These are the Abbreviated ESMP for Rehabilitation Works in lieu to the SPPL under the
GOI regulations for the first-year implementation subprojects.
19.1 DI Pamukkulu
Environmental and Social Management Plan
Mitigation and Monitoring Plan
Checklist for Construction and Rehabilitation Activities
PART 1: INSTITUTIONAL & ADMINISTRATIVE
Country Indonesia
Project title Strategic Irrigation Modernization And Urgent Rehabilitation Project (SIMURP)
Scope of project and activity
• Land preparation for the syphon, about 1500 m2. The land will be acquired through direct negotiation with 2 land owners.
• Mobilization of equipment, material, and labor. The small-scale of construction works will not create labor influx.
• Demolition of existing damage structure;
• Irrigation drainage rehabilitation.
• Sediment removal;
• Installation of the irrigation gate.
Institutional arrangements
(Name and contacts)
WB (Project Team Leader)
Jun
Matsumoto
Project Management
Dirrectorate of Irrigation and Low Land
Local Counterpart and/or Recipient
N/A
Implementation arrangements
(Name and contacts)
Safeguard Supervision
Virza S.
Sasmitawidjaja
Ninin K. Dewi
Local Counterpart Supervision
Dirrectorate of Irrigation and Low Land
Local Inspectorate Supervision
N/A
Contractor
N/A
SITE DESCRIPTION
Name of site DI Pamukkulu
Describe site location
DI Pamukkulu located on Takalar District, South Sulawesi Province. Pamukkulu irrigation scheme is under BBWS Pompengan Jeneberang.
Attachement 1: Site Map [✓]Y [ ] N
Who owns the land?
Government The land to be purchased for syphon construction owned by community
Geographic description
The site are located mostly in the village area. However some area are passing the urban area.
LEGISLATION
Identify national & local legislation & permits that apply to project activity
• Law No. 32 Year 2009 on Environmental Protection and Management • Government Regulation (PP) No. 27 Year 2012 on The Environmental Permit
• Ministry of Environment Regulation (Permen LH) No. 05 Year 2012 on Type of Activities Required EIA
• Ministry of Environment Regulation (Permen LH) No. 13 Year 2010 on Environmental Management Efforts and Environmental Monitoring Effort (EMME) and Statement Letter of Assurance for Implementation of Environmental management and Monitoring (SPPL)
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
2
• Ministry of Public Work Regulation No. 10/PRT/M/2008 on Type of Business Plan and/or Activities under Public Works that Required Environmental Management Efforts and Environmental Monitoring Efforts (EMME) document.
PUBLIC CONSULTATION Identify when / where the public consultation process took place
07 November 2017 at Hotel Grand Kalampa Takalar, South Sulawesi Province
INSTITUTIONAL CAPACITY BUILDING Will there be any capacity building?
[ ✓ ] N or [ ]Y if Yes, Attachment 2 includes the capacity building program
3
4
5
6
7
8
19.2 DI Jurang Batu
Environmental and Social Management Plan
Mitigation and Monitoring Plan
Checklist for Construction and Rehabilitation Activities
PART 1: INSTITUTIONAL & ADMINISTRATIVE
Country Indonesia
Project title Strategic Irrigation Modernization And Urgent Rehabilitation Project (SIMURP)
Scope of project and activity
• Mobilization of equipment, material and labor. The small-scale of construction works will not create labor influx.
• Demolition of existing damage structure;
• Irrigation drainage rehabilitation.
• Sediment removal;
• Installation of the irrigation gate.
Institutional arrangements
(Name and contacts)
WB (Project Team
Leader)
Jun Matsumoto
Project Management
Dirrectorate of Irrigation and Low Land
Local Counterpart and/or Recipient
N/A
Implementation arrangements
(Name and contacts)
Safeguard Supervision
Virza S.
Sasmitawidjaja
Ninin K. Dewi
Local Counterpart Supervision
Dirrectorate of Irrigation and Low Land
Local Inspectorate Supervision
N/A
Contractor
N/A
SITE DESCRIPTION
Name of site DI Jurang Batu
Describe site location
DI Jurang Batu located in Central Lombok District, West Nusa Tenggara Province. Jurang Batu irrigation scheme is under B/BWS Nusa Tenggara I
Attachement 1: Site Map [✓]Y [ ] N
Who owns the land?
Government
Geographic description
The site are located mostly in the village area. However some area are passing the urban area.
