CODES AND STANDARDS

CONSTRUCTION TYPE  ‐

USE GROUP CLASSIFICATION  ‐  

CODE DATA

AREA CALCULATIONS  GROSS SQUARE FEET

FIREPROOFING SCHEDULEHOURSFIRE RESISTANCE RATINGS U.L. # OR OTHER

EQUIP equipment

perimeterPERIM

janitorJAN

SVGC suspended vinyl gypsum ceiling

basementBSMTgalvanizedGALV

CPT carpet

glassGL

gypsum boardGYP.BD.

CY cubic yardCTC center to center

general contractor

gypsum board ceilinggypsum board soffit

gypsum board bulkhead

GCGBSGBCGBBcrash rail

CRBCR

ceramic tilecourse(s,ing)

CTCRS

coved resilient base

futureFUT

footingFTG

FA fasten, fastener

existingEXIST

CONST construction

CLS closure

CL centerline of

CH channel

gage, gaugeGA

caulk(ing)CLK

CLO closet

BUL bulletinBUR built-up roof

framefireproof(ing)

FRFP

ceramic mosaic tile

clear

CMT

CLR

furred(ing)

feet or foot

FUR

FT

continuousconcrete

CONTCONCCOL

contractorCORRCONTR

corridor

column

FRT fire retardant

concrete masonry unitCMU

each wayEW

exterior

EXP

EXT

exhaustEXHexpansion

face brickFBFDFE

fire extinguisher cabinetfinish floor elevationFFE

FFLFGL

FEC

cabinetcarpet basecubicle curtaincubicle curtain trackcubic feet

foundation

FHCFINFLRFND

face of concreteface of masonry

FOCFOM

contr. furnished, contr. installedcorner guard

chamfercircumferencecontrol joint

ceiling

contract limit line

floor drainfire extinguisher

finish floor linefiberglassfire hose cabinetfinish(ed)floor(ing)

CABCBCCCCTCFCFCICG

CHAMCIRCCJ

CLG

CLL

rough openingRO

mouldingMLD

marker boardMRKBD

movableMOV

ROWRUB

right of wayrubber

masonry openingMO

mount(ed),(ing)metal

MP

MTMTL

multi-paint

windowwood

weight

waterproof(ing)waterstopwainscot

welded wire meshwall to wall

WINWD

WTWSCT

WPWS

WWMWTW

quantityQTY

PTN partition

mediumMED

LTWT lightweight

LTG lightinglightlow point

LTLP

LAM laminated

KO knock out

polyvinyl chloridePVC

PTD paper towel dispenser

LVR louver

PLPG

plastic laminateplate glass

plaster

PNLPLWDPLSTRPLC

pounds per square footPSFPRPP

panel

pairpush plate

plywood

plastic laminate clad

QTQTR RD

quarry tilequarter round

PSI pounds per square inch

jointJT

radius

reference

RADRDREFREINF

requiredresilient

revision

REQ'DRESILRETREV

roof drain

reinforcing

return

reflectedRFLRM

riserR

room

kitchen

kick plate

length, long

lavatory

KIT

KPL

L

LAVLBL

linear footlong leg horizontallong leg vertical

level

masonry

lintel

LFLLHLLV

LVL

MAS

LTL

label

mechanical

manufacturer

maximum

miscellaneousminimum

MAXMECH

MFR

MISCMIN

MAT material

TMPRD tempered

TEL telephonetop of curb

temporarytongue and groovethick(ness)

top of pavement

top of slab

tread

toilet paper dispenser

TC

TEMPT&GTHK

TP

TSTTSL

T

TPD

typicaltop of wall

verticalvinyl composition tilevapor barrier

west, width, wide

vinyl wall coveringveneer

TWTYP

VERTVCTVB

W

VWCVNR

top of steel

water closetwood base

WCWB

EIFS ext. insulation & finish sys.

