EEP Watershed Planning Overview August 12, 2009. Ecosystem Enhancement Program Nationally recognized, innovative, non-regulatory program formed in July.
Post on 21-Dec-2015
215 Views
Preview:
Transcript
EEP Watershed Planning OverviewEEP Watershed Planning OverviewAugust 12, 2009August 12, 2009
Ecosystem Enhancement ProgramEcosystem Enhancement Program
Nationally recognized, innovative, non-regulatory Nationally recognized, innovative, non-regulatory program formed in July 2003 through an program formed in July 2003 through an
agreement sponsored by:agreement sponsored by:
NC Department of Environment & Natural ResourcesNC Department of Environment & Natural Resources
NC Department of TransportationNC Department of Transportation
U.S. Army Corps of Engineers, Wilmington District U.S. Army Corps of Engineers, Wilmington District
U.S. Army Corpsof EngineersWilmington District
Ecosystem Enhancement ProgramEcosystem Enhancement Program
MissionMission: To restore, enhance, : To restore, enhance, preserve, and protect the preserve, and protect the functionsfunctions associated with wetlands, streams, associated with wetlands, streams, and streamside buffers including, but and streamside buffers including, but not limited to those necessary for the not limited to those necessary for the restoration, maintenance, and restoration, maintenance, and protection of protection of water qualitywater quality and and riparian riparian habitatshabitats throughout North Carolina. throughout North Carolina.
Subwatershed
14-Digit HU
8-Digit CU
River Basin
EEP Watershed Planning ScaleEEP Watershed Planning Scale
EEP Watershed Planning ScaleEEP Watershed Planning Scale
Local Watershed PlanningLocal Watershed Planning
Selection Criteria For LWP Area
Contain anticipated quantity / types of mitigation projects
Consider willingness of local RPs (and other stakeholders) to work with EEP
Consider scale and potential to evaluate water quality or habitat improvements
Local Watershed PlanningLocal Watershed Planning
Purpose
identify major causes/sources of impacts to water quality, habitat and hydrology and develop strategies for addressing these watershed stressors.
Goal
ensure that projects are selected and located to achieve maximum long-term improvement to local watershed functions.
Local Watershed Planning: Phase ILocal Watershed Planning: Phase I
Preliminary Watershed Characterization
Preliminary characterization of watershed conditions & functional needs based on best available data/GISProducts:
• Collection and evaluation of existing data
• Identification of critical data gaps
• Convene Local Advisory Team
• Develop Outreach Strategy
• Preliminary Findings & Recommendations report
Local Watershed PlanningLocal Watershed Planning
Subwatershed Delineation
Function Stressor Functional Indicator Measure and Data Source
Hydrology Buffer removal, storm-water
Stream Bank Erosion Potential
Mean Bank Erosion Hazard Index score (field)
Channelized Streams
Extent of Stream Channelization
% of low gradient streams channelized (GIS analysis)
Habitat Riparian area cleared
Woody Debris/instream habitat
NCDWQ stream habitat protocol (field survey)
Sedimentation
Microhabitat Diversity and Abundance
Mean microhabitat score, NCDWQ stream habitat protocol (field survey)
Water Quality
Ag. and road runoff
Specific Conductance
Mean specific conductance(field measurement)
Riparian area cleared
Riparian Forest Area Extent
% of stream length with forested riparian zone ≥30 ft1 wide (GIS analysis)
Local Watershed Planning, Phase IILocal Watershed Planning, Phase II
Detailed Assessment