LEGISLATION
Identify national & local legislation & permits that apply to project activity
• Law No. 32 Year 2009 on Environmental Protection and Management • Government Regulation (PP) No. 27 Year 2012 on The Environmental Permit
• Ministry of Environment Regulation (Permen LH) No. 05 Year 2012 on Type of Activities Required EIA
• Ministry of Environment Regulation (Permen LH) No. 13 Year 2010 on Environmental Management Efforts and Environmental Monitoring Effort (EMME) and Statement Letter of Assurance for Implementation of Environmental management and Monitoring (SPPL)
• Ministry of Public Work Regulation No. 10/PRT/M/2008 on Type of Business Plan and/or Activities under Public Works that Required Environmental Management Efforts and Environmental Monitoring Efforts (EMME) document.
PUBLIC CONSULTATION Identify when / where the public consultation process took place
09 november 2017 at Hotel Dmax, Lombok, West Nusa Tenggara Province
9
INSTITUTIONAL CAPACITY BUILDING Will there be any capacity building?
[✓ ] N or [] Y if Yes, Attachment 2 includes the capacity building program
10
11
12
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
13
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
14
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
15
19.3 DI Talang
Environmental and Social Management Plan
Mitigation and Monitoring Plan
Checklist for Construction and Rehabilitation Activities
PART 1: INSTITUTIONAL & ADMINISTRATIVE
Country Indonesia
Project title Strategic Irrigation Modernization And Urgent Rehabilitation Project (SIMURP)
Scope of project and activity
• Mobilization of equipment, material and labor. The small-scale of construction works will not create labor influx.
• Demolition of existing damage structure;
• Irrigation drainage rehabilitation.
• Sediment removal;
• Installation of the irrigation gate.
Institutional arrangements
(Name and contacts)
WB (Project Team
Leader)
Jun Matsumoto
Project Management
Dirrectorate of Irrigation and Low Land
Local Counterpart and/or Recipient
N/A
Implementation arrangements
(Name and contacts)
Safeguard Supervision
Virza S.
Sasmitawidjaja
Ninin K. Dewi
Local Counterpart Supervision
Dirrectorate of Irrigation and Low Land
Local Inspectorate Supervision
N/A
Contractor
N/A
SITE DESCRIPTION
Name of site DI Talang
Describe site location
DI Talang located in Jember District, East Java Province. Talang irrigation scheme is under B/BWS Brantas.
Attachement 1: Site Map [✓]Y [ ] N
Who owns the land?
Government
Geographic description
The site are located mostly in the village area. However some area are passing the urban area.
LEGISLATION
Identify national & local legislation & permits that apply to project activity
• Law No. 32 Year 2009 on Environmental Protection and Management • Government Regulation (PP) No. 27 Year 2012 on The Environmental Permit
• Ministry of Environment Regulation (Permen LH) No. 05 Year 2012 on Type of Activities Required EIA
• Ministry of Environment Regulation (Permen LH) No. 13 Year 2010 on Environmental Management Efforts and Environmental Monitoring Effort (EMME) and Statement Letter of Assurance for Implementation of Environmental management and Monitoring (SPPL)
• Ministry of Public Work Regulation No. 10/PRT/M/2008 on Type of Business Plan and/or Activities under Public Works that Required Environmental Management Efforts and Environmental Monitoring Efforts (EMME) document.
PUBLIC CONSULTATION Identify when / where the public
09 november 2017 at Gedung PU Bina Marga, Jember, East Java
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
16
consultation process took place INSTITUTIONAL CAPACITY BUILDING Will there be any capacity building?
[ ✓ ] N or [ ]Y if Yes, Attachment 2 includes the capacity building program
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
17
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
18
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
19
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
20
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
21
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
22
19.4 DI Kedung Putri
Environmental and Social Management Plan
Mitigation and Monitoring Plan
Checklist for Construction and Rehabilitation Activities
PART 1: INSTITUTIONAL & ADMINISTRATIVE
Country Indonesia
Project title Strategic Irrigation Modernization And Urgent Rehabilitation Project (SIMURP)
Scope of project and activity
• Mobilization of equipment, material and labor. The small-scale of construction works will not create labor influx.
• Demolition of existing damage structure;
• Irrigation drainage rehabilitation.
• Sediment removal;
• Installation of the irrigation gate.
Institutional arrangements
(Name and contacts)
WB (Project Team
Leader)
Jun Matsumoto
Project Management
Dirrectorate of Irrigation and Low Land
Local Counterpart and/or Recipient
N/A
Implementation arrangements
(Name and contacts)
Safeguard Supervision
Virza S.