BC bottom of curb

ASPH asphalt

depth, deepD

detaildemolitiondouble

DETDEMODBL

dimensiondiagonaldiameter

DIMDIAGDIA

drinking fountainDF

anchor bolt

door openingDODN

drawer

downspoutdoor

DWRDWGDSDR

acousticaladdendumadjustableabove finish flooralternatealuminumanodized

above

drawing

down

expansion bolteacheast

EBEAE

electric(al)elevationexpansion joint

each face

ELECELEJ

EF

access panelarchitectural

boardbumper guardbituminous

equalelevator

EQELEV

blockingbench mark

bearing platebearingbrick

bottom

building

both sides

ABABVACOUSADDADJAFFALTALUMANODAPARCH

BDBGBITUMBLDGBLKGBMBOTBPLBRGBRKBS

pre-formed composite metal panel

owner furnished, owner installedowner furnished, contr. installed

NC no ceiling

PCMPPCC pre-cast concrete

MTLFUR metal furringMUL mullion

HT heighthigh pointHP

GMU glazed masonry units

ounceOZ

NOMNO

nominalnumber

on centerOCOA

outside diameter

OHOFOIOFCIOD

overhead

overall

openingOPG

P

OPP

particle boardPBDpaint

opposite

gravelgrab bargrade

hardboard

height, high

grout

GRVLGRBGR

HDBD

H

GT

hardwood

hollow core

heating, ventilating, air-conditioninghorizontal

hollow metalHDWDHDW

HC

HVACHORZ

HM

interiorinsulationinclude(d),(ing)

invertINTINSULINCL

INV

inside diameterID

hardware

not to scaleNTS

millwork

north

not in contract

MWK

N

NIC

sanitary napkin dispenserSND

STRUC structural

STD standardSTLSTOR storage

steel

SSTL stainless steelSS solid surfacingSQ square

SGC suspended gypsum ceiling

suspendedsheet vinyl

SUSPSV

southsuspended acoustical ceilingsanitary

SSACSAN

soap dispenserSCHSDSEC

solid coreSCschedule

section

sheetsimilar

space

SHTSIM

SP

specialSPECSPLSPM

square foot

specification

single-ply membrane

SF

PINNACLE  ARCHITECTSPROJECT ARCHITECTS210 N. SAINT CLAIR STREET DAYTON, OHIO 45402

STRUCTURAL ENGINEERSDAYTON, OHIO 45409

PROJECT TITLE:

ABBREVIATIONS:

SYMBOLS LEGEND:

PROJECT TEAM:

DRAWING INDEX:

ED TRAUMA ROOMS RENOVATION 2018405 GRAND AVE.  DAYTON, OHIO 45405

OCTOBER 31 , 2018 ‐ PHASE 10 ‐ PACKAGE #7 PACKAGE 7 CASEWORK, REFLECTED  CEILING, INTERIOR FINISHES & MEP

unit dimensionunderwriters laboratoriesunfinishedunless noted otherwise

UDULUNFUNO

ARCHITECTURAL

MECHANICAL

verify in fieldVIF

ELECTRICAL LEGEND, SCHEDULES AND INDEXPARTIAL FIRST FLOOR ‐ NEW WORK LIGHTING PLANPARTIAL FIRST FLOOR ‐ NEW WORK POWER PLAN

7.E0017.E1017.E201

7.M0017.M0027.M1017.M401

MECHANICAL LEGEND AND SHEET INDEXMECHANICAL SCHEDULESPARTIAL FIRST FLOOR ‐ NEW WORK MECH. PLANMECHANICAL CONTROLS

PLUMBING LEGEND, NOTES & INDEXSCHEDULES, DETAILS & DIAGRAMSPARTIAL BASEMENT FLOOR ‐ NEW WORK PLANPARTIAL FIRST FLOOR  ‐ NEW WORK PLANPARTIAL SECOND FLOOR ‐ INTERSTITIAL SPACE  PLAN

7.P0017.P0027.P1007.P1017.P102

PK7 A4‐E

PK7 A9‐6

PARTIAL DEMO, NEW, REFLECTED CEILING &FINISH PLANS, DOOR SCHEDULE, WALL & FRAMETYPESINTERIOR ELEVATIONS AND SECTIONS.

