 f// 60.85.615.632
While every care has been taken in compiling this document to ensure that the information herein is correct at the time of printing, no warranties or representations are given or implied thereby. Erickson Air-Crane’s policy is one of continuous product improvement and, as such, reserves the right to, without notice, make any alterations in design and manufacture that the company may deem necessary. This document does not form part of or constitute any offer or contract with the company unless attached to and expressly stated to be incorporated therein.
Central Point Facility 3100 Willow Springs Road Central Point, Oregon 97502 t // +1.541.664.5544 e // marketing@ericksonaircrane.com
top related