Digital Stormwater Data
Post on 14-Jun-2015
171 Views
Preview:
DESCRIPTION
Transcript
Omaha Digital Data Omaha Digital Data Solutions for Solutions for Stormwater Stormwater
ManagementManagementJesse W. Poore, CFM
Felsburg Holt & Ullevig
Introduction to Permix Introduction to Permix & PIRT& PIRT
Facilitate New Post Construction Stormwater Requirements, BMP Locations, Documentation
Expedite Public Improvement Plan Review Enhance the Grading Permitting and
Inspection Process and Oversight Capabilities Monitor and Report Environmental
Commitments for CSO Projects AND Tie Permitting Processes to Each Other
Benefits and Benefits and OpportunitiesOpportunities
Standardize & Centralize Application Information
Track Decision Making Sequence Minimize the Paper Pushing Process Retain Important Design Assumptions Streamline Communication Between Parties Enhance Accountability to Stakeholders Control Circulation of Important News and
Info. Geographic Referencing to Interact with GIS
Permix Modular Permix Modular FrameworkFramework
Permits Tied to ProjectsPermits Tied to Projects
Sequential Review Sequential Review ProcessProcess
Post Construction Post Construction Stormwater ModuleStormwater Module
Start with the Applicant
Log In To the Websitewww.omahastormwater.org
Step 1: Account Log-inStep 1: Account Log-in
Step 2: Project Initiation Request
Name and location of the project as well as responsible parties
Grading: Disturb at least one (1) acre of soil (Yes) (No) Tied to an existing grading permit (Yes) (No)
Post-Construction: Will at least 5,000 square feet of surface area be disturbed (Yes) (No) Benefitting from a previously approved Post construction permit (Yes) (No)
Public Improvements: Will the project require public improvements as part of a subdivision or development agreement, building permit, or other approval (Yes) (No) Provide information regarding existing agreements, permits, or approvals already in place for this project.
Building: Will the project require a Building Permit from the City (Yes) (No) Tied to an existing building permit (Yes) (No)
Step 3: Request Permit Step 3: Request Permit NumberNumber
Step 4: Complete Step 4: Complete ApplicationApplication
Step 3: Request Permit Step 3: Request Permit NumberNumber
Grading Permit Numbers SAR20100830-777-2
Post Construction Permit Numbers BEL20090215-222-P
Omaha Public Works Permit Numbers OPW51699
These numbers are required for application forms, plans, and other documents submitted
Step 4: Upload Step 4: Upload Supporting InfoSupporting Info
Step 4: Submit Step 4: Submit ApplicationApplication
Applicant Project List Applicant Project List StatusStatus
Kicked over to the ReviewerCity or Natural Resource
District
Reviewer Project List Reviewer Project List StatusStatus
Reviewer Project ScreenReviewer Project Screen
Document Commenting Document Commenting ScreenScreen
Multiple Reviewer Multiple Reviewer CommentsComments
Summary Comment ListSummary Comment List
Kicked back to the Applicant
Step 5: Comments Step 5: Comments Summary ListSummary List
Step 5: Review Step 5: Review CommentsComments
Step 5: Review Step 5: Review CommentsComments
Step 5: Upload RevisionsStep 5: Upload Revisions
Step 5: Upload RevisionsStep 5: Upload Revisions
Step 6: Resubmit with Step 6: Resubmit with ResponsesResponses
Kicked back to the Reviewer
Reviewer Assesses Reviewer Assesses ResponsesResponses
Satisfactory Review Satisfactory Review CompleteComplete
Submit Approval and Submit Approval and CommentsComments
Electronic Approval Electronic Approval NotificationNotification
Waiting for Applicant to Certify the
Project
Step 7: Certify BMPs & Step 7: Certify BMPs & As-BuiltsAs-Builts
Next Steps for PermixNext Steps for Permix
Incorporate Public Improvement Projects Migrate Grading Permits and Inspection
Tool Address CSO Environmental Commitments Kick Out BMP Inspection Reports Generate Programmatic Summary Reports Integrate BMP Locations into GIS Model Water Quality Benefits of BMPs
Migration from PCWP Migration from PCWP SiteSite
Match Capabilities to Match Capabilities to PIRTPIRT
Site Information Site Information QuestionsQuestions
Current BMP List ScreenCurrent BMP List Screen
PIRT BMP 1 Data Entry PIRT BMP 1 Data Entry ScreenScreen
Current BMP Current BMP Maintenance ScreenMaintenance Screen
PIRT BMP Findings PIRT BMP Findings ScreenScreen
PIRT BMP 2 Data Entry PIRT BMP 2 Data Entry ScreenScreen
Some PIRT BenefitsSome PIRT Benefits
Tracking and Trending Data for: Communities : Watersheds : Inspectors :
BMPs : BMP Problems : Enforcement : Other Priorities
Functional and Educational Interface Improve Consistency of Findings and
Corrective Actions by Project and City Inspectors
Tied Back to Permix for Permit Dependancies
Comments or
Questions