PK7 ‐COVER

PLUMBING

ELECTRICAL

GRAVEL

NOTE REFERENCE

LINTEL TYPE

METAL

BRICK

CONCRETE

CEILING HEIGHT

CONCRETE MASONRY UNIT

REFERENCE DRAWING NUMBERDETAIL NUMBER

COLUMN REFERENCE

TEST BORING WALL TYPE

DOOR NUMBER

WINDOW NUMBER

L‐1

PLASTIC LAMINATE

SHIM

WOOD, FRAMING

WOOD, FINISH

PLYWOOD

LOUVER TYPE

ELEVATION LETTER

REFERENCE DRAWING NUMBER

REFERENCE DRAWING NUMBERSECTION NUMBER

EXISTING POINT ELEVATION

NEW CONTOUR

NEW POINT ELEVATION

EXISTING CONTOUR

INSULATION, BATT

INSULATION, RIGID

GRID LINES

CARD READER

ELEVATION

MTL STUD

EARTH

GYPSUM BOARD/PLASTER

SET NO. SEALfield verifyFV

GLBLK glass block

gypsum wall boardGWB

gypsum boardGB

ROOM NUMBERROOM NAMEWAITING

107

3 REVISION NUMBER& TYPE

O

MICHAEL

7744TAYLOR

T.

OTSTA

OE FIH

EST

E

I

GR

T

H IRDRE A C

C

TE

VICINITY MAP:

AREA OF WORK

N

DANIS BUILDING CONSTRUCTION CO

DAYTON, OHIO 45405CONSTRUCTION MANAGER 2 RIVERS PLACE

SHELL  &  MEYER  ASSOCIATESSTRUCTURAL ENGINEERS2202 S. PATTERSON BLVD. DAYTON, OHIO 45409

ADMIRAL ENGINEERING & SURVEYING

14 WEST FIRST STREET DAYTON, OHIO 45402

HEAPY ENGINEERINGMECHANICAL ELECTRICAL CONSULTANTS1400 WEST DOROTHY LANE DAYTON, OHIO 45409

CL

CONSULT1257

PHARM.1258

P. TOILET1256

ISOLATION EXAM1253

HAZMAT1252

CART STORAGE1250

TRMT #301251

TRMT #291234

ELECT.1236

PASSAGE1235

I.T. CLOSET1232

NURSE ST.1271

I.T. CLOSET1232

OFFICE1233

TRMT #291234

PASSAGE1235

ELECT.1236

TRMT #301251

HAZMAT1252

CART STORAGE1250

O.

ISOLATION EXAM1253

P. TOILET1256

PHARM.1258

P. TOILET1254

CL

NURSE ST.1271

OFFICE 1233A

CG‐1

CG‐2

CG‐1

CG‐2

CG‐1

CG‐1

CG‐1

CG‐2

CG‐2

Phase 6

CG‐1

e 7

Phase 10

Phase 10

Phase 10

CR

CG‐1 CG‐1

44'‐117 8"

127° 5'‐11 58 "

8'‐1114"143°

2'‐6"

2'‐6"

NC

EXISTING TOREMAIN

CONSULT1257

PHARM.1258

P. TOILET1256

ISOLATION EXAM1253

HAZMAT1252

CART STORAGE1250

TRMT #301251

TRMT #291234

ELECT.1236

PASSAGE1235

I.T. CLOSET1232

NURSE ST.1271

I.T. CLOSET1232

OFFICE1233

TRMT #291234

PASSAGE1235

ELECT.1236

TRMT #301251

HAZMAT1252

CART STORAGE1250

O.

ISOLATION EXAM1253

P. TOILET1256

PHARM.1258

P. TOILET1254

NURSE ST.1271

OFFICE 1233A

EXIS. EXIS.

EXIS.

EXIS.

EXIS.

EXIS.

EXIS.

R17'‐634"

R17'‐6

3 4"

R19'‐51 4"

*IN

P‐1

P‐1

P‐1

PATCH INTO THEEXISTING FLOORING

PAINT WALL TOMATCH EXISTING

PAINT WALL TOMATCH EXISTING

REMOVE EXIST. GWB WALL AS SHOWN.REMOVE EXIST. DOOR., FRAME, & HARDWARE.REMOVE EXIST. EXT. SLIDING DOOR OR FULL GLASSALUMINUM DOOR & GIVE TO OWNER.REMOVE EXIST. COUNTER & CABINETSREMOVE PORTION OF COUNTER &/OR CABINETSTO COORDINATE WITH NEW WORK.REMOVE EXIST. SINK ‐ SEE PLUMB. DWGS.REMOVE EXIST. WINDOW.REMOVE PORTION OF WALL & GRAB BAR FOR NEWDOOR & FRAME.REMOVE EXIST. TOILET ‐ SEE PLUMB. DWGS.REMOVE EXIST. PLASTIC LAMINATE STORAGECABINETS.EXISTING CASEWORK TO REMAIN. U.N.O. ON NEWWORK PLAN.REMOVE EXISTING JANITORS SINK ‐ SEE PLUMB.