Detailed assessment of watershed down to reach scale
Products:• Develop GIS datasets• Field data collected and analyzed • Watershed Assessment Report
Local Watershed PlanningLocal Watershed Planning
Field Data
Biological SamplingBiological Sampling•InsectsInsects•FishFish• AlgaeAlgae
Water Quality SamplingWater Quality Sampling•Flow, DO, pH, Temperature, conductivity Flow, DO, pH, Temperature, conductivity •NutrientsNutrients•ToxicityToxicity
Physical Measurements Physical Measurements •Riparian AssessmentRiparian Assessment•Channel MorphologyChannel Morphology•Channel StabilityChannel Stability•HydrologyHydrology
Local Watershed PlanningLocal Watershed Planning
Stakeholder Process
• Identify local liaison/partner Identify local liaison/partner • Convene Local Advisory TeamConvene Local Advisory Team• Community outreach / educationCommunity outreach / education
Local Watershed Planning, Phase IIILocal Watershed Planning, Phase III
Developing The Watershed Plan
Stressor Management Strategy
Livestock grazing, access to stream
Stream restoration, riparian buffers, livestock exclusion, BMPs
Lack of adequate forested buffer Stream restoration, riparian buffers
Impervious coverStormwater BMPs, stormwater ordinance, low impact
development
Upland erosion
Agriculture & forestry BMPs, erosion and sedimentation control ordinance, subdivision ordinance modifications, steep slope ordinance, public education
NutrientsIllicit discharge program, ag BMPs, riparian buffers,
watershed education program, stormwater BMPs,
Local Watershed PlanningLocal Watershed Planning
Matching Management Strategies to Implementation
#*#*
#*
#*
#*
#*#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*#*
#*#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
po
po
po
po
po
popopo
po
_̂
_̂
_̂
_̂_̂
_̂
_̂
_̂
_̂
_̂
FS1bFS1a
FS3a
FS3b
MR1a BD1aBD1b
BD1c
BD3a
BD3b
BD2a
BD1d
MR2a
MR1b
MR1c
FS3c
FS2
RO1
RO2b
RO2a
RO3b
RO3a
RO4a
RO4d
RO4b
RO4cBD3c
RO5b
RO5a
MR2b
m Swamp
al
Shallotte
GR
EE
N S
WA
MP
RD
SOUTHPORT-SUPPLY RD
OLD OCEAN HWY
_̂ Restoration Sites
_̂ Stormwater BMP Sites
Coastal Plain Stream Assessment
#* Severely Altered
#* Altered
#* Somewhat Altered
#* Relatively Unaltered
po Impounded
Additional Assessment Sites
Stream & Wetland Assessment
Stream Assessment
Wetland Assessment
Visual Assessment
Subbasins
Royal Oak Swamp Subbasin
Model Subwatersheds
Tier 2 Subwatersheds
Municipalities
Major Roads
Minor Roads
Waterbodies
Streams
0 60003000 Feet
p
D D D D D D D D D D D D D D D D D D D DD D D D D D D D D D D D D D D D D D D DD D D D D D D D D D D D D D D D D D D DD D D D D D D D D D D D D D D D D D D DD D D D D D D D D D D D D D D D D D D DD D D D D D D D D D D D D D D D D D D DD D D D D D D D D D D D D D D D D D D DD D D D D D D D D D D D D D D D D D D DD D D D D D D D D D D D D D D D D D D DD D D D D D D D D D D D D D D D D D D DD D D D D D D D D D D D D D D D D D D DD D D D D D D D D D D D D D D D D D D DD D D D D D D D D D D D D D D D D D D DD D D D D D D D D D D D D D D D D D D D
DWE I LLC
DWE I LLC
Woodington
Muckalee
p
0 500250 Feet
RO
YA
L O
AK
RD
NWProject Site
Streams
Hydric Soils
D D DD D DWetland Restoration
Parcels
2ft Contours
^
Local Watershed Planning, Phase IVLocal Watershed Planning, Phase IV
Implementation
Use momentum to move from plan development to implementation
Ecosystem Enhancement ProgramEcosystem Enhancement Program
Watershed Project Implementation
Focus on projects that have the greatest likelihood for improving watershed conditions
Consolidate compensatory mitigation resources in targeted areas to achieve maximum watershed benefit