Sasmitawidjaja
Ninin K. Dewi
Local Counterpart Supervision
Dirrectorate of Irrigation and Low Land
Local Inspectorate Supervision
N/A
Contractor
N/A
SITE DESCRIPTION
Name of site DI Kedung Putri
Describe site location
DI Kedung Putri located on Purworejo District, Central Java Province. Kedung Putri Irrigation Scheme is under B/BWS Serayu Opak.
Attachment 1: Site Map [✓]Y [ ] N
Who owns the land?
Government
Geographic description
The site are located mostly in the village area. However some area are passing the urban area.
LEGISLATION
Identify national & local legislation & permits that apply to project activity
• Law No. 32 Year 2009 on Environmental Protection and Management • Government Regulation (PP) No. 27 Year 2012 on The Environmental Permit
• Ministry of Environment Regulation (Permen LH) No. 05 Year 2012 on Type of Activities Required EIA
• Ministry of Environment Regulation (Permen LH) No. 13 Year 2010 on Environmental Management Efforts and Environmental Monitoring Effort (EMME) and Statement Letter of Assurance for Implementation of Environmental management and Monitoring (SPPL)
• Ministry of Public Work Regulation No. 10/PRT/M/2008 on Type of Business Plan and/or Activities under Public Works that Required Environmental Management Efforts and Environmental Monitoring Efforts (EMME) document.
PUBLIC CONSULTATION Identify when / where the public
02 november 2017 at Hotel Sanjaya Inn, Purworejo, Central Java Province
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
23
consultation process took place INSTITUTIONAL CAPACITY BUILDING Will there be any capacity building?
[✓ ] N or [ ] Y if Yes, Attachment 2 includes the capacity building program
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
24
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
25
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
26
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
27
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
28
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
29
19.5 DI JATILUHUR
Environmental and Social Management Plan
Mitigation and Monitoring Plan
Checklist for Construction and Rehabilitation Activities
PART 1: INSTITUTIONAL & ADMINISTRATIVE
Country Indonesia
Project title Strategic Irrigation Modernization And Urgent Rehabilitation Project (SIMURP)
Scope of project and activity
• Mobilization of equipment, material and labor. The small-scale of construction works will not create labor influx.
• Demolition of existing damage structure;
• Irrigation drainage rehabilitation.
• Sediment removal;
• Installation of the irrigation gate.
Institutional arrangements
(Name and contacts)
WB (Project Team
Leader)
Jun Matsumoto
Project Management
Dirrectorate of Irrigation and Low Land
Local Counterpart and/or Recipient
N/A
Implementation arrangements
(Name and contacts)
Safeguard Supervision
Virza S.
Sasmitawidjaja
Ninin K. Dewi
Local Counterpart Supervision
Dirrectorate of Irrigation and Low Land
Local Inspectorate Supervision
N/A
Contractor
N/A
SITE DESCRIPTION
Name of site DI Jatiluhur (SS Macan and SS Pamanukan)
Describe site location
DI Jatiluhur (SS Macan and SS Pamanukan) located in Subang District, West Java Province. Jatiluhur irrigation scheme is under BBWS Citarum
Attachment 1: Site Map [✓]Y [ ] N
Who owns the land?
Government.
Geographic description
The site are located mostly in the village area. However some area are passing the urban area.
LEGISLATION
Identify national & local legislation & permits that apply to project activity
• Law No. 32 Year 2009 on Environmental Protection and Management • Government Regulation (PP) No. 27 Year 2012 on The Environmental Permit
• Ministry of Environment Regulation (Permen LH) No. 05 Year 2012 on Type of Activities Required EIA
• Ministry of Environment Regulation (Permen LH) No. 13 Year 2010 on Environmental Management Efforts and Environmental Monitoring Effort (EMME) and Statement Letter of Assurance for Implementation of Environmental management and Monitoring (SPPL)
• Ministry of Public Work Regulation No. 10/PRT/M/2008 on Type of Business Plan and/or Activities under Public Works that Required Environmental Management Efforts and Environmental Monitoring Efforts (EMME) document.
PUBLIC CONSULTATION
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
30
Identify when / where the public consultation process took place
31 Oktober 2017 at Hotel Lotus, Subang Regency, West Java Province
INSTITUTIONAL CAPACITY BUILDING Will there be any capacity building?
[ ✓ ] N or [ ] Y if Yes, Attachment 2 includes the capacity building program
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
31
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
32
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
33
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
34
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
35
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
36
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
37
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
38
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
39
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
40
Environmental and Social Safeguard Framework Strategic Irrigation Modernization and Urgent Rehabilitation Project (SIMURP)
41
top related