1.2.3.

4.5.

6.7. 8.

 9.10.

11.

12.

REMOVE EXISTING JANITORS SINK ‐ SEE PLUMB.DWGS.EXISTING PLUMBING FIXTURE TO REMAIN ‐ SEEMEP DWGS. FOR ANY IMPROVEMENTS TO THEEXIST. FIXTURE.LOCKERS TO REMAIN. SEE NEW WORK PLAN FORNEW LOCKERS & NOTES ON MODIFYING EXISTING.REMOVE EXISTING SPIRAL STAIR & UPPER LANDING.SEE PARTIAL SECOND FLOOR PLAN FORDEMOLITION OF CORRIDOR DOOR & UPPERLANDING ALCOVE.MODIFY COLUMN SURROUND AS SHOWN ON NEWWORK PLAN.MODIFY CANOPY SIDE, METAL PANELS & CEILINGAS NECESSARY TO BUILD NEW ADDITION.REMOVE EXTERIOR WALL & REINFORCE ANYOVERHEAD BRACING AS NECESSARY.REMOVE & MODIFY EXISTING 'X' BRACING ASSHOWN ON STRUCT. DWGS. SHORE & BRACEFRAME AS NOTED ON STRUC. DURING REMOVALS.EXISTING DUMBWAITER ELEVATORS FROM O.R. TO

12.

13.

14.

15.

16.

17.

18.

19.

20.

REMOVE EXISTING JANITORS SINK ‐ SEE PLUMB.DWGS.EXISTING PLUMBING FIXTURE TO REMAIN ‐ SEEMEP DWGS. FOR ANY IMPROVEMENTS TO THEEXIST. FIXTURE.LOCKERS TO REMAIN. SEE NEW WORK PLAN FORNEW LOCKERS & NOTES ON MODIFYING EXISTING.REMOVE EXISTING SPIRAL STAIR & UPPER LANDING.SEE PARTIAL SECOND FLOOR PLAN FORDEMOLITION OF CORRIDOR DOOR & UPPERLANDING ALCOVE.MODIFY COLUMN SURROUND AS SHOWN ON NEWWORK PLAN.MODIFY CANOPY SIDE, METAL PANELS & CEILINGAS NECESSARY TO BUILD NEW ADDITION.REMOVE EXTERIOR WALL & REINFORCE ANYOVERHEAD BRACING AS NECESSARY.REMOVE & MODIFY EXISTING 'X' BRACING ASSHOWN ON STRUCT. DWGS. SHORE & BRACEFRAME AS NOTED ON STRUC. DURING REMOVALS.EXISTING DUMBWAITER ELEVATORS FROM O.R. TO

12.

13.

14.

15.

16.

17.

18.

19.

20.

EXISTING DUMBWAITER ELEVATORS FROM O.R. TOC.S.S. TO REMAIN. PROTECT DURINGCONSTRUCTION.PREP WALL FOR NEW DOOR & FRAME  SHOWN INNEW WORK PLAN.EXISTING ROOM, DOORS, EQUIP., CEILINGS TOREMAIN IN IMAGING SUITE. PROTECT ALL DURINGCONSTRUCTION & ALWAYS MAINTAIN A PATHWAYINTO THE SUITE THROUGHOUT CONST.REMOVE EXIST. LOCKERS & RETURN TO OWNER.EXISTING NON‐COMBUSTIBLE WALL BASICALLYREMAINS IN TACT UP TO THE FLOOR DECK ABOVEEXCEPT WHERE NEW ALCOVES & DOORS REQUIREDEMOLITION. SEE NEW WORK PLAN FOR THESELOCATIONS.REMOVE DOOR & FRAME & HARDWARE & STOREFOR RELOCATION AS SHOWN ON NEW WORK PLAN.CAREFULLY PROTECT ALL IT, DATA, PHONE,ELECTRICAL SYSTEMS IN THESE RMS. DURINGDEMO. & NEW WORK.REMOVE EXIST. FLOORING & BASE & PREP FLOOR

20.

21.

22.

23.24.

25.

26.

27.

REMOVE EXIST. FLOORING & BASE & PREP FLOORSLAB FOR NEW FLOORING SPECIFIED.REMOVE FLOORING AND BASE AS NECESSARYAND/ OR PATCH IN NEW TO MATCH ADJACENTWHERE WALLS & DOORS ARE REMOVED.REMOVE EXIST. KITCHENETTE EQUIP. & OTHEREQUIP. & MOVE TO NEW SPACE WHERE POSSIBLE.MODIFY EXIT. CONC. SLAB & CURB AS NECESSARYTO BUILD UP & EXTEND TO CREATE NEW FLOORSLAB FOR NEW ADDITION WHERE SHOWN ON NEWWORK PLAN.SALVAGE ANY RECESSED LED'S OR PADDING ORHARDWARE OR EQUIP. POSSIBLE FROM EXIST.PADDED ROOMS TO RELOCATE IN NEW PSYCH.ROOMS.OWNER TO RELOCATE VENDING MACHINES.REMOVE WALL MTD. MARKER/ BULLETIN BOARD.REMOVE EXIST. CRASH RAILS.REMOVE EXIST. HANDRAILS.REMOVE EXIST. CORNER GUARDS.REMOVE EXIST. CHAIR RAILS.

27.

28.

29.

30.

31.

32.33.34.35.36.37.

REMOVE EXIST. CHAIR RAILS.REMOVE TILE WALLS, BASE & FLOORING.REMOVE ALL TOILET ROOM ACCESSORIES.STOREFRONT TO REMAIN. REMOVE GLAZING FORNEW INSULATED PANEL INSTALLATION.REMOVE DOOR & HARDWARE & PREPARE STOPSFOR NEW INSUALTION PANEL INSTALLATION.REMOVE EXIST. EXTERIOR BRICK VENEER & METALFRAMING WALL.  SHORE, BRACE & INSTALL NEWLINTELS ABOVE TO HOLD BRICK VENEER &FRAMING ABOVE THAT REMAIN. SEE NEW WORKPLAN & STRUCT. DWGS FOR MORE DETAIL.REMOVE COLUMN COVER.REMOVE WALL MTD. FEC & RETURN TO OWNER.REMOVE EXISTING WATER LINE & VALVES ‐ SEEPLUMBING DWGS.REMOVE CHAIR RAILREMOVE DOOR CENTRAL SYSTEM & GIVE TOOWNER ‐ SEE ELECT. DWGS.SEE ELECT. & PLUMBING DWGS. FOR REMOVAL OFMISC. WALL MTD. ITEMS.REMOVE STOREFRONT WINDOW & GLAZING

37.38.39.40.

41.

42.

43.44.45.

46.47.

48.

49.

REMOVE STOREFRONT WINDOW & GLAZINGSYSTEM.REMOVE EXIST. PLC SHELVING.EXIST.METAL DETECTOR SYSTEM TO REMAIN.REMOVE DRAPERY & RETURN TO OWNEREXIST. STOREFRONT TO REMAIN. PROTECT DURINGCONSTRUCTION.

49.

50.51.52.53.

GENERAL DEMOLITION NOTES:

ALL OBJECTS TO BE DEMOLISHED ARE SHOWNDASHED.  ITEMS SHOWN IN THE DEMO LEGEND ARETO BE REMOVED PER THE CORRESPONDING NOTEAND APPLIES TO THE CONSTRUCTION AREA ASSHOWN ON THIS SHEET.

IF THE CONTRACTOR SUSPECTS OR DISCOVERSEXISTING PRODUCTS CONTAINING ASBESTOS/HAZARDOUS MATERIALS DURING THE COURSE OFTHE  WORK, HE IS EXPECTED TO STOP WORK ANDISOLATE THAT PRODUCT, NOTIFY THE OWNER OF ITSPRESENCE AND PROVIDE CLEAR ACCESS TO THEOWNER FOR ITS REMOVAL AND DISPOSAL.

THE GENERAL CONTRACTOR WILL BE RESPONSIBLEFOR THE COORDINATION BETWEEN THE PLUMBING,ELECTRICAL AND MECHANICAL CONTRACTORSBEFORE AND DURING DEMOLITION.

A.

B.

C.

ALL PLUMBING AND ELECTRICAL DISCONNECTIONSARE TO BE TERMINATED AT THE NEAREST BRANCH.SEE PLUMBING & ELECTRICAL DWGS AND SPECS.

PROTECT ALL EXISTING TO REMAIN WALLS,CASEWORK, DOORS, WINDOWS, CEILINGS,FURNITURE & EQUIPMENT DURING DEMOLITION.REPAIR OR REPLACE ANY ITEMS DAMAGED DURINGCONSTRUCTION.

MAINTAIN ALL EGRESS PATHS AND FIRE RATEDASSEMBLIES THROUGHOUT CONSTRUCTION,INCLUDING PATCHING OF ALL HOLES EXPOSED INFLOOR CONSTRUCTION WITH 2 HOUR RATED FIRESAFING.

REMOVE ALL EXISTING FIXED MEDICAL EQUIPMENTAND RETURN TO OWNER.

D.

E.

F.

G.

O

MICHAEL

7744TAYLOR

T.

OTSTA

OE FIH

EST

E

I

GR

T

H IRDRE A C

C

TE

AREA OF WORK

PARTIAL NEW FLOOR PLAN PARTIAL REFLECTED CEILING PLANPARTIAL DEMO FLOOR PLAN PARTIAL FINISH PLAN

CUT EXIST. CLG.TO CREATE NEWDESIGN SHOWN

EXTEND EXISTING2 X 2 GRIDWITH NEW

RELOCATE EXITSIGN

SX

TRMT #29/#30

GB‐42

2'‐9"

1'‐0"

3'‐4"

GB‐36GB‐18

1'‐9" 2'‐878"

PT BULLNOSE

PORCELAIN (PT) WALL TILE

4'‐6"

33 4"1'‐0"4"

GB‐42

GB‐36

6"

GB‐18

7"1'‐9" 2'‐10"

CL

1'‐6"

PTD(OFCI)SD

3'‐71 2"

3'‐4"

3'‐0"

1'‐6"

1'‐178"

PORCELAIN (PT) WALL TILE

MOSAICACCENT

MOSAICACCENT

1'‐6"

SD (OFCI)

3'‐4"

3'‐0"

2'‐018"

3'‐71 2"

PT BULLNOSE

PORCELAIN (PT) WALL TILE

CL

SD

PWC

PWC PANELTO BE FULL PANELSTARTING FROMCENTER OF HEADWALLOUT

4'‐11 2"

BASE AS SPECIFIED

PWC

7'‐4"

VERIFY WITH DOOR SCHEDULE

SO SX

CUBICLECURTAINTRACK

10"

ISOLATION EXAM  #1253 ISOLATION EXAM  #1253 ISOLATION EXAM  #1253 ISOLATION EXAM  #1253

P. TOILET #1254 P. TOILET #1254 P. TOILET #1254 TRMT #29/#30 TRMT #29/#30

2'‐10"

C

PTD(OFCI)

L

SD(OFCI)

2'‐0"1'‐6"2'‐0"

3'‐5"

4"

3'‐5"

7'‐2"

2'‐0" 2'‐0"

11 2"4"

2'‐4"

2'‐0"

6"1'‐0" PULL‐OUT SHELVES

ADJ SHELVESCUT OUT

FOR GLOVEBOXES

INSTALLEDON EQUIP. RAIL

LS GFISS

PLC

CL

4'‐3"  @

 BOT.OF PLAT

E

PWC

9'‐0"

PHONE

4'‐11 2"

PWC PANELTO BE FULL PANELSTARTING FROM

CENTER OF HEADWALLOUT

EQ. EQ.

1'‐6"

BASE AS SPECIFIED

PWC

PTD(OFCI)

SD(OFCI)

PWC

4'‐11 2"

PWC

PWC

214"

2'‐10"

2'‐4"

2'‐0"

7'‐2"

4'‐11 2"

4'‐11 2"

CG

PHARM.  #1258

9'‐0"

BASE ASSPECIFIED

SOLIDSURFACE

CG CG

4"2'‐6"

11 2"23 4"

4"1'‐9

3 4"

TV

PATIENT MONITORBRACKET.  GEN.

CONTRACTOR SHALLPROVIDE BLOCKING

DATA

5'‐0"

5'‐6"

7"

PATIENT MONITORBRACKET.  GEN.

CONTRACTOR SHALLPROVIDE BLOCKING

DATA

NC

PHONE

EQ. EQ.

NC

1'‐6"

1'‐0"1'‐0"

1'‐0"1'‐0"

E ‐  DUPLEX; NORMAL POWEREP ‐ DUPLEX; EMERGENCY POWERV ‐ VACUUMS‐ VACUUM SLIDE BRACKETO ‐ OXYGENA ‐ AIR

E ‐  DUPLEX; NORMAL POWEREP ‐ DUPLEX; EMERGENCY POWERV ‐ VACUUMS‐ VACUUM SLIDE BRACKETO ‐ OXYGENA ‐ AIR

1'‐10"

2'‐712"

PWC

EQUAL EQUAL4'‐0"

4'‐0"4'‐214"

ATOMIC WALLMOUNTED

CLOCK

ATOMIC WALLMOUNTED

CLOCK

PWC W/ALUM TRIM.

PWC W/ALUM TRIM.

PWC W/ALUM TRIM.

BASE AS SPECIFIED

PWC W/ALUM TRIM.

PWC

PWC

PWC

214"1'‐234"1'‐234"

CG

3'‐0" 512"

PLCPANEL

1'‐6" 512"

9'‐714"

CG

VARIES, SEE

 ELEVA

TIONS

34"

3 4"

34" 1

4" 1'‐0" 34"

1'‐134"

14" BACK

34" PLCADJ SHELF

RECESSEDSTANDARDS

34" PLC

UPR CABINET W/ SHELVES

1'‐814"

FRT WOODBLOCKING

WHITE MELAMINEINTERIOR

34"

14" BACKPANEL

14"

FRT WOODBLOCKING

BASE ASSPECIFIED

4"

3"

PLC

34"

10"

1'‐312" ROOM 6131

REFER TO

 REFLECT

ED CEILN

IG PLAN3 4"

3 4"

6'‐6"

FRT WOODBLOCKING

FIXEDPLCSHELF

3'‐0"

PLC

3'‐9

3 4"

PULL OUTSHELVES W/SLIDING HDW

1'‐10"

SECTION THRU TALL CABINET

3 4"

7'‐2"

PULL OUTSHELVES W/SLIDING HDW

SECTION THRU SINK 

1'‐0"

VARIESFIXED

PANEL

12" SOLID SURFACEW/ INTEGRAL SINK

11 2"

134"

4"

2'‐1"

6"

34 "

FIXEDPANEL3

4"

12"

OPEN BELOW

1'‐1

5 8"

634"

BASE ASSPECIFIED

R 18"

FRT WOODBLOCKING

BASE ASSPECIFIED

GROMMETS @ 24" O.C.COORD. LOCATION W/OWNER.

12" SOLID SURFACE

ON 34" PLYWOOD

R 18"

SECTION THRU COUNTERTOP

12" SOLID SURFACE

ON 34" PLYWOOD

R 18"

2'‐1"

11 2"

FRT WOODBLOCKING

CONTINUOUSWALL CLEAT

VARIES

METALSUPPORT BASEIF NEEDED

USE HEAVYDUTY BRACKETSAT ENG. STONELOCATIONS.

2'‐1"

8"

4"8"

DOOR TYPES

358"58"

58"

478"

358"

414"58"

NON‐COMBUSTIBLE SMOKE PARTITIION EXTENDSTUDS & GYP. BD. & SAB ON ONE SIDE TO SLABABOVE AND SEAL.  EXTEND OPPOSITE SIDE TO 6"MIN. ABOVE FINISHED CEILING OR ROOF.

FULL HEIGHT 1 HOUR SMOKE COMPARTMENTBARRIER WALL. EXTEND STUDS & SAB'S & GYP.BD. FROM FLOOR TO UNDERSIDE OF FLOOR ORROOF DECK ABOVE,   & SEAL BOTH SIDES ONPERIMETER.

1‐HR. RATED, GA FILE NO. WP1200. EXTENDSTUDS & SAB'S & GYP. BD. FROM FLOOR TOUNDERSIDE OF FLOOR OR ROOF DECKABOVE,   & SEAL BOTH SIDES ON PERIMETER.

EXTEND STUDS & GYP. BD. & SAB ON ONE SIDETO SLAB ABOVE AND SEAL.

EXTEND STUDS & GYP. BD. & SAB FROM FLOORTO MIN. 6" ABOVE FINISHED CEILING.

58" GYP. BD.FIRECODE 'X' ONE SIDE

358" MT'L STUDS @ 16" O.C.

58" GYP. BD.FIRECODE 'X' EA. SIDE

358" MT'L STUDS @ 16" O.C.

EXTEND STUDS & GYP. BD. & SAB FROM FLOOR TO 6"ABOVE FINISHED CEILING. EXTEND SOUND BATTS.OUT OVER ROOM CEILING MIN. 12" HORIZ.

EXTEND STUDS & GYP. BD. FROM FLOOR TO 6"ABOVE FINISHED CEILING.

NON‐COMBUSTIBLE SMOKE PARTITION EXTENDSTUDS & GYP. BD. & SAB ON ONE SIDE TO SLABABOVE AND SEAL.  EXTEND OPPOSITE SIDE TO 6"MIN. ABOVE FINISHED CEILING OR ROOF.

1‐HR. RATED, GA FILE NO. WP1200. EXTENDSTUDS & GYP. BD. & SAB'S FROM FLOOR TOUNDERSIDE OF FLOOR OR ROOF DECKABOVE,   & SEAL BOTH SIDES ON PERIMETER.EXTEND STUDS & GYP. BD. & SAB FROM FLOOR TO 6ABOVE FINISHED CEILING. EXTEND SOUND BATTS.OUT OVER ROOM CEILING MIN. 12" HORIZ.FULL HEIGHT 1 HOUR SMOKE COMPARTMENTBARRIER WALL

6" 58"

714"

6" MT'L STUDS @ 16" O.C.

2" SOUND ATTENUATIONBLANKET (S.A.B.)

58" GYP. BD.FIRECODE 'X' EA. SIDE

58"

2" SOUND ATTENUATIONBLANKET (S.A.B.)

2" SOUND ATTENUATIONBLANKET (S.A.B.)

EX.  STUDS & GYP. BD. & SAB FROM FLOOR TOHARD CEILING & EXTEND SOUND BATTS OUTOVER ROOM CEILING MIN. 12" HORIZ.EXT. STUDS, SABS AND GYP. BD. FROM FLOORTO DECK ABOVE.

212"58"

318"

1 HR RATED SHAFT WALL, GA. FILE NO. WP 7008.EXTEND STUDS & GYP. BRD. FROM FLOOR TOUNDERSIDE OF STRUCTURE ABOVE AND SEAL.

212" MT'L "C‐h" STUDS@ 16" O.C.

58" GYP. BD.FIRECODE 'X' ONE SIDE

6"

658"58"

6" MT'L STUDS @ 16" O.C.

58" GYP. BD.FIRECODE 'X' EA. SIDE

312"

618"58"

3‐1/2" MT'L STUDS @ 16" O.C.

58" GYP. BD.FIRECODE 'X' EA. SIDE

58"

58"58"

2 HR RATED SHAFT WALL, GA. FILE NO. WP 1522EXTEND STUDS & GYP. BRD. & SAB FROM FLOOR TOUNDERSIDE OF SLAB ABOVE AND SEAL BOTH SIDES.

2" SOUND ATTENUATIONBLANKET (S.A.B.)

2" SOUND ATTENUATIONBLANKET (S.A.B.)

EXTEND STUDS & GYP. BD. & SAB FROM FLOORTO MIN. 6" ABOVE FINISHED CEILING.

WALL TYPES

O

MICHAEL

7744TAYLOR

T.

OTSTA

OE FIH

EST

E

I

GR

T

H IRDRE A C

C

TE

AREA OF WORK

NOTE:1. TWO PANEL ALUMINUM SLIDING DOOR.2. CARD READER PROVIDED BY OWNER.3. PROVIDE AIR SEAL WEATHERSTRIPPING & DROP SILL SEAL @BOTTOM OF DOOR.4. REUSE EXISTING HARDWARE. REPLACE ANY EXISTING HARDWARE THAT IS WORN OUT

OR NOT FUNCTIONING PROPERLY.